Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P3791999-10-21021 October 1999 Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196H8081999-06-28028 June 1999 Discusses 990528 Meeting Re Results of Periodic PPR for Period of Feb 1997 to Jan 1999.List of Attendees Encl ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage ML20207E7421999-06-0303 June 1999 Refers to from NRC Which Issued Personnel Assignment Ltr to Inform of Lm Padovan Assignment as Project Manager for Farley Npp.Reissues Ltr with Effective Date Corrected to 990525 ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20207D9861999-05-28028 May 1999 Informs That,Effective 990325,LM Padovan Was Assigned as Project Manager for Plant,Units 1 & 2 ML20207D2701999-05-19019 May 1999 Forwards Insp Repts 50-424/99-03 & 50-425/99-03 on 990321- 0501.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206M5141999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Rl Emch Section Chief for Vogtle. Reorganization Chart Encl ML20206U4061999-05-11011 May 1999 Confirms Telcon with J Bailey Re Mgt Meeting Scheduled for 990528 to Discuss Results of Periodic Plant Performance Review for Plan Nuclear Facility Fo Period of Feb 1997 - Jan 1999 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 ML20206A6371999-04-21021 April 1999 Forwards SE Authorizing Licensee Re Rev 9 to First 10-yr ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205Q3351999-04-15015 April 1999 Forwards Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320.Three Violations Identified & Being Treated as Non-Cited Violations ML20205T2351999-04-0909 April 1999 Informs That on 990317,B Brown & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Scheduled for Wk of 991213 for Approx 10 Candidates ML20205K7501999-04-0505 April 1999 Informs That Effective 990329,NRC Project Mgt Responsibility for Plant Has Been Transferred from Dh Jaffe to R Assa ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 ML20205F9091999-03-29029 March 1999 Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged ML20205G0761999-03-26026 March 1999 Provides Results of Individual Monitoring for 1998.Encl Media Contains All Info Required by Form NRC 5.Without Encl 1999-09-20
[Table view] Category:NRC TO UTILITY
MONTHYEARML20058E8811990-10-29029 October 1990 Forwards Insp Repts 50-424/90-27 & 50-425/90-27 on 901016-17.Violations Noted ML20058F6541990-10-25025 October 1990 Forwards Insp Repts 50-424/90-20 & 50-425/90-20 on 900825- 0928 & Notice of Violation ML20058E8451990-10-23023 October 1990 Advises That Rev 12 & Proposed Rev 13 to Plant Emergency Plan Appear to Be Inconsistent w/10CFR50.47(b).Changes Should Not Be Implemented Until Addl Justification Provided Per Encl ML20058F0351990-10-19019 October 1990 Forwards Insp Repts 50-424/90-26 & 50-425/90-26 on 901009-12.Noncited Violation Noted ML20062B2631990-10-12012 October 1990 Requests That Analyses of Liquid Samples Spikes W/ Radionuclides Be Completed as Soon as Practicable,But No Later than 60 Days from Receipt of Samples.Results Should Be Sent to DM Collins at Listed Address ML20062B2461990-10-12012 October 1990 Requests That Analyses of Liquid Samples Spiked W/ Radionuclides Be Completed as Soon as Practicable,But No Later than 60 Days from Receipt of Samples.Results Should Be Sent to DM Collins at Listed Address ML20058A3431990-10-0505 October 1990 Ack Receipt of 900925 Response to Notice of Violation in Insp Repts 50-424/90-15 & 50-425/90-15 ML20062A8951990-10-0404 October 1990 Confirms 901003 Telcon Granting Regional Waiver of Compliance from Tech Specs 3.6.1.1,3.6.1.2 & 3.6.3 ML20062E9091990-10-0303 October 1990 Discusses NRC Operator Requalification Exam Process ML20059M7861990-09-20020 September 1990 Forwards Insp Repts 50-424/90-17 & 50-425/90-17 on 900630-0824.No Violations or Deviations Noted.Attention to Unresolved Item Identified in Insp Rept Requested ML20059K4471990-09-17017 September 1990 Advises That Ds Hood Assigned as Project Manager for Plant ML20059H1441990-09-12012 September 1990 Ack Receipt of & Payment in Amount of $50,000 for Civil Penalties Imposed by NRC in ML20059K1071990-09-0505 September 1990 Requests Listed Info in Preparation for Reactor & Senior Operator Exams Scheduled for 901210.Preliminary License Applications Should Be Submitted at Least 30 Days Prior to Exam in Order to Review Training & Experience of Candidates