ML20155A749
| ML20155A749 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/15/1998 |
| From: | Skinner P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Beasley J SOUTHERN NUCLEAR OPERATING CO. |
| Shared Package | |
| ML20155A753 | List: |
| References | |
| 50-424-98-07, 50-424-98-7, 50-425-98-07, 50-425-98-7, NUDOCS 9810290242 | |
| Download: ML20155A749 (6) | |
See also: IR 05000424/1998007
Text
_ _ _ . . .
. _ . -
_ _ _ _ _ _ _ _ _ ~
,
.
,p s
,l
..,
g
-
_
.
'!
l
October 15, 1998
i
)
,
Southem Nuclear Operating Company, Inc.
)
ATTN: Mr. J. B. Beasley
i
Vice President
Vogtle Electric Generating Plant
P. O. Box 1295
i
Birmingham, AL 35201
SUBJECT:
NRC INTEGRATED INSPECTION REPORT NOS. 50-424/98-07 AND
50-425/98-07 AND NOTICE OF VIOLATION
Dear Mr. Beasley:
This refers to the inspection conducted August 16,1998, through September 26,1998, at the
i
-Vogtle Units 1 and 2 reactor facilities. The enclosed report presents the results of that
,
inspection.
= During the inspection period, your conduct of activities at the Vogtle facility was generally
characterized by safety-conscious operations, sound engineering and maintenance practices,
and appropriate radiological work controls.
Based on the results of this inspection, the NRC has determined that a violation of NRC
requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice) and
_
i
' the circumstances surrounding it are described in detail in the subject inspection report. The
'
- violation is of concern because it was identified by the NRC.
The NRC has. concluded that information regarding the reason for the violation, the corrective
actions taken and planned to correct the violation and prevent recurrence is already adequately
addressed in this inspection report. Therefore, you are not required to respond to this letter
1
unless the description therein does not accurately reflect your corrective actions or your
position. In that case, or if you choose to provide c.dditional information, you should follow the
instructions specified in the enclosed Notice.
During the inspection period, the NRC received a response dated August 16,1998 to Notice of
Violation 50-424,425/98-05-01. We have evaluated your response and found that it meets the
requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions
during future inspections.
m f *-[J
j
n ee, L
-
\\
9810290242 981015
I
ADOCK 05000424
i
G
ZEDI l
.
.
..
.
.- -
-
-
- -
.
. _ _
._m..
_ _ . ~
_ _-._.-. . . _ _
_ . _ _ - . -
.
. _ _ _
. . . _ - . . _ _ ,
_
.
.
J
- *
.
.,
j
.
,
..
1
2
i
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosures, will be placed in the NRC Public Document Room (PDR)._
Sincerely.
(Original signed by
Pierce'H. Skinner)
.
Pierce H. Skinner, Chief
.
Reactor Projects Branch 2
Division of Reactor Projects
,
Docket Nos. 50-424,50-425
)
Enclosures:
1. Notice of Violation .
2. NRC Integrated Inspection Report
50-424/98-07,50-425/98-07
cc w/6ncis:
J. D. Woodard
Executive Vice President
i
Southern Nuclear Operating Company, Inc.
P. O. Box 1295
Birmingham, AL 35201-1295
J. T. Gasser
General Manager, Plant Vogtle
. Southern Nuclear Operating Company, Inc.
P. O. Box 1600
Waynesboro, GA 30830
J. A. Bailey
Manager Licensing
Southern Nuclear Operating Company, Inc.
P. O. Box 1295
Birmingham, AL 35201-1295
Director, Consumers' Utility Counsel Division
Governor's Office of Consumer Affairs
2 M. L. King, Jr. Drive
Piaz,a Lovel East; Suite 356
Atlanta, GA 30334-4600
cc /w/encls cont'd: (See Page 3)
i
_
.-
. .
.
.
. _ .
. _ .
-
- .. . . _ _
_ _ _ _
.
. . . _ . - __
. . _ . _
_ - _ _ . _ _ . . _
..
,
- *
.
,
..
.
