Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy
ML20210E043
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/15/1999
From: Skinner P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Beasley J
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20210E049 List:
References
50-424-99-04, 50-425-99-04, EA-99-045, NUDOCS 9907280108
Download: ML20210E043 (4)


See also: IR 05000424/1999004

Text

l

1

July 15, 1999

1

'

EA No.99-045

Southern Nuclear Operating Company, Inc.

ATTN: Mr. J. B. Beasley

,

l

- Vice President

!

Vogtle Electric Generating Plant

P. O. Box 1295

Birmingham, AL 35201

SUBJECT:

NRC INTEGRATED INSPECTION REPORT NOS. 60-424/99-04 AND

50-425/99-04

Dear Mr. Beasley:

This refers to the inspection conducted May 2,1999, through June 19,1999, at the Vogtle Units

l'

- 1 and 2 reactor facilities. The enclosed report presents the results of that inspection.

Based on the results of this inspection, the NRC has determined that two violations of NRC

requirements occurred. These violations are being treated as Non-Cited Violations (NCVs),

consistent with Appendix C of the Enforcement Policy. These NCVs are described in the

subject inspection report. If you contest the violations or severity level of the NCVs, you should

provide a response within 30 days of the date of this inspection report, with the basis for your

denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington,

j

DC 20555-0001, with copies to the Regional Administrator, Region 11, and the Director, Office of

'

Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's ' Rules of Practice," a copy of this letter and its

i

enclosures will be placed in the NRC Public Document Room.

I

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by

i

Pierce H.

SkinnerP

Pierce H. Skinner, Chief

l

Reactor Projects Branch 2

l

Division of Reactor Projects

i

Docket Nos. 50-424,50-425

)

License Nos. NPF-68, NPF-81

j

Enclosure: NRC Integrated inspection Report

50-424/99-04 and 50-425/99-04

i

cc w/sncl:(See Page 2)

9907290100 990715

PDR

ADOCK 05000424

0

PDR

~f E OI

j

r

,

l

j

SNC'

2

cc w/ encl:

J. D. Woodard

Executive Vice President

Southem Nuclear Operating Company, Inc.

P. O. Box 1295

Birmingham, AL 35201-1295

J. T. Gasser

l

General Manager, Plant Vogtle

l

Southern Nuclear Operating Company, Inc.

P. O. Box 1600

Waynesboro, GA 30830

J. A. Bailey '

Manager-Licensing

Southern Nuclear Operating Company, Inc.

P. O. Box 1295

Birmingham, AL 35201-1295

Director, Consumers' Utility Counsel Division

Governor's Office of Consumer Affairs

2 M. L. King, Jr. Drive

Plaza Level East; Suite 356

Atlanta, GA 30334-4600

Office of Planning and Budget

Room 615B

270 Washington Street, SW

Atlanta, GA 30334

Office of the County Commissioner

Burke County Commission

Waynesboro, GA 30830

Director, Department of Natural Resources

205 Butler Street, SE, Suite 1252

Atlanta, GA 30334

Manager, Radioactive Materials Program

Department of Natural Resources

4244 International Parkway

Suite 114

Atlanta, GA 30354

cc w/enci cont'd: (See Page 3)

'

l

!

I

J

4

.

SNC

3

cc w/ encl: Continued

Attorney General

Law Department

132 Judicial Building

Atlanta, GA 30334

Program Manager

Fossil & Nuclear Operations

Oglethorpe Power Corporation

2100 E. Exchange Place

Tucker, GA 30085-1349

Charles A. Patrizia, Esq.

Paul, Hastings, Janofsky & Walker

10th Floor

1299 Pennsylvania Avenue

Washington, D. C. 20004-9500

Arthur H. Domby, Esq.

Troutman Sanders

NationsBank Plaza

600 Peachtree Street, NE, Suite 5200

Atlanta, GA 30308-2216

Senior Engineer - Power Supply

Municipal Electric Authority

of Georgia

1470 Riveredge Parkway NW

Atlanta, GA 30328-4684

Distribution w/ encl:

L. Plisco, Ril

P. Skinner, Rll

R. Assa, NRR

PUBLIC

NRC Senior Resident inspector

U.S. Nuclear Regulatory Commission

8805 River Road

Waynesboro, GA 30830

/

,

OFFICE

Ril:DRP

Ril:DRP

Ril:DRP

F fp{,, , A

e

SIGNATURE

/'y

/f J / gy/

NAME

CWReph:dka

JZeller

Ko'Donohue

i qagir$6rge/ /

gf @

DATE.

7/ gg

7/ /99

7/ /99

pg/ly /

y/y/99

7/ /99

7/ /99

COPY?

YEs fNOf

YEs

NO

YEs

NO

VIES / N(7

QfEs)

NO

YEs

No

YEs

No

,

OFFICIAL RETORD COPY

DOCUMENT NAME: G:W(IITLE\\i

vog

' JUL-83-1999 a/d:56

USiRC V0GTLE

1 706 554 9548

P.02

4

SNC

ccw/enci: Continued

Attorney General

Law Department

132 Judicial Building

Atlanta,GA 30334

Program Manager

Fossil & Nuclear Operations

Oglethorpe Power Corporation

2100 E. Exchange Place

Tucker, GA 30085-1349

-

Charles A. Patrizia. Esq.

Paul, Hastings,Janofsky & Walker

10th Floor

l

1299 Pennsyhrania Avenue

Washington, D. C. 20004-950r)

' Arthur H. Domby, Esq.

Troutman Sanders

NationsBank Plaza

600 Peachtree Street, NE, Suite 5200

Atlanta, GA 30308-2216

Senior Engineer- Power Supply

Municipal Electric Authority

of Georgia

1470 Riveredge Parkway NW

Atlanta, GA 30328 4 684

I

Dighibution w/ encl:

L Plisco, Ril

P. Skinner, Ril

R. Assa, NRR

PUBLIC

'

NRC Senior Residentinspector

O.S. Nuclear Regulatory Commission

8805 River Road

Waynesboro,GA 30830

.

~

RN:DRP

M NtP

RR:DRP

Rit:DR5

{J

_

- ^TURE

AQg

.

-

I4ARE

C

.'-dka

q

KO'Donohus

wKleinsorge

DATE

Ti see

Js5ies

rig 3ses

ri ies

71 ies

ri roe

7e ise

YES

No

(YE&i

NO

YES

No

YES

NO

YES

NO

YES

NO

YES

No _

'

(UFi?

DOCUMENT NAME: G:WoGTLE\\itse64vog

oPFICiALREcoRO COPY

TOTAL P.02