Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl
ML20209C404
Person / Time
Site: Vogtle  
Issue date: 07/01/1999
From: Beasley J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20209C411 List:
References
LCV-1341A, NUDOCS 9907090286
Download: ML20209C404 (7)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

J. Bernio 8 Xsley, Jr.. P.E.

Souther 2 Nuclear Vice President Operating Cornpany. Inc.

,Vogtie Prefect 40 in,verness Center Parkway PO Box 1295 Birmingham. A!aSama 35201 m

(V)

Tei 205 992 7 f1]

Fax 205 992 0*]3 SOUTHERN COMPANY Energy to Serve 1 bur Wid

July 1, 1999 LCV-1341 A Docket Nos. 50-424 50-425 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 VOGTLE ELECTRIC GENERATING PLANT EMERGENCY PLAN REVISION 29 Ladies and Gentlemen:

In accordance with 10CFR50.54(q) and 10CFR50.4(b)(5), Southern Nuclear Operating Company hereby submits Revision 29 to the Vogtle Electric Generating Plant (VEGP) Units 1 and 2 g

Emergency Plan.

Revision 29 incorporates a design change associated with the consolidation of the Emergency Response Facilities Computer and Proteus (plant) computer. This consolidation resulted in the elimination of some unneeded equipment. Justifications for the changes are located in Enclosure

1. Enclosure 2 provides the insertion instructions. Enclosure 3 identifies the revised page. This emergency plan change does not decrease the effectiveness of the Emergency Plan.

Please contact this office if you have any questions regarding this submittal or contact Mr. L. E.

Mayo Emergency Preparedness Coordinator at (706) 826-3356.

Sincerely, hI

. B. Beacle, Jr.

JBB/LEM

Enclosures:

1. Justification for Revision 29 to the VEGP Emergency Plan
2. Insertion Instructions g\\'h O
3. Revised Plan Pages 9907090286 990701 PDR ADOCK 05000424 F

PDR

c

)

-i, cc:

Southern Nuclear Operating Company Mr. J. T. Gasser.

Mr. M. Sheibani Mr. L. E. Mayo SNC Document Management US Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator (2 copies) l Mr. R. R. Assa, Licensing Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle O

s O

i

.l O

ENCLOSURE 1 Justification For Revision 29 To The VEGP Emergency Plan O

O

JUSTIFICATION FOR REVISION 29 TO THE VEGP EMERGENCY PLAN rs Enclosure # 1 Sheet l of t 1.

Page 11-14, Delete the following wording. "This room houses a analog Section e input module (Albf) mounted in the multiplier cabinet. The multiplier cabinet serves as an isolation device and " splits" field inputs: one leg goes to the abandoned Emergency Response Facilities computer system and one leg goes to the IPC. "

Justification:

With the consolidation of the Emergency Response Facilities (ERF) Computer and the Proteus computer, the multiplier cabinet's functionality was not required. As such, the electronic equipment that provided that isolation and 4

" split" field inputs was deleted under the design change process. This elimination of the equipment increased the reliability of the inputs to the IPC.

0 0

4 9

i O

ENCLOSURE 2 Insertion Instructions O

l O

VEGP UNIT 1 AND UNIT 2 EMERGENCY PLAN REVISION 29 6/99

)

INSERTION INSTRUCTIONS PAGE l INSTRUCTIONS Remove Enclosure #1 - Justification For Replace Enclosure #1 -

Revision 28 To The VEGP Emergency Plan, Justification For Revision (Sheets 1 through 10) 29 To The VEGP Emergency Plan, (Sheet 1 of 1)

TABLE OF CONTENTS Remove Page xii Replace with REV 29 Remove page H-14 Replace with REV 29 O