ML20059E9091990-08-31031 August 1990 Forwards Exemption from Restriction of 10CFR20,App a, Footnote d-2(c) & Grants Authorization for Use of Solvent Iodine Canisters at Facility,Per 890928 Request.Safety Evaluation Also Encl ML20059H3311990-08-29029 August 1990 Forwards Insp Repts 50-424/90-15 & 50-425/90-15 on 900730- 0803 & Notice of Violation ML20059C9111990-08-23023 August 1990 Forwards Requalification Exam Rept 50-424/OL-90-03 During Wks of 900723 & 900730 ML20058L6731990-07-26026 July 1990 Forwards Insp Repts 50-424/90-16 & 50-425/90-16 on 900709-13.Violations Noted But Not Cited ML20058L7081990-07-23023 July 1990 Forwards Insp Repts 50-424/90-13 & 50-425/90-13 on 900519- 0629.Violations Noted But Not Cited ML20056A4991990-07-23023 July 1990 Ack Receipt of 900712 Response to Violations Noted in Insp Repts 50-424/90-10 & 50-425/90-10 ML20055H6071990-07-0606 July 1990 Forwards Insp Repts 50-424/90-14 & 50-425/90-14 on 900611-15.No Violations or Deviations Noted ML20055H3981990-06-29029 June 1990 Ack Receipt of 900525 & 0608 Ltrs Forwarding Objectives & Scenarios for Emergency Exercise Scheduled for Wk of 900730 IR 05000424/19900111990-06-27027 June 1990 Discusses Insp Repts 50-424/90-11 & 50-425/90-11 on 900430-0501 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Insp Reviewed Incident Re Unsecured Cabinet W/Safeguards Info ML20055D5481990-06-25025 June 1990 Advises That 890711 Response to Generic Ltr 89-08, Erosion/ Corrosion Induced Pipe Wall Thinning, Acceptable ML20059M9561990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20055F7111990-06-12012 June 1990 Advises That Util 900315 Response Adequately Addresses Generic Ltr 89-19, Request for Action Re Resolution of USI A-47 'Safety Implication of Control Sys in LWR Nuclear Power Plants' & Provides Sufficient Basis for Closure of Review ML20055G0231990-06-11011 June 1990 Advises That Util 890113,0331,1106 & 900328 Responses to NRC Bulletin 88-010 & Suppl 1, Non-Conforming Molded-Case Circuit Breakers Adequately Addresses Bulletin Requirements ML20248D1111989-09-20020 September 1989 Ack Receipt of 890830 Response to Violations Noted in Insp Repts 50-424/89-19 & 50-425/89-23 ML20248G9731989-09-20020 September 1989 Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu ML20247P4401989-09-18018 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-424/89-20 & 50-425/89-20 IR 05000424/19890221989-09-18018 September 1989 Forwards Insp Repts 50-424/89-22 & 50-425/89-26 on 890708- 0818 & Notice of Violation ML20247M1891989-09-12012 September 1989 Forwards Partially Withheld Insp Repts 50-424/89-23 & 50-425/89-27 on 890731-0803 & Notice of Violation.Notice Withheld (Ref 10CFR2.790(d) & 10CFR73.21) ML20246F4481989-08-23023 August 1989 Forwards Exam Rept 50-424/OL-89-01 of Exams Administered on 890612-15 ML20246H6471989-08-21021 August 1989 Forwards Summary of 890804 Meeting W/Util in Region II Re Efforts to Identify & Correct Root Cause of Recurring Problems.Attendee List & Handouts Encl ML20246A6561989-08-10010 August 1989 Ack Receipt of 890720 Response to Violations Noted in Insp Repts 50-424/89-17 & 50-425/89-19 ML20245J9331989-08-0707 August 1989 Forwards Insp Repts 50-424/89-21 & 50-425/89-25 on 890725- 27.No Violations or Deviations Noted IR 05000424/19890141989-08-0707 August 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-424/89-14 & 50-425/89-15 ML20248C8501989-07-31031 July 1989 Forwards Insp Repts 50-424/89-19 & 50-425/89-23 on 890609-0707 & Notice of Violation ML20248D4861989-07-31031 July 1989 Confirms 890719 Telcon Re 890804 Mgt Meeting in Region II Ofc to Discuss Proposed Actions to Identify & Correct Root Cause for Recurring Violations of Security Requirements,Per 890621 Request.Proposed Meeting Agenda Encl IR 05000424/19880531989-07-27027 July 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-424/88-53.Violation Re Failure to Log Safeguards Event Occurred as Stated in Notice of Violation.Encl Withheld (Ref 10CFR2.790 & 73.21) ML20248D1531989-07-25025 July 1989 Forwards Insp Repts 50-424/89-20 & 50-425/89-24 on 890626-30 & Notice of Violation ML20246Q0591989-07-13013 July 1989 Ack Receipt of Forwarding Detailed Scenario for Plant Emergency Preparedness Exercise Scheduled for 890726. Questions & Comments Will Be Provided at Controller/Evaluator Briefing on 890725 ML20246Q3521989-07-12012 July 1989 Forwards Insp Repts 50-424/89-18 & 50-425/89-21 