Category:Inservice/Preservice Inspection and Test Report
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Inservice/Preservice Inspection and Test Report"
The following 200 pages are in this category, out of 3,164 total.
(previous page) (next page)1
- 1CAN011602, Amended Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)
- 1CAN021002, Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests
- 1CAN030402, Response to RAI Regarding ANO-1 Steam Generator Tube Inspection Report from 1R17
- 1CAN030601, Unit 1 Inservice Inspection (ISI) Summary Report
- 1CAN030804, Revised Relief Request for 10 Year Update to the 120 Month Inservice Testing Interval, Arkansas Nuclear One, Unit 1
- 1CAN030902, Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21)
- 1CAN030907, Steam Generator Tube Inspection Report - 1R21
- 1CAN031203, Unit 1, Steam Generator Tube Inspection Report - 1R23
- 1CAN031702, Reactor Building Inspection Summary Report - 1R26
- 1CAN031703, Steam Generator Tube Inspection Report - 1R26
- 1CAN031705, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (1R26)
- 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)
- 1CAN041305, Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections
- 1CAN050201, Inservice Inspection (ISI) Summary
- 1CAN050401, Steam Generator C-3 Report for 1R18
- 1CAN051502, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)
- 1CAN061004, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (1R22)
- 1CAN071802, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27)
- 1CAN072102, Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29)
- 1CAN080401, Arkansas, Unit 1 - Once Through Steam Generator Inservice Inspection Report
- 1CAN080403, Unit 1 - Inservice Inspection (ISI) Summary Report
- 1CAN080501, License Amendment Request Response to NRC Request for Additional Information on ANO-1 Once Through Steam Generator Inservice Inspection Report
- 1CAN080701, Inservice Inspection (ISI) Summary Report
- 1CAN081808, Inservice Testing Plan for the Fifth 10-Year Interval
- 1CAN091703, Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval
- 1CAN091802, Snubber Testing Program for Fifth Inservice Test Interval
- 1CAN101301, Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-023
- 1CAN101304, Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)
- 1CAN101306, Unit 1, Steam Generator Tube Inspection Report - 1R24
- 1CAN101802, Submittal of 45th-Year Reactor Building Inspection Report
- 1CAN102104, Steam Generator Tube Inspection Report - 1R29
- 1CAN110702, Inservice Inspection (ISI) Summary Report
- 1CAN111301, Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)
- 1CAN111602, Fifth Ten-Year Interval Inservice Testing Program, Relief Request VRR-ANO1-2017-1
2
- 2CAN010403, (Ano), Unit 2 - Inservice Inspection (ISI) Summary Report
- 2CAN010702, Arkansas, Unit 2 - Inservice Inspection (ISI) Summary Report
- 2CAN011105, Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program
- 2CAN011503, Year Containment Building Tendon Surveillance and Concrete Inspection
- 2CAN011903, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage
- 2CAN021906, Steam Generator Tube Inspection Report
- 2CAN022201, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28)
- 2CAN030502, Inservice Inspection (ISI) Summary Report Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6
- 2CAN030601, Steam Generator Tube Inservice Inspection Report Arkansas Nuclear One - Unit 2
- 2CAN031006, Inservice Testing Plan for the Fourth 10-Year Interval
- 2CAN040301, Annual Report of Steam Generator Tubing In-service Inspections
- 2CAN040501, Unit 2, Steam Generator Plugged Tube Report
- 2CAN051102, Inservice Inspection Summary Report for the Twenty-First Refueling Outage
- 2CAN052202, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) - Revision 1
- 2CAN070501, Inservice Inspection (ISI) Summary Report
- 2CAN070802, Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19)
- 2CAN072001, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27)
- 2CAN081404, Steam Generator Tube Inspection Report - 2R23
