MONTHYEAR2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 2CAN052202, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) - Revision 12022-05-31031 May 2022 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) - Revision 1 ML22126A0332022-05-10010 May 2022 Review of the Spring 2021 Steam Generator Tube Inspections During Refueling Outage 1R29 2CAN022201, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28)2022-02-0808 February 2022 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) ML22034A8992022-02-0303 February 2022 Steam Generator Tube Inspection Reports in Support of TSTF-577 1CAN102104, Steam Generator Tube Inspection Report - 1R292021-10-22022 October 2021 Steam Generator Tube Inspection Report - 1R29 2CAN082103, Unit 2 - Fifth 10-Year Interval Snubber Program Plan2021-08-31031 August 2021 Unit 2 - Fifth 10-Year Interval Snubber Program Plan 1CAN072102, Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29)2021-07-19019 July 2021 Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29) 2CAN122001, Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection2020-12-0404 December 2020 Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection 2CAN112005, Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval2020-11-24024 November 2020 Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval 2CAN072001, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27)2020-07-0808 July 2020 Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27) 1CAN012004, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage2020-01-28028 January 2020 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage 2CAN091901, Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program2019-09-0303 September 2019 Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program 2CAN021906, Steam Generator Tube Inspection Report2019-02-28028 February 2019 Steam Generator Tube Inspection Report 2CAN011903, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage2019-01-23023 January 2019 Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage 1CAN101802, Submittal of 45th-Year Reactor Building Inspection Report2018-10-10010 October 2018 Submittal of 45th-Year Reactor Building Inspection Report 1CAN091802, Snubber Testing Program for Fifth Inservice Test Interval2018-09-24024 September 2018 Snubber Testing Program for Fifth Inservice Test Interval 1CAN081808, Inservice Testing Plan for the Fifth 10-Year Interval2018-08-27027 August 2018 Inservice Testing Plan for the Fifth 10-Year Interval 1CAN071802, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27)2018-07-25025 July 2018 Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27) 2CAN101701, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25)2017-10-0606 October 2017 Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25) 1CAN091703, Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval2017-09-21021 September 2017 Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval 1CAN031703, Steam Generator Tube Inspection Report - 1R262017-03-22022 March 2017 Steam Generator Tube Inspection Report - 1R26 1CAN031702, Reactor Building Inspection Summary Report - 1R262017-03-14014 March 2017 Reactor Building Inspection Summary Report - 1R26 1CAN031705, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (1R26)2017-03-14014 March 2017 Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (1R26) 1CAN111602, Fifth Ten-Year Interval Inservice Testing Program, Relief Request VRR-ANO1-2017-12016-11-16016 November 2016 Fifth Ten-Year Interval Inservice Testing Program, Relief Request VRR-ANO1-2017-1 1CAN011602, Amended Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)2016-01-18018 January 2016 Amended Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25) 1CAN051502, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)2015-05-28028 May 2015 Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25) 2CAN011503, Year Containment Building Tendon Surveillance and Concrete Inspection2015-01-16016 January 2015 Year Containment Building Tendon Surveillance and Concrete Inspection 2CAN081406, Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23)2014-08-21021 August 2014 Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23) 2CAN081404, Steam Generator Tube Inspection Report - 2R232014-08-18018 August 2014 Steam Generator Tube Inspection Report - 2R23 1CAN111301, Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)2013-11-0505 November 2013 Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) 1CAN101306, Unit 1, Steam Generator Tube Inspection Report - 1R242013-10-23023 October 2013 Unit 1, Steam Generator Tube Inspection Report - 1R24 1CAN101304, Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)2013-10-21021 October 2013 Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) 1CAN101301, Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-0232013-10-0808 October 