Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged
ML20205F909
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 03/29/1999
From: Beasley J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1336, NUDOCS 9904070055
Download: ML20205F909 (1)


Text

sn

?- J. Barnie Bersley. Jr., P.E. Southern Nuclesr Vice President - Opercting Comptny,Inc.

Vogtie Project. 40 invemms Center Parkway PO Box 1295 Birmmgham. Alabama 35201 Tel 205 9923110 Fax 205992 0403 SOUTHERN COMPANY Energy to Serve Your World" March 29,.1999 LCV-1336 Docket Nos.30-424 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 VOGTLE ELECTRIC GENERATING PLANT TECHNICAL SPECIFICATION REPORT 1-99-1 NUMBER OF STEAM GENERATOR TUBES PLUGGED DURING 1R8

. Ladies and Gentlemen:

In accordance with the requirements of Vogtle Electric Generating Plant Technical Specification 5.6.10, Southern Nuclear Operating Company submits this report of the j number of steam generator (SG) tubes plugged durir,g the Unit 1 eighth maintenance / refueling outage (1R8).

During the outage, inservice inspections were conducted on SG #1 and SG #4. As a result of these SG tube inspections completed on March 15,1999, no tubes were plugged.

Should there be any questions, please contau this oflice.

n er ly,

~^ \

. B. ea ey, O' JBBffEW/gmb

' xc: Southern Nuclear Ooerating Company Mr. J. T. Gasser Mr. M. Sheibani q\

D SNC Document Management M000g 7 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. R. Assa, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector - Vogtle 9904070055 990329 3 PDR ADOCK 05000424j G PM fg