BYRON 2007-0056, Steam Generator Inservice Inspection Summary Report for Refueling Outage 13
ML072120522 | |
Person / Time | |
---|---|
Site: | Byron ![]() |
Issue date: | 07/31/2007 |
From: | Hoots D Exelon Generation Co, Exelon Nuclear |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
BYRON 2007-0056 | |
Download: ML072120522 (1) | |
Similar Documents at Byron | |
---|---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARBYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023
[Table view]Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23159A1302023-06-0808 June 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B1R25) BYRON 2023-0002, Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2023-04-0606 April 2023 Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements BYRON 2022-0045, Day Inservice Inspection Report for Interval 4, Period 2, (B2R23)2022-07-15015 July 2022 Day Inservice Inspection Report for Interval 4, Period 2, (B2R23) ML21355A4072021-12-21021 December 2021 Day Inservice Inspection Report for Interval 4, Period 2, (81 R24) BYRON 2021-0001, Day Inservice Inspection Report for Interval 4, Period 2, (B2R22)2021-01-13013 January 2021 Day Inservice Inspection Report for Interval 4, Period 2, (B2R22) ML20240A1422020-09-17017 September 2020 Day Inservice Inspection Report for Interval 4, Period 2, (B1R23) BYRON 2020-0053, Steam Generator Tube Inspection Report for Refueling Outage 232020-09-10010 September 2020 Steam Generator Tube Inspection Report for Refueling Outage 23 RS-20-085, Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2020-07-24024 July 2020 Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-8792019-10-16016 October 2019 Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 ML19192A0492019-07-11011 July 2019 Day Inservice Inspection Report for Interval 4, Period 1, (B2R21) NMP2L2700, Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants2019-04-30030 April 2019 Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants BYRON 2018-0130, Transmittal of 90-Day Lnservice Inspection Report for Interval 4, Period 1, (B1R22)2018-12-20020 December 2018 Transmittal of 90-Day Lnservice Inspection Report for Interval 4, Period 1, (B1R22) BYRON 2018-0027, Steam Generator Tube Inspection Report for Refueling Outage 202018-04-0505 April 2018 Steam Generator Tube Inspection Report for Refueling Outage 20 BYRON 2018-0002, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (B2R20)2018-01-18018 January 2018 Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (B2R20) RS-17-163, Withdrawal of Relief Request RV-2 Associated with the Fourth Inservice Testing Interval2017-11-20020 November 2017 Withdrawal of Relief Request RV-2 Associated with the Fourth Inservice Testing Interval BYRON 2017-0048, Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (BYR21)2017-06-15015 June 2017 Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (BYR21) RS-16-224, Relief Request for Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval2016-11-0808 November 2016 Relief Request for Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval ML16300A0362016-10-26026 October 2016 Fourth Ten-Year Interval Inservice Inspection Program BYRON 2016-0076, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R19)2016-08-11011 August 2016 Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R19) ML16203A1082016-07-21021 July 2016 Fourth Ten-Year Interval Inservice Testing Program BYRON 2016-0011, Steam Generator Tube Inspection Report for Refueling Outage 202016-02-0505 February 2016 Steam Generator Tube Inspection Report for Refueling Outage 20 BYRON 2015-0152, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 4, (B1R20)2015-12-29029 December 2015 Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 4, (B1R20) ML15216A6092015-08-20020 August 2015 Review of Fall 2014 Steam Generator Tube Inservice Inspection Report RS-15-170, Submittal of Relief Requests Associated with the Fourth Inservice Testing Interval2015-06-22022 June 2015 Submittal of Relief Requests Associated with the Fourth Inservice Testing Interval RS-15-155, Response to Preliminary