IR 05000425/1988007
| ML20153F570 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 04/29/1988 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Head G GEORGIA POWER CO. |
| References | |
| NUDOCS 8805100373 | |
| Download: ML20153F570 (2) | |
Text
7-g
-
--
-.-- - -_-_----- - _-------__ _ --_ _
!i k
Gegrgia Power Company APR 2 9 1968 fN: Mr. George F. Head Senior Vice President-P. O. Box 4545 Atlanta, GA 30302 Gentlemen:
SUBJECT:
REPORT NO. 50-425/88-07 Thank you for your response of April 14, 1988, to our Notice of Violation issued on March 18, 1988, concerning activities conducted at your Vogtle facility.
We have evaluated your response and found that it meets the requirements of 10 CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, NAL SIGNED BY ALAN R. HERDT Alan R. Herdt, Chief Engineering Branch Division of Reactor Safety cc: M D. Rice, Vice President, Project Director C W. Hayes, Vogtle Quality Assurance Manager VBockhold, Jr., General Manager, Nuclear Operations d c Gucwa, Manager, Nuclear Safety and Licensing Gr* A. Bailey, Project Licensing Manager Sf W. Churchill, Esq., Shaw, Pittman, Potts and Trowbridge dX Kirkland, III, Counsel.
Office of the Consumer's Utility founcil V. Feig, Georgians Against Nuclear Energy bec:
(See page 2)
8805100373 880429 ADOCK O 4 5 f
gDR ZE C/
-_
,
s> o APR I 9 Y
. Georgia Power Company
s bec: 8 Reis. OGC W. Hopkins, NRR M. Sinkule RII Dy, Technical Assistant WRC Resident Inspector Document Control Desk State of Georgia l
l..
R RII RI!
/
Mv6 ion:tj TConlon MSinkule 04/,t /88 04/g/88
$/88 p
..