BVY 03-106, Revision to Vermont Yankee'S 2002 Summary Report for In-service Inspection (NIS-1 Report)

From kanterella
Jump to navigation Jump to search
Revision to Vermont Yankee'S 2002 Summary Report for In-service Inspection (NIS-1 Report)
ML033320050
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 11/18/2003
From: Devincintis J
Entergy Nuclear Operations, Entergy Nuclear Vermont Yankee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 03-106
Download: ML033320050 (5)


Text

Entergy Nuclear Vermont Yankee, LLC

- Entergy Entergy Nuclear Operations, Inc.

185 Old Ferry Road Brattleboro, VT 05302-0500 November 18, 2003 BVY 03-106 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)

Revision to Vermont Yankee's 2002 Summary Report for In-service Inspection (NIS-1 Report)

On January 9, 2003, Vermont Yankee Nuclear Power Station (VY) submitted to the NRC the 2002 Form NIS-1 Owner's Summary Report for In-service Inspections'. The report described the in-service inspections performed during the period May 21, 2001 through October 25, 2002. As a result of internal reviews, it was recently identified that the NIS-1 report warranted revision. Accordingly, the letter hereby transmits a revised page 18 (page 18 of 20). Revision bars have been added to identify the two lines where data has been updated. No formal action or response is requested of the NRC for this revision.

Attachment I identifies the commitments contained within this letter. Attachment 2 contains the revised pages to the NIS- I report.

If you have any questions on this transmittal, please contact Mr. Thomas B. Silko at (802) 258-4146.

Sincerely, ManJagerM. Lienintis

/ Manaer, Liensin Attachments cc: USNRC Region I Administrator USNRC Resident Inspector - VY USNRC Project Manager - VY Vermont Department of Public Service 1 Reference VYNI'S Letter to USNRC, BVY 03-02 "Vermont Yankee 2002 Summary Reports for In-service Inspection and Repairs or Replacements," dated January 9, 2003. 4 (A /

Docket No. 50-271 BVY 03-106 Attachment 1 Vermont Yankee Nuclear Power Station Revision to Vermont Yankee's 2002 Sumnmary Report for In-service Inspection (NIS-I Report)

List of Commitments

SUMMARY

OF VERMONT YANKEE COMMITMENTS BVY NO.: 03-106 The following table identifies commitments made in this document by Vermont Yankee. Any other actions discussed in the submittal represent intended or planned actions by Vermont Yankee. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Licensing Manager of any questions regarding this document or any associated commitments.

COMMITMENT COMMITTED DATE 1 l _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ lO R "O UTA G E " l N/A N/A

y Docket No. 50-271 BVY 03-106 Attachment 2 Vermont Yankee Nuclear Power Station Revision to Vermont Yankee's 2002 Summary Report for In-service Inspection (NIS-I Report)

Revised Page 18 of 20

FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As Required by the Provisions of the ASME Code rules Entergy Northeast Vermont Yankee Owner Certification: DPR-28 Commercial Service Date: 11/30/72 Components Inspected/Abstract of examinations Sections 7 and 11 Code Categoiy Quantity Inspected 2002 Quantity Previously Quantity Scheduled, Third Percent of Third Interval l Code Category Outage Inspected, Third Interval Interval Complete B-M-20 BM-2 0 266No. Per approved Relief Request N/A B-2 B-N-I 0 2 Each Period 100%

B-N-2 0 Partial 1 100%

B-O 0 6 6 100%

C-A 1 3 4 100%

C-B 2 2 4 100%

C-C 3 17 20 100%

C-F-2 5 67 72 100%

D-A 3 8 11 100%

F-A 31 88 119 100%

Page 18 of 20