August 2, 1999 Southern Nuclear Operating Company, Inc.
ATTN: Mr. J. B. Beasley, Jr., Vice President P. O. Box 1295 Birmingham, AL 35201-1295
SUBJECT:
REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION VOGTLE ELECTRIC GENERATING PLANT
Dear Mr. Beasley:
In a telephone conversation on July 27,1999, between Mr. Richard S. Baldwin, Senior License Examiner and Mr. Robert Brown, Manager of Training and Emergency Preparedness,
arrangements were made for the administration of licensing examinations at Vogtle Electric Generating Plant during the week of December 13,1999.
As agreed during the telephone conversation the NRC will prepare the examinations based on the guidelines in Revision 8 of NUREG-1021," Operator Licensing Examination Standards for Power Reactors. Your staff will be given the opportunity to review the examinations during the week of November 29,1999.
To meet the above schedule, your staff furnished the reference materials identified in of ES-201 on June 1,1999.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has g
been completed should be submitted at least 14 days before the first examination date.
(
9908110024 990802 k
~'
PDR ADOCK 05000424 V
p SNC 2
o This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Menagement and Budget, approval number 3150-0101, which expires on September 30,2000.
The public reporting burden for this collection of information is estimated to average [500] ((50))
hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the l
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC. GOV; and to the l
Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of j
Management and Budget, Washington, DC 20503.
I The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control ~ number.
Thank you for your cooperation in this matter. Mr. R. Brown has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's i
examination procedures and guidelines, please contact Richard Baldwin at 404-562-4642, or me at 404-562-4638.
l' Sincerely, (Orginal signed by H. O. Christensen)
Harold O. Christensen, Chief Operator Licensing and j
Human Performance Branch l
Division of Reactor Safety Docket Nos. 50-424, 50-425 License Nos. NPF-68, NPF-81 i
l cc:
J. D. Woodard Executive Vice President I
Southern Nuclear Operating Company, Inc.
P. O. Box 1295 i
l Birmingham, AL 35201-1295 J. T. Gasser
(
General Manager, Plant Vogtle l
Southem Nuclear Operating Company, Inc.
P. O. Box 1600 Waynesboro, GA 30830
)
cc cont'd: (See page 3 l
l
l SNC 3
cc con't:
Charles A. Patrizia, Esq.
J. A. Bailey Paul, Hastings, Janofsky & Walker Manager-Licensing 10th Floor Southern Nuclear Operating Co., Inc.
1299 Pennsylvania Avenue P. O. Box 1295 Washington, D. C. 20004-9500 Birmingham, AL 35201-1295 Arthur H. Domby, Esq.
Director, Consumers' Utility Counsel Troutman Sanders l
Division NationsBank Plaza Governor's Office of Consumer Affairs 600 Peachtree Street, NE, Suite 5200 2 M. L. King, Jr. Drive Atlanta, GA 30308-2216 Plaza Level East; Suite 356 Atlanta, GA 30334-4600 Senior Engineer - Power Supply Municipal Electric Authority Office of Planning and Budget of Georgia l
Room 615B 1470 Riveredge Parkway NW 270 Washington Street, SW Atlar,ta, GA 30328-4684 Atlanta, GA 30334 Bob Brown, Plant Training &
Office of the County Commissioner Emergency Preparedness Manager Burke County Commission Vogtle Electric Generating Plant Waynesboro, GA 30830 P. O.13ox 1600 Waynesboro, GA 30830 l
Director, Department of Natural i
Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Manager, Radioactive Materials Program Department of Natural Resources 4244 International Parkway Suite 114 Atlanta, GA 30354 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 Program Manager Fossil & Nuclear Operations l
Oglethorpe Power Corporation l
2100 E. Exchange Place Tucker, GA 30085-1349 Distribution: (See page 4) f l
I I
SNC 4
Distribution:
L. Plisco, Ril -
P. Skinner, Ril-R. Assa, NRR M. Ernstes, Ril '
PUBLIC NRC Senior Resident inspector U.S. Nuclear Regulatory Commission 8805 River Road Waynesboro, GA 30830
- For Previous concurrence see attached page OFFICE R1l:DRS RII:DRS R!l:DRP
$!GNATURE NAME R8eldwin Hchristensen PSkinner DATE Sk
/99 8/m
/99 8/
/99 8/
/99 8/
/99 8/
/99 8/
/99
=a (vss) un krt/
mo yrs fud yrs un vrs no yrs no yrs no 0FFICIAL RECORD COPY DOCUMENT NAME: G \\LA\\V0G\\120DAYLTR.wpd l
l
SNC-4 Distribution:
' L. Plisco, Ril P. Skinner, Ril
_ pg.
&-dsffe, NRR
'i M. Ernstes, Ril PUBLIC NRC Senior Resident inspector U.S. Nuclear Regulatory Commission i
8805 River Road Waynesboro, GA 30830 l
l l
l 1
I i
l nlb OFFICE Ril:DRs Ril;DRs j Ril:D5Wl T
slONATURE
/M iM
{%
l NARIE R8aldwin H66ristensen Pskinnier DATE 7/ja199 A6/99
@ll//pt.
7/ 199 7/ 199 71 199 71 199 OOPY?
[YEd NO
/YER/
NO YIS /bo)
YES NO YES NO YES NO YES NO OFML RECORD WY DOCURRENT k#EI: G:\\LAWOG\\120DAYLTR.wpd
)