NMP2L2700, Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants | 30 April 2019 | Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants | Boric Acid Loop seal Nondestructive Examination |
ML18085A168 | 19 March 2018 | Inspection Report for End of Cycle 21 Refueling Outage | Nondestructive Examination |
ML18009A434 | 8 January 2018 | Submittal of T1R22 Refueling Outage Lnservice Inspection Owner'S Activity Report | Boric Acid Packing leak Moisture barrier |
ML17087A082 | 28 March 2017 | Submittal of the Update to the Fifth Ten-Year Interval Lnservice Testing Program | Safe Shutdown Boric Acid Stroke time Squib Incorporated by reference FLEX Cold shutdown justification Power-Operated Valves Power Operated Valves Grace period |
ML16144A791 | 21 May 2016 | Inspection Report for Refueling Outage T1R21 | Nondestructive Examination |
TMI-16-023, T1R21 Refueling Outage Inservice Inspection (Isli) Owner'S Activity Report and Attachments | 22 February 2016 | T1R21 Refueling Outage Inservice Inspection (Isli) Owner'S Activity Report and Attachments | Packing leak |
TMI-15-048, Submittal of the Update to the Fifth Ten-Year Interval Lnservice Testing Program | 13 April 2015 | Submittal of the Update to the Fifth Ten-Year Interval Lnservice Testing Program | Safe Shutdown Boric Acid Stroke time Squib Incorporated by reference Cold shutdown justification Power-Operated Valves Power Operated Valves Grace period |
TMI-14-058, (TMI-1) - Steam Generator Tube Inspection Report | 22 May 2014 | (TMI-1) - Steam Generator Tube Inspection Report | Nondestructive Examination |
TMI-14-069, Submittal of the Fifth Ten-Year Interval Inservice Testing Program | 16 May 2014 | Submittal of the Fifth Ten-Year Interval Inservice Testing Program | Safe Shutdown Boric Acid Stroke time Squib Incorporated by reference Cold shutdown justification Power-Operated Valves Power Operated Valves Grace period |
TMI-14-029, T1R20 Refueling Outage Inservice Inspection (ISI) Owner'S Activity Report and Attachments | 25 February 2014 | T1R20 Refueling Outage Inservice Inspection (ISI) Owner'S Activity Report and Attachments | Boric Acid Packing leak |
TMI-13-048, Response to Request for Additional Information - Submittal of End of Interval Relief Request RR-12-01 | 18 March 2013 | Response to Request for Additional Information - Submittal of End of Interval Relief Request RR-12-01 | |
TMI-13-043, Response to Request for Additional Information - Relief Request VR-01 Associated with the Fifth Inservice Testing (IST) Interval | 15 March 2013 | Response to Request for Additional Information - Relief Request VR-01 Associated with the Fifth Inservice Testing (IST) Interval | Stroke time |
TMI-13-038, Relief Request RR-12-02 Concerning the Installation of a Full Structural Weld Overlay on the Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds and Alloy 600 Safe-End | 11 March 2013 | Relief Request RR-12-02 Concerning the Installation of a Full Structural Weld Overlay on the Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds and Alloy 600 Safe-End | Weld Overlay Hydrostatic Finite Element Analysis Dissimilar Metal Weld DM weld |
TMI-12-071, Transmittal of Steam Generator Tube Inspection Report | 15 May 2012 | Transmittal of Steam Generator Tube Inspection Report | Nondestructive Examination |
TMI-12-016, T1R19 Refueling Outage Inservice Inspection (ISI) Owner'S Activity Report and Attachments | 20 February 2012 | T1R19 Refueling Outage Inservice Inspection (ISI) Owner'S Activity Report and Attachments | Boric Acid |
TMI-11-158, Submittal of Relief Request PR-05 Associated with the Fourth Inservice Testing (IST) Interval | 28 October 2011 | Submittal of Relief Request PR-05 Associated with the Fourth Inservice Testing (IST) Interval | |
ML11105A160 | 5 April 2011 | 2010 Augmented Reactor Building (Iwl) In-Service Inspection, Topical Report 204, Rev. 0 | Coatings Incorporated by reference |
TMI-11-060, Response to a Request for Additional Information - Relief Request RR-10-01 Concerning Control Rod Drive Housing Examinations Associated with the Third Inservice Inspection Interval | 5 April 2011 | Response to a Request for Additional Information - Relief Request RR-10-01 Concerning Control Rod Drive Housing Examinations Associated with the Third Inservice Inspection Interval | Nondestructive Examination VT-2 Liquid penetrant |
