ML20059C911

From kanterella
Jump to navigation Jump to search
Forwards Requalification Exam Rept 50-424/OL-90-03 During Wks of 900723 & 900730
ML20059C911
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/23/1990
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20059C914 List:
References
NUDOCS 9009050412
Download: ML20059C911 (2)


Text

-

l

. August 23, 1990 Gecrgia Power Company ATTN: Mr. W. G. Hairston, III Senior Vice President Nuclear Operations P. O.-Box 1295 Birmingham, AL 35201 Gentlemen:

SUBJECT:

V0GTLE ELECTRIC GENERATING PLANT RE0VALIFICATION EXAMINATION REPORT I N0. 50-424/0L-90-03

.The NRC administered examinations during the weeks of July 23, 1990,' andl

- July 30,1990, to employees of your company who currently hold licenses to  ;

operate the Vogtle Electric Generating Plant. At the conclusion of the i examination, the examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report.

Copies of the written examinations and answer keys are included in the report as Enclosure 2.

A requalification program evaluation report is included as Enclosure 3. The

. evaluation report finds that the Vogtle Electric Generating Plant requalifica-cation program is classified as satisfactory. 3 A Simulator Fidelity Report is provided in this report as Enclosure 4.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and its Enclosures will be placed in the NRC Public Document Room.

1 Should you have any questions concerning this examination, please contact.us.

l Sincerely, (Original signed by T. A. Peebles) 4 Thomas A. . Peebles, Chief Operations Brinch i

Division of Reactor Safety i l

Enclosures:

l 1. Examination Report No. 50-424/0L-90-03 L 2. R0/SR0 Examination and Answer Key (RO)

R 3. Requalification Program Evaluation L 4. Simulator Facility Report cc w/encls: (See Page 2) l 03183

' \.

9009050412 900823 1 D {

PDR ADOCK 050004 4

v 1 L. ,,

l o ,

Georgia Power _ Company l l2 . August'23, 1990 (pp t W  ?- -ce w/encis. 1, 3, and 4:

& (" G. Bockhold,KJr., General Manager cc w/encls. 1, 2,-3, and 4:

  1. K._ Holmes, Nuclear Training Supervisor cc w/ encl.'1:

State of Georgia bec.wiencls. 1, 3, and 4:

, J Hopkins, NRR-E. Merschoff, DRS

'K. Brockman: DRP b

B. Bonser, Vogtle Senior Resident- Inspector M._Ernstes, DRS .

Operator Licensing Branch, NRR.

1=

ber .;/;r.cis. 1, 2, 3, and 4:-

Document Control Desk 8

L

  • l' w

j.:

n 1

's l-

[

L l

RII:DRS R I:DRS RII:QR1o RII:D S

'. Wd

//? C 1  ?

MErnlstes:btm Mdnro bKBrockman T eebles 8/zo /90 8/k /90 8/vi/90 8/47/90

.