May 8, 2019

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1, 2 - NUCLEAR REGULATORY COMMISSION INTEGRATED INSPECTION REPORT 05000424/2019001 AND 05000425/2019001

Dear Mr. Taber:

On March 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Vogtle Units 1, 2. On April 15, 2019 the NRC inspectors discussed the results of this inspection with Jessie Thomas (Plant Manager) and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Alan J. Blamey, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Docket Nos.: 05000424 and 05000425 License Nos.: NPF-68 and NPF-81

Enclosure:

Inspection Report 05000424/2019001 and 05000425/2019001

Inspection Report

Docket Number(s):

05000424 and 05000425

License Number(s):

NPF-68 and NPF-81

Report Number(s):

05000424/2019001 and 05000425/2019001

Enterprise Identifier: I-2019-001-0029

Licensee:

Southern Nuclear Operating Co., Inc.

Facility:

Vogtle Electric Generating Plant, Units 1 and 2

Location:

Waynesboro, GA 30830

Inspection Dates:

January 01, 2019 to March 31, 2019

Inspectors:

B. Collins, Reactor Inspector

S. Downey, Senior Reactor Inspector

C. Dykes, Health Physicist

M. Endress, Senior Resident Inspector

M. Magyar, Reactor Inspector

W. Pursley, Health Physicist

C. Safouri, Resident Inspector

Approved By:

Alan J. Blamey, Chief

Reactor Projects Branch 2

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Quarterly inspection at Vogtle Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below.

List of Findings and Violations

No findings were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 operated at or near 100 percent rated thermal power (RTP) for the entire inspection period.

Unit 2 operated at or near 100 percent RTP until it was shut down for planned refueling outage cycle 20 (2R20) on March 10, 2019. The unit was restarted on March 29, 2019, and reached 30% RTP, but was manually tripped on March 30, 2019, due to a main steam isolation valve (MSIV) failing closed. Unit 2 remained shutdown for the remainder of the period for troubleshooting and repair of the MSIV.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.03) (1 Sample)

The inspectors evaluated readiness for impending adverse weather conditions for extreme cold temperatures from a winter weather cold front on January 28, 2019.

71111.04 - Equipment Alignment

Partial Walkdown (IP Section 02.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)2B residual heat removal (RHR) system with 2A RHR out of service (OOS) for preventative maintenance (PM) outage on January 7, 2019.

(2)2B nuclear service cooling water (NSCW) during 'A' train NSCW pump and check valve inservice test (IST) on January 17, 2019.

(3)2A motor driven auxiliary feedwater (MDAFW) pump and turbine driven auxiliary feedwater (TDAFW) pump with 2B MDAFW pump OOS on February 28, 2019.

(4) Unit 1 'A' train NSCW with #4 NSCW pump OOS on March 7, 2019.

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01) (5 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Unit 2 auxiliary feed water (AFW) pump house, Zone 155/156/157A/157B, on January 9, 2019.
(2) Unit 1 level 'B' east and west penetration areas, Zone 60/61/62/63/64/82, on January 16, 2019.
(3) Unit 2 'A' and 'B' component cooling water (CCW) heat exchanger rooms, switchgear room, and mechanical AC room, zone 23/54/55/147/148/172, on January 22, 2019.
(4) Unit 2 'A' and 'B' battery and switchgear rooms, zone 71/76/77A/77B/78A/78B, on January 30, 2019.
(5) Unit 2 containment, zone 140 A/B/C/E, on March 21, 2019.

71111.08P - Inservice Inspection Activities (PWR) PWR Inservice Inspection Activities Sample (IP Section 03.01)

The inspectors evaluated pressurized water reactor non-destructive testing by reviewing the following examinations from March 11 - 15, 2019:

1. Ultrasonic Examination (UT)

a. three 4 reactor coolant pipe-to-pipe welds (21201-030-20-RB, -22-RB, -46-RB), ASME Class 1, manual UT (observed)b. two 29.5 main steam pipe-to-pipe welds (21301-001-11-RB, -12-RB), ASME Class 1, encoded UT (reviewed and observed, respectively)c. pressurizer upper head to upper shell weld (21201-V6-002-W01), ASME Class 1, manual UT (reviewed)d. six 4 reactor vessel head control rod drive mechanism penetrations (#3, #21,

  1. 32, #46, #48, #67), ASME Class 1, encoded UT (observed)

2. Liquid Penetrant Examination (PT)

a. repair weld on reactor vessel flange face between stud holes 26 and 27, ASME Class 1 (reviewed; associated with welding package, which was also reviewed)

3. Visual Examination

a. Steam generator (SG) 3 secondary side tubesheet cleanliness inspection, ASME Class 1 (observed)

4. Eddy Current Testing (ET)

a. SG 2 (tube R58C70), ASME Class 1 (observed)b. SG 3 (tubes R42C64, R52C83), ASME Class 1 (observed)c. SG 4 (tubes R42C64, R52C83), ASME Class 1 (observed)

The Inspectors evaluated the licensees boric acid control program performance.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

The inspectors observed and evaluated licensed operator performance in the Control Room during Unit 2 shutdown and cooldown operations on March 10, 2019, and Engineered Safety Features Actuation System (ESFAS) preparation and testing on March 20, 2019.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

The inspectors observed and evaluated operator response in the simulator to a pressurizer instrument failure and cold leg rupture on February 4, 2019.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (2 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Unit 1 NSCW pump #4 maintenance preventable functional failure, condition report (CR) 10587846 and technical evaluation (TE) 1036844, on March 5, 2019.
(2) Units 1 and 2 'A' and 'B' engineered safety features (ESF) systems, CR10575614 and TE10336644, on January 24, 2019.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1)2A emergency diesel generator (EDG) fragnet for shutdown logic board repair on January 9, 2019.