TMI-11-061, ISI Program Plan, Fourth Ten-Year Inspection Interval | 15 March 2011 | ISI Program Plan, Fourth Ten-Year Inspection Interval | Boric Acid Weld Overlay Internal Flooding Hydrostatic Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Moisture barrier License Renewal Control of Heavy Loads EVT-1 Liquid penetrant Dissimilar Metal Weld Power change |
TMI-11-007, Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection Interval | 25 January 2011 | Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection Interval | Probabilistic Risk Assessment Large early release frequency |
TMI-10-101, Three Mile, Unit 1, Supplemental Information Request - Fourth Inservice Inspection (ISI) Interval Relief Request I4R-02 | 8 October 2010 | Three Mile, Unit 1, Supplemental Information Request - Fourth Inservice Inspection (ISI) Interval Relief Request I4R-02 | Probabilistic Risk Assessment Seismically rugged |
TMI-10-079, Submittal of Relief Requests Associated with the Fourth Inservice Inspection Interval | 10 August 2010 | Submittal of Relief Requests Associated with the Fourth Inservice Inspection Interval | Weld Overlay Internal Flooding Probabilistic Risk Assessment Nondestructive Examination VT-2 Dissimilar Metal Weld |
TMI-10-069, Supplement to Cycle 17 Refueling (T1R18) Inservice Inspection (ISI) Summary Report | 7 July 2010 | Supplement to Cycle 17 Refueling (T1R18) Inservice Inspection (ISI) Summary Report | |
TMI-10-033, TMI Unit 1 T1 R18 Outage ASME Code Section XI Inservice Inspection (ISI) Form NIS-1 Owner'S Report for Inservice Inspections, Part I, TMI Unit 1 Form NIS-2 Owner'S Report for Repairs or Replacements, and Topical Report Number 203, Part 2 | 21 April 2010 | TMI Unit 1 T1 R18 Outage ASME Code Section XI Inservice Inspection (ISI) Form NIS-1 Owner'S Report for Inservice Inspections, Part I, TMI Unit 1 Form NIS-2 Owner'S Report for Repairs or Replacements, and Topical Report Number 203, Part 2 | Safe Shutdown Commercial Grade Dedication Coatings Nondestructive Examination Condition Adverse to Quality Aging Management Foreign Material Exclusion Moisture barrier Scaffolding |
ML101400273 | 21 April 2010 | TMI Unit 1 T1 R18 Outage ASME Code Section Xi Inservice Inspection (ISI) Form NIS-1 Owner'S Report for Inservice Inspections, Part I, TMI Unit 1 Form NIS-2 Owner'S Report for Repairs or Replacements, and Topical Report Number 203, Part 1 | |
TMI-09-101, Submittal of the Fourth Ten-Year Interval Inservice Testing Program, Revision 1, for September 23, 2004 Through September 22, 2014 | 14 August 2009 | Submittal of the Fourth Ten-Year Interval Inservice Testing Program, Revision 1, for September 23, 2004 Through September 22, 2014 | Safe Shutdown Stroke time Excess Flow Check Valve Cold shutdown justification Power-Operated Valves Power Operated Valves |
TMI-09-086, Submittal of Concerning Unsatisfactory Laboratory Performance Tests | 30 July 2009 | Submittal of Concerning Unsatisfactory Laboratory Performance Tests | |
ML060540412 | 15 February 2006 | Cycle 16 Refueling (T1R16) Inservice Inspection (ISI) Summary Report | |
ML052940347 | 14 October 2005 | Additional Information Regarding Kinetic Expansion Inspection and Repair Criteria | Shutdown Margin Non-Destructive Examination Finite Element Analysis Flow Induced Vibration |
ML032521375 | 27 August 2003 | TMI, Unit 1 - Third Ten-Year Inservice Inspection (ISI) Program, Supplemental Information, Risk-Informed Inservice Inspection Program Alternative to the ASME Boiler & Pressure Vessel Code, Section XI Requirements for Class 1 & 2 Piping Weld | VT-2 |
ML022770144 | 8 October 2002 | (TMI-1), Amergen Energy Company, LLC (Amergen), March 5, 2002, Cycle 14, Inservice Inspection (ISI) Summary Report | |
ML022830211 | 1 October 2002 | Third Ten-Year Interval Inservice Inspection (ISI) Program Risk-Informed Inservice Inspection Program Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping Welds | Non-Destructive Examination Internal Flooding VT-2 Large early release frequency Scaffolding |