SNC'
3
'cc'w/encls: Continued
1
Office of Planning and Budget
Room 6158
270 Washington Street, SW -
. Atlanta, GA: 30334
Office of the County Commissioner
Burke County Commission
Waynesboro, GA 30830 -
Director, Department of Natural Resources
- 205 Butler Street, SE, Suite 1252
Atlanta, GA' 30334
Manager, Radioactive Materials Program
. Department of Natural Resources
4244 International Parkway
Suite 114
Atlanta, GA 30354
Attorney General
~ Law Department
132 Judicial Building
Atlanta, GA 30334
Program Manager
Fossil & Nuclear Operations
Oglethorpe Power Corporation
2100 E. Exchange Place
Tucker, GA 30085-1349
l
Charles A. Patrizia, Esq.
Paul, Hastings, Janofsky & Walker
10th Floor
1299 Pennsylvania Avenue
,
Washington, D. C. 20004-9500
-
Senior Engineer - Power Supply
'
Municipal Electric Authority
of Georgia
1470 Riveredge Parkway NW
Atlanta, GA 30328-4684
,
Distribution w/encis:(See Page 4)
,
i
~
- , _ .
_ _ _
-.
, _ .
. . . , _ .
-
. . _ . _ . .
. ._ ..-
. _ _ _ . _
.
_ . . . . _ . _ .__._
. _ . _ _ . . . . _ . . _ . .. . _ . . . . _ . .
.
-.
.
. ..
.
..:
.
SNC-
4
Disrtibution w/encis:
L. Plisco, Ril-
P. Skinner, Rll
PUBLIC
- NRC Senior Resident inspector -
U.S. Nuclear Regulatory Commission
8805 River Road
Waynesboro, GA 30830
- SEE PREVIOUS CONCURRENCE
vrrsw.
RN:DRP
RN:DRP
RN:DRP
RN:DRP
RN:DRP
RN:DRP
RN:DRS
f
-i
/
/
k$hh
- /
CRepp:dka
JZoHert/
MTWidmengr
KO'Dop*
5Holbrook
.EtTnday
V
WK$orge*
DATE
1W /98
IW /98
IW /98
IW /98
1Wgy/98
10%/98
1W /98
COPY 7
YE5
NO
YE5
NO
YE5
NO
YES
NO
YES
NO
YES
NO
YES
NO
OFFICIAL RECORD COPY
DOCUMENT NAME: G:WOGTLEi9807R1.DRF
.
.
.
.
. -
-_-
.
.
-
.
,
'
.SNC
4
Distribution w/encls:
Continuee
NRC Senior Resident Inspector
U.S. Nuclear Regulatory Commission
8805 River Road
Waynesboro, GA 30830
,
OFFICE
Ril:DRP
Rll:DRP
RII:DRP
Ril:DRP
Ril:DRP
Ril:DRP
Ril:DRSg
-
51GNATIME
g[ g
NAE
CRg:cAta
J2eiler
NTWidmarsi
K0'Donohue
BHothrook
JNLriday
peinsgr9e
DATE
13/
/95
10/
/95
10/
/95
10/
/95
10/
/95
10/
/95
-r i0/ 7 /95
weur
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
OFFICIAL RECORD COPY
DOCUENT NAME: G:\\v0GTLE\\9807R1.DRF
.
- . _ .
.. .. -
. .
. . . . - . . - . . - - . - - . - . - -
..
.OCT-14-1998 11:58
UStRC UDGTLE
1 706 554 9548
P.62
-
,
.
4
7
OFFICE
RII tDIIP
RIItDRP
y tDP
RIIsDEF
RII DEP
Ril:DRP
RII:DRS
sIquiRTunt
N4 g4jgtu
(g g(
{
IWWE
CRapp:A a
WZeld4r
/
MTWy-..
T0'Doriehum
smotbrook
.ukmdsy
WKleinmarNe
l
DATE
10/
/95
10/ 1 i Qf/ if IM
10/ J3 /95
10/
/95
~10/
/ 9 15
10/
/yu
COPY? -
Trs
NU
Ylt
11 0
YE8
11 0
YE5
NO
TES
NO
YE5
NO
YE5
NO
OFFICIAL RECORD COPY
DOCUMENT NAME: C:\\0F FICE\\WPWIN\\WPDOCS\\lll8 PREP \\9807 ti.DRF
1
1
1
9
i
.
f
'
1
l
TOTAL P.02
.