JAFP-23-0008, Supplement to Inservice Inspection Summary Report Cycle 25 | 22 February 2023 | Supplement to Inservice Inspection Summary Report Cycle 25 | |
JAFP-22-0053, Inservice Inspection Summary Report Cycle 25 | 20 December 2022 | Inservice Inspection Summary Report Cycle 25 | Through-Wall Leak |
JAFP-20-0087, Inservice Inspection Summary Report Cycle 24 | 28 December 2020 | Inservice Inspection Summary Report Cycle 24 | Through-Wall Leak Through Wall Leak |
JAFP-19-0004, Inservice Inspection Summary Report Cycle 23 | 4 January 2019 | Inservice Inspection Summary Report Cycle 23 | Through-Wall Leak Through Wall Leak |
JAFP-18-0113, Fifth Ten-Year Lnservice Inspection Interval Program Plan | 17 December 2018 | Fifth Ten-Year Lnservice Inspection Interval Program Plan | Non-Destructive Examination Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Aging Management Moisture barrier License Renewal EVT-1 Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld |
JAFP-18-0078, Fifth Ten-Year Interval Inservice Testing Program Plan | 6 August 2018 | Fifth Ten-Year Interval Inservice Testing Program Plan | Safe Shutdown Stroke time Hydrostatic Squib Incorporated by reference Surveillance Frequency Control Program Scram Discharge Volume Cold shutdown justification Power-Operated Valves Grace period |
JAFP-17-0057, Inservice Inspection Summary Report 2017 Refuel Outage 22 | 25 May 2017 | Inservice Inspection Summary Report 2017 Refuel Outage 22 | Weld Overlay |
JAFP-16-0136, Alternative Examination Requirements Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-241 | 24 August 2016 | Alternative Examination Requirements Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-241 | |
JAFP-14-0012, Inservice Testing Program 10 CFR 50.55a Request PRR-05 | 21 February 2014 | Inservice Testing Program 10 CFR 50.55a Request PRR-05 | |
JAFP-13-0004, Inservice Inspection Summary Report 2012 Refuel Outage (Reload 20/Cycle 21) | 14 January 2013 | Inservice Inspection Summary Report 2012 Refuel Outage (Reload 20/Cycle 21) | |
JAFP-11-0009, Inservice Inspection Summary Report 2010 Refuel Outage (Reload 19/Cycle 20) | 18 January 2011 | Inservice Inspection Summary Report 2010 Refuel Outage (Reload 19/Cycle 20) | Coatings |
JAFP-09-0088, Proposed Relief Request VRR-06 for the Fourth Interval In-Service Testing Program | 31 July 2009 | Proposed Relief Request VRR-06 for the Fourth Interval In-Service Testing Program | Stroke time VT-2 Grace period |
JAFP-09-0008, Response to Request for Additional Information Regarding: Request for Additional Information Third Ten-Year Inservice Inspection Interval Program Plan Relief Request RR-CRV-01 | 20 January 2009 | Response to Request for Additional Information Regarding: Request for Additional Information Third Ten-Year Inservice Inspection Interval Program Plan Relief Request RR-CRV-01 | Liquid penetrant |
JAFP-09-0004, Inservice Inspection Summary Report 2008 Refuel Outage (Reload 18/Cycle 19) | 10 January 2009 | Inservice Inspection Summary Report 2008 Refuel Outage (Reload 18/Cycle 19) | Weld Overlay Coatings |
JAFP-08-0109, Submittal of the Final Ultrasonic Test Results on the N2C-SE Weld Overlay | 20 October 2008 | Submittal of the Final Ultrasonic Test Results on the N2C-SE Weld Overlay | Weld Overlay |
JAFP-08-0038, Inservice Inspection Program Relief Requests Third Ten-year Interval Closeout | 30 April 2008 | Inservice Inspection Program Relief Requests Third Ten-year Interval Closeout | VT-2 |
JAFP-07-0116, Fourth Interval Inservice Testing Program for Pumps and Valves | 26 September 2007 | Fourth Interval Inservice Testing Program for Pumps and Valves | Stroke time Hydrostatic Squib Incorporated by reference Cold shutdown justification Power-Operated Valves |