2013 Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-023 1CAN041305, Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections2013-04-30030 April 2013 Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections 2CAN121204, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22)2012-12-13013 December 2012 Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22) 1CAN031203, Unit 1, Steam Generator Tube Inspection Report - 1R232012-03-22022 March 2012 Unit 1, Steam Generator Tube Inspection Report - 1R23 2CAN051102, Inservice Inspection Summary Report for the Twenty-First Refueling Outage2011-05-25025 May 2011 Inservice Inspection Summary Report for the Twenty-First Refueling Outage 2CAN011105, Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program2011-01-25025 January 2011 Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program ML1036305792010-12-29029 December 2010 Notification of Inspection (NRC Inspection Report 050-368/2011002) and Request for Information ML1022504182010-07-29029 July 2010 Steam Generator Tube Inspection Report - 1R22 1CAN061004, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (1R22)2010-06-29029 June 2010 Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (1R22) 2CAN031006, Inservice Testing Plan for the Fourth 10-Year Interval2010-03-25025 March 2010 Inservice Testing Plan for the Fourth 10-Year Interval 1CAN021002, Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests2010-02-0909 February 2010 Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests 2CAN120901, Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20)2009-12-0707 December 2009 Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20) 1CAN030907, Steam Generator Tube Inspection Report - 1R212009-03-30030 March 2009 Steam Generator Tube Inspection Report - 1R21 1CAN030902, Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21)2009-03-0404 March 2009 Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21) CNRO-2009-00002, Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval2009-03-0404 March 2009 Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval 2CAN070802, Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19)2008-07-0101 July 2008 Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19) 2023-08-10
[Table view] Category:Letter type:
MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] |
Text
- T~ Entergy Operations, Inc.
En e1448 Oy S.R. 333 UR72802
~Russellville, Tel 501 858 5000 1 CAN030601 March 21, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Inservice Inspection (ISI) Summary Report Arkansas Nuclear One - Unit I Docket No. 50-313 License No. DPR-51
Dear Sir or Madam:
Pursuant to the requirements of 10CFR50.55a, the attached Inservice Inspection (ISI)
Summary Report for ASME Class 1, 2 and 3 pressure retaining components and their supports for Arkansas Nuclear One, Unit 1 (ANO-1) is provided for your information. The resull:s presented by this letter are representative of inspections performed up to and including refueling outage 1R1 9 during the third inspection period of the third ten-year inspection interval. This submittal is provided in accordance with ASME Section Xl and Code Case N-532-1. The attachment provides ASME form OAR-1 "Owner's Activity Report" plus tables that present: (1) an abstract of examinations and tests, (2) conditions requiring evaluation and (3) actions necessary for continued service.
This correspondence contains no commitments. Should you have any questions or comments, please contact Mr. Fred Van Buskirk at (479) 858-3155.
Sincerely, Dale E/James Mang er, Licensing DEJI pv Attachment
' ,4r047
1CAN030601 Page 2 cc: Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Drew Holland Mail Stop 0-7 D1 Washington, DC 20555-0001
Attachment I CAN030601 Owner's Activity Report OAR-1331
FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number OAR-1331 Owner Enteray Arkansas. Inc.1 P.O. Box 551. Little Rock, AR. 72203 (Name and Address of Owner)
Plant - Arkansas Nuclear One/ 1448 S.R. 333. Russellville. AR. 72802 (Name and Address of Plant)
Unit No. I Commercial service date December 19. 1974 Refueling outage no. IR19 (If applicable)
Curren: Inspection interval Third (3rd) Inspection Interval (1st. 2nd, 3rd, 4th, other)
Curren: inspection period Third (3nd) Inspection Period (1st, 2nd, 3rd)
Edition and Addenda of Section Xl applicable to the inspection plan 1992 Edition. Portions of 1993 Addenda for Pressure Testing Date and revision of inspection plan July 26. 2005/ Revision 7: through PCN-1 3 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan Same CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owners Activity Report are correct, and that the examinations, test. repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certificate of Authorization No. N/A Expiration Date N/A (If applicable)
Signed_ ' )&26~/744iL cS 4e.
