IR 05000424/1988029
| ML20205D187 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/13/1988 |
| From: | Cline W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| References | |
| NUDOCS 8810270073 | |
| Download: ML20205D187 (2) | |
Text
-
.
o.
.,. '
'.
.
OCT 131988 Georgia Power Company ATTN: Mr. W. G. Hairston, III Senior Vice President -
Nuclear Operations
%@
P. O. Box 4545 Atlanta, GA 30302
Idp Gentlemen:
'QD SUBJECT:
REPORT NO. 50-424/88-29 Thank you for your response of September 21, 1988, to our Notice of Violation issued on August 25, 1988, concerning activities conducted at your Vogtle facility.
After careful consideration of your response to violation 50-424/88-29-01 we have concluded for the reasons presented in the enclosure to this letter, that the response is inadequate.
Our concerns. were discussed on October 5,1988, with Mr. J. Edwards of your staff and Ms. C. Perny of this office.
It was agreed that a revised response will be provided to this office within 30 days of the date of this letter.
As indicated in your response, we acknowledge that the Notice of Violation is applicable to docket number 50-424 only.
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the enclosure will not be placed in the Public Document Room.
We appreciate your cooperation in this matter.
Sincerely,
, (T) l blM b
,
u Will'am E. Cline, Chief o
g Nuclear Materials Safety and s
V Safeguards Branch Division of Radiation Safety and Safeguards Enclosure:
Summary of Licensee's Response
,
(Safeguards Information)
cc w/ enc 1:
(See page 2)
e
'
$@'
i(
---
<~e.- m m m SAFEGUARDS INFORMATl0N-EO5Wh 8910270073 881013 PDR ADOCK 05000424
-
- '
'OCT 13 988 Georgia Power Company
cc w/ encl:
R. P. Mcdonald, Executive Vice President, Nuclear Operations P. D. Rice, Vice President, Project
Director C. W. Hayes, Vogtle Quality Assurance Manager G. Bockhold, Jr., General Manager,
-
Nuclear Operations
,
J. P. Kane, Manager Licensing and Engineering
cc w/o encl:
J. A. Bailey, Project Licensing
.
Manager i
B. W. Churchill, Esq., Shaw, Pittman, Potts and Trowbridge D. Kirkland, III, Counsel, Office of the Consumer's Utility Council D. Feig, Georgians Against Nuclear Energy State of Georgia j
bec w/ enc 1:
!
NRR/DRIS/SB i
B. Murray, dIV
'
bec w/o encl:
Document Control Desk (RIDS IE04), 016 NRC Resident Inspector
,
E. Reis, OGC
'
J. Hopkins, NRR M. Sinkule, RII DRS, Technical Assistant
l w knwomed M eaun wwwe w'****4 asorem me so*** *
..a mtun.m w ww--
j
-
l i
.
.RII RI!
Mh RII
'
n W
v. 409 CPe ny:ser CATI lean
..icGuire MSinkule
)
10/\\y88
10/ffS8 10/g/88 10/g} /88
. -
.
w
..
.
.'
-
42,r,..
-ce.
.
-
w,.e a..es
,
.;3*t3 # C i d3CE w,4 e.c es:
,
Ya s ec Aort's mtC" aEe.'4'45
.
ma*ta G. o<; i:0?r
.
.
-
o
.
W. G. HaitS10R. ill
-
.
?'
r i,t e. < >...o e
,;;g UU7$a7'$7'
ENCt0SURE CONTAINS NON-00328
'"4 SEPARATION THIS PAGE IS DECONTROLLED 0055e
-
September 21, 1988 U. S. Nuclear Regulatory Comission S
ATTN: Document Control Desk to C
Washington, D. C. 20555 Q
-
U h
PLANT YOGTLE - UNIT 1 h j.j
NRC DOCKET 50-424
=
o OPERATING LICENSE NPF-68 OF
..
REPLY TO A NOTICE OF VIOLATION f
ow Gentlemen:
In accordance with the provisions of 10 CFR 2.201, Georgia Power Company (GPC) submits the enclosed infonnation in response to NRC Inspection Report 50-424/88-29 which concerns the inspection conducted by Mr. A. Tillman and Ms.
C. Perny of the NRC Region II staff on July 18-22, 1988.
A copy of this response is being provided to the NRC Region II office for review.
We believe that the Notice of Violation for NRC Inspection Report 50-424/88-29 (as submitted by NRC Region !! letter dated August 25, 1988)
incorrectly refers to Plant Vogtle Ur.it 2 by docket number and as a result implies that it is in violation also.
The Inspection Report "Details' section specifically identifies the violations as being ap Unit i by the violation designators '50-424/88-29-01,plicable to Plant Vogtle and '50-424/88-29-02".
In the enclosure, transcription of the NRC violation precedes the GPC response.
Should there be any questions in this regard, please contact this office at any time.
.
Sincerely
.
.
'
'
f
/
W. G. Hairston, !!!
,
KP/11h
-
Y lation 88 29-01 and GPC Response
Violation 88-29-02 and GPC Response ENCLOSURE CONTAINS SAFEGUARDS INFORMAil0N
.
m " wwn m em nreceu Et c:
(see next page)
2 9 C c7 t e c.1 7 o
%pp
/
l
.-
.
-
.
.
.
.
A 84ROUMDB NOllMATION Georgia l'oner 9 ENCLOSURE CONTm3 MM MDM
~
UPON SDARADON THl3 PAGE 13 DECONTROLLED
,
,
.
U. S. Nuclear Regulatory Comission Septenter 21, 1988 Page Two
,
c: Georgia Power Company Mr. P. D. Rice w/o enclosure Mr. G. Bockhold, Jr. w/ enclosure Mr. J. H. Lukehart w/ enclosure Mr. J. E. Swartzwelder w/o enclosure Mr. F. R. Timons w/o enclosure G0-NORMS w/o enclosure
U. S. Nuclear Regulatory Consission Dr. J. N. Grace, Regional Administrator w/ enclosure Mr. J. B. Hopkins, Licensing Project Manager, NRR w/o enclosure Mr. J. F. Rogge, Senior Resident Inspector-Operations, Yogtle w/o enclosure
.
ENCLOSURE CONTANt33AFEQUARDS NORttAD0N
.i UPON SEPARAD0N THt3 PAGE 13 DECONTROLLED l
0055e i
i
~... _ _.. _ _
.
- _ _, _,
. _,. _ - _ _ _ -
_. _ _ _ _,-
_
_
_ - _ _ _ - -. - - _ _ _ -.
--
- - -..