Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NMP2L2700, Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants30 April 2019Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for PlantsBoric Acid
Loop seal
Nondestructive Examination
ML18085A16819 March 2018Inspection Report for End of Cycle 21 Refueling OutageNondestructive Examination
ML18009A4348 January 2018Submittal of T1R22 Refueling Outage Lnservice Inspection Owner'S Activity ReportBoric Acid
Packing leak
Moisture barrier
ML17087A08228 March 2017Submittal of the Update to the Fifth Ten-Year Interval Lnservice Testing ProgramSafe Shutdown
Boric Acid
Stroke time
Squib
Incorporated by reference
FLEX
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Grace period
ML16144A79121 May 2016Inspection Report for Refueling Outage T1R21Nondestructive Examination
TMI-16-023, T1R21 Refueling Outage Inservice Inspection (Isli) Owner'S Activity Report and Attachments22 February 2016T1R21 Refueling Outage Inservice Inspection (Isli) Owner'S Activity Report and AttachmentsPacking leak
TMI-15-048, Submittal of the Update to the Fifth Ten-Year Interval Lnservice Testing Program13 April 2015Submittal of the Update to the Fifth Ten-Year Interval Lnservice Testing ProgramSafe Shutdown
Boric Acid
Stroke time
Squib
Incorporated by reference
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Grace period
TMI-14-058, (TMI-1) - Steam Generator Tube Inspection Report22 May 2014(TMI-1) - Steam Generator Tube Inspection ReportNondestructive Examination
TMI-14-069, Submittal of the Fifth Ten-Year Interval Inservice Testing Program16 May 2014Submittal of the Fifth Ten-Year Interval Inservice Testing ProgramSafe Shutdown
Boric Acid
Stroke time
Squib
Incorporated by reference
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Grace period
TMI-14-029, T1R20 Refueling Outage Inservice Inspection (ISI) Owner'S Activity Report and Attachments25 February 2014T1R20 Refueling Outage Inservice Inspection (ISI) Owner'S Activity Report and AttachmentsBoric Acid
Packing leak
TMI-13-048, Response to Request for Additional Information - Submittal of End of Interval Relief Request RR-12-0118 March 2013Response to Request for Additional Information - Submittal of End of Interval Relief Request RR-12-01
TMI-13-043, Response to Request for Additional Information - Relief Request VR-01 Associated with the Fifth Inservice Testing (IST) Interval15 March 2013Response to Request for Additional Information - Relief Request VR-01 Associated with the Fifth Inservice Testing (IST) IntervalStroke time
TMI-13-038, Relief Request RR-12-02 Concerning the Installation of a Full Structural Weld Overlay on the Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds and Alloy 600 Safe-End11 March 2013Relief Request RR-12-02 Concerning the Installation of a Full Structural Weld Overlay on the Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds and Alloy 600 Safe-EndWeld Overlay
Hydrostatic
Finite Element Analysis
Dissimilar Metal Weld
DM weld
TMI-12-071, Transmittal of Steam Generator Tube Inspection Report15 May 2012Transmittal of Steam Generator Tube Inspection ReportNondestructive Examination
TMI-12-016, T1R19 Refueling Outage Inservice Inspection (ISI) Owner'S Activity Report and Attachments20 February 2012T1R19 Refueling Outage Inservice Inspection (ISI) Owner'S Activity Report and AttachmentsBoric Acid
TMI-11-158, Submittal of Relief Request PR-05 Associated with the Fourth Inservice Testing (IST) Interval28 October 2011Submittal of Relief Request PR-05 Associated with the Fourth Inservice Testing (IST) Interval
ML11105A1605 April 20112010 Augmented Reactor Building (Iwl) In-Service Inspection, Topical Report 204, Rev. 0Coatings
Incorporated by reference
TMI-11-060, Response to a Request for Additional Information - Relief Request RR-10-01 Concerning Control Rod Drive Housing Examinations Associated with the Third Inservice Inspection Interval5 April 2011Response to a Request for Additional Information - Relief Request RR-10-01 Concerning Control Rod Drive Housing Examinations Associated with the Third Inservice Inspection IntervalNondestructive Examination