Manager. Programs & Components . Date 21
/Otwner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arkansas and employed by ABS Group Inc. of Houston, Texas have inspected the items described In this Owner's Activity Report, during the period May 14. 2004 to December 23. 2005, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
_ _ _ _ _ Commissions NB-9985. ARK-1 054 "r' NS" "A" "B" "N"T Inspector's Signature National Board, State, Province, and Endorsements Date I2-2n- ol This form (E001127) may be obtained from the Order Dept., ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300.
Entergy South/ANO-1 2127/2006 TABLE I ABSTRACT OF EXAMINATIONS AND TESTS Interval: 3 Period: 3 E in Total Examinations Total Examinations Total Examinations Total Examinations xaminaon Required for The Third Credited for The Third Credited (%) for The Credited (%) To Date Remarks
. ilniervai relrou hinird Period ior ine T hird intervai B-A 13 0 0% 0%
B-B 6 0 0% 50.00%
B-D 38 0 0% 37.00%
B-F 7 0 0% 43.00%
B-G-1 32 1 4.54% 35.00% Examinations are within the percentages when calculated per bolt B-G-2 25 2 20.00% 68.00 B-J 40 3 18.75% 80.00% RISK Informed ISI is applied B-K 7 1 33.33% 58.00%
B-L-1 0 0 0% 0%
B-L-2 0 0 0% 0%
B-M-1 0 0 0% 0%
B-M-2 1 0 0% 100%
B-N-1 3 0 0% 66.67%
B-N-2 2 0 0% 0%
B-N-3 1 0 0% 0%
B-O 3 0 0% 0%
B-Q 0 0 0% 0%
C-A 8 0 0% 50.00%
C-B 7 0 0% 58.00%
C-C 14 1 16.66% 65.00 C-F-1 93 5 19.23% 65.00%
C-F-2 28 4 36.36% 72.00%
D-A 9 1 25.00% 67.00%
F-A 138 13 29.54% 63.00%
B-P 7 1 50.00% 85.71%
C-H 165 24 43.63% 81.21%
D-B 51 1 5.88% 68.62%
E-A 3 1 50.00% 83.33%
E-D 3 1 100% 100%
E-G 11 3 75.00% 90.90 L-A 57 0 0% 100%
L-B 10 0 0% 100%
Pagel - I
TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Item 1Flaw or Relevant Condition Found During Scheduled Section XI Category Number Item Description Flaw Characterization(IWA-3300) Examination or Test (Yes or No)
F-A F7 40 Pressurizer T-1 support lugs including Configuration Discrepancy Yes
. bolting (CR-ANO-1-2005-1673) (ISI# 05-039)
F-. 11.03Supr HC2-HIIAnchor deformation Yes F-A F1.30B Support HCC-23-H 1 (CR-ANO-1-2005-0140) (ISI# 57-013)
E-C E4. 11 Equipment Hatch C- I Surface Corrosion Yes E-C (CR-ANO-1-2005-2467) (ISI# Al .E4. 11.C- 1-EC-2)
Discolored grease and water from Vertical Corrosion Protection Medium L-B L2.40 Tendons V73, V76, V78, V79 V89, (CR-ANO-1-2005-1330 / 1355) N
___LV85 & V61 4 buttonheads protruding & 3 L-B L2.20 Tendon 311H32 & 31 H1 8 missing buttonheads (respectfully) No (CR-ANO-1-2005-1671)
L-B L2. I 0 Horizontal & Vertical Tendons Tendon Elongation No
_______ _____Horizontal_&_VerticalTendons(CR-ANO-1-2005-2853) No Tendon grease amount exceeded L-B L2.40 Tendon Greasing average with no grease at exit end (CR-ANO-1 -2005-2985) No D-B D2.30 Service Water Piping Evaluate Hydro Pressure Drop D-B D2.30 Service_ WaterPiping_ (CR-ANO-1-2004-2196) No Tendon grease leakage L-B L2.40 Tendon Greasing (CR-ANO-1-2004-2443) Yes
PAGE I of S UNIT 1 INTERVAL 3 PERIOD 3 (For Cycle 19)
TABLE 3 ABS~gTR A CT OF RVD A.1D DoDT A,1_.., NTT (,DD CflDD~CTT"t iV' A STTDVS DVIUTTTnVT'm Vir.