- 2CAN081406, Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23)
- 2CAN082103, Unit 2 - Fifth 10-Year Interval Snubber Program Plan
- 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)
- 2CAN091901, Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program
- 2CAN101701, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25)
- 2CAN112005, Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval
- 2CAN120901, Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20)
- 2CAN121204, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22)
- 2CAN122001, Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection
3
- 3F0102-04, 90 Day Inservice Inspection (ISI) Summary Report
- 3F0102-05, Special Report 02-01: Results of the Once Through Steam Generator (OTSG) Tube Inservice Inspection Conducted During Refueling Outage 12
- 3F0104-03, Special Report 04-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 13
- 3F0204-04, 90-Day Inservice Inspection (ISI) Summary Report
- 3F0206-09, 90 Day Inservice Inspection (ISI) Summary Report
- 3F0306-01, Special Report 06-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 14
- 3F0308-01, Transmittal of 90-Day Inservice Inspection (ISI) Summary Report
- 3F0505-12, Revised Response to NRC Request for Additional Information Regarding Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 13
- 3F0508-03, Special Report 08-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refuel Outage 15
- 3F0508-06, Inservice Inspection Program Plan, Ten Year Update Response to Request for Additional Information
- 3F1007-12, Inservice Testing Program, Ten-Year Update
- 3F1009-05, Response to Request for Additional Information on the Third 10-Year Inservice Inspection Interval Requests for Relief 09-001-II, 09-002-II and 09-003-II
- 3F1211-03, Relief Request (RR) 11-001-MX, Revision 0, Containment Surveillance Schedule, Fourth 10-Year Interval of the Inservice Inspection (ISI) Program (Second 10-Year Containment ISI Interval)
A
- AEP-NRC-2008-12, Inservice Inspection Summary Report for Period of 11/14/2006 Through 04/29/2008
- AEP-NRC-2008-41, Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License - Amendment for Submittal of ISI Information and Analyses
- AEP-NRC-2009-51, Inservice Inspection Summary Report, Cycle 18, 2009 Refueling Outage
- AEP-NRC-2010-19, Fourth Ten-Year Interval Inservice Testing Program Relief Request REL-004
- AEP-NRC-2010-56, Submittal of Owner'S Activity Report for Inservice Inspection Activities
- AEP-NRC-2012-63, 2012 Steam Generator Tube Inspection Report
- AEP-NRC-2013-54, Submittal of Form OAR-1, Owner'S Activity Report
- AEP-NRC-2014-13, Form OAR-1 Owner'S Activity Report
- AEP-NRC-2015-01, Steam Generator Tube Inspection Report
- AEP-NRC-2015-06, Form OAR-1, Owner'S Activity Report
- AEP-NRC-2015-65, Form OAR-1, Owner'S Activity Report
- AEP-NRC-2016-35, Fifth 10-Year Interval Pump and Valve Inservice Testing Program
- AEP-NRC-2017-13, Transmittal of 2016 Steam Generator Tube Inspection Report
- AEP-NRC-2018-14, Form OAR-1, Owner'S Activity Report
- AEP-NRC-2018-19, Submittal of 2017 Steam Generator Tube Inspection Report
- AEP-NRC-2018-47, Submittal of Form OAR-1, Owner'S Activity Report
- AEP-NRC-2019-35, Form OAR-1, Owner'S Activity Report
- AEP-NRC-2020-08, Form OAR-1, Owner'S Activity Report
- AEP-NRC-2020-51, CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval
- AEP-NRC-2021-01, Form OAR-1, Owner'S Activity Report
- AEP-NRC-2021-35, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-05
- AEP-NRC-2022-42, Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements
- AEP-NRC-2022-50, Form OAR-1, Owner'S Activity Report
- AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report
B
- BSEP 02-0102, Inservice Inspection Program for Third 10-Year Interval - Evaluation of Leakage at Bolted Connections
- BSEP 03-0137, Inservice Inspection Program for the Third 10-Year Interval-Refueling Outage 15 (B216R1) Owner'S Activity Report
- BSEP 07-0110, BNP-TR-014, Rev. 1, IST Program Plan Fourth Ten-Year Inspection Interval.
