ML20055D548

From kanterella
Jump to navigation Jump to search

Advises That 890711 Response to Generic Ltr 89-08, Erosion/ Corrosion Induced Pipe Wall Thinning, Acceptable
ML20055D548
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/25/1990
From: Tim Reed
Office of Nuclear Reactor Regulation
To: Hairston W
GEORGIA POWER CO.
References
GL-89-08, GL-89-8, TAC-73558, TAC-73559, NUDOCS 9007090088
Download: ML20055D548 (2)


Text

_

j 4

Docket 1os. 50-424 June 25, 1990 and 50-425 i

DISTRIBUTION:

Mr. W. G. Hairston, 111 Docketfilesb EJordan Senior Vice President.

NRC/ Local PDRs ACRS(10)

Nuclear Operations PDil.3 R/F Vogtle File Georgia Power Company SVarga T. Chan Post Office Box 1295 Glainas F. Witt Birmingham, Alabama 35201 Ringram A. Herdt, Ril Treed

Dear Mr. Hairston:

OGC SUBJECT CLOSE0VT OF GENERIC LETTER (GL) 89 08, " EROSION / CORROSION INDUCED PIPE WALL THINNING " FOR V0GTLE ELECTRIC GENERATING PLANT, UNITS 1 AND2(TACNOS. 73558/73559)

Your letter of July 11, 1989, (ELV-00634) responded to Generic Letter 89 08 for the Vogtle Electric Generating Plant (VEGP), Units 1 and 2.

Your response stated that:

1.

The Vogtle Unit 1 Erosion / Corrosion Program meets the intent of the NUMARC guidelines; however, a few areas were identified where program enhancements are appropriate in light of the GL 89-08 guidance.

You committed to incorporate these Unit 1 program revisions prior to the recent Unit I refueling outage (February-April 1990).

2.

AVogtleUnit2 Erosion /CorrosionProgram(equivalenttotheUnit1 program) will be developed prior to the first refueling outage for Unit 2(currentlySeptember 14,1990).

Your response and the stated actions adequately address GL 89 08 and provide a suf ficient basis for closure of NRR's review of this matter. Any further NRC review will be pursued through the inspection or sudit process.

Sincerely, Timothy A. Reed, Project Manager Project Directorate 11-3 Division of Reactor Projects. 1/11 Office of Nuclear Reactor Regulation i

cc: See next page

......:....h...lb....:..............:..............:.............

D:PD@

OFC iLA:PDIIp3

PM:PD

-3

......:... g..,j.....:..

M............:[........k....:..............:...........

NAME

RIngram /
TRe ot2
DMatth2ws

..... 3 3

90

& /p/90

<DATE :B/M/90 OFFICIAL RECORD COPY Document Name: GL 8908 CLOSE0VT I/ k 9007090088 900625 C

0

~PDR ADOCK 05000424 (I

Q F

PDC

~

t Mr. W. G. Hairston, III Georgia Power Company Yogtle Electric Generating Plant CC:

Mr. J. A. Bailey Mr. 4 Leonard Ledbetter. Director Manager - Licensing Environmental Protection Division Georgia Power Company Department of Natural Resources P. O. Box 1295 205 Butler Street, SE., Suite 1252 Birmingham, Alabama 35201 Atlanta, Georgia 30334 Mr. G. Bockhold, Jr.

Attorney General General Manager, Vogtle Electt'ic Law Department Generating Plant 132 Judicial Building P. O. Box 1600 Atlanta, Georgia 30334 Waynesboro, Georgia 30830 Regional Administrator, Region 11 Project Branch #3 U. S. Nuclear Regulatory Comission U. S. Nuclear Regulatory Comission 101 Marietta Street, NW., Suite 2900 101 Marietta Street, NW., Suite 2900 Atlanta, Georgia 30323 Atlanta, Georgia 30323 Office of the County Comissioner Mr. Dan Smith Burke County Comission Program Director of Waynesboro, Georgia 30830 Power Production Oglethorpe Power Corporation Office of Planning and Budget 100 Crescent Centre Room 615B Tucker, Georgia 30085 270 Washington Street, SW.

Atlanta, Georgia 30334 Charles A. Patrizia, Esq.

Paul, Hastings, Janofsky & Walker Mr. C. K. McCoy 12th floor Vice President - Nuclear, Vogtle Project 1050 Connecticut Avenue, NW.

Georgia Power Company Washington, DC 20036 P. O. Box 1295 Birmingham, Alabama 35201 Resident Inspector U. S. Nuclear Regulatory Comission P. O. Box 572 Waynesboro, Georgia 30830 Mr. R. P. Mcdonald Executive Vice President -

Nuclear Operations Georgia Power Company P. O. Box 1295 Birmingham, Alabama 35201

- -