October 19, 1990
Docket Nos. 50-424, 50-425
Georgia Power Company
ATTN: Mr. W. G. Hairston, III
Senior Vice President -
Nuclear Operations
j
P. O. Box 1295
Birmingham, AL 35201
Gentlemen:
' SUBJECT: NRC INSPECTION REPORT NOS. 50-424/90-26 AND 50-425/90-26
This refers to the inspection conducted by R. W. Newsome of this office on
October 9-12, 1990.
The inspection included a review of activities authorized
for your Vogtle facility.
At the conclusion of the inspection, the findings
were discussed with those members of your staff identified in the report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The enclosed Inspection Report identifies activities that appeared to violate
NRC requirements that are not cited; therefore, a response is not required.
'
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosure will be placed in the NRC Public Document Room.
!
Should you have any questions concerning this letter, please contact us.
-
Sincerely.
Original signed by
Jerome J. Blake
i
3
Caudie A. Julian, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
See page 2
- r
.. a
9011000064 901019
i
ADOCK 05000424
\\
G
PNU
g,
)
--
E ,.
.-
. l--
,'-
_,
1 Georgia Power Company
2
October 19, 1990
Enclosure:
N_RC Inspection Report
cc w/ encl:-
R. P. Mcdonald
Executive Vice President-Nuclear
Operations-.
<
Georgia Power Company
l'
P. O. Box 1295
Birmingham, AL 35201-
C. K. McCoy
_
j
Vice President-Nuclear
Georgia Power Company
P. 0.--1295
'
B.irmingham, AL 35201
G. Bockhold, Jr.
l
General _ Manager, Nuclear Operations
l
- Georgia Power Company-
-1
P. O. 1600
i
Waynesboro, GA '30830
]
.
J.'A.. Bailey-
Manager-Licensing-
Georgia Power Company
P.40 ~ Box 1295
'
l
-Birmingham, AL 35201
1
1
D. Kirkland, III, Counsel
{
Office of.the Consumer's
'l
Utility Council
.
i
Suite'225,'32 Peachtree Street, NE
<
-
Atlanta,.GA--30302'
4
Office of Planning and Budget
-Room 615B
.
1
'270 Washington: Street, SW
!
-
Atlanta, GA 30334l
!
Office of the County Commissioner
l
Burke Cour.ty Commission
Waynesboro,: GA: . 30830
j
i
Lonice Barrett, Commissioner
i
Department of. Natural Resources
{
205 Butler Street, =SE, Suite 1252
'
Atlanta,:GA 30334
(cc_w/ encl cont'd --See page 3)
!
'l
,
,
. , _
g ;.
a.n
$!k
.l
.
..
%,
1
?!f -.
j
October 19, 1990
h
- Georgia Power Company
3
l
l
(ccw/ encl-cont'd)-
i
- Thomas Hill. Manager-
-!
Radioactive Materials Program
j
- Department-of Natural Resources
1
878 Peachtree St., NE., Room 600-
-l
- 6.
Atlanta, GA 30309.
j
a
,
'
. Attorney General
l
-
Law Department 1
132 Judicial Building
Atlanta .GA' 30334
j
-
c
.
'
State of Georgia
,
1
..
bec w/ enc 1:
-
S. Sparks',-RII
D. Hood,=.NRR
Kc Brockman, RII
A. Herdt, RII
. Document / Control' Desk-
'
NRC Resident Inspector
a
,
V
'- U.S. Nuclear Regulatory Coninission
1
' P.-'0. Box 572
,
Waynesboro, GA.~30830
'
-
n:w
I
9
(-p
qc
i
,
<
2'.
._
-
4
'b;
I
,
a
t
y
I
I
.
,if
I
L
i
. RII DRS
I
DRS.
DR
'
'
' R wsome:tj
ake
KBrockdn
10/ r1/90
/g1/90 -
10/16/90
1-
4,
NI-
.I