on 890612-16.No Violations or Deviations Noted ML20246N5621989-07-10010 July 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-424/89-13.Example Two of Violation 50-424/89-13-01 Still Considered Valid ML20246F9801989-07-10010 July 1989 Requests Written Response Re Oglethorpe Power Corp 890524 Allegations Re Georgia Power Co Noncompliance W/Antitrust License Conditions within 30 Days of Ltr Date ML20246C3931989-07-0303 July 1989 Forwards SER Accepting Westinghouse Owners Group Response to Generic Ltr 83-28,Item 4.5.3 Re Intervals for on-line Testing of Reactor Protective Sys ML20246E2571989-06-30030 June 1989 Forwards Insp Repts 50-424/89-15 & 50-425/89-17 on 890522-26.No Violations or Deviations Identified ML20246C0981989-06-23023 June 1989 Forwards Insp Repts 50-424/89-16 & 50-425/89-18 on 890506-0608.Violations Noted 1990-09-05
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20196H8081999-06-28028 June 1999 Discusses 990528 Meeting Re Results of Periodic PPR for Period of Feb 1997 to Jan 1999.List of Attendees Encl ML20207E7421999-06-0303 June 1999 Refers to from NRC Which Issued Personnel Assignment Ltr to Inform of Lm Padovan Assignment as Project Manager for Farley Npp.Reissues Ltr with Effective Date Corrected to 990525 ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20207D9861999-05-28028 May 1999 Informs That,Effective 990325,LM Padovan Was Assigned as Project Manager for Plant,Units 1 & 2 ML20207D2701999-05-19019 May 1999 Forwards Insp Repts 50-424/99-03 & 50-425/99-03 on 990321- 0501.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206M5141999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Rl Emch Section Chief for Vogtle. Reorganization Chart Encl ML20206U4061999-05-11011 May 1999 Confirms Telcon with J Bailey Re Mgt Meeting Scheduled for 990528 to Discuss Results of Periodic Plant Performance Review for Plan Nuclear Facility Fo Period of Feb 1997 - Jan 1999 ML20206A6371999-04-21021 April 1999 Forwards SE Authorizing Licensee Re Rev 9 to First 10-yr ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205Q3351999-04-15015 April 1999 Forwards Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320.Three Violations Identified & Being Treated as Non-Cited Violations ML20205T2351999-04-0909 April 1999 Informs That on 990317,B Brown & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Scheduled for Wk of 991213 for Approx 10 Candidates ML20205K7501999-04-0505 April 1999 Informs That Effective 990329,NRC Project Mgt Responsibility for Plant Has Been Transferred from Dh Jaffe to R Assa ML20205B9601999-03-24024 March 1999 Seventh Partial Response to FOIA Request for Documents. Records in App N Already Available in Pdr.App O Records Being Released in Entirety & App P Records Being Withheld in Part (Ref FOIA Exemptions 7C,2 & 5) ML20205A2771999-03-19019 March 1999 Advises of NRC Planned Insp Effort Resulting from Vogtle PPR on 990208.PPR for Plant Involved Participation of All Technical Divs in Evaluating Insp Results & Safety Performance Info for Period of Dec 1997 - Jan 1999 ML20207L8281999-03-0808 March 1999 Forwards Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 & Notice of Violation ML20207J0431999-03-0303 March 1999 Forwards Insp Repts 50-424/98-10 & 50-425/98-10 on 981227- 990213.No Violations Noted.Licensee Conduct of Activities at Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices ML20203G5691999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Ltr Indicating No Candidates or Ltr Listing Names of Candidates for Exam ML20202H9691999-01-29029 January 1999 Forwards Safety Evaluation Authorizing Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant, Unit 1 ML20199J7931999-01-20020 January 1999 Forwards Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226 at Vogtle Units 1 & 2.No Violations Were Identified.Conduct of Activities at Vogtle Was Generally Characterized by safety-conscious Operations ML20199K1381999-01-12012 January 1999 Informs That on 990117,Region II Implemented Staff Reorganization as Part of agency-wide Streamlining Effort, Due to Staffing Reductions in FY99 Budget.Organization Charts Encl ML20198S1601998-12-31031 December 1998 Forwards SER of Licensee Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Vogtle Electric Generating Plant Submitted on 970529. INEEL/EXT-98-01007 Rept Also Encl ML20199E4741998-12-23023 December 1998 Provides Summary of 981105 