RAI Regarding Braidwood and Byron Stations Relief Request for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations2015-05-29029 May 2015 Response to Preliminary RAI Regarding Braidwood and Byron Stations Relief Request for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations BYRON 2015-0009, 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R18)2015-01-21021 January 2015 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R18) RS-14-251, Revision to the Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations2014-09-0808 September 2014 Revision to the Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations BYRON 2014-0078, Day Inservice Inspection Report for Interval 3, Period 3, (B1R19)2014-06-24024 June 2014 Day Inservice Inspection Report for Interval 3, Period 3, (B1R19) BYRON 2013-0100, Day Inservice Inspection Report for Interval 3, Period 3, (B2R17)2013-07-29029 July 2013 Day Inservice Inspection Report for Interval 3, Period 3, (B2R17) ML13008A0772013-01-0303 January 2013 Inservice Inspection Summary Report, for Inspection Activities from April 24, 2011 to October 8, 2012 ML13008A0932013-01-0303 January 2013 Inservice Inspection Summary Report, Chapter 6.0, Containment ISI Program, Part 7 of 7-08X ML13008A0752013-01-0303 January 2013 Inservice Inspection Summary Report, Form NIS-2 Owner'S Report for Repair/Replacement Activity, as Required by the Provisions of the ASME Code Section XI ML13008A0732013-01-0303 January 2013 Inservice Inspection Summary Report, Form NIS-2 Owner'S Report for Repair/Replacement Activity, as Required by the Provisions of the ASME Code Section XI ML13008A0882013-01-0303 January 2013 Inservice Inspection Summary Report, Form NIS-1 Owner'S Report for Inservice Inspections, Part 4 of 7-05 ML13008A0802013-01-0202 January 2013 Inservice Inspection Summary Report, Weld/Component Outage Summary, Part 2 of 7-03 ML13008A0762013-01-0202 January 2013 Inservice Inspection Summary Report, Common-3rd Interval ASME Section XI Examination Status Report ML1129907832012-02-0101 February 2012 Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations BYRON 2012-0001, Steam Generator Inservice Inspection Summary Report for Refueling Outage 162012-01-0404 January 2012 Steam Generator Inservice Inspection Summary Report for Refueling Outage 16 BYRON 2011-0103, Day Inservice Inspection Report for Interval 3, Period 2, (B1R17)2011-07-21021 July 2011 Day Inservice Inspection Report for Interval 3, Period 2, (B1R17) RS-11-069, Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations2011-04-19019 April 2011 Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations ML1110105352011-04-0808 April 2011 Supplement to Byron Unit 1, Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations RS-11-045, Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations2011-03-24024 March 2011 Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations BYRON 2010-0042, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 2, (B2R15)2010-08-0303 August 2010 Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 2, (B2R15) BYRON 2010-0041, Steam Generator - Inservice Inspection Summary Report for Refueling Outage 152010-07-23023 July 2010 Steam Generator - Inservice Inspection Summary Report for Refueling Outage 15 ML1000503572010-01-0505 January 2010 90-Day Inservice Inspection Report for Interval 3, Period 1, (B1R16) ML1000503622009-12-17017 December 2009 B1R16 Lsi Outage Report - Form NIS-1 Owner'S Report for Inservice Inspections ML1000503602009-12-17017 December 2009 B1R16 Lsi Outage Report, Bolts, Pumps, and Valves Outage Summary ML0902600752009-01-22022 January 2009 Inservice Inspection Report for Interval 3, Period 1, (B2R14), Cover Through Section 2.0 2023-06-08 Category:Letter type:BYRON MONTHYEARBYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023
[Table view]Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) BYRON 2023-0029, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements2023-06-0101 June 2023 Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements BYRON 2023-0022, 2022 Annual Radiological Environmental Operating Report (AREOR)2023-05-0404 May 2023 2022 Annual Radiological Environmental Operating Report (AREOR) BYRON 2023-0002, Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2023-04-0606 April 2023 Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements BYRON 2023-0012, Cycle 26 Core Operating Limits Report2023-03-16016 March 2023 Cycle 26 Core Operating Limits Report BYRON 2022-0081, CFR72.48 Evaluation Summary Report2022-12-0909 December 2022 CFR72.48 Evaluation Summary Report BYRON 2022-0072, Steam Generator Tube Inspection Report for Refueling Outage 232022-10-27027 October 2022 Steam Generator Tube Inspection Report for Refueling Outage 23 BYRON 2022-0069, 2021 Regulatory Commitment Change Summary Report2022-10-13013 October 2022 2021 Regulatory Commitment Change Summary Report BYRON 2022-0071, Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Final Causal Report and Description of Corrective Action Assignment2022-10-13013 October 2022 Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Final Causal Report and Description of Corrective Action Assignment BYRON 2022-0065, Registration of Use of Cask to Store Spent Fuel2022-10-13013 October 2022 Registration of Use of Cask to Store Spent Fuel BYRON 2022-0063, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report for September 9, 2021 to September 8, 20222022-09-29029 September 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report for September 9, 2021 to September 8, 2022 BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) BYRON 2022-0059, Registration of Use of Cask to Store Spent Fuel2022-09-15015 September 2022 Registration of Use of Cask to Store Spent Fuel BYRON 2022-0045, Day Inservice Inspection Report for Interval 4, Period 2, (B2R23)2022-07-15015 July 2022 Day Inservice Inspection Report for Interval 4, Period 2, (B2R23) BYRON 2022-0026, Annual Radiological Environmental Operating Report2022-05-0505 May 2022 Annual Radiological Environmental Operating Report BYRON 2022-0030, Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Report2022-05-0303 May 2022 Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Report BYRON 2022-0028, Cycle 24 Core Operating Limits Report2022-04-28028 April 2022 Cycle 24 Core Operating Limits Report BYRON 2022-0016, Annual Dose Report for 20212022-04-0707 April 2022 Annual Dose Report for 2021 BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline BYRON 2021-0063, Reactor Coolant System Pressure and Temperature Limits Report2021-09-28028 September 2021 Reactor Coolant System Pressure and Temperature Limits Report BYRON 2021-0064, Cycle 25 Core Operating Limits Report2021-09-28028 September 2021 Cycle 25 Core Operating Limits Report BYRON 2021-0032, 2020 Annual Radiological Environmental Operating Report (AREOR)2021-05-0606 May 2021 2020 Annual Radiological Environmental Operating Report (AREOR) BYRON 2021-0031, 2020 Annual Radioactive Effluent Release Report2021-04-21021 April 2021 2020 Annual Radioactive Effluent Release Report BYRON 2021-0027, Annual Dose Report for 20202021-03-30030 March 2021 Annual Dose Report for 2020 BYRON 2021-0023, Registration of Use of Cask to Store Spent Fuel2021-03-25025 March 2021 Registration of Use of Cask to Store Spent Fuel BYRON 2021-0024, 2020 Regulatory Commitment Change Summary Report2021-03-19019 March 2021 2020 Regulatory Commitment Change Summary Report BYRON 2021-0001, Day Inservice Inspection Report for Interval 4, Period 2, (B2R22)2021-01-13013 January 2021 Day Inservice Inspection Report for Interval 4, Period 2, (B2R22) BYRON 2020-0087, National Pollutant Discharge Elimination System (NPDES) Permit No. IL00483132020-12-16016 December 2020 National Pollutant Discharge Elimination System (NPDES) Permit No. IL0048313 BYRON 2020-0084, 10 CFR 72.48 Evaluation Summary Report2020-12-10010 December 2020 10 CFR 72.48 Evaluation Summary Report BYRON 2020-0085, 10 CFR 50.59 Summary Report2020-12-10010 December 2020 10 CFR 50.59 Summary Report BYRON 2020-0067, Cycle 22 Core Operating Limits Report2020-10-20020 October 2020 Cycle 22 Core Operating Limits Report BYRON 2020-0063, Independent Spent Fuel Storage Installation - Transmittal of Annual Radioactive Effluent Release Repo2020-10-0101 October 2020 Independent Spent Fuel Storage Installation - Transmittal of Annual Radioactive Effluent Release Repo BYRON 2020-0053, Steam Generator Tube Inspection Report for Refueling Outage 232020-09-10010 September 2020 Steam Generator Tube Inspection Report for Refueling Outage 23 BYRON 2020-0025, Annual Dose Report 20192020-03-24024 March 2020 Annual Dose Report 2019 BYRON 2020-0015, Cycle 24 Core Operating Limits Report2020-03-17017 March 2020 Cycle 24 Core Operating Limits Report BYRON 2020-0010, Revision to Byron Station Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 172020-02-13013 February 2020 Revision to Byron Station Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 17 BYRON 2020-0008, 2019 Regulatory Commitment Change Summary Report2020-02-0707 February 2020 2019 Regulatory Commitment Change Summary Report BYRON 2019-0105, Post Examination Submittal Letter2019-11-26026 November 2019 Post Examination Submittal Letter BYRON 2019-0095, Registration of Use of Cask to Store Spent Fuel2019-10-10010 October 2019 Registration of Use of Cask to Store Spent Fuel BYRON 2019-0090, Registration of Use of Cask to Store Spent Fuel2019-09-18018 September 2019 Registration of Use of Cask to Store Spent Fuel BYRON 2019-0078, Registration of Use of Cask to Store Spent Fuel2019-08-22022 August 2019 Registration of Use of Cask to Store Spent Fuel BYRON 2019-0041, Revision to Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 162019-04-25025 April 2019 Revision to Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 16 BYRON 2019-0035, Submittal of 2018 Annual Radioactive Effluent Release Report2019-04-18018 April 2019 Submittal of 2018 Annual Radioactive Effluent Release Report BYRON 2019-0040, Cycle 22 Core Operating Limits Report2019-04-15015 April 2019 Cycle 22 Core Operating Limits Report BYRON 2019-0039, Annual Dose Report for 20182019-04-11011 April 2019 Annual Dose Report for 2018 BYRON 2019-0022, 2018 Regulatory Commitment Change Summary Report2019-03-13013 March 2019 2018 Regulatory Commitment Change Summary Report BYRON 2019-0015, Cycle 23 Core Operating Limits Report and Byron Station Unit 2 Cycle 21 Core Operating Limits Report2019-03-0707 March 2019 Cycle 23 Core Operating Limits Report and Byron Station Unit 2 Cycle 21 Core Operating Limits Report BYRON 2018-0130, Transmittal of 90-Day Lnservice Inspection Report for Interval 4, Period 1, (B1R22)2018-12-20020 December 2018 Transmittal of 90-Day Lnservice Inspection Report for Interval 4, Period 1, (B1R22) 2023-06-01 |
Text
Exekn,.
5~
- ~~tb0nCompany, LLC www.exeloncorp.com N uci ear 4450 North German Church Road Byron, L 610109794 July 31, 2007 LTR: BYRON 2007-0056 File: 1.10.0101 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Nuclear Power Station, Unit 2 Facility Operating License NPF-66 NRC Docket No. STN 50-455
Subject:
Byron Station Unit 2 Steam Generator Inservice Inspection Summary Report for Refueling Outage 13 In accordance with Technical Specification 5.6.9, Steam Generator (SG) Tube Inspection Report, Exelon Generation Company, LLC is reporting the results of the steam generator inspections that were completed during the Byron Station Unit 2, Refueling Outage 13. The attached report is also being submitted in accordance with the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, 2001 Edition through the 2003 Addenda,Section XI, Rules for lnservice Inspection of Nuclear Power Plant Components, Article IWA-6000, Record and Reports, and Paragraph 11-890.2.3, Reporting of ASME Section V Nondestructive Examination, Article 8 Appendix II, Eddy Current Examination of Nonferromagnetic Heat Exchanger Tubing, 2001 Edition through the 2003 Addenda.
If there are any questions regarding this report, please contact W. Grundmann, Regulatory Assurance Manager, at (815) 406-2800.
Respectfully, David M. Hoots Site Vice President Byron Nuclear Generating Station
Attachment:
Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 13 Refueling Outage, April 2007 DMH/JS/TLH/rah