N}nXTTITT TYn'1TT' CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND MAT OR WO NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR
._ _TEST(YES/NO)
T3 Replacement Pump Replaced pump column on P-4A No 11/3/04 Plan # 02-2021, WO 50248105 2 Replacement Support Replaced support member on CCB No 10/11/04 Plan #02-2109, WO 50250096 H012 3 Replacement Valve Replaced B/B fasteners on valve SF-37 No 8/11/04 Plan #02-2213, WO 68991 2 Replacement Valve Replaced Disc on valve CV-1406 No 12/11/05 Plan # 03-2105, WO 50271509 T3 Repair Valve Machined Disc on valve CV-3805 No 12/20/05 Plan # 03-2119, WO 50272146 T3 Replacement Valve Replaced valve SW-2B No 6/29/04 Plan # 04-2065, WO 44955 T3 Replacement Filter Replaced drain plug on filter F-6A No 11/3/04 Plan # 04-2083, WO 44311-03 T3 Replacement Filter Replaced drain plug on filter F-6B No 3/1/05 Plan # 04-2084, WO 44311-02 T3 Replacement Filter Replaced drain plug on filter F-6C No 1/17/05 Plan # 04-2085, WO 44311-01 T3 Repair Pump Weld repair on pump column P-4B No 1/27/05 Plan # 04-2114, WO 39398 T3 Replacement Pipe Removed/Reinstalled HCD-123-2" No 11/10/04 Plan # 04-2127, WO 50248105 piping. N-416-2 T3 Replacement Support Replaced support bearing on HBD-2-H 12 No 4/19/05 Plan # 04-2129, WO 50247275 2 Replacement Valve Replaced Disc on valve CV-1235 No 10/19/05 Plan #05-2001, WO 53195 T3 Repair Pump Weld repair on pump column P-4C No 1/28/05 Plan # 05-2004, WO 58754 T3 Replacement Valve Replaced Disc on valve CV-6034 No 1/18/05 Plan # 05-2007, WO 58700 2 Replacement Valve Replaced valve MU-2 IC. No 6/21/05 Plan # 05-2055, WO 35986 N-416-2 T3 Replacement Cooling Coil Replaced coil VUC-ID & associated No 7/20/05 Plan # 05-2059, WO 50268810 piping. N-416-2 2 Replacement Valve ReplacedDisc on valve CA-61 No 11/3/05 Plan # 05-2062, WO 26124 MC Replacement Hatch Replaced equipment hatch C-I fasteners No 12/19/05 Plan # 05-2075, WO 44165 I Replacement Valve Replaced valve PSV-1002 No 12/20/05 Plan # 05-2078, WO 50983317 2 Replacement Valve Replaced Disc on valve CV-1207 No 11/3/05 Plan #05-2086, WO 63107 2 Replacement Valve Replaced valve PSV-2685 No 12/20/05 Plan # 05-2088, WO 52445
PAGE 2 of 5 UNIT 1 INTERVAL 3 PERIOD 3 (For Cycle 19)
CODE 1REPAIR, ITEM 1DESCRIPTION OF WORK FLAW OR l DATE REPAIR/REPLACEMENT V I CLASS I REPLACEMENT I DESCRIPTION I I RELEVANT COMPLETEI) PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND MAI OR WO NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YES/NO) 2 Replacement Valve Replaced valve PSV-2686 No 12/20/05 Plan # 05-2089, WO 52444 2 Replacement Valve Replaced valve PSV-2688 No 12/20/05 Plan # 05-2090, WO 52443 2 Replacement Valve Replaced valve PSV-2692 No 12/20/05 Plan # 05-2091, WO 52108 2 Replacement Valve Replaced valve PSV-2696 No 12/20/05 Plan # 05-2092, WO 52112 2 Replacement Valve Replaced valve PSV-2698 No 12/20/05 Plan # 05-2093, WO 52114 2 Replacement Valve Replaced valve MU-28D. No 12/19/05 Plan # 05-2094, WO 43993 N-416-2 T3 Replacement Pipe Replaced Service Water pipe HBD-2-18". No 10/27/05 Plan # 05-2103, WO 50269101 N-416-2 T3 Replacement Support Replace support stanchion on HBD-2-H2 No 10/27/05 Plan # 05-2104, WO 50269101 T3 Replacement Support Replace support stanchion on HBD-2-H3 No 10/27/05 Plan # 05-2105, WO 50269101 T3 Replacement Support Replace support stanchion on HBD-2-H4 No 10/27/05 Plan # 05-2106, WO 502691 01 2 Replacement Pipe Replaced EBB-1-14 piping. No 12/20/05 Plan # 05-2123, WO 61100 N-416-2.