Training Managers Conference Held in Atlanta,Georgia.Conference Agenda,List of Conference Attendees,Presentation Slides & Preliminary Schedule for FY99 & FY00 Encl ML20199J9781998-12-22022 December 1998 Responds to 981209 Meeting Re Installation of Seismic Clips on Cutler Hammer Electrical Circuit Breakers.Forwards List of Attendees & Handouts ML20198F6711998-12-11011 December 1998 Forwards Insp Repts 50-424/98-08 & 425/98-08 on 980927-1114. No Violations Identified ML20198N9431998-12-10010 December 1998 Ack Receipt of Response, to NOV Issued on 980112 Re Surveillance Testing of Reactor Trip Sys P-4 Interlock Feature at Licensee Facility.Nrc Agrees That Surveillance Testing Not Required ML20196J2181998-12-0101 December 1998 Advises of Planned Insp Effort Resulting from 981102 Insp Planning Meeting.Historical Listing of Plant Issues Called Plant Issues Matrix & Insp Plan,Including Specific Insps Such as in Security & Radiological Protection Areas Encl ML20196J2581998-12-0101 December 1998 Confirms Arrangements Made Between J Bailey & B Holbrook, Re Info Meeting Scheduled for 990210 to Discuss Licensee Performance,New Initiatives & Other Regulatory Issues Pertaining to Listed Facilities ML20196B1231998-11-23023 November 1998 Confirms Telephone Conversation Between J Bailey & P Skinner on 981120 Re Info Meeting Which Has Been Scheduled for 981209 in Atlanta,Ga,To Discuss Issues Re Seismic Retainer Clips ML20196D4981998-11-13013 November 1998 Informs That on 981007,NRC Administered Gfes of Written Operator Licensing Examination.Copy of Answer Key & Master Bw/Pwr GFE Encl,Even Though Facility Did Not Participate in Exam.Without Encl ML20195B3391998-11-0909 November 1998 Forwards Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21).No Violations Noted.Conduct of Activities Generally Characterized by safety-conscious Operations & Sound Engineering ML20155H2501998-10-21021 October 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-424/98-05 & 50-425/98-05 Issued on 980723.Concluded for Reasons Stated That Example 2 Violation Occurred as Stated in NOV ML20155A7491998-10-15015 October 1998 Forwards Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926 & Nov.Insp Generally Characterized by Safety Conscious Operations,Sound Engineering & Maint Practices & Appropriate Radiological Controls ML20155B7771998-10-0909 October 1998 Extends Invitation to Attend Training Manager Conference on 981105 in Atlanta,Georgia.Conference Designed to Inform Regional Training & Operations Mgt of Issues & Policies That Effect Licensing of Reactor Plant Operators ML20155B4621998-09-25025 September 1998 Discusses OI Investigation Which Completed on 980728. Investigation Reviewed Circumstances Surrounding Apparent Disabling of Fire Computer Trouble Alarm by Unit Shift Supervisor.Concludes Enforcement Discretion Warranted ML20153B0401998-09-17017 September 1998 Responds to 980904 e-mail Message Making Certain Observations Re Apparent Increase in Reactor Trips at Plant, Units 1 & 2.NRC Concluded That Licensee post-trip Reviews Adequately Conducted & That No Adverse Trends,Apparent ML20153B9311998-09-16016 September 1998 Forwards RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations, Responses for Plant,Units 1 & 2 ML20153F7081998-09-11011 September 1998 Provides Summary of 980909 Meeting Held to Discuss TS & Other Regulatory Issues Re Vogtle Electric Generating Plant. List of Meeting Attendees & Copy of Presentation Slides Encl ML20154C4871998-09-10010 September 1998 Forwards Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815 & Nov.One Violation Involved Failure to Implement Adequate C/As for Repeated Failures to Enter Applicable TS Limiting Conditions for Operation ML20151U7901998-09-0909 September 1998 Discusses 980615 Request for Exemption from Requirement of 10CFR73.55(e)(1) & (f)(1) to Provide Continuous Staffing of Plant CAS During Contingency Events.Request Denied ML20151S7291998-09-0202 September 1998 Discusses Evaluation of Util Response to GL 97-05 for Plant, Units 1 & 2.NRC Did Not Identify Any Concerns W/Sg Tube Insp Techniques Employed at Plant ML20239A4251998-08-27027 August 1998 Informs of Change Being Implemented by Region II Re Administrative Processing of Licensee Responses to Nov.Nov Responses Will Be Formally Ack as Part of Periodically Issued Integrated Insp Repts 1999-09-01
[Table view] |
Text
-,
p,; ;v' i:.
September 5, 1990 Georgia Power Company .
, ATTN: Mr. W. G. Hairston, III Senior Vice President Nuclear Operations P. O. Box 1295 Birmingham, AL 35201 .
l Gentlemen:
SUBJECT:
REACTOR OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. Rob Dorman, Superintendent of Operations Training, and Mr. Mike Ernstes,- NRC Region II Operator Licensing Section, arrangements were made for administration of inital licensing examinations at the Vogtle Electric Generating Plant.
The written examinations are scheduled for December 10,1a0. The operating examinations are scheduled for December 10, 1990. Additionaly, retake examinations will be administered to those individuals who failed the last requalification examination.
To meet the above schedule, it will be necessary for the facility to furnish reference material listed in Enclosure 1, " Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations," by October 10, 1990.
Any delay.in receiving approved, properly bound and indexed reference material, or the submittal of inadequate or incomplete reference material may result in the examinations being rescheduled. Mr. Dorman has been advised of our reference material requirements, and the address where each set is to be mailed.
The facility management -is responsible for providing adequate space and accommodations for administration of the written examinations. Enclosure 2, i
" Requirements for Administration of Written Examinations," describes our requirements for conducting these examinations. Mr. Dorman has also been informed of these requirements.
Enclosure 3 contains the Rules and Guidelines that will be in effect during the administr.Aion of the written examinations. The facility management is responsible for ensuring that all applicants are aware of these rules.
The facility staff review of the written examination will be conducted in accordance with requirements specified in Enclosure 4, " Requirements for Facility Review of Written Examinations." Mr. Dorman has been informed of these requirements.
\
9009210136 900905
- 0?0 0 PDR ADOCK 050g4 ; yM
r f,* C: 'O Georgia Power Company 2 September 5, 1990 t
To better document simulator examinations, the Chief Examiner will have the simulator operator record predetermined plant conditions (i.e., plant pressure, temperature, pressurizer level, etc.), for each simulator scenario. The applicant will be responsible for providing this information, with any appeal of a simulator operating examination. Therefore, your training staff should retain the original simulator examination scenario .information until all applicants who took examiaations have passed the operating examination, accepted the denial of their license, or filed an appeal.
P Preliminary reactor operator and senior reactor operator license applications should be submitted at least 30 days before the first examination dates'so that :
we will be able to review the training and experience of the candidates, process 1 i the, medical certifications, and prepare final examiner assignments after appli-cant eligibility has been determined. If the applicants are not received at 1
least 30 days'before the examination dates, it _ is likely that a postponement' :
will be necessary. Final signed applications certifying that all training ~has been completed shall be subn tted at least 14 days _ before the first examination date. '
This request. is covered by Of fice of Management and Budget Clearance Number -!
3150-0101 which expires May 31, 1992. The estimated average burden is 7.7 !
hours per response, including gathering, xeroxing and mailing the . required ,
material. Send comments regarding this burden estimate or any other aspect of '
this collection of information, including suggestions for reducing = this burden, .to the Information and Records Management Branch, Division of Information Support Services, Office of Information Resources Management,, U. S. Nuclear' '
Regulatory Commission, Washington D. C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Management and Budget, Washington, D. C. 20503.
Thank you for your consideration in this matter. If you have any questions i 4-regarding the examination procedures and requirements, please contact ,
Mr. John F. Munro, Chief, Operator Licensing Section 1, at 404/331-5544.
Sincerely, (0RIGINAL SIGNED BY T. A. PEEBLES) i Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety Enclosures-
- 1. Reference Material Requirements for Reactor / Senior Reactor Operator Ucensing Examinations
- 2. Requirements for Administration of Written Examinations
- 3. Procedures for the Administration of Written Examinations
- 4. Requirements for Facility Review of Written Examinations i
cc w/encis:
K. Holmes, Training and Emergency Prepardness Manager !
B. Bockhold, Jr. , Plant Manager State of Georgia >
c
9 g
.}. l ti ;;. g'
. l' e <, '. l f.y,; &. .,' '.i ' '
~
g ,
i-
..a l I
- f a .GeorgiatPowe,r Company- l 3 September 5. 1990- !
3 , . e 3 . -
o bec w/encis- .]