(2)1A solid state protection system (SSPS) OOS for corrective maintenance on January 14, 2019.

(3)2A ESF switchgear room fan trip and emergent maintenance on January 28, 2019.

(4)2B RHR pump system outage on January 29, 2019.

(5) YELLOW Risk for only one train of spent fuel pool cooling on Unit 2 on March 18, 2019.

71111.15 - Operability Determinations and Functionality Assessments

Sample Selection (IP Section 02.01) (5 Samples)

The inspectors evaluated the following operability determinations and functionality assessments:

(1)2A EDG low control air pressure on January 10, 2019.

(2)1A reactor trip undervoltage coil improper voltage readings during testing on January 14, 2019.

(3)2B EDG air intake louvers cycling on January 23, 2019.

(4) Unit 2 TDAFW pump leak by turbine casing on February 13, 2019.
(5) Unit 1 'A' and 'B' EDG generator brush squealing and rattling noise on February 20, 2019.

71111.19 - Post Maintenance Testing

Post Maintenance Test Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the following post maintenance tests:

(1) Unit 1 N41 power source replacement and calibration on January 4, 2019, SNC

===989814.

(2) Unit 2 'A' EDG shutdown logic board replacement on January 11, 2019, SNC 903517.
(3) Unit 2 TDAFW pump governor valve maintenance on February 13, 2019, SNC 901588.
(4) Unit 2 safety injection (SI), accumulator sample isolation valve repair, 2HV10950, on March 24, 2019, SNC 1004361.

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01)===

The inspectors evaluated refueling outage 2R20 activities from March 10, 2019 to March 31, 2019.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Containment Isolation Valve (ISO) (IP Section 03.01) (2 Samples)

(1) Unit 2 containment sump penetration 78, 14378-2, on March 6, 2019.
(2) Unit 2 containment purge supply penetration 83, 14383-2, on March 26, 2019.

In Service Testing (IST) (IP Section 03.01) (2 Samples)

(1) Unit 1 TDAFW pump operability and IST, 14810-1, on January 2, 2019.
(2) Unit 2 'A' SI pump response time and IST, 14804A-2, on January 8, 2019.

Surveillance Testing (IP Section 03.01) (2 Samples)

(1) Unit 1 'A' EDG monthly operability run, 14980A-1, on January 7, 2019.
(2) Unit 1 'A' train ESFAS testing, 14666-2, on March 20, 2019.

71114.06 - Drill Evaluation

Emergency Preparedness (EP) Drill (IP Section 02.01) (1 Sample)

The inspectors observed one emergency preparedness drill conducted on February 26, 2019. The inspectors observed licensee activities in the simulator and technical support center to evaluate implementation of the emergency plan, including event classification, notification, dose assessment, and protective action recommendations. The inspectors evaluated the licensees performance against criteria established in the licensees procedures. Additionally, the inspectors attended the post-exercise critique to assess the licensees effectiveness in identifying emergency preparedness weaknesses and verified the identified weaknesses were entered in the corrective action program.

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

02.01 Radiological Hazard Assessment (1 Sample)

The inspectors evaluated radiological hazards assessments and controls. The inspectors reviewed the following:

Radiological surveys

  • Survey #223820, Reactor Cavity Area (2RXB2), 03/13/2019.
  • Survey #223854, Reactor Cavity Area (2RXB2), 3/14/2019.
  • Survey #223828, Level 1 Reactor (Rx) Head Stand Area (2RX1), 03/13/2019.
  • Survey #223851, Level 1 Overview, 03/01/2019.

Risk significant radiological work activities

  • I/R nozzle dams S/G.
  • Pressurizer code safety removals.
  • Rx head/internals lift and set.
  • Rx vessel under head NDE.

Air sample survey records

  • Sample #13Mar19-026, U-2 Rx Head Lift - RP Gas, 03/13/2019.
  • Sample #12Mar19-004, U2 Code Safety Lift, 03/12/2019.
  • Sample #12Mar19-005, U2 Containment (CTMT) top of Pressurizer (PZR)-Code Safeties lift.
  • Sample #14Mar19-009, U-2 CTMT Upper Internal lift North-Cavity, 03/14/2019.

02.02 Instructions to Workers (1 Sample)

The inspectors evaluated instructions to workers including radiation work permits used to access high radiation areas:

Radiation work packages

  • RWP 19-0101 & 19-0102, General entry, RP to provide job coverage for at power containment entries in areas outside the bioshield.
  • RWP 19-2406, High Risk, Rx Head/internals lift and set.
  • RWP 19-2515, High Risk, Rx Vessel Under head work.

Electronic alarming dosimeter alarms

===10538129 - Unanticipated dose rate alarm-briefed to high radiation area (HRA),malfunctioning dosimeter.

