IR 05000424/1988018
| ML20154R333 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/26/1988 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R GEORGIA POWER CO. |
| Shared Package | |
| ML20154R336 | List: |
| References | |
| NUDOCS 8806070273 | |
| Download: ML20154R333 (2) | |
Text
" -'
..
.
..
MAY 261988
~
"
-
.
Docket Nos. 50-424, 50-425 License Nos. NPF-61, CPPR-109
.
Georgia Power Company ATTN: Mr. R. P. Mcdonald Executive Vice President -
Nuclear Operations P. O. Box 4545 Atlanta, GA 30302 Gentlemen:
SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT NOS. S'
24/88-18AND50-425/88-20)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by W. P. Kleinsorge on April 18-22 and May 2 5, 1988.
The inspection included a review of activities authorized for your Vogtle facility. At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within these areas, the inspection consisted of selective examinations of procedures and representative. records, interviews with personnel, and observation of activities in progress.
The inspection findings indicate that certain activities appeared to violate NRC requirements.
The violation, references to pertinent requirements, and elements to be included in your response are described in the enclosed Notice of Violation.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
8806070273 880526 ADOCK 0500
gDR
.
-
.
.
.
7.'
MAY 261988
.
Georgia Power Company
,
Should you have any questions concerning this letter,'please contact us.
Sincerely, Alan R.' Herdt, Chief I
Engineering Branch Division of Reactor Safety Enclosures:
1.
NRC Inspection Report cc w/encis:
P. D. Rice, Vice President, Project Director C. W. Hayes, Vogtle Qualit,y Assurance Manager G. Bockhold, Jr., General Manager,
Nuclear Operations t
L. Gucwa, Manager, Nuclear Safety and Licensing
J. A. Bailey, Project Licensing
~
Manager
!
B. W. Churchill, Esq., Shaw,
!
Pittman, Potts and Trowbridge D. Kirkland, III, Counsel,
Office of the Consumer's Utility
'
Council D. Feig, Georgians Against Nuclear Energy bec w/encis:
M. Sinkule, RII DRS, Technical Assistant i
NRC Resident Inspector i
Document Control Desk State of Georgia i
i
% ^
/
'/
c[MSinkule kdb
/31ake l
W
- nso e:ser 0F
p5ff/88 05/p/88 l
dih $ l1
-