T Reed, Project Manager, NRR' . Ei E, Merschoff, DRS . .
n K. Brockman,;Section Chief, DRP' '
.' . M. Ernstes, OL. Examiner, DRSL '
i pDocumentControlDesk-enior Resident' Inspector.- Vogtle:
i u :,
- )
.i
'i
- ' J p .j 3
~
, i',
r 1
,:, ,q q
if
,- j l
.n 4 ,
s
-i
,t m :;
-]
i
' ';l .
n N r i d
t .!
o< j I
.. , g RII:DRS' R I:DRS RII:DR q1)g .
sy .,'l
". .MErnstes Munro - TP,4e es .,
09/ov/90 ,09/y/90 09/f/90 Li h
r a,
L,.x .
p ENCLOSURE I REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS
- 1. Existing learning objectives, Job Performance Measures (JPMs) and lesson
, plans (including training manuals, plant orientation manual, system
-descriptions, reactor theory, thermodynamics, etc.).
A copy of the facility Job and Task Analysis (JTA), specifying the knowledges and abilities required of an operator at the facility. Each particular kr.owledge and/or ability will include an importance rating correlating it to ensuring the health and the safety of the public. If a JTA is not furnished, the Knowledges and Abilities Catalog for Nuclear Power Plant Operators, NUREG 1122 will be used to establish content validity for the examination.
All JPMs used to ascertain the competence of the operators in pehforming tasks within the control room complex and, as identified in the facility JTAs, outside of the control room, i.e., local operations.
Training materials shall include all substantive written material used for preparing applicants for initial R0 and SRO licensing. The writtt.n material shall include learning objsetives .and the details presented during. lectures, rather than outlines. Training materials shall be #
identified by plant and unit, bound, and indexed. FAILURE TO PROVIDE COMPLETE, PROPERLY BOUND AND INDEXED PLANT _ REFERENCE MATERIAL MAY RESULT IN THE RETURN OF THE MATERIAL TO THE PERSON WHO IS THE HIGHEST LEVEL OF CORPORATE MANAGEMENT WHO IS RESPONSIBLE FOR PLANT OPERATIONS (E.G., VICE PRESIDENT OF NUCLEAR OPERATIONS). ACCOMPANYING THE MATERIAL WILL BE A COVER LETTER EXPLAINING THE DEFICIENCIES IN THE REFERENCE MATERIAL AND THE - FACT THAT THIS WAS THE REASON THE EXAMINATIONS WERE CANCELLED OR POSTPONED. Training materials which include the following shall be -
provided:
System descriptions including descriptions of all operationally relevant flow . paths, components, controls and instrumentation.
System training material should draw parallels to the actual procedures used for operating the applicable system.
Complete and operationally useful descriptions of all safety-system interactions and, where available, BOP system interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.
Training material used to clarify and strengthen understanding of emergency operating procedures.
m .
i
,e, . - j L
~
Enclosure 2 !.
I,
- 2. Complete Procedure Index (alphabetical by subject).
p
- 3. All administrative procedures (as applicable to reactor operation. or l safety). .
]
- 4. All integrated plant procedures (normal or general operating
!' procedures).
- 5. Emergency procedures (emergency instructions, abnormal or special l
procedures).
- 6. Standing orders (important orders that are safety-related and may supersede the regular procedures). 1 7.- Fuel-handling and core-loading procedures. !'
1 -
- 8. Annunciator procedures (alarm procedures), including set points.- ,
=9. Radiation protection manual (radiation control manual or procedures),, !
- 10. Emergency plan implementing procedures.
- 11. Technical Specifications.. ;l
- 12. . System operating procedures.
- 13. Piping and instrumentation diagrams, electrical single-line diagrams, or ,
flow diagrams. )
-14. Technical Data Book, and/or- plant curve information as' used by operators ;
and facility precautions, limitations, and set points (DLS) for the'
)
facility. ,
a
- 15. Questions and answers that the facility licensee has prepared and which i may be used in the written or operating examinations. .
16, The following-on the plant reference simulation facility:
1 1
- a. List of all readily available initialization points.
- b. List of all preset malfunctions with a clear identification' number..
The list should include cause and effect information, Specifically,
- for each malfunction, a concise description of the expected result, or range of results, that will occur upon implementation should be,.
provided. Additionally, an indication of which annunciators are te be initially expected should be given. ;
- c. A description of simulator capabilities for valves, breakers, indicators, and alarms. 7 F
- ~ . - . -.
p
=
,* . . s Enclosure 3- 3 '
3
- d. Where the capability exists, an explanation of the ability. to vary the severity of a particular malfunction should be provioed, i.e.,
ability to vary the size of a given LOCA or stew leak, or the ;
ability to cause a slow failure of a component such as a feed pump, l turbine generatar or major valve (e.g., drif ting shut of a main feedwater control valve),
- e. An identification of modeling conditions / problems that .may' impact l the examination, i
- f. Identification of any known Performance Test Failures not yet l completed,
- g. Identification of significant differences between the simulator and
-the reference plant's control room,
- h. Copies of facility generated scenarios that expose the candidates to situations of degraded pressure control (PWR), degraded heat removal :
capabil_ity (PWR and BWR), and containment challenges (BWR) shall be , l provided.