- BSEP 08-0062, Inservice Inspection Plan for the Fourth 10-Year Inspection Interval
- BSEP 08-0109, Owner'S Activity Report for Third 10-Year Inservice Inspection Program
- BSEP 08-0140, Proposed Alternative for Reactor Vessel Skirt Support Examinations
- BSEP 09-0024, Proposed Alternative for the Third 10-Year Inservice Inspection Program
- BSEP 09-0043, Submittal of Proposed Alternative for the Third 10-Year Inservice Inspection Program
- BSEP 09-0078, Submittal of Inservice Inspection Program Owner'S Activity Report, Refueling Outage 18
- BSEP 09-0125, Response to Request for Additional Information Regarding Third 10-Year Inservice Inspection Interval Request for Relief RR-46
- BSEP 10-0043, Proposed Alternatives for the Third 10-Year Inservice Inspection Program
- BSEP 10-0091, Inservice Inspection Program Owner'S Activity Report, Refueling Outage 17
- BSEP 11-0011, Response to Request for Additional Information - Proposed Alternatives for the Third 10-Year Inservice Inspection Program
- BSEP 11-0027, Response to Request for Additional Information Regarding Proposed Alternatives for the Third 10-Year Inservice Inspection Program
- BSEP 11-0060, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 19
- BSEP 12-0086, Inservice Inspection Program Owner'S Activity Report for Unit I Refueling Outage 18
- BSEP 13-0089, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 20
- BSEP 15-0051, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 21
- BSEP 16-0037, Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 21
- BSEP 17-0044, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 22
- BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program
- BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan
- BSEP 18-0015, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations
- BSEP-06-0066, Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 15 Owner'S Activity Report
- BSEP-07-0063, Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 17 Owner'S Activity Report
- BVY 03-106, Revision to Vermont Yankee'S 2002 Summary Report for In-service Inspection (NIS-1 Report)
- BVY 04-116, Summary Reports for In-service Inspection and Repairs or Replacements
- BVY 06-013, Summary Reports for In-Service Inspection and Repairs or Replacements
- BVY 06-029, Relief Request ISI-013, Fourth ISI Interval
- BVY 06-072, Response to Request for Additional Information Regarding Relief Request ISI-013, Fourth 10-Year ISI Interval
- BVY 07-061, Summary Reports for Inservice Inspection and Repairs or Replacements
- BVY 07-071, Re-Submittal of Relief Request No. ISI-PT-01, Alternate Testing for Buried Piping Components, Fourth Inservice Inspection (ISI) Interval
- BVY 09-011, 2008 Summary Report Inservice Inspection and Repair or Replacement
- BVY 09-066, 10CFR50.55a(a)(3)(i) Inservice Inspection Program Request VY-ISI-014
- BVY 10-049, Summary Report - Inservice Inspection and Repair and Replacement
- BVY 12-010, Vermont, Submittal of Inservice Inspection, Repair and Replacement for 2011
- BVY 12-086, Inservice Inspection Program Relief Request ISI-PT-02, (Fourth ISI Program Interval)
- BVY 13-008, Inservice Testing Program Plan for the Fifth Ten-Year Interval
- BVY 13-018, Inservice Inspection Program for the Fifth Ten-Year Interval
- BVY 13-071, Supplemental Information Re Inservice Inspection Program for Fifth Ten-year Interval & Relief Request ISI-05
- BVY 13-073, Response to Request for Additional Information Regarding Relief Request ISI-02 - Application of Code Case N-716
- BVY 13-078, Submittal of Snubber Program for the Fifth Ten-Year Inservice Inspection Interval
- BVY 14-063, Relief Request ISI-06 Inservice Inspection Limited Examinations for the Fourth Ten-Year Interval Vermont Yankee Nuclear Power Station
- BVY 14-075, Relief Request ISI-06 Inservice Inspection Limited Examinations for the Fourth Ten-Year Interval - Supplement 1
- BW200095, Inservice Inspection Summary Report
- BW210002, Fourth Ten-Year Interval Inservice Testing Program Plan, Revision 3
- BW210032, Inservice Testing Program Fourth Ten Year Interval July 29, 2018- July 28, 2028
- BW210083, Revision to Unit 1 Inservice Inspection Summary Report
- BW220019, Steam Generator Tube Inspection Report Refueling Outage 22 (A2R22)
- BW230019, Steam Generator Eddy Current Inspection Report Refueling Outage 23 (A1R23) - October 2022
- BYRON 2002-0135, Day Inservice Inspection Report for Interval 2, Period 2, Outage 1 (B2R10)
- BYRON 2002-5008, Steam Generator Inservice Inspection Summary Report
- BYRON 2004-0004, Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (81 R12)
- BYRON 2004-0077, Day Inservice Inspection Report for Interval 2, Period 2, Outage 2 (B2R11)
