NL-18-063, Submission of IP2 Steam Generator Examination Program Results for the 2018 (2R23) Refueling Outage in Accordance with Technical Specification 5.6.7 | 13 August 2018 | Submission of IP2 Steam Generator Examination Program Results for the 2018 (2R23) Refueling Outage in Accordance with Technical Specification 5.6.7 | Nondestructive Examination |
NL-18-049, 2018 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements | 10 July 2018 | 2018 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements | Weld Overlay |
NL-18-021, Indian Point, Unit 2 - Submittal of Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability | 6 April 2018 | Indian Point, Unit 2 - Submittal of Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability | |
NL-18-021, Submittal of Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability | 6 April 2018 | Submittal of Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability | |
ML18103A030 | 6 April 2018 | Attachment 1 to NL-18-021, LTR-SDA-18-035-NP, Revision 0, Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability | VT-2 Finite Element Analysis Earthquake Liquid penetrant |
NL-18-019, Relief Request Number IP2-ISI-RR-06 - Proposed Alternative to Use Reactor Vessel Head Penetration Flaw Weld Repair Method | 4 April 2018 | Relief Request Number IP2-ISI-RR-06 - Proposed Alternative to Use Reactor Vessel Head Penetration Flaw Weld Repair Method | Weld Overlay Nondestructive Examination VT-2 Liquid penetrant |
NL-17-059, Request IP2-ISI-RR-22 for Relief from Examination of Non-Regenerative Heat Exchanger Base Support Welded Attachments for Fourth Ten-Year Inservice Inspection Interval Closeout | 30 May 2017 | Request IP2-ISI-RR-22 for Relief from Examination of Non-Regenerative Heat Exchanger Base Support Welded Attachments for Fourth Ten-Year Inservice Inspection Interval Closeout | VT-2 |
NL-17-057, Request IP2-ISI-RR-20 for Relief from Examinations of Code Class 1 Component Welds with Less than Essentially 100% Examination Coverage for Fourth Ten-Year Inservice Inspection Interval Closeout | 30 May 2017 | Request IP2-ISI-RR-20 for Relief from Examinations of Code Class 1 Component Welds with Less than Essentially 100% Examination Coverage for Fourth Ten-Year Inservice Inspection Interval Closeout | VT-2 Dissimilar Metal Weld |
NL-16-096, 2016 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements | 9 September 2016 | 2016 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements | Weld Overlay |
NL-16-097, Fifth Ten Year Interval Inservice Inspection Program Plan | 6 September 2016 | Fifth Ten Year Interval Inservice Inspection Program Plan | Weld Overlay Nondestructive Examination VT-2 Incorporated by reference Aging Management Moisture barrier Pressure Boundary Leakage Dissimilar Metal Weld |
NL-16-091, Submittal of Fifth Ten Year Interval Inservice Inspection Program Plan | 17 August 2016 | Submittal of Fifth Ten Year Interval Inservice Inspection Program Plan | Incorporated by reference |
NL-16-092, Submittal of Fifth Ten Year Interval Lnservice Testing Program Plan | 17 August 2016 | Submittal of Fifth Ten Year Interval Lnservice Testing Program Plan | Safe Shutdown Boric Acid Stroke time Incorporated by reference Cold shutdown justification Power-Operated Valves |
NL-16-032, Entergy Transmittal of Indian Point 2 ASME Section XI, Iwl Concrete Containment Inspection in Accordance with the Parties Approved Settlement of License Renewal Contention NYS-24 Indian Point Unit 2 | 16 March 2016 | Entergy Transmittal of Indian Point 2 ASME Section XI, Iwl Concrete Containment Inspection in Accordance with the Parties Approved Settlement of License Renewal Contention NYS-24 Indian Point Unit 2 | Boric Acid Coatings Nondestructive Examination VT-2 Foreign Material Exclusion Earthquake Scaffolding |