- 1. Simulator instructors manual.
J. Description of the scenarios used for the training class (voluntary l by licensee).
- 17. Surveillance procedures (procedures that are frequently run, i.e., weekly or daily).
l
- 18. Additional material required by the examiners to develop examinations that meet the requirements of these standards and the regulations.. -
The above reference material should be approved, final = issues and'should be so ?
marked. If a plant has not finalized some of the material, the Chief Examince shall verify with the facility that the most complete, up-to-date material is :
available and that agreement has been reached with the licensee for limiting i changes before the administration of the examination. All procedures and reference material should be bound with appropriate indexes or tables of ;
contents so that they can- be used efficiently. Failure to provide complete, ,
properly' bound and indexed plant reference material will result in the [
material being returned and could result in cancellation or rescheduling of ?
the examinations.
i I
L
.j
r.
p4 , ,. .s-L i ENCLOSURE 2 REQUIREMENTS FOR ADMINISTRATION OF WRITTEN EXAMINATIONS 1'
[L 1. A single room shall be provided for completing the written examination.
L The location of this room and supporting restroom facilities shall be such as to prevent contact with all other f acility and/or contractor- ,
[E personnel during the duration of the written examination. If necessary, !
} the facility should make arrangements for the use of a suitable room at a ;
L local school, motel, or other building. Obtaining this room is the responsibility of the licensee.
l ,
, 2. Minimuu spacing is required to ensure examination integrity as determined !
by the Chief Examiner. Minimum spacing should be one candidate per ;
table, with a 3-foot space between tables.
- 3. Suitable arrangements shall be made by the facility if the candidates are.
to have lunch, coffee, or other refreshments. These arrangements shall ;
comply with Item 1 above. These arrangements shall be reviewed by the !
examiner and/or proctor. ,
t
, 4. The facility staff shall be provided a copy of the written examination .
L and answer key after the last candidate has' completed and handed in his ;
written examination. The facility staf f shall then have five working days to provide formal written comments- with supporting documentation on ;
the examination and answer key to the Chief Examiner or to the Regional ;
Office Section Chief. ;
i S. The facility licensee shall provide pads of 8-1/2 by.11 inch lined paper _;
in unopened packages for each candidate's use examination. The. examiner: r shall distribute these _ pads to the candidates. All reference material i
needed to complete the examination shall be furnished by the examiner'.
Candidates can bring only pens, pencils, or calculators into the examination room.
-l
- 6. Only- black ink or dark pencils should be used for writing answers to questions. '
f n,. ' ' , 7. No other equipment or reference material shall be allowed unless provided by the examiner.
3 J i
i t
D
f -
'I
.] a
'l ,
.e ENCLOSURE 3 {
PROCEDURES FOR THE ADMINISTRATION OF WRITTEN EXAMINATIONS !
F
- 1. Check identification badges.
2 .- Pass out examinations and all handouts. Remind applicants not to review examination until instructed to do so.
READ THE FOLLOWING INSTRUCTIONS VERBATIM:
During.the administration of this examination the following rules. apply:
- 1. Cheating on the examination means an automatic denial of your application _;
and could result in more severe penalties. j t
- 2. Af ter the examination has been completed, you must sign the statement on i the' cover sheet indicating that the work is your own and^you have not ;
received or given assistance in coinpleting the examination. This must be }
done after you complete the examination. '
. READ THE FOLLOWING INSTRUCTIONS i
Restroom trips are to be limited and only one applicant at a time may
~
1.
leave. You must' avoid-all_ contacts with anyone outside the examination >
room to avoid even the appearance or possibility of cheating. .
- 2. Use black ink or dark pencil only to facilitate legible reproductions. ,
- 3. Print-your name in the blank provided in the upper right-hand corner of j the examination cover sheet. ;
- 4. Mark your answers on the answer sheet provided. USE ONLY. THE ' PAPER PROVIDED AND 00 NOT WRITE ON THE BACK SIDE OF THE PAGE.
E '
- 5. Print your name .in the. upper right hand corner of each of your answer sheets.
q
c '
L ,
s,-. ..
o i I
? Enclosure 3 2 i' ,
e -- .[
- 6. -Before you turn in your examination, number $ach answer sheet including f any additional pages inserted when writing your answers.
l 7. Use abbreviations only if they are commonly used'in facility literaturr .;
Avoid using symbols such as S or 5 signs to avoid a simple transpositior, error.resulting in an incorrect answer. .;
7
- 8. The poins value for each question is indicated in parentheses after the r question. .
