Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML16155A30723 May 2016Summary of Facility Changes, Tests, Experiments and Commitment ChangesB.5.b Mitigating Strategies
ML12264A56318 September 2012Reactor Vessel Internals Inspection Plan Review Request Response to Request for Additional Information
ML12215A01224 July 20122012 Inservice Inspection Summary ReportVT-2
Through Wall Leak
ML12125A2793 May 2012Inservice Inspection Program Fourth Ten-Year Interval 10 CFR 50.55a Request No. RR-2-4Safe Shutdown
Boric Acid
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Commercial Grade Dedication
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
VT-2
Emergency Lighting
Aging Management
Code Reconciliation
B.5.b Mitigating Strategies
Exemption Request
Maintenance Rule Program
Pressure Boundary Leakage
Through-Wall Leak
Fire Protection Program
Scaffolding
ML12125A3003 May 2012Inservice Inspection Program Fourth Ten-Year Interval Withdrawal of 10 CFR 50.55a Request No. RR-2-3
ML12123A2701 May 2012Inservice Inspection Program Fourth Ten-Year Interval Supplement to 10 CFR 50.55a Request No. RR-2-3Boric Acid
Nondestructive Examination
Temporary Modification
VT-2
Functionality Assessment
Code Reconciliation
Through-Wall Leak
ML12122A13730 April 2012Inservice Inspection Program Fourth Ten-Year Interval, 10 CFR 50.55A Request No. RR-2-3, Response to Request for Additional InformationTemporary Modification
ML12129A03630 April 2012Inservice Inspection Program Fourth Ten-Year Interval 10 CFR 50.55a Request No. RR-2-3, Response to Request for Additional InformationTemporary Modification
ML12120A00429 April 2012Inservice Inspection Program Fourth Ten-Year Interval Relief Request RR-2-3Nondestructive Examination
Temporary Modification
VT-2
Code Reconciliation
Through-Wall Leak
ML11355A15612 December 2011Reactor Vessel Internals Inspection Plan Review RequestAging Management
EVT-1
ML11284A19328 September 2011Inservice Inspection Program Fourth Ten-Year Interval Limitation to Examination Relief Request No. RR-G-5VT-2
Liquid penetrant
ML11178A03313 June 20112011 Inservice Inspection Summary ReportBoric Acid
Hydrostatic
VT-2
Moisture barrier
ML1025200787 September 2010Inservice Inspection Program Fourth Ten-Year Interval 10 CFR 50.55a Request No. RR-2-2
ML1000705544 January 20102009 Inservice Inspection Summary ReportBoric Acid
Hydrostatic
VT-2
Moisture barrier
Liquid penetrant
ML08218065629 July 2008Inservice Inspection Summary ReportBoric Acid
Hydrostatic
VT-2
Moisture barrier
Liquid penetrant
ML0701005248 January 2007Inservice Inspection Summary ReportBoric Acid
Packing leak
Hydrostatic
VT-2
Loctite
ML06081026317 March 2006Second 10-year Inservice Inspection Class Mc (ISI) ProgramIncorporated by reference
Moisture barrier
Dissimilar Metal Weld
ML05244026323 June 2005Inservice Inspection Third 10-Year Interval June 16, 1994 - June 16, 2004 Limitation to Examination Relief Requests of the Kewaunee Nuclear Power PlantTemporary Modification
VT-2
Liquid penetrant
ML05062024224 February 20052004 Inservice Inspection (ISI) Summary ReportBoric Acid
Hydrostatic
VT-2
Moisture barrier
Liquid penetrant
Dissimilar Metal Weld
ML04272036617 September 2004Response to Request for Additional Information Related to Third and Fourth 10-Year In-Service Inspection Intervals Request for Relief for Nuclear Management Company, LLCDissimilar Metal Weld
ML04239015616 August 2004Inservice Testing Program Fourth Ten-Year Interval UpdateSafe Shutdown
Boric Acid
Shutdown Margin
Stroke time
Anchor Darling
Incorporated by reference
Cold shutdown justification
Power Operated Valves
ML04118058016 April 2004In-Service Inspection (ISI) Program Relief Request No. RR-1-8 Rev.1, RR-1-9, RR-1-10, RR-1-11 and RR-G-6 for Third Ten-Year Interval. In-Service Inspection (ISI) Program Relief Request No. RR-1-7 Rev. 1 and RR-1-8 Rev. 1 for Fourth Ten-YearNondestructive Examination
Dissimilar Metal Weld
DM weld
ML04028037716 January 2004In-Service Inspection (ISI) Program Relief Request No. RR-MC-2 for Class Mc
ML03358073516 December 2003to Risk-Informed Inservice Inspection Program Plan, Kewaunee Nuclear Power PlantSafe Shutdown
Boric Acid
Shutdown Margin
Packing leak
Non-Destructive Examination
Mission time
Anticipated operational occurrence
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Large early release frequency
Turbine Missile
Liquid penetrant
Dissimilar Metal Weld
ML03358073416 December 2003Inservice Inspection Program for Fourth Inspection IntervalHydrostatic
Probabilistic Risk Assessment
VT-2
Incorporated by reference
Through-Wall Leak
Dissimilar Metal Weld
DM weld
ML03232052214 August 2003Inservice Testing Program ProjectSafe Shutdown
Boric Acid
Shutdown Margin
Stroke time
Incorporated by reference
Cold shutdown justification
Power Operated Valves
ML0322501656 August 20032003 Inservice Inspection (ISI) Summary ReportBoric Acid
Hydrostatic
Nondestructive Examination
VT-2
Liquid penetrant
ML02072054722 February 2002Part 2 of 2, Kewaunee Nuclear Power Plant, 2001 Inservice Inspection (ISI) Summary Report
ML02072055922 February 2002Part 1 of 2, Kewaunee Nuclear Power Plant, 2001 Inservice Inspection (ISI) Summary ReportHydrostatic
Nondestructive Examination
VT-2
Moisture barrier
Liquid penetrant
Dissimilar Metal Weld