JAFP-07-0107, Response to Request for Additional Information Regarding Proposed Relief Request PRR-01 for the Fourth Interval In-Service Testing Program | 29 August 2007 | Response to Request for Additional Information Regarding Proposed Relief Request PRR-01 for the Fourth Interval In-Service Testing Program | |
JAFP-07-0050, Proposed Relief Requests for the James A. FitzPatrick Power Plant Fourth Interval In-Service Testing Program | 11 April 2007 | Proposed Relief Requests for the James A. FitzPatrick Power Plant Fourth Interval In-Service Testing Program | Stroke time Power-Operated Valves Power Operated Valves |
JAFP-07-0030, Fourth Inservice Inspection Interval Inspection Program Plan | 27 February 2007 | Fourth Inservice Inspection Interval Inspection Program Plan | Non-Destructive Examination Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Moisture barrier Earthquake Liquid penetrant Dissimilar Metal Weld |
JAFP-07-0020, Submittal of James A. Fitzpatrick - Inservice Inspection Summary Report 2006 Refuel Outage (Reload 17/Cycle 18) | 2 February 2007 | Submittal of James A. Fitzpatrick - Inservice Inspection Summary Report 2006 Refuel Outage (Reload 17/Cycle 18) | |
JAFP-05-0151, Request for Approval of Relief Request No. RR-39, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals and Components Inspection | 7 October 2005 | Request for Approval of Relief Request No. RR-39, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals and Components Inspection | VT-2 EVT-1 |
ML051580203 | 26 May 2005 | Request for Relief from System Hydrostatic Test Requirements for Small Bore (5 1 Inch), ASME Code Class 1 Reactor Coolant Pressure Boundary (RCPB) Vent, Drain, and Branch (Vtdb) Lines and Connections | Hydrostatic |
JAFP-05-0013, Inservice Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17) | 19 January 2005 | Inservice Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17) | |
JPN-04-010, Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure Studs | 14 April 2004 | Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure Studs | Incorporated by reference |
JAFP-03-0096, James a FitzPatrick Nuclear Power Plant, Proposed Relief Request No. VRR-08 to In-Service Testing Program | 8 July 2003 | James a FitzPatrick Nuclear Power Plant, Proposed Relief Request No. VRR-08 to In-Service Testing Program | Hydrostatic |
JAFP-02-0251, In-Vessel Visual Inspection Summary Report 2002 Refuel Outage (Reload 15/Cycle 16) | 26 December 2002 | In-Vessel Visual Inspection Summary Report 2002 Refuel Outage (Reload 15/Cycle 16) | VT-2 EVT-1 |
JPN-02-026, Relief Request RR-28, Revision 3 for Third 10-Year Inservice Inspection Interval Program Plan | 12 September 2002 | Relief Request RR-28, Revision 3 for Third 10-Year Inservice Inspection Interval Program Plan | High Radiation Area Weld Overlay Through Wall Leak |
JPN-02-022, License DPR-59, Relief Request RR-28, Revision 2 for the Third 10-Year Inservice Inspection Interval Program Plan | 10 July 2002 | License DPR-59, Relief Request RR-28, Revision 2 for the Third 10-Year Inservice Inspection Interval Program Plan | High Radiation Area Weld Overlay Through Wall Leak |
JPN-02-001, Submittal of James A. FitzPatrick Owner'S Activity Report, JAF-RPT-MULTI-04331, Rev. 0 Which Contains Inservice Inspection Results & Repair/Replacement Activities Performed During 1st Period of Third 10-Year ISI Interval | 28 January 2002 | Submittal of James A. FitzPatrick Owner'S Activity Report, JAF-RPT-MULTI-04331, Rev. 0 Which Contains Inservice Inspection Results & Repair/Replacement Activities Performed During 1st Period of Third 10-Year ISI Interval | Weld Overlay Moisture barrier |