NL-15-073, Request for Relief Request IP2-ISI-RR-18 Maintaining ISI Related Activities on the 2001 Edition/2003A ASME Section XI Code for Fifth 10-Year Inservice Inspection (ISI) Interval | 1 June 2015 | Request for Relief Request IP2-ISI-RR-18 Maintaining ISI Related Activities on the 2001 Edition/2003A ASME Section XI Code for Fifth 10-Year Inservice Inspection (ISI) Interval | Nondestructive Examination Incorporated by reference |
NL-14-060, 2014 Summary Reports for In-Service Inspection and Repairs or Replacements | 9 May 2014 | 2014 Summary Reports for In-Service Inspection and Repairs or Replacements | |
NL-13-032, Technical Specification 5.6.8 - IP3 Steam Generator Tube Inspection Report - Spring 2013 Refueling Outage | 15 August 2013 | Technical Specification 5.6.8 - IP3 Steam Generator Tube Inspection Report - Spring 2013 Refueling Outage | Nondestructive Examination |
NL-13-031, Submittal of 2013 Summary Reports for Inservice Inspection and Repairs or Replacements | 18 June 2013 | Submittal of 2013 Summary Reports for Inservice Inspection and Repairs or Replacements | |
NL-13-040, Relief Request IP2-ISI-RR-16: Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination | 20 February 2013 | Relief Request IP2-ISI-RR-16: Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination | |
NL-13-002, Proposed Technical Specification Bases Changes to Credit Four Fan Cooler Units in Containment Integrity Analysis | 28 January 2013 | Proposed Technical Specification Bases Changes to Credit Four Fan Cooler Units in Containment Integrity Analysis | |
NL-11-075, Submittal of Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination | 29 June 2011 | Submittal of Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination | |
NL-11-050, Submittal of 2011 Summary Reports for In-Service Inspection and Repairs or Replacements | 20 June 2011 | Submittal of 2011 Summary Reports for In-Service Inspection and Repairs or Replacements | |
ML102440036 | 24 August 2010 | Submittal of Steam Generator Examination Program Results 2010 Refueling Outage (2R19) | Nondestructive Examination |
NL-10-058, Summary Reports for In-Service Inspection and Repairs or Replacements | 9 June 2010 | Summary Reports for In-Service Inspection and Repairs or Replacements | |
NL-10-059, Relief Request IP2-ISI-RR-11 for Fourth Ten-Year Inservice Inspection Interval | 3 June 2010 | Relief Request IP2-ISI-RR-11 for Fourth Ten-Year Inservice Inspection Interval | Nondestructive Examination |
NL-09-107, Relief Request 2-10 for Fourth Ten-Year Inservice Inspection Interval | 5 August 2009 | Relief Request 2-10 for Fourth Ten-Year Inservice Inspection Interval | |
NL-09-097, Submittal of Fourth Ten-Year Interval Inservice Inspection and Containment Inservice Inspection Program Plan | 21 July 2009 | Submittal of Fourth Ten-Year Interval Inservice Inspection and Containment Inservice Inspection Program Plan | Nondestructive Examination VT-2 Moisture barrier Dissimilar Metal Weld |
NL-09-090, Relief Requests 08 and 09 for Fourth Ten-Year Inservice Inspection Interval | 1 July 2009 | Relief Requests 08 and 09 for Fourth Ten-Year Inservice Inspection Interval | Boric Acid Locked High Radiation Area Pressure Boundary Leakage |
NL-09-069, 2009 Summary Reports for In-Service Inspection and Repairs or Replacements | 1 July 2009 | 2009 Summary Reports for In-Service Inspection and Repairs or Replacements | Moisture barrier |
NL-09-087, Relief Request IP3-ISI-RR-01, IP3-ISI-RR-02, and IP3-ISI-RR-03 for Fourth Ten-Year Inservice Inspection Interval | 24 June 2009 | Relief Request IP3-ISI-RR-01, IP3-ISI-RR-02, and IP3-ISI-RR-03 for Fourth Ten-Year Inservice Inspection Interval | Nondestructive Examination VT-2 |
NL-09-037, Response to Request for Information Regarding Request for Relief 3-48 Supporting Refuel Outage 15 Inservice Inspection Program | 23 March 2009 | Response to Request for Information Regarding Request for Relief 3-48 Supporting Refuel Outage 15 Inservice Inspection Program | |
