ML20246E257
| ML20246E257 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/30/1989 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20246E259 | List: |
| References | |
| NUDOCS 8907120166 | |
| Download: ML20246E257 (2) | |
See also: IR 05000424/1989015
Text
_
_
L .
rf&c/d/
,
..
,;.
,,
'
L
JUN 3 01989
Docket Nos. 50-424, 50-425
Georgia Power Company
ATTN: Mr. W. G. Hairston, III
Senior Vice President -
Nuclear Operations
P. O. Box 1295
Birmingham, AL 35201
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-424/89-15 AND 50-425/89-17
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
W. B. Gloersen and R. B. Shortridge 'on May 22-26, 1989.
The inspection
included a review of activities authorized for your Vogtle facility.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the insnection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Criq.nal6 JVW fLj
lO lb2nKin Itj~
Douglas M. Collins, Chief
Radiological Protection Branch
Division of Radiation Safety
and Safeguards
Enclosure:
NRC Inspection Report
cc w/ encl:
(See page 2)
\\
8907120166 890630
Nt
ADOCK 03000424
Q
3gj
_ _ - _ _ _ .
~
.,
l
Georgia Power Company
2
JUN 3 01989
!'
cc w/ encl:
'
R. P. Mcdonald, Executive Vice
President-Nuclear Operations
C. K. McCoy, Vice President-Nuclear
G. R. Fredrick, Quality Assurance
Site Manager
G. Bockhold, Jr. , General Manager
Nuclear Operations
J. A. Bailey, Manager-Licensing
B. W. Churchill, Esquire, Shaw,
Pittman, Potts, and Trowbridge
J. E. Joiner, Esquire, Troutman,
Sanders, Lockerman, and
Ashmore
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
State of Georgia
.
bec w/ encl:
E. Reis, OGC
J. Hopkins, NRR
M. Sinkule, RIl
NRC Resident Inspector
Document Control Desk
gr) WGloersen RSh(10[
'
/
R1
RIl
RIIc _
RII y5
%&
)
,
ortridge
JPotter
N54nktle
6/fo/89
6/7;D /89
6/44/89
6/s /89
1
i
_ _ _ _ . _ _ _ _ _ _ . _ _ . . . _ _ _ _ _ _ _ .
_ . _ _ _ _ _ _
_