VT-2
Liquid penetrant
TMI-11-061, ISI Program Plan, Fourth Ten-Year Inspection Interval15 March 2011ISI Program Plan, Fourth Ten-Year Inspection IntervalBoric Acid
Weld Overlay
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Incorporated by reference
Moisture barrier
License Renewal
Control of Heavy Loads
EVT-1
Liquid penetrant
Dissimilar Metal Weld
Power change
TMI-11-007, Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection Interval25 January 2011Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection IntervalProbabilistic Risk Assessment
Large early release frequency
TMI-10-101, Three Mile, Unit 1, Supplemental Information Request - Fourth Inservice Inspection (ISI) Interval Relief Request I4R-028 October 2010Three Mile, Unit 1, Supplemental Information Request - Fourth Inservice Inspection (ISI) Interval Relief Request I4R-02Probabilistic Risk Assessment
Seismically rugged
TMI-10-079, Submittal of Relief Requests Associated with the Fourth Inservice Inspection Interval10 August 2010Submittal of Relief Requests Associated with the Fourth Inservice Inspection IntervalWeld Overlay
Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Dissimilar Metal Weld
TMI-10-069, Supplement to Cycle 17 Refueling (T1R18) Inservice Inspection (ISI) Summary Report7 July 2010Supplement to Cycle 17 Refueling (T1R18) Inservice Inspection (ISI) Summary Report
TMI-10-033, TMI Unit 1 T1 R18 Outage ASME Code Section XI Inservice Inspection (ISI) Form NIS-1 Owner'S Report for Inservice Inspections, Part I, TMI Unit 1 Form NIS-2 Owner'S Report for Repairs or Replacements, and Topical Report Number 203, Part 221 April 2010TMI Unit 1 T1 R18 Outage ASME Code Section XI Inservice Inspection (ISI) Form NIS-1 Owner'S Report for Inservice Inspections, Part I, TMI Unit 1 Form NIS-2 Owner'S Report for Repairs or Replacements, and Topical Report Number 203, Part 2Safe Shutdown
Commercial Grade Dedication
Coatings
Nondestructive Examination
Condition Adverse to Quality
Aging Management
Foreign Material Exclusion
Moisture barrier
Scaffolding
ML10140027321 April 2010TMI Unit 1 T1 R18 Outage ASME Code Section Xi Inservice Inspection (ISI) Form NIS-1 Owner'S Report for Inservice Inspections, Part I, TMI Unit 1 Form NIS-2 Owner'S Report for Repairs or Replacements, and Topical Report Number 203, Part 1
TMI-09-101, Submittal of the Fourth Ten-Year Interval Inservice Testing Program, Revision 1, for September 23, 2004 Through September 22, 201414 August 2009Submittal of the Fourth Ten-Year Interval Inservice Testing Program, Revision 1, for September 23, 2004 Through September 22, 2014Safe Shutdown
Stroke time
Excess Flow Check Valve
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
TMI-09-086, Submittal of Concerning Unsatisfactory Laboratory Performance Tests30 July 2009Submittal of Concerning Unsatisfactory Laboratory Performance Tests
ML06054041215 February 2006Cycle 16 Refueling (T1R16) Inservice Inspection (ISI) Summary Report
ML05294034714 October 2005Additional Information Regarding Kinetic Expansion Inspection and Repair CriteriaShutdown Margin
Non-Destructive Examination
Finite Element Analysis
Flow Induced Vibration
ML03252137527 August 2003TMI, Unit 1 - Third Ten-Year Inservice Inspection (ISI) Program, Supplemental Information, Risk-Informed Inservice Inspection Program Alternative to the ASME Boiler & Pressure Vessel Code, Section XI Requirements for Class 1 & 2 Piping WeldVT-2
ML0227701448 October 2002(TMI-1), Amergen Energy Company, LLC (Amergen), March 5, 2002, Cycle 14, Inservice Inspection (ISI) Summary Report
ML0228302111 October 2002Third Ten-Year Interval Inservice Inspection (ISI) Program Risk-Informed Inservice Inspection Program Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping WeldsNon-Destructive Examination
Internal Flooding
VT-2
Large early release frequency
Scaffolding