Confirms 901003 Telcon Granting Regional Waiver of Compliance from Tech Specs 3.6.1.1,3.6.1.2 & 3.6.3
ML20062A895
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/04/1990
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
References
NUDOCS 9010230201
Download: ML20062A895 (3)


Text

!

a; s,

n f

.et py 13W DCT 0 4

" Docket Nos.- 50-424', 50-425-License Nos. NPF-68, NPF-81 Georgia Power Company ATTN: Mr. W. G. Hairston, 111 Senior Vice President -

-Nuclear Operations

. P.-0. Box 12,95 Birmingham, AL 35201 Gentlemen:

a

SUBJECT:

REGIONAL. WAIVER OF COMPLIANCE - V0GTLE UNIT 1

'This letter confirms the telephone conversation between Mr. J. Bailey of your staff and Mr.-'K. Brockman of my staff on October 3,1990, granting. a Regional-Waiver of Compliance for Vogtle Unit 1. 'Our action was based on your written request' of October 3 1990, and as amended on October 4,1990.- The one-time-waiver - is granted for 'a. cumulative duration of-eight' (8) hours.between 4:00'p.m. (EDT)= October 3,'1990 and 2:30 p.m. (EDT), October 6, 1990.

Technical: Specification (TS) 3.6.1.1, 3.6.1.2, and 3.6.3-place requirements on Emaintaining - containment : integrity, limiting containment leakage rates and 4

maintaining operable! containnent isolation valves.

A waiver of these TS was requested to: allow leak rate testing of check valve 1-1206-U6-016, which serves as the containment isolation valve inside containment' for penetration No. ' 34 in the. containment spray system.

Following valve disassembly on March.14,1990, a -

leakirate. test of check valve 016 was not performed after valve' reassembly.

j This waiver of compliance.is granted for a cumulative duration of 8, hours.to allow the performance of a leak rateltest for check valve 016.

As compensatory actions, the' containment penetration will be isolated during'the test,:except

when the ' leak '. rate ' test connection' inside containment is opened to allow testing of check valve 016.. Plant personnel stationed at the testiconnection-

--:during. the test.and at drain valves prior to the test will be in. continuous

. communication with the control room and will close. these-connections if an abnormal' condition is observed.

This is a one-time waiver of compliance based'

on.'the-justification provided in your request letter dated October 3, -1990,

.and as amended on'0ctober 4, 1990.

UShould you have any questions concerning this letter, please contact us.

Sincerely, Original Signed by James L. Milhoan/for Stewart D. Ebneter Regional Administrator s

cc,:

(, Seepage 2) 90ld2bo201 901o04

/

gDR ADOCK 0300 4

go/

R 5;

p G'eorgiaPowerLCompany 2'-

l 1

g OCT 0 4-y 1

- cc:

R. P.: Mcdonald Executive Vice President-Nuclear

.i Operations..

Georgta Power Company P. O. Box 1295 Birmingham, AL 35201 t

C. K. McCoy-

}

Vice President-Nuclear Georgia Power Company

.P. 0. 1295 Birmingham, AL '35201 G. Dockhold, Jr.

General Manager, Nuclear Operations Georgia Power Company-P. O. 1600 Waynesboro, GA 30830 y

-J. A. Bailey Manager-Licensing Georgia Power Company.

P. 0.. Box:1295 Birmingham, AL 35201 D. Kirkland, III, Counsel m

Office-of the Consumer's.

a

' Utility. Council-

_v Suite 225, 32 Peachtree Street, NE Atlanta,- GA 30302 Office of Planning and Budget Room 615B 270 Washingt6n Street, SW q

l Atlanta, GA' 30334~

i Office of'the County Commissioner Burke: County Commission Wayne,sboro, GA 30830' Lonice Barrett, Commissioner

' Department of Natural Resources

- 205 Butler Street, SE, Suite 1252 Atlanta, GA' 30334

'n Thomas Hill, Manager

?

Radioactive Materials Program Department of Natural Resources 878'Peachtree St.,- NE, Room 600 l

At1anta, GA' 30309 (cccont'd-seepage 3) l-c.

i

&, i ;

a

p;m=

ii, Th;,

,c

., y, g..

~

3 OCT 0 41990

' 5. ' '

i t

Georgia Power'CompanyL y

l' it

.cc:

(Continued)i Attorney General Law Department:

132 Judicial Building.

Atlanta, GA 30334

. State of Georgia l

'bec:.S'. Sparks, RII D. Hood, NRR.

K. Brockman,-RII

.i

.A. Herdt, RII

]

. Document Control Desk NRC Resident Inspector' i

l U.S. Nuclear Regulatory Commission P. 0.. Box 572 d

Waynesboro, GA-30830 I

q

l

.I q

.}

-q 7

q l

.i 6

d a

{

if

.q. '

..l*i

.)
,+

a a

s*

4 RII:DRP

.RII:DRP R I:DRP R

DNP II:DRP RI -

R : RS RI RA

- KBrock)ma pdVJ gf

~l erd t -

schoff LRey a en ins A n JMilhoan SSparks