05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi

From kanterella
Jump to navigation Jump to search
Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed
ML20206N007
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/10/1999
From: Beasley J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20206N014 List:
References
LCV-1281-C, NUDOCS 9905170107
Download: ML20206N007 (1)


LER-2098-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed
Event date:
Report date:
4242098006R00 - NRC Website

text

[E J. Bzrnie Beasley. Jr., PE. Southern Nuclear Mce Presdent Operating Company, Inc.

Vogtle Project 40 invemen Center Parkway P0. Box 1295 l Birminghem, Alatiama 35201 Tel 205 992.7110 Fax 20S 992 0403 l SOUTHERN May 10, 1999 COMPANY Energy ro Serve 1'our World" LCV-1281-C l

Docket Nos. 50-424 50-425 i

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemen:

l VOGTLE ELECTRIC GENERATING PLANT LICENSEE EVENT REPORT l-98-006 MOTOR CONTROL CENTER BREAKER BUCKETS NOT SEISMICALLY OUALIFIED Southern Nuclear Operating Company hereby submits a revision to the Vogtle Electric Generating Plant licensee event report that was transmitted to the NRC on November 6, 1998, December 11,1998 and February 25,1999. This revision is submitted to document the results of seismic testing that demonstrated that no condition outside of the design basis or outside of Technical Specification requirements existed.

~

cerel , .

I 1

l l

\m i J. asle , Jr.

JBB/BHW/gmb

Enclosure:

LER l-98-006, Revision 3 xc: Southern Nuclear Operatina Company ~

\

Mr. J. T. Gasser  !

Mr. M. Sheibani

SNC Document Management ,

U. S. Nuclear Regulatory Commissior Mr. L. A. Reyes, Regional Administrator Mr. R. R. Assa, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, VEGP }g

. o /

9905170107 990510 i PDR ADOCK 05000424 1 S PDR