  • 10536832 - Individual received a dose rate alarm.
  • No alarms occurred during the period of this inspection.

Labeling of containers

  • Containers in Radwaste Processing Facilities.
  • Shipment that contained code safeties.
  • Railroad Bay area containers.

02.03 Contamination and Radioactive Material Control===

The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material. The inspectors verified the following sealed sources are accounted for and are intact:

  • Source # 0183-00-00
  • Source #0177-00-00
  • Source #0413-00-00
  • Source #0999-00-00

02.04 Radiological Hazards Control and Work Coverage (1 Sample)

The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.

Radiological work package for areas with airborne radioactivity

02.05 High Radiation Area and Very High Radiation Area Controls (1 Sample)

The inspectors evaluated risk-significant high radiation area and very high radiation area controls.

02.06 Radiation Worker Performance and Radiation Protection Technician Proficiency (1 Sample)

The inspectors evaluated radiation worker performance and radiation protection technician proficiency.

71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage,

and Transportation

Radioactive Material Storage (IP Section 02.01)

Performed walkdowns of plant radioactive material storage areas including the outside storage building, the satellite storage areas near the radwaste processing facility and the auxiliary building inside the protected area specifically observing container labeling compliance and container integrity for various sea/land containers, waste drums and shipping containers stored in these facilities.

Radioactive Waste System Walkdown (IP Section 02.02) (1 Sample)

The inspectors evaluated radwaste processing equipment which included storage tanks, transfer piping, resin dewatering and packaging components during plant walkdowns.

Waste Characterization and Classification (IP Section 02.03) (1 Sample)

The inspectors evaluated the radioactive waste characterization and classification for the following waste streams:

  • 2017 Dry Active Waste, dated 06/27/2019.
  • 2018 U-1 RCS Filters, dated 02/25/2019.
  • 2017 U-2 Spent Fuel Pool Filters, dated 03/19/2019.

Shipment Preparation (IP Section 02.04) (1 Sample)

The inspectors evaluated the licensees radioactive material shipment preparation processes during a limited quantity shipment of pressurizer relief valves. No other shipments were available during the inspection. The inspectors reviewed training records for personnel qualified to perform shipping duties.

Shipping Records (IP Section 02.05) (1 Sample)

The inspectors evaluated the following non-excepted package shipment records:

  • RSR RVRS-17-031 (Type A).
  • RSR 18-10-006 (SCO).

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===

(1) Unit 1 (January 1, 2018 - December 31, 2018)
(2) Unit 2 (January 1, 2018 - December 31, 2018)

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (2 Samples)

(1) Unit 1 (January 1, 2018 - December 31, 2018)
(2) Unit 2 (January 1, 2018 - December 31, 2018)

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (2 Samples)

(1) Unit 1 (January 1, 2018 - December 31, 2018)
(2) Unit 2 (January 1, 2018 - December 31, 2018)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

Operating experience smart sample (OpESS) 2018/01, 10 CFR Part 21 notification of the potential existence of defects related to control rod drive mechanism (CRDM) thermal sleeves (CR 10499608).

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 15, 2019, the inspector presented the quarterly resident inspector inspection results to Jessie Thomas (Plant Manager) and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Miscellaneous

Conservative System Operations Warning Communication

January 28,

2019

71111.01

Procedures

11889-C

Severe Weather Checklist

Version 26

71111.01

Procedures

NMP-DP-001

Operational Risk Awareness

Version 16.0

71111.01

Procedures

NMP-DP-001-

GL01

Risk Assessment Worksheets

Version 11.1

71111.01

Procedures

NMP-GM-021

Switchyard Access and Maintenance Controls

Version 6.0

71111.01

Procedures

NMP-OS-017

Severe Weather

Version 1.1

71111.01

Procedures

NMP-OS-020

Station Response to Southern Company System Alert

Conditions

Version 1.2

71111.04

Drawings

2X4DB122

Unit 2 P&I Diagram - Residual Heat Removal - System No.

205

Version 54

71111.04

Drawings

2X4DB133-2

Unit 2 P&I Diagram - Nuclear Service Cooling Water -

System No. 1202

Version 55

71111.04

Drawings

2X4DB161-2

Unit 2 P&I Diagram - Auxiliary Feedwater System - System

No. 1302

Version 26

71111.04

Drawings

2X4DB161-3

Unit 2 P&I Diagram - Auxiliary Feedwater Pump System

(Auxiliary Feedwater Pump Turbine Driver) - System No.

1302

Version 38

71111.04

Procedures

13150B-2

Train B Nuclear Service Cooling Water System

Version 15.1

71111.04

Procedures

13610-2

Checklist 2 - Auxiliary Feedwater System Alignment for

Standby Readiness (Trains A and C)

Version 48

71111.05Q Corrective Action

Documents

10576827

71111.05Q Drawings

2X4DB207-1

P&I Diagram Control Building Safety Feature Electrical

Equipment Room Level A & B HVAC System - System No.