L 9.. Show all calculation. methods, or assumptions used to obtain an answer, f
-I
- 10. Partial credit 'may be given. Therefore, ANSWER ALL PARTS OF THE QUESTION ;
7 AND 00 NOT LEAVE ANY ANSWER BLANK. There is no partial credit for' l 6 multiple choice questions. ,
e b-a 11. Proportional grading will be applied. Any wrong information . that is .. :
provided will count against you. For example, if a question is worth-one- !
point and asks'for four responses,.each of which is worth 0.25 points, and- )
you give five responses, each of your responses will be worth 0.20 points. !
If one of your five responses is incorrect, 0.20 will be deducted and your. ;
total'eredit for that question will be 0.80 instead of 1.00 even though ;
you have four correct answers. i
- 12. If ' the intent of a question is unclear, ask questions of the examiner I only, i
- 13. When turning in your examination, assemble the completed examination with examination questions, examination aids, and answer sheets. In addition, a l
turn in all scrap - paper. Ensure all information you wish to have evaluated as part of your' answer is on your answer sheet. Scrap paper j
will be discarded without review.
.i
- 14. To pais the examination, you must achieve an 'overall grade-of at least 80~ percent.
_i
- 15. . There is a time limit of 4-1/2 hours for completion of the examination.
- 16. When you are done and have turned in your examination, leave ' the examination area If you are found in this area while the examination < is' '
still in progress, your license may be denied or revoked.
?
[- >
I
(< j , f .
l-p .
ENCLOSURE 4 t
REQUIREMENTS FOR F/sCILITY REVIEW OF WRITTEN EXAMINATIONS
- 1. At the option of the Chief Examiner, the facility may review the written examination up to two weeks prior to its administration. This review may take place at the facility or_in the Regional office. The Chief Examiner-l will coordinate the details of the review whh the facility. An NRC~
examiner will always be-present during the revi w.
F '
Whenever .this option of examination review is utilized, the facility reviewers will sign the following statement prior to being' allowed access to the examination. The examination or written notes will not by L retained by the facility.
- a. Pre-Examination Security Agreement I agree that I will not knowingly divulge any information concerning the replacement (or initial) examination scheduled for- to any unauthorized persons. I understand that I am not to participate in any instruction involving those reactor operator or senior reactor operator applicants scheduled to be admd .istered the above replacement (or initial) examination-from now until-after the examination has been administered. I understand that violation. of this security agreement could result in the examination being voided.
Signature /Date In addition, the facility staff _ reviewers will sign the following statement af ter the written examination has been administered.
b '. Post-Examination Security Agreement I did not, to the best of my knowledge, divulge any. information' concerning. the written examination administered _on' to any unauthorized persons. I
- did not participate in providing any instruction to those . reactor operater and senior reactor operatee applicants who wert.
administered the examination from the t ime that I was allowed access to the examination.
Signature /Date
k 3).A b ,
L Enclosure.4 2 g 2. Regardless of whether the above examination review option is exercised, immediately following the administration of the written examination the
. facility staff shall be provided a marked up copy of the examination and the answer key. The' copy of the written examination shall include pen and ink changes made to questions during the examination administration.
'If the facility did not review the examination prior to its administra-t, tion, they will have five (5) working days from the day of the written examination to submit formal comments. If the facility reviewed the examination prior to its administration, any additional comments must be given to the Chief Examiner prior to leaving the site at the end of the week of the written examination administration. In either case, the comments will be addressed to the responsible Regional Office by the
, highest level of corporate management for plant operations, e.g. , Vice President for . Nuclear Operations.- A copy of the submittal will be forwarded to the Chief Examiner, as appropriate. Comments not submitted within the required time frame will be considered for inclusion in the grading process' on a case-by-case basis by the Regional Office Section Chief. . Should the comment submittal deadline not be met, a long delay in grading the exRminations may occur.
- 3. The following format should be adhered to for submittal of specific comments:
- a. Listing of NRC Question, answer and reference,
- b. Facility comment / recommendation.
- c. Reference (to support facility comment).
NOTES: 1. No change to the examination will be'made without submittal of a reference to support the facility comment. Any supporting documentation that was not previously supplied, should be-provided.
- 2. Comments made witSout a concise facility recomnendation will not be addressed.
- 4. A two-hour post examination review may be held at the discretion of the Chief Examiner. If this review is held, the facility staff shculd be informed that only written comments that are properly supported will be considered in the grading of the examination, e