- BYRON 2005-0073, Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 1
- BYRON 2006-0018, Transmittal of Corrected Page 1 of 1 of the Outage Inspection Summary Containment Structure
- BYRON 2006-0027, Transmittal of Inservice Inspection Program Plan for Third Ten Year Inspection Interval
- BYRON 2007-0006, Inservice Inspection Program Second Interval Relief Requests I2R-21, I2R-22, I2R-23, I2R-25 and I2R-53
- BYRON 2007-0055, B2R13, Spring 2007 Outage, Inservice Inspection Summary Report, for Inspection Activities from October 12, 2005 to May 3, 2007, Section 5.0 (Continued) Form NIS-2: Repairs/Modifications Through End
- BYRON 2007-0056, Steam Generator Inservice Inspection Summary Report for Refueling Outage 13
- BYRON 2008-0063, Steam Generator Inservice Inspection Summary Report for Refueling Outage 15
- BYRON 2008-0067, Day Inservice Inspection Report for Interval 3, Period 1, Outage 2 (B1R15)
- BYRON 2009-0003, Steam Generator Inservice Inspection Summary Report for Refueling Outage 14
- BYRON 2009-0005, Inservice Inspection Report for Interval 3, Period 1, (B2R14), Section 5.0 Through End
- BYRON 2010-0041, Steam Generator - Inservice Inspection Summary Report for Refueling Outage 15
- BYRON 2010-0042, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 2, (B2R15)
- BYRON 2011-0103, Day Inservice Inspection Report for Interval 3, Period 2, (B1R17)
- BYRON 2012-0001, Steam Generator Inservice Inspection Summary Report for Refueling Outage 16
- BYRON 2013-0100, Day Inservice Inspection Report for Interval 3, Period 3, (B2R17)
- BYRON 2014-0078, Day Inservice Inspection Report for Interval 3, Period 3, (B1R19)
- BYRON 2015-0009, 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R18)
- BYRON 2015-0152, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 4, (B1R20)
- BYRON 2016-0011, Steam Generator Tube Inspection Report for Refueling Outage 20
- BYRON 2016-0076, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R19)
- BYRON 2017-0048, Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (BYR21)
- BYRON 2018-0002, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (B2R20)
- BYRON 2018-0027, Steam Generator Tube Inspection Report for Refueling Outage 20
- BYRON 2018-0130, Transmittal of 90-Day Lnservice Inspection Report for Interval 4, Period 1, (B1R22)
- BYRON 2020-0053, Steam Generator Tube Inspection Report for Refueling Outage 23
- BYRON 2021-0001, Day Inservice Inspection Report for Interval 4, Period 2, (B2R22)
- BYRON 2022-0045, Day Inservice Inspection Report for Interval 4, Period 2, (B2R23)
- BYRON 2023-0002, Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements
- BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)
C
- CCN:22-14, Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 3
- CNL-14-073, 151-1 and 13-151-2 Relief Request Interval Applicability Clarification
- CNL-14-139, Request for Alternative ISPT-03
- CNL-14-142, Response to Request for Additional Information Related to Relief Requests Associated with Unit 2 Inservice Testing and Preservice Test Programs (MF4118)
- CNL-15-014, Updated Lnservice Test Program and Relief Requests for Third Ten Year Interval
- CNL-16-135, Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch)
- CNL-17-013, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program, Unit 3 Third Ten Year Interval Request for Relief for 3-ISI-28 and 3-ISI-29
- CNL-17-057, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Inservice Inspection (ISI) Program, Third Ten Year Interval Request for Relief for 17-ISI-1
- CNL-18-080, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program, Unit 1 Second Ten-Year Interval Request for Relief for 1-ISI-28 and 1-ISI-29
- CNL-18-123, Re-Submittal of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program and Augmented Program, Second Ten Year Interval Request for Relief 1-ISI-27
- CNL-19-012, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection Program, Request for Alternative, 18-ISI-1
- CNL-20-019, American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Request for Alternative 0-ISI-47
- CNL-21-076, Request for Alternative, 21-ISI-2, Alternative Inspection for Upper Head Injection J-groove Welds
- CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements
- CNL-23-011, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements
- CNL-23-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47
- CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan
- CNRO-2003-00009, Entergy Operations, Referenced Paper for Request to Use ASME Code Case N-663
- CNRO-2004-00016, Request for Alternative ANO2-R&R-002, Rev. 1 - Use of Mechanical Nozzle Seal Assemblies