1532

Version 15.0

71111.05Q Miscellaneous

SG-16405 / REA

97-VAA632

Request for Engineering Assistance - Consequences of

Positioning Doors in Off normal Configurations

71111.05Q Procedures

2872-2

Zone 172 - Auxiliary Building - Level 2 Fire Fighting Preplan

1.2

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.05Q Procedures

13302-2

Control Building ESF Ventilation Systems

10.1

71111.05Q Procedures

29100-C

Portable Fire Extinguishers and Fire Hose Station Visual

Inspection (FSAR Fire Protection Surveillance)

65.2

71111.05Q Procedures

2040-C

Fire Protection Functionality and LCO Requirements

71111.05Q Procedures

2723-2

Zone 23 - Auxiliary Building - Electrical Chase Rooms Fire

Fighting Preplan

2.1

71111.05Q Procedures

2754-2

Zone 54 - Auxiliary Building - Level 2, Train A CCW HX

Fire Fighting Preplan

0.2

71111.05Q Procedures

2755-2

Zone 55 - Auxiliary Building - Level 2, Train B CCW HX

Fire Fighting Preplan

0.2

71111.05Q Procedures

2760-1

Zone 60 - Control Building Level B Fire Fighting Preplan

1.2

71111.05Q Procedures

2761-1

Zone 61 - Control Building Level B Fire Fighting Preplan

2.1

71111.05Q Procedures

2762-1

Zone 62 - Control Building Level B Fire Fighting Preplan

4.0

71111.05Q Procedures

2763-1

Zone 63 - Control Building - Level B Fire Fighting Preplan

1.2

71111.05Q Procedures

2764-1

Zone 64 - Control Building - Level B Fire Fighting Preplan

4.1

71111.05Q Procedures

2771-2

Zone 71 - Control Building - Level B Fire Fighting Preplan

Version 2

71111.05Q Procedures

2776-2

Zone 76 - Control Building - Level B, Non Train 1-E MCC

Room Fire Fighting Preplan

1.1

71111.05Q Procedures

2777A-2

Zone 77A - Control Building - Level B Fire Fighting Preplan

2.0

71111.05Q Procedures

2777B-2

Zone 77B - Control Building - Level B Fire Fighting Preplan

1.4

71111.05Q Procedures

2778A-2

Zone 78A - Control Building - Level B Fire Fighting Preplan

1.0

71111.05Q Procedures

2778B-2

Zone 78B - Control Building - Level B, Train A Battery

Room Fire Fighting Preplan

1.2

71111.05Q Procedures

2782-1

Zone 82 - Control Building - Level B Fire Fighting Preplan

1.2

71111.05Q Procedures

2840A-2

Zone 140A - Containment Building - Levels A, B, 1, 2 and 3

Fire Fighting Preplan

3.0

71111.05Q Procedures

2840B-2

Zone 140B - Containment Building - Levels A, B, 1, 2 and 3

Fire Fighting Preplan

4.0

71111.05Q Procedures

2840C-2

Zone 140C - Containment Building - Levels A, B, 1, 2 and 3

Fire Fighting Preplan

2.0

71111.05Q Procedures

2840E-2

Zone 140E - Containment Building - Levels A, B, 1, 2 and 3

Fire Fighting Preplan

1.0

71111.05Q Procedures

2847-2

Zone 147 - Auxiliary Building - Level 2 Fire Fighting Preplan

1.3

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.08P

Calibration

Records

S/N 29600122

Exelon Generation Certificate of Calibration: IR

Thermometer

8/31/2018

71111.08P

Calibration

Records

SN: 221070

Certificate of Calibration, Omni-200

June 5, 2018

71111.08P

Engineering

Evaluations

LTR-SDA-19-024

Evaluation of Liquid Penetrant Indication Found After Weld

Repair of Vogtle Unit 2 Reactor Vessel Inner O-Ring Seating

Surface

March 23,

2019

71111.08P

Miscellaneous

GBE-01-119,

560 Bobbin 50

IPS

Acquisition Technique Specification Sheet

71111.08P

Miscellaneous

Schrader

Welder Performance Qualification

1/17/19

71111.08P

Miscellaneous

063

Procedure Qualification Record

4/16/2014

71111.08P

Miscellaneous

27091.2

Eddy Current Examination Technique Specification Sheet

71111.08P

Miscellaneous

600

Procedure Qualification Record

1/23/2017

71111.08P

Miscellaneous

MN-GTAW

Welding Procedure Specification

71111.08P

Miscellaneous

899

Procedure Qualification Record

8/25/15

71111.08P

Miscellaneous

915681-01

Certificate of Conformance: ER 308/308L GTAW Wire, Lot #

YT9686

3/20/2019

71111.08P

Miscellaneous

96041.1

Eddy Current Examination Technique Specification Sheet

71111.08P

Miscellaneous

GBE-01-119, 560

Bobbin 50 IPS

Acquisition Technique Specification Sheet

71111.08P

Miscellaneous

GBE-02-119, 560

Bobbin 40 IPS

Acquisition Technique Specification Sheet

71111.08P

Miscellaneous

GBE-03-119, 560

Bobbin 24 IPS

Acquisition Technique Specification Sheet

71111.08P

Miscellaneous

GBE-04-119, 540

Bobbin 24 IPS

Acquisition Technique Specification Sheet

71111.08P

Miscellaneous

GBE-A-119,

Bobbin

Analysis Technique Specification Sheet

71111.08P

Miscellaneous

Johnston

Wesdyne International Certificate of Qualification: UT II-PDI

