Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC
ML20217N252
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/20/1999
From: Beasley J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1307-A, NUDOCS 9910280151
Download: ML20217N252 (3)


Text

E J. Barnie Beasley, Jr., P.E. Southern Nuclear Vice President Op: rating Cornpiny,Inc.

/. # -

Vogtle Project 40 Invemess Center Parkway l_ PD Scx 1295 l Brmmgham. Alabama 35201

,- e /

Tel 205932.7110 Fax 205 992 0403 -

SOUTHERN u COMPANY Energy to Smre %r %rld*

October 20, 1999.

LCV 1307-A Docket Nos.: 50-424-

'50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemen.

VOGTLE ELECTRIC GENERATING PLANT SUPPLEMENTAL INFORM ATION - CONTAINM ENT INSERVICE INSPECTION REOUESTS FOR RELIEF Pursuant to a telephone conference call between NRC staff and Southern Nuclear Operating Company (SNC) personnel on October 13,1999, the following supplemental information is provided concerning Vogtle Electric Generating Plant (VEGP), Units 1 and 2, Containment inservice Inspection Program Requests for Relief RR-L-1 and RR-L-2. Those requests for relief were originally submitted to the NRC in our submittal

. LCV-1307 dated April 5,1999.

REOUEST FOR RELIEF RR-L-1 NRC Question:

How are illumination and distance requirements determined by the Registered Professional Engineer?

SNC Response:

l l' It is our intention to apply the requirements of 10CFR50.55a(b)(x)(B) that applies to IWE l and allows the maximum direct examination distance specified in Table IWA-2210-1 to be extr.ded and the minimum illumination requirementr to be decreased provided that ,

the conditions or indications for which the visual examination is performed can be \j \

detected at the chosen distance and illumination. Procedures and equipment used, e.g.,

optical aids, will be demonstrated to the satisfaction of the Authorized Nuclear Inservice I

if[\

m. m.

9910290151 991020 DR ADOCK 050004 4 l l u  ;

v s U. S. Nuclear Regulatory Commission LCy;1307._A Page Two HEQUEST FOR RELIEF RR-L-1 (continued)

Inspector (ANII) for the examination of concrete surfaces. The visual examinations will be performed in sufficient detail to identify areas of concrete deterioration and distress, such as defined in the appropriate American Concrete institute (ACI) documents, e.g.,

ACI 201.1, ACI 349.R3-96. Further, the Registered Professional Engineer (RPE) will use the ACI documents as guidance for determining the limiting flaw sim.

REQUEST FOR RELIEF RR-L-2 NRC Question:

When will the tendon and concrete examinations addressed in the " Proposed Alternative" statement of the request for relief be completed?

SNC Response:

The next tendon and concrete examinations will be completed on VEGP-1 and 2 by August 1,200011 year and every 5 years i 1 year thereafter.

Should there be any questions in this regard, please contact this office.

1 Sincerely, i

l 1

N 4 . B, Beasley, Jr. i l JBB/JAE/

xc: (see next page for distribution) l l

l l

-. 4 U. S. Nuclear Regulatory Commission .

LCY;1307c.A Page ' hree xc: Southern Nuclear Operating Company i Mr. W. L. Burmeister-Mr. J. T. Gasser -

7 Mr. M. Sheibani SNC Document Management

'.U. S. Nuclear Regulatory Commission Mr. R. R. Assa, Project Manager, NRR Mr. L. A. Reyes, Regional AdnJnistrator Mr. J. Zeiler, Senior Resident Inspector i