Forwards Insp Repts 50-424/90-26 & 50-425/90-26 on 901009-12.Noncited Violation Noted
ML20058F035
Person / Time
Site: Vogtle  
Issue date: 10/19/1990
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20058F040 List:
References
NUDOCS 9011080064
Download: ML20058F035 (3)


See also: IR 05000424/1990026

Text

\\

o

u

o

1

i

. ' '

<-

.

October 19, 1990

Docket Nos. 50-424, 50-425

License Nos. NPF-68, NPF-81

Georgia Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

j

P. O. Box 1295

Birmingham, AL 35201

Gentlemen:

' SUBJECT: NRC INSPECTION REPORT NOS. 50-424/90-26 AND 50-425/90-26

This refers to the inspection conducted by R. W. Newsome of this office on

October 9-12, 1990.

The inspection included a review of activities authorized

for your Vogtle facility.

At the conclusion of the inspection, the findings

were discussed with those members of your staff identified in the report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The enclosed Inspection Report identifies activities that appeared to violate

NRC requirements that are not cited; therefore, a response is not required.

'

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosure will be placed in the NRC Public Document Room.

!

Should you have any questions concerning this letter, please contact us.

-

Sincerely.

Original signed by

Jerome J. Blake

i

3

Caudie A. Julian, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

See page 2

r

.. a

9011000064 901019

i

PDR

ADOCK 05000424

\\

G

PNU

g,

)

--

E ,.

.-

. l--

,'-

_,

1 Georgia Power Company

2

October 19, 1990

Enclosure:

N_RC Inspection Report

cc w/ encl:-

R. P. Mcdonald

Executive Vice President-Nuclear

Operations-.

<

Georgia Power Company

l'

P. O. Box 1295

Birmingham, AL 35201-

C. K. McCoy

_

j

Vice President-Nuclear

Georgia Power Company

P. 0.--1295

'

B.irmingham, AL 35201

G. Bockhold, Jr.

l

General _ Manager, Nuclear Operations

l

Georgia Power Company-

-1

P. O. 1600

i

Waynesboro, GA '30830

]

.

J.'A.. Bailey-

Manager-Licensing-

Georgia Power Company

P.40 ~ Box 1295

'

l

-Birmingham, AL 35201

1

1

D. Kirkland, III, Counsel

{

Office of.the Consumer's

'l

Utility Council

.

i

Suite'225,'32 Peachtree Street, NE

<

-

Atlanta,.GA--30302'

4

Office of Planning and Budget

-Room 615B

.

1

'270 Washington: Street, SW

!

-

Atlanta, GA 30334l

!

Office of the County Commissioner

l

Burke Cour.ty Commission

Waynesboro,: GA: . 30830

j

i

Lonice Barrett, Commissioner

i

Department of. Natural Resources

{

205 Butler Street, =SE, Suite 1252

'

Atlanta,:GA 30334

(cc_w/ encl cont'd --See page 3)

!

'l

,

,

. , _

g ;.

a.n

$!k

.l

.

..

%,

1

?!f -.

j

October 19, 1990

h

Georgia Power Company

3

l

l

(ccw/ encl-cont'd)-

i

- Thomas Hill. Manager-

-!

Radioactive Materials Program

j

- Department-of Natural Resources

1

878 Peachtree St., NE., Room 600-

-l

6.

Atlanta, GA 30309.

j

a

,

'

. Attorney General

l

-

Law Department 1

132 Judicial Building

Atlanta .GA' 30334

j

-

c

.

'

State of Georgia

,

1

..

bec w/ enc 1:

-

S. Sparks',-RII

D. Hood,=.NRR

Kc Brockman, RII

A. Herdt, RII

. Document / Control' Desk-

'

NRC Resident Inspector

a

,

V

'- U.S. Nuclear Regulatory Coninission

1

' P.-'0. Box 572

,

Waynesboro, GA.~30830

'

-

n:w

I

9

(-p

qc

i

,

<

2'.

._

-

4

'b;

I

,

a

t

y

I

I

.

,if

I

L

i

. RII DRS

I

DRS.

DR

'

'

' R wsome:tj

ake

KBrockdn

10/ r1/90

/g1/90 -

10/16/90

1-

4,

NI-

.I