1/17/19

71111.08P

Miscellaneous

Johnston

Westinghouse Vision Acuity Examination Record

1/16/2019

71111.08P

Miscellaneous

Kall

PCI Energy Services NDE VT Level II Personnel Certificate

August 8,

2016

71111.08P

Miscellaneous

Kall

PCI Energy Services Vision Examination Report

6/4/18

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.08P

Miscellaneous

Linden

Sonic Systems International, Inc. Vision Acuity Record

08/08/2018

71111.08P

Miscellaneous

LTR-CDMP-19-

Vogtle 2R20 Spring 2019 Steam Generator Secondary Side

Visual Inspection Plan

71111.08P

Miscellaneous

Michael

Sonic Systems International, Inc. Vision Acuity Record

2/3/2018

71111.08P

Miscellaneous

Michael

Sonic Systems International, Inc. Certificate of Qualification:

UT II-PDI

1-18-19

71111.08P

Miscellaneous

Overly

Sonic Systems International, Inc. Certificate of Qualification:

UT II-PDI

1/11/2019

71111.08P

Miscellaneous

Overly

Sonic Systems International, Inc. Vision Acuity Record

6/14/2018

71111.08P

Miscellaneous

Permuka

Westinghouse Certification Record, Eddy Current Level II

08/07/2017

71111.08P

Miscellaneous

Permuka

Westinghouse Vision Acuity Examination Record

06/11/2018

71111.08P

Miscellaneous

SN: 0163-0618

Certificate of Conformance, Bobbin Probe

July 11,

2018

71111.08P

Miscellaneous

Wheeler

NDE Technology, Inc. Personnel Certification Summary,

Level IIIA Eddy Current Data Analysis

05/01/2016

71111.08P

Miscellaneous

Wheeler

NDE Technology Inc. Personnel Vision Certification

2/08/2018

71111.08P

NDE Reports

GBE-R20-CP02-

03-02

Wesdyne Ultrasonic Report Data Sheet (CRDM Pen. 03)

3/19/2019

71111.08P

NDE Reports

GBE-R20-CP02-

21-01

Wesdyne Ultrasonic Report Data Sheet (CRDM Pen. 21)

3/15/2019

71111.08P

NDE Reports

GBE-R20-CP02-

2-01

Wesdyne Ultrasonic Report Data Sheet (CRDM Pen. 32)

3/19/2019

71111.08P

NDE Reports

GBE-R20-CP02-

46-03

Wesdyne Ultrasonic Report Data Sheet (CRDM Pen. 46)

3/17/2019

71111.08P

NDE Reports

GBE-R20-CP02-

48-03

Wesdyne Ultrasonic Report Data Sheet (CRDM Pen. 48)

3/16/2019

71111.08P

NDE Reports

GBE-R20-CP02-

67-01

Wesdyne Ultrasonic Report Data Sheet (CRDM Pen. 67)

3/15/2019

71111.08P

NDE Reports

Linden

Sonic Systems International, Inc. Certificate of Qualification:

UT III-PDI

1/15/2019

71111.08P

NDE Reports

NDE-915681-01

Report of Nondestructive Examination - Visible, Solvent-

Removable Liquid Penetrant Examination (RV Flange)

3-22-19

71111.08P

NDE Reports

S19V2U053

UT Calibration/Examination Record (21201-030-20-RB)

3/19/2019

71111.08P

NDE Reports

S19V2U053

UT Calibration/Examination Record (21201-030-46-RB)

3/19/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.08P

NDE Reports

S19V2U055

UT Calibration/Examination Record (21201-030-22-RB)

3/19/2019

71111.08P

NDE Reports

S19V2U060

UT Calibration/Examination Record (21301-001-11-RB)

3/19/2019

71111.08P

NDE Reports

S19V2U061

UT Calibration/Examination Record (21301-001-12-RB)

3/19/2019

71111.08P

Procedures

MRS 2.4.2 GPC-

Steam Generator Eddy Current Data Analysis Techniques

for Vogtle Units 1 & 2

71111.08P

Procedures

MRS 2.4.2-GEN-

Eddy Current Inspection of Pre-service and In-service Heat

Exchanger Tubing

71111.08P

Procedures

NMP-ES-004

Steam Generator Program

16.0

71111.08P

Procedures

NMP-ES-004-

GL01

Steam Generator Program Strategic Plan

17.0

71111.08P

Procedures

NMP-ES-024-501

PDI Generic Procedure for the Ultrasonic Examination of

Austenitic Pipe Welds (Appendix VIII)

7.0

71111.08P

Procedures

NMP-MA-005

SNC Welding Program

5.3

71111.08P

Procedures

NMP-MA-005-

2

General Welding Standard for Pressure Boundary

Applications

5.2

71111.08P

Procedures

SG-PLG-RIB-PS-

GEN

Steam Generator Tube Procedure Specification for

Expanded Ribbed Mechanical Plugs

71111.08P

Work Orders

SNC1006491

Unit 2 Reactor Vessel Flange Repair

71111.11Q Procedures

2004-C

Power Operation

Version

119.3

71111.11Q Procedures

2006-C

Unit Cooldown to Cold Shutdown

Version 103

71111.11Q Procedures

14666-2

Train A Diesel Generator and ESFAS Test

Version 38.1

71111.11Q Procedures

18004-C

Reactor Coolant System Leakage

Version 30.2

71111.11Q Procedures

19000-1

E-0 Reactor Trip or Safety Injection

Version 2.1

71111.11Q Procedures

93300-C

Conduct of Refueling Operations

Version 24.2

71111.11Q Procedures

NMP-EP-141-003

Vogtle Unit 1 and Unit 2 Emergency Action Levels and Basis

Version 3.0

71111.11Q Procedures

NMP-EP-142-F01

Emergency Notification Form (ENF)

Version 1.0

71111.11Q Procedures

NMP-OS-007

Conduct of Operations

Version 13.1

71111.12

Corrective Action

Documents

10568195

71111.12

Corrective Action

Documents

10575614

71111.12

Corrective Action

10577663

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

71111.12

Corrective Action

Documents

10587846

71111.12

Corrective Action

Documents

10590639

71111.12

Corrective Action

Documents

10590733

71111.12

Corrective Action

Documents

10595737

71111.12

Engineering

Evaluations

1033664

71111.12

Engineering

Evaluations

1036844

71111.12

Miscellaneous

Maintenance Rule Expert Panel Meeting #2019-02 - Agenda

71111.12

Procedures

NMP-AD-028-

GL01

Guidelines for Determination of Functional Failures and their

Related Safety Significance

Version 2

71111.12

Procedures

NMP-ES-027

Maintenance Rule Program

Version 8

71111.13

Drawings

2X4DB221

P&I Diagram Safety Related (Essential) Chillers Unit 2

Trains A & B System No. 1592

Version 26

71111.13

Drawings

2X4DB228

P&I Diagram Engineered Safety Feature Room Coolers

System 1555

Version 15

71111.13

Miscellaneous

Unit 2 Phoenix Integrated Risk Reports for January 9, 2019

through January 11, 2019

71111.13

Miscellaneous

Unit 2 Narrative Control Room Logs for January 9, 2019

through January 11, 2019

71111.13

Miscellaneous

Plan of the Day for January 9, 2019 through January 11,

2019

71111.13

Miscellaneous

Unit 1 Phoenix Integrated Risk Reports for January 14, 2019

71111.13

Miscellaneous

Unit 1 Narrative Control Room Logs for January 14, 2019

71111.13

Miscellaneous

Plan of the Day for January 14, 2019

71111.13

Miscellaneous

Unit 2 Phoenix Integrated Risk Reports for January 28, 2019

71111.13

Miscellaneous

Unit 2 Narrative Control Room Logs for January 28, 2019

71111.13

Miscellaneous

Plan of the Day for January 28, 2019

71111.13

Miscellaneous

Unit 2 Phoenix Integrated Risk Reports for January 29, 2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.13

Miscellaneous

Unit 2 Narrative Control Room Logs for January 29, 2019

71111.13

Miscellaneous

Unit 2 Narrative Control Room Logs for March 18, 2019

71111.13

Miscellaneous

10032-C

Outage Risk Assessment Monitoring for March 18, 2019

71111.13

Procedures

10032-C

Outage Risk Assessment Monitoring

Version 11

71111.13

Procedures

13744A-2

Train A Essential Chilled Water System

Version 14

71111.13

Procedures

NMP-GM-031-

001

Online Maintenance Rule (a)(4) Risk Calculations

Version 5.0

71111.13

Procedures

NMP-GM-031-

003

Risk Management Actions for 10 CFR 50.65(a)(4) and the

Risk Informed Completion Time Program

Version 6

71111.13

Procedures

NMP-OS-010

Protected Train/Division and Protected Equipment Program

Version 8.0

71111.13

Procedures

NMP-OS-010-003 Vogtle Protected Equipment Logs

Version 10.0

71111.15

Corrective Action

Documents

10517236

71111.15

Corrective Action

Documents

10570828

71111.15

Corrective Action

Documents

10578267

71111.15

Corrective Action

Documents

10581743

71111.15

Corrective Action

Documents

10583274

71111.15

Drawings

1X6AX01-411

Master System Tester Failure and Alarm, Rev. J (Sheet 1

through 3)