NL-09-003, Supplemental Response to Request for Additional Information on Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination | 20 January 2009 | Supplemental Response to Request for Additional Information on Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination | Large early release frequency |
NL-08-110, Summary Reports for In-Service Inspection and Repairs for Replacements | 14 July 2008 | Summary Reports for In-Service Inspection and Repairs for Replacements | |
NL-08-053, 10 CFR 50.55a Request RR-CRV-75 - Relief from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third-Ten Year Inservice Inspection Interval Closeout | 26 March 2008 | 10 CFR 50.55a Request RR-CRV-75 - Relief from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third-Ten Year Inservice Inspection Interval Closeout | Weld Overlay VT-2 |
NL-07-069, Inservice Inspection Third Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval | 13 June 2007 | Inservice Inspection Third Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval | Hydrostatic Through Wall Leak |
ML070710007 | 19 March 2007 | Summary of the Staff'S Review of the 2006 Steam Generator Tube Inservice Inspection Reports for Refueling Outrage 17 | |
NL-07-028, Inservice Testing Program Summary for 4th Interval, Revision 0 | 28 February 2007 | Inservice Testing Program Summary for 4th Interval, Revision 0 | Safe Shutdown Boric Acid Stroke time |
NL-07-029, 4th Ten-Year Interval Inservice Inspection and Containment Inservice Inspection Program Plan | 28 February 2007 | 4th Ten-Year Interval Inservice Inspection and Containment Inservice Inspection Program Plan | |
NL-05-088, Inservice Inspection (ISI) Second Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval | 6 July 2005 | Inservice Inspection (ISI) Second Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval | |
NL-05-0211, Inservice Testing Program Summary for the Interval July 1, 1994 Through April 6.2006. Revision 3 | 22 February 2005 | Inservice Testing Program Summary for the Interval July 1, 1994 Through April 6.2006. Revision 3 | Safe Shutdown Boric Acid Ultimate heat sink Stroke time Incorporated by reference B.5.b Mitigating Strategies |
ML050630405 | 22 February 2005 | Inservice Inspection (ISI) Third Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval | VT-2 Moisture barrier |
JPN-04-010, Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure Studs | 14 April 2004 | Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure Studs | Incorporated by reference |
NL-03-188, Request for Approval for Alternative to Use Code Case N-613-1 for Reactor Vessel Nozzle to Vessel Weld Inspection | 30 December 2003 | Request for Approval for Alternative to Use Code Case N-613-1 for Reactor Vessel Nozzle to Vessel Weld Inspection | |
NL-03-078, Relief Request RR 63, Risk-Informed Inservice Inspection (RI-ISI) Program | 12 May 2003 | Relief Request RR 63, Risk-Informed Inservice Inspection (RI-ISI) Program | Internal Flooding Probabilistic Risk Assessment Nondestructive Examination VT-2 |
NL-03-055, Withdrawal of Relief Request RR3-29 for Inservice Inspection Program | 27 March 2003 | Withdrawal of Relief Request RR3-29 for Inservice Inspection Program | |
NL-03-026, Refueling Outage Inservice Inspection (ISI) Program Summary Report - Third Outage, Second Period, Third Interval | 25 February 2003 | Refueling Outage Inservice Inspection (ISI) Program Summary Report - Third Outage, Second Period, Third Interval | Boric Acid Hydrostatic Nondestructive Examination Loctite |
NL-04-006, St Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval | 20 January 2003 | St Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval | |
ML020990092 | 3 April 2002 | Revised Relief Request Nos. 3-12, 3-14, 3-16 & 3-17, Third 10-Year Inservice Inspection Interval Program Plan | Weld Overlay Hydrostatic VT-2 Liquid penetrant |
ML020580391 | 5 February 2002 | Relief Request RR 3-28, Risk-Informed Inservice Inspection (RI-ISI) Program | Probabilistic Risk Assessment Nondestructive Examination VT-2 |