IR 05000424/1988019
| ML20196C264 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/13/1988 |
| From: | Kirby J, Mcguire D, Thompson D, Tillman A, Tobin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20196C262 | List: |
| References | |
| 50-424-88-19, 50-425-88-21, NUDOCS 8807010045 | |
| Download: ML20196C264 (1) | |
Text
SAFEGUAR,QSMFORMATION
"
-
-
...
[,,,,, Do NUCLEAR REGULATORY COMMISSION
~
,d h@ N ~kM
,
101 MARIETTA STREET.N.W.
REGION 11
1}
g ATL ANTA, G EORGI A 50323 b#
JUN 211988
""*
Report Nos.:
50-424/88-19 and 50-425/88-21 Licensee:
Georgia Power Company P. O. Box 4545 Atlanta, GA 30302 Docket Nos.:
50-424 and 50-425 License Nos.:
NPF-68 and CPPR-109 Facility Name:
Vogtle 1 and 2 Inspection Conducted:
April'25 - 29, 1988 Inspectors: b).ld ab Gbo/R
[pW.Tobin,SecurityInspecyor Date Signed
'
(NN.
t idAq b fro Jf(
p.Tillman,SecurityInspe or Da",e Signed w JfA a/s/s Thompson, Sectfrity Insp tor 7 ate / Signed p%wkW h/9 In J.(Kirby, 5 eguards Ass tant Date ~5fgned Approved by:
C J/Jf g
D. R. McGuire, Physical Security Section, D&te Signed Nuclear Materials Safety and Safeguards Branch, Division of Radiation Safety and Safeguards SUMMARY Scope:
This special, announced inspection was conducted to verify corrective actions to previous enforcement issues.
In addition, the readiness of Unit 2 was reviewed.
l Results:
Violations were identified in the following areas:
1.
Failure to conduct an adequate search at the protected area portal
(88-19-01)
2.
Failure to document all Safeguards Events (88-19-02)
l 3.
Failure to account for all Safeguards Information (88-19-03).
This is considered a Licensee Identified Violation and, as such, is l
closed.
l EMCLOSURE CoNTAIMS SAFEoUARDS I!!PoM!^'m UPCN SEP.9R?, TIT: 7'
\\
VACC Ii DCic!.*@
8807010045 880621 !
'
PDR ADOCK 05000424 Q
DCD t