Version 2

71111.15

Drawings

2X4AF03-00187

Terry Turbine Longitudinal Section

Version 2

71111.15

Drawings

2X4AF03-00190

Terry Turbine Assembly Parts List

Version 3

71111.15

Miscellaneous

Unit 1 Narrative Control Room Logs for January 13, 2018

through January 14, 2018

71111.15

Miscellaneous

Unit 2 TDAFW Pump Inboard/Outboard Lube Oil Analysis

10/11/18

71111.15

Miscellaneous

AX4AK01-00564, Associated Publications Manual, Book 2

Standby Diesel Generator, Volume III

71111.15

Miscellaneous

Diesel Generator Surveillance Manual - GEN-95 Emergency

Generator

71111.15

Miscellaneous

Unit 2 TDAFW Pump Inboard/Outboard Lube Oil Analysis

9/14/18

71111.15

Miscellaneous

1X6AX01-00466

Technical Manual - Solid State Protection System

Version 18

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.15

Procedures

14546-2

Turbine Driven Auxiliary Feedwater Pump Operability Test

Version 28.2

71111.15

Procedures

14701A-1

Reactor Trip Breaker Train A UV and Shunt Trip Test

Version 11.6

71111.15

Procedures

NMP-AD-012

Operability Determinations and Functionality Assessments

Version 13.3

71111.15

Work Orders

SNC958717

TDAFW Pump Possible Turbine Seal Leak

February 13,

2019

71111.15

Work Orders

SNC959800

Month Staggered, (Train A) Reactor Trip Breakers

Undervoltage & Shunt Trip Test

January 13,

2019

71111.15

Work Orders

SNC991876

A Train SSPS logic test panel UV coil voltage meter failed

to indicate correctly

January 14,

2019

71111.19

Corrective Action

Documents

10517236

71111.19

Corrective Action

Documents

10568034

71111.19

Corrective Action

Documents

10568055

71111.19

Corrective Action

Documents

10568072

71111.19

Corrective Action

Documents

10568355

71111.19

Corrective Action

Documents

10568394

71111.19

Corrective Action

Documents

10568404

71111.19

Corrective Action

Documents

10581743

71111.19

Procedures

14546-2

Turbine Driven Auxiliary Feedwater Pump Operability Test

Version 28.2

71111.19

Procedures

24700-2

Nuclear Instrumentation System Power Range Channel

2N41 Channel Calibration

Version 44.3

71111.19

Procedures

87006-2

Movable Incore Detector System Operating Instructions

Version 21

71111.19

Procedures

NMP-MA-014-

001

Post Maintenance Testing Guidance

Version 5.1

71111.19

Work Orders

SNC958717

TDAFW Pump Possible Turbine Seal Leak

February 13,

2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.19

Work Orders

SNC822667

18MO Channel Calibration, 2P-5180, AFW Pump Speed

Control

February 14,

2019

71111.19

Work Orders

SNC892341

1604, 21604Q5PP30345, w/w 822667, Generate MWO for

replacement 7300 board

February 14,

2019

71111.19

Work Orders

SNC901588

1302 - 21302P4001GOV - Repack Governor Valve

February 12-

18, 2019

71111.19

Work Orders

SNC989634

Low voltage power supply replacement

January 4,

2019

71111.19

Work Orders

SNC989814

2NI-41 Drawer and peripheral devices calibration

January 4,

2019

71111.19

Work Orders

SNC989951

Replacement of 2NI0041C meter

January 5,

2019

71111.20

Corrective Action

Documents

10596727

71111.20

Corrective Action

Documents

10596728

71111.20

Corrective Action

Documents

10596729

71111.20

Miscellaneous

Core Map Certification for Unit 2 Cycle 21

71111.20

Miscellaneous

Maintenance and Operation Shift Schedules, 2R20

71111.20

Miscellaneous

10006-C

Reactor Trip Review

Version 30

71111.20

Miscellaneous

NMP-MA-009-

F10

FME Deviation Plan for 2R20

71111.20

Procedures

2002-2

Unit Heat up to Normal Operating Temperature and

Pressure

Version 1.0

71111.20

Procedures

2003-2

Reactor Startup (Mode 3 to Mode 2)

