A J. Bernie Beesley, Jr., P.E.
Southern Nuclear Vice President Operating Company. lac.
Vogtle Project.
40 invemess Center Parkway P0. Box 1295 Birmingham. Alabama 35201.
Tel 205992.7110 Fax ?05.992.0403 SOUTHERN COMPANY Energy to Serve hur World" April 29, 1999 LCV-1328 Docket Nos. 50-424
]
50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 VOGTLE ELECTRIC GENERATING PLANT 1998 ANNUAL REPORT Gentlemen:
f In accordance with the applicable regulatory requirements, Southem Nuclear Operating Company (SNC) hereby submits the 1998 Annual Report of operating information.
The remainder of the 1998 reports not previously submitted are included.
Sincerely, b4 f
easley,,.r.
JBB/JLL
Enclosure:
1998 Annual Report of g., 4 (', Y...
- 3
~
9905040177 990429 PDR ADOCK OSOOO424i R
PMJ Ls
r:
I a-U. S. Nuclear Regulatory Commission Page 2 xc: Southern Nuclear Operating Company Mr. J. T. Gasser Mr. M. Sheibani SNC Document Management Georgia Power Company Mr. M. C. Nichols j
U. S. Nuclear Regu' latory Commission Mr. L. A. Reyes, Regional Administrator
{
Mr. R. R. Assa, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle State of Georgia
- Mr. J. L. Setser, DNR American Nuclear Insurers Mr. R. Oliveira
I:
VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 AND 2 NRC DOCKET NOS. 50-424 AND 50-425 FACILITY OPERATING LICENSE NOS. NPF-68 AND NPF-81 1998 ANNUAL REPORT TABLE OF CONTENTS I.
INTRODUCTION II.
ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT III.
ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT 1
i f
d
I VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 1998 ANNUAL REPORT INTRODUCTION The Vogtle Electric Generating Plant Units 1 and 2 are powered by pressurized water reactors, each rated at 3565 megawatts thermal. It is located on the Savannah River in Burke County Georgia, at a site 34 miles southeast of Augusta.
l The Unit 1 operating license was initially received on January 16,1987 and conunercial operation started on May 31,1987. Unit 1 is in its eighth fuel cycle.
I Unit 2 received its initial operating license on February 9,1989, and began commercial operation on May 19,1989. Unit 2 is operating in its seventh fuel cycle.
W 1
II VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 AND 2 1998 ANNUAL REPORT ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT l