 Issue dateTitleTopic
JAFP-23-0008, Supplement to Inservice Inspection Summary Report Cycle 2522 February 2023Supplement to Inservice Inspection Summary Report Cycle 25
JAFP-22-0053, Inservice Inspection Summary Report Cycle 2520 December 2022Inservice Inspection Summary Report Cycle 25Through-Wall Leak
JAFP-20-0087, Inservice Inspection Summary Report Cycle 2428 December 2020Inservice Inspection Summary Report Cycle 24Through-Wall Leak
Through Wall Leak
JAFP-19-0004, Inservice Inspection Summary Report Cycle 234 January 2019Inservice Inspection Summary Report Cycle 23Through-Wall Leak
Through Wall Leak
JAFP-18-0113, Fifth Ten-Year Lnservice Inspection Interval Program Plan17 December 2018Fifth Ten-Year Lnservice Inspection Interval Program PlanNon-Destructive Examination
Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Aging Management
Moisture barrier
License Renewal
EVT-1
Liquid penetrant
Through-Wall Leakage
Dissimilar Metal Weld
JAFP-18-0078, Fifth Ten-Year Interval Inservice Testing Program Plan6 August 2018Fifth Ten-Year Interval Inservice Testing Program PlanSafe Shutdown
Stroke time
Hydrostatic
Squib
Incorporated by reference
Surveillance Frequency Control Program
Scram Discharge Volume
Cold shutdown justification
Power-Operated Valves
Grace period
JAFP-17-0057, Inservice Inspection Summary Report 2017 Refuel Outage 2225 May 2017Inservice Inspection Summary Report 2017 Refuel Outage 22Weld Overlay
JAFP-16-0136, Alternative Examination Requirements Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-24124 August 2016Alternative Examination Requirements Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-241
JAFP-14-0012, Inservice Testing Program 10 CFR 50.55a Request PRR-0521 February 2014Inservice Testing Program 10 CFR 50.55a Request PRR-05
JAFP-13-0004, Inservice Inspection Summary Report 2012 Refuel Outage (Reload 20/Cycle 21)14 January 2013Inservice Inspection Summary Report 2012 Refuel Outage (Reload 20/Cycle 21)
JAFP-11-0009, Inservice Inspection Summary Report 2010 Refuel Outage (Reload 19/Cycle 20)18 January 2011Inservice Inspection Summary Report 2010 Refuel Outage (Reload 19/Cycle 20)Coatings
JAFP-09-0088, Proposed Relief Request VRR-06 for the Fourth Interval In-Service Testing Program31 July 2009Proposed Relief Request VRR-06 for the Fourth Interval In-Service Testing ProgramStroke time
VT-2
Grace period
JAFP-09-0008, Response to Request for Additional Information Regarding: Request for Additional Information Third Ten-Year Inservice Inspection Interval Program Plan Relief Request RR-CRV-0120 January 2009Response to Request for Additional Information Regarding: Request for Additional Information Third Ten-Year Inservice Inspection Interval Program Plan Relief Request RR-CRV-01Liquid penetrant
JAFP-09-0004, Inservice Inspection Summary Report 2008 Refuel Outage (Reload 18/Cycle 19)10 January 2009Inservice Inspection Summary Report 2008 Refuel Outage (Reload 18/Cycle 19)Weld Overlay
Coatings
JAFP-08-0109, Submittal of the Final Ultrasonic Test Results on the N2C-SE Weld Overlay20 October 2008Submittal of the Final Ultrasonic Test Results on the N2C-SE Weld OverlayWeld Overlay
JAFP-08-0038, Inservice Inspection Program Relief Requests Third Ten-year Interval Closeout30 April 2008Inservice Inspection Program Relief Requests Third Ten-year Interval CloseoutVT-2
JAFP-07-0116, Fourth Interval Inservice Testing Program for Pumps and Valves26 September 2007Fourth Interval Inservice Testing Program for Pumps and ValvesStroke time
Hydrostatic
Squib
Incorporated by reference
Cold shutdown justification
Power-Operated Valves
JAFP-07-0107, Response to Request for Additional Information Regarding Proposed Relief Request PRR-01 for the Fourth Interval In-Service Testing Program29 August 2007Response to Request for Additional Information Regarding Proposed Relief Request PRR-01 for the Fourth Interval In-Service Testing Program
JAFP-07-0050, Proposed Relief Requests for the James A. FitzPatrick Power Plant Fourth Interval In-Service Testing Program11 April 2007Proposed Relief Requests for the James A. FitzPatrick Power Plant Fourth Interval In-Service Testing ProgramStroke time
Power-Operated Valves
Power Operated Valves
JAFP-07-0030, Fourth Inservice Inspection Interval Inspection Program Plan27 February 2007Fourth Inservice Inspection Interval Inspection Program PlanNon-Destructive Examination
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
Moisture barrier
Earthquake
Liquid penetrant
Dissimilar Metal Weld
JAFP-07-0020, Submittal of James A. Fitzpatrick - Inservice Inspection Summary Report 2006 Refuel Outage (Reload 17/Cycle 18)2 February 2007Submittal of James A. Fitzpatrick - Inservice Inspection Summary Report 2006 Refuel Outage (Reload 17/Cycle 18)
JAFP-05-0151, Request for Approval of Relief Request No. RR-39, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals and Components Inspection7 October 2005Request for Approval of Relief Request No. RR-39, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals and Components InspectionVT-2
EVT-1
ML05158020326 May 2005Request for Relief from System Hydrostatic Test Requirements for Small Bore (5 1 Inch), ASME Code Class 1 Reactor Coolant Pressure Boundary (RCPB) Vent, Drain, and Branch (Vtdb) Lines and ConnectionsHydrostatic
JAFP-05-0013, Inservice Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17)19 January 2005Inservice Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17)
JPN-04-010, Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure Studs14 April 2004Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure StudsIncorporated by reference
JAFP-03-0096, James a FitzPatrick Nuclear Power Plant, Proposed Relief Request No. VRR-08 to In-Service Testing Program8 July 2003James a FitzPatrick Nuclear Power Plant, Proposed Relief Request No. VRR-08 to In-Service Testing ProgramHydrostatic
JAFP-02-0251, In-Vessel Visual Inspection Summary Report 2002 Refuel Outage (Reload 15/Cycle 16)26 December 2002In-Vessel Visual Inspection Summary Report 2002 Refuel Outage (Reload 15/Cycle 16)VT-2
EVT-1
JPN-02-026, Relief Request RR-28, Revision 3 for Third 10-Year Inservice Inspection Interval Program Plan12 September 2002Relief Request RR-28, Revision 3 for Third 10-Year Inservice Inspection Interval Program PlanHigh Radiation Area
Weld Overlay
Through Wall Leak
JPN-02-022, License DPR-59, Relief Request RR-28, Revision 2 for the Third 10-Year Inservice Inspection Interval Program Plan10 July 2002License DPR-59, Relief Request RR-28, Revision 2 for the Third 10-Year Inservice Inspection Interval Program PlanHigh Radiation Area
Weld Overlay
Through Wall Leak
JPN-02-001, Submittal of James A. FitzPatrick Owner'S Activity Report, JAF-RPT-MULTI-04331, Rev. 0 Which Contains Inservice Inspection Results & Repair/Replacement Activities Performed During 1st Period of Third 10-Year ISI Interval28 January 2002Submittal of James A. FitzPatrick Owner'S Activity Report, JAF-RPT-MULTI-04331, Rev. 0 Which Contains Inservice Inspection Results & Repair/Replacement Activities Performed During 1st Period of Third 10-Year ISI IntervalWeld Overlay
Moisture barrier