I Repair Valve Removed pipe nipple from spare valve No 10/11/05 Plan # 05-2124, WO 64036 S/N-8.
Replacement Support Modify support MU-210 No 11/28/05 Plan # 05-2131, WO 75414 2 Replacement Support Replaced pipe strap on HBB-4-H007 No 12/1/05 Plan # 05-2133, WO 44006 2 Replacement Support Reinstalled support item on support No 12/12/05 Plan # 05-2138, WO 61100 MFW-HI 9 2 Replacement Pipe Remove/Reinstall CCB-9-1.5 pipe. No 12/20/05 Plan # 05-2139, WO 61100 N-416-2 MC Replacement Hatch Replaced emergency escape hatch C-I No 1/4/05 Plan # 05-2140, WO 45885 fasteners I_ Replacement CRDM Replaced CRDM LIE-I 187 fasteners. No 12/3/05 Plan # 05-2143, WO 53895 CC Replacement Containment Restoration of the concrete containment No 12/20/05 Plan # 05-2150, WO 51243 opening for generator replacement
PAGE 3 of 5 UNIT 1 INTERVAL 3 PERIOD 3 (For Cycle 19)
CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR l DATE REPAIRIREPLACEMENT I ILASS; REPLACEMENT DESCRIPTION RF.LEVANT COMPT.FETD PLAN NIUMRER AND OR CORRECTIVE CONDITION FOUND MAT OR WO NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YESPNO)
CC Replacement Tendon Replacement and reinstallation of No 12/20/05 Plan # 05-2151, WO 50956 containment building tendons.
MC Replacement Containment Restoration of the containment building No 12/20/05 Plan # 05-2152, WO 51244 liner plate for generator replacement Replacement Steam Replaced Steam Generator E-24A No 12/20/05 Plan # 05-2153, WO 51541 Generator including re-installation of cold leg welds.
N-416-2 Replacement Pipe Replaced hot leg elbow and reinstallation No 12/20/05 Plan # 05-2154, WO 51545 of piping CCA-1-36. N-416-2 Replacement Steam Replaced Steam Generator E-24B No 12/20/05 Plan # 05-2155, WO 51543 Generator including re-installation of cold leg welds.
N-416-2 I Rcplacemcnt Pipe Replaced hot leg elbow and reinstallation No 12/20/05 Plan # 05-2156, WO 51546
_ of piping CCA-1-36. N-416-2 2 Replacement Pipe Re-installation of EFW piping EBB-2-4 No 12/20/05 Plan # 05-2157, WO 51447 and their supports for E-24A. NA416-2 2 Replacement Pipe Re-installation of MFW piping EBB-1-14 No 12/20/05 Plan # 05-2158, WO 50967 and their supports for E-24A. N-416-2 2 Replacement Pipe Re-installation of EFW piping EBB-2-4 No 12/20/05 Plan # 05-2159, WO 51448 and their supports for E-24B. N-416-2 2 Replacement Pipe Re-installation of MFW piping EBB-1-14 No 12/20/05 Plan # 05-2160, WO 51446 and their supports for E-24B. NA416-2 2 Replacement Pipe Re-installation of MS piping EBB-3-24 No 12/20/05 Plan # 05-2162, WO 50966 and their supports for E-24A. NA 16-2 2 Replacement Pipe Re-installation of MS piping EBB-3-24 No 12/20/05 Plan # 05-2163, WO 51430 and their supports for E-24B. NA 16-2 2 Replacement Pipe Re-installation of secondary vent piping No 12/20/05 Plan # 05-2164, WO 51486 EBB-5-1.5 and their supports for E-24A.