Version 2.0

71111.20

Procedures

2004-C

Power Operation

Version

119.3

71111.20

Procedures

2006-C

Unit Cooldown to Cold Shutdown

Version 103

71111.20

Procedures

14005-2

Shutdown Margin and Keff Calculations

Version 22.0

71111.20

Procedures

14864-2

Containment General Leak Inspection

Version 2.7

71111.20

Procedures

17013-2

Annunciator Response Procedures for ALB 13 on Panel 2B1

on MCB

Version 30

71111.20

Procedures

17014-2

Annunciator Response Procedures for ALB 14 on Panel 2B1

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

on MCB

71111.20

Procedures

240C-C

Reactor Vessel Head Lift for ISI Inspection

Version 5.2

71111.20

Procedures

93300-C

Conduct of Refueling Operations

Version 24.2

71111.20

Procedures

NMP-MA-009

FME Program Implementation

71111.20

Procedures

NMP-OS-003-

F01

Operational Decision-Making Issue Worksheet

Version 6.4

71111.20

Procedures

NMP-OS-007

Conduct of Operations

Version 13.1

71111.20

Procedures

NMP-RE-007

Core Verification

Version 4.0

71111.22

Corrective Action

Documents

10571483

71111.22

Corrective Action

Documents

10593683

71111.22

Procedures

14378-2

Containment Penetration No. 78 Containment Sump Pumps

Discharge Local Leak Rate Test

Version 10.3

71111.22

Procedures

14383-2

Containment Penetration No. 83 Containment Purge Supply

Local Leak Rate Test

Version 14

71111.22

Procedures

14546-1

Turbine Driven Auxiliary Feedwater Pump Operability Test

Version 32.2

71111.22

Procedures

14600-2

ESFAS Slave Relay and Final Device Train A Block Test

Version 21

71111.22

Procedures

14630-2

SSPS Slave Relay K624 Train A Test Containment Isolation

Version 10

71111.22

Procedures

14666-2

Train A Diesel Generator and ESFAS Test

Version 38.1

71111.22

Procedures

14804A-2

Safety Injection Pump A Inservice and Response Time Tests

Version 7.2

71111.22

Procedures

14810-1

TDAFW Pump Operability, Response Time and Check Valve

IST

Version 51.1

71111.22

Procedures

14980A-1

Diesel Generator 1A Operability Test

Version 30

71111.22

Work Orders

SNC394770

A-D/G-ESF-ACT-18MS

March 20,

2019

71111.22

Work Orders

SNC779634

214HV0780 CNMT Drains Rx Cavity/CNMT Sumps,

LLRT/PEN 78-2Y 14378-201

March 6,

2019

71124.01

Corrective Action

Documents

10538129

10590087

10550302

71124.01

Procedures

403032-C

Reactor Head and Upper Internals Movement

71124.01

Procedures

240c-A

Reactor Vessel Head Life for ISI

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.01

Procedures

NMP-HP-302-001

Radiological Key Control

Version 3.2

71124.01

Procedures

NMP-HP-306

Radiological Job Coverage

71124.01

Procedures

NMP-HP-501-001

Instruction for Selection and Use of Respiratory Protection

Equipment for Radiological Protection

Version 1.5

71124.01

Radiation

Surveys

46002-C

Control and Accountability of Radioactive Source: Data

Sheet 2, Source #0999-00-00; #0413-00-00; #0365-00-00;

  1. 0292-00-00; #0177-00-00

71124.01

Radiation

Surveys

Gamma Sample

  1. 12Mar19-006

U2 CTMT top of PZR-Code Safeties Lift

71124.01

Radiation

Surveys

Gamma

Spectrum

Analysis

  1. 14MAR19-002

U-2 Upper Internals Lift-South Cavity Particulate

71124.01

Radiation

Surveys

Gamma

Spectrum

Analysis

  1. 14MAR19-003

U-2 Upper Internals Lift-South Cavity-Charcoal

71124.01

Radiation

Surveys

Gamma

Spectrum

Analysis

  1. 14MAR19-008

U-2 Upper Internal Lift;

71124.01

Radiation

Surveys

NMP-HP-400

Radioactive Source Inventory Form 4

71124.01

Radiation

Surveys

Survey #218010

RHR Pump room train B

09/11/2018

71124.01

Radiation

Surveys

Survey #221185

RHR Pump room train B

2/11/2018

71124.01

Radiation

Surveys

Survey #222070

Pipe penetration room

01/18/2019

71124.01

Radiation

Surveys

Survey #222386

Pipe penetration room

2/01/2019

71124.01

Radiation

Surveys

Survey #223436

Lower Cavity (2RXAI17)

03/10/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.01

Radiation

Surveys

Survey #223610

Upper Cavity (rev#2) (2RXAI18)

03/11/2019

71124.01

Radiation

Surveys

Survey #223644

Top of Pzr-252el

03/12/2019

71124.01

Radiation

Surveys

Survey #223684

Level 1 Rx Head Stand area,

03/12/2019

71124.01

Radiation Work

Permits (RWPs)

RWP 19-2300

Remove and install S/G manway covers and diaphragms

and associated work

71124.01

Radiation Work

Permits (RWPs)

RWP 19-2301

Install and remove Nozzle dams on S/Gs and associated

work

71124.01

Radiation Work

Permits (RWPs)

RWP 19-2403

Rx cavity decon

71124.01

Radiation Work

Permits (RWPs)

RWP 19-2515

Reactor Vessel Under Head NDE CRDM Penetrations

71124.08

Corrective Action

Documents

Condition Report

Numbers

10589756,

10589757,

10589759,

10589756 and

10587893

71124.08

Procedures

Process Control

Program (PCP)

Spent Resin Processing

VERSION

27.1

71124.08

Procedures

285-CNMP-

HP-405

Spent Resin Processing

VERSION

27.1

71124.08

Procedures

NMP-HP-405

Shipment of Radioactive Waste Scaling Factor

Determination and Radioactive Material

Version 3.6

71124.08

Procedures

NMP-HP-408

Solid Radioactive Waste Scaling Factor Determination and

Implementation and Waste Classification

Rev. 12

71124.08

Radiation

Surveys

Survey #223070

Tractor and Open Trailer Survey of incoming Westinghouse

Box 307474

2/28/2019

71124.08

Radiation

Surveys

Survey #223073

Receipt of Radioactive Material - Package (C)

2/28/2019

71124.08

Radiation

Survey #223096

Tractor and Open Trailer Survey Prior to Leaving Site

2/28/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Surveys

71124.08

Radiation

Surveys

Survey #223097

Misc. Westinghouse Shipping Package Boxes and Contents

Survey (C)

2/28/2019

71124.08

Radiation

Surveys

Survey #223283

Railroad Bay Unloading Area (1FHB1&37) Contamination

Survey of Floor for Trailer Entry

2/28/2019

71124.08

Shipping Records

Shipment Logs,

09/05/2017

2/26/2019

Shipment Logs from 09/05/2017 to 02/26/2019

71151

Miscellaneous

Unit 1 and Unit 2 Narrative Logs (eSOMS) between January

1, 2018 and December 31, 2018

71151

Procedures

00163-C

NRC Performance Indicator & Monthly Operating Report

Preparation & Submittal

14.6

71151

Procedures

NMP-AD-029

Preparation and Reporting of Regulatory Assessment

Performance Indicator Data and the Monthly Operating

Report

Version 1.1

71151

Procedures

NMP-GM-002

Corrective Action Program

Version 15