ML20246Q352

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-424/89-18 & 50-425/89-21 on 890612-16.No Violations or Deviations Noted
ML20246Q352
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/12/1989
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20246Q353 List:
References
NUDOCS 8907210083
Download: ML20246Q352 (2)


See also: IR 05000424/1989018

Text

._

_

_

ChC]CL)

'

'

d

'.

.

JUL i 2129

j

!

Docket Nos. 50-424, 50-425

a

License Nos. NPF-68, NPF-81

l

Georgia Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

,

P. O. Box 1295

]

Birmingham, AL 35201

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-424/89-18 AND 50-425/89-21

Tids refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

{

A. Gooden on June 12-16, 1989. The inspection included a review of activities

1

authorized for your Vogtle facility.

At the conclusion of the inspection, the

i

findings were discussed with those members of your staff identified in the

k

enclosed inspection report.

I

Areas examined during the inspection are identified in the report.

Within

l

these areas, the inspection consisted of selective examinations of procedures

i

and representative records, interviews with personnel, and observation of

i

activities in progress.

i

i

Within the scope of the inspection, no violations or deviations were

!

identified.

1

In accordance with Section 2.790 of the NRC's 'i,'iles of Practice," Part 2,

i

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in-the NRC Public Document Room.

.

l

1

Should you have any questions concerning this letter, please contact us.

Sincerely,

Crigina] S(qned by

h~ l OHetSDi'

Douglas M. Collins, Chief

Emergency Preparedness and

Radiological Protection Branch

Division of Radiation Safety

and Safeguards

Enclosure:

(See page 2)

i

J

o

ru

,

""

_ _ ____-__ __

--

'.

'.

-

.

Georgia Power Company

2

i

Enclosure:

NRC Inspection Report

cc w/ enc 1:

R. P. Mcdonald, Executive Vice

President-Nuclear Operations

C. K. McCoy, Vice President-Nuclear

G. R. Fredrick, Quality Assurance

Site Manager

G. Bockhold, Jr., General Manager

Nuclear Operations

J. A. Bailey, Manager-Licensing

B. W. Churchill, Esquire, Shaw,

Pittman, Potts, and Trowbridge

J. E. Joiner, Esquire, Troutman,

Sanders, Lockerman, and

Ashmore

D. Kirkland, III, Counsel,

i

Office of the Consumer's Utility

Council

State of Georgia

bec w/ enc 1:

E. Reis, OGC

J. Hopkins, NRR

NRC Resident Inspector

Document Control Desk

i

l

I

1

RIItyRSS

RII

RSS

RII:DRP ,

& t"

0

II

LIr/L/

l

AGooden

WRankin

ocine

7/j/83

7q/89

7/ 89

,

- - _ _ _ _ _ _ _ _ _ _