NA416-2
PAGE 4 of 5 UNIT 1 INTERVAL 3 PERIOD 3 (For Cycle 19)
CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RF.T.F.VANT COMPi.F.TFV.1 PL.AN NITMRFR ANn 1 i' OR CORRECTIVE CONDITION FOUND MAI OR WO NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YESINO) 2 Replacement Pipe Re-installation of secondary vent piping No 12/20/05 Plan # 05-2165, WO 51487 EBB-6-1.5 and their supports for E-24B.
N-416-2 T2 Replacement Pipe Re-installation of secondary drain piping No 12/20/05 Plan # 05-2166, WO 51450 EBD-I 9-1.5 for E-24A. N-416-2 T2 Replacement Pipe Re-installation of secondary drain piping No 12/20/05 Plan # 05-2167, WO 51485 EBD-19-1.5 for E-24B. N-416-2 Replacement Reactor Replaced reactor vessel closure head for No 12/20/05 Plan # 05-2168, WO 53895 and CRDM's for R-1 3 Replacement Pipe Capped an abandoned HBC-1-2 & HBC- No 12/20/05 Plan # 05-2169, WO 51558 2-2 drogen purge pipe.
I Replacement Support Modify supports HS-100 & HS-101 No 12/1/05 Plan # 05-2170, WO 51545 I Repair Steam Non-welded repair to remove roller No 11/23/05 Plan # 05-2171, WO 51499 Generator indentation on E-24B I Repair Steam Non-welded repair to remove roller No 11/23/05 Plan # 05-2172, WO 51499 Generator indentation on E-24A I Replacement Steam Installed manway handling devices on No 11/3/05 Plan # 05-2174, WO 51498 Generator support skirt for E-24A Replacement Steam Installed manway handling devices on No 11/3/05 Plan # 05-2175, WO 51499 Generator support skirt for E-24B I Repair Pipe Non-welded repair to remove arc strike No 11/6/05 Plan # 05-2176, WO 51573
__ on CCA-15-1 pipe.
1 Repair Pipe Weld repair on partially removed existing No 12/9/05 Plan # 05-2177, WO 51492 weld on CCA-13-1 pipe I Repair Steam Non-welded repair to remove arc strike No 12/2/05 Plan # 05-2178, WO 51559 Generator on E-24A __
T2 Repair Pipe Non-welded repair to remove indication No 12/2/05 Plan # 05-2179, WO 51564 on EBD-I 9-1 pipe coupling
PAGE 5 of 5 UNIT I INTERVAL 3 PERIOD 3 (For Cycle 19)
CODE l REPAIR, l ITEM l DESCRIPTION OF WORK FLAW OR l DATE REPAIR/REPLACEMENT I CLASS I REPLACEMENT l DESCRIPTION R E LEFT.F.VANT I COMPJ.F.Wn PlAN NTTMRFR ANDi OR CORRECTIVE CONDITION FOUND MAI OR WO NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YES/NO) 3 Repair Support Weld repair gouge on damaged support No 11/29/05 Plan # 05-2180, WO 51573 for PT-1070 2 Repair Pipe Non-welded repair to remove arc strike No 12/4/05 Plan # 05-2181, WO 51447 on EBB-2-6 pipe Repair Steam Non-welded repair to remove arc strike No 12/4/05 Plan # 05-2182, WO 51430
. Generator on E-24B .-
Note: Table 3 is an abstract of all Repair/Replacement activities performed during cycle 19 due to site procedure requirements.