Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML16155A307 | 23 May 2016 | Summary of Facility Changes, Tests, Experiments and Commitment Changes | B.5.b Mitigating Strategies |
ML12264A563 | 18 September 2012 | Reactor Vessel Internals Inspection Plan Review Request Response to Request for Additional Information | |
ML12215A012 | 24 July 2012 | 2012 Inservice Inspection Summary Report | VT-2 Through Wall Leak |
ML12125A279 | 3 May 2012 | Inservice Inspection Program Fourth Ten-Year Interval 10 CFR 50.55a Request No. RR-2-4 | Safe Shutdown Boric Acid Offsite Dose Calculation Manual Fire Barrier Stroke time Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification VT-2 Emergency Lighting Aging Management Code Reconciliation B.5.b Mitigating Strategies Exemption Request Maintenance Rule Program Pressure Boundary Leakage Through-Wall Leak Fire Protection Program Scaffolding |
ML12125A300 | 3 May 2012 | Inservice Inspection Program Fourth Ten-Year Interval Withdrawal of 10 CFR 50.55a Request No. RR-2-3 | |
ML12123A270 | 1 May 2012 | Inservice Inspection Program Fourth Ten-Year Interval Supplement to 10 CFR 50.55a Request No. RR-2-3 | Boric Acid Nondestructive Examination Temporary Modification VT-2 Functionality Assessment Code Reconciliation Through-Wall Leak |
ML12122A137 | 30 April 2012 | Inservice Inspection Program Fourth Ten-Year Interval, 10 CFR 50.55A Request No. RR-2-3, Response to Request for Additional Information | Temporary Modification |
ML12129A036 | 30 April 2012 | Inservice Inspection Program Fourth Ten-Year Interval 10 CFR 50.55a Request No. RR-2-3, Response to Request for Additional Information | Temporary Modification |
ML12120A004 | 29 April 2012 | Inservice Inspection Program Fourth Ten-Year Interval Relief Request RR-2-3 | Nondestructive Examination Temporary Modification VT-2 Code Reconciliation Through-Wall Leak |
ML11355A156 | 12 December 2011 | Reactor Vessel Internals Inspection Plan Review Request | Aging Management EVT-1 |
ML11284A193 | 28 September 2011 | Inservice Inspection Program Fourth Ten-Year Interval Limitation to Examination Relief Request No. RR-G-5 | VT-2 Liquid penetrant |
ML11178A033 | 13 June 2011 | 2011 Inservice Inspection Summary Report | Boric Acid Hydrostatic VT-2 Moisture barrier |
ML102520078 | 7 September 2010 | Inservice Inspection Program Fourth Ten-Year Interval 10 CFR 50.55a Request No. RR-2-2 | |
ML100070554 | 4 January 2010 | 2009 Inservice Inspection Summary Report | Boric Acid Hydrostatic VT-2 Moisture barrier Liquid penetrant |
ML082180656 | 29 July 2008 | Inservice Inspection Summary Report | Boric Acid Hydrostatic VT-2 Moisture barrier Liquid penetrant |
ML070100524 | 8 January 2007 | Inservice Inspection Summary Report | Boric Acid Packing leak Hydrostatic VT-2 Loctite |
ML060810263 | 17 March 2006 | Second 10-year Inservice Inspection Class Mc (ISI) Program | Incorporated by reference Moisture barrier Dissimilar Metal Weld |
ML052440263 | 23 June 2005 | Inservice Inspection Third 10-Year Interval June 16, 1994 - June 16, 2004 Limitation to Examination Relief Requests of the Kewaunee Nuclear Power Plant | Temporary Modification VT-2 Liquid penetrant |
ML050620242 | 24 February 2005 | 2004 Inservice Inspection (ISI) Summary Report | Boric Acid Hydrostatic VT-2 Moisture barrier Liquid penetrant Dissimilar Metal Weld |
ML042720366 | 17 September 2004 | Response to Request for Additional Information Related to Third and Fourth 10-Year In-Service Inspection Intervals Request for Relief for Nuclear Management Company, LLC | Dissimilar Metal Weld |
ML042390156 | 16 August 2004 | Inservice Testing Program Fourth Ten-Year Interval Update | Safe Shutdown Boric Acid Shutdown Margin Stroke time Anchor Darling Incorporated by reference Cold shutdown justification Power Operated Valves |
ML041180580 | 16 April 2004 | In-Service Inspection (ISI) Program Relief Request No. RR-1-8 Rev.1, RR-1-9, RR-1-10, RR-1-11 and RR-G-6 for Third Ten-Year Interval. In-Service Inspection (ISI) Program Relief Request No. RR-1-7 Rev. 1 and RR-1-8 Rev. 1 for Fourth Ten-Year | Nondestructive Examination Dissimilar Metal Weld DM weld |
ML040280377 | 16 January 2004 | In-Service Inspection (ISI) Program Relief Request No. RR-MC-2 for Class Mc | |
ML033580735 | 16 December 2003 | to Risk-Informed Inservice Inspection Program Plan, Kewaunee Nuclear Power Plant | Safe Shutdown Boric Acid Shutdown Margin Packing leak Non-Destructive Examination Mission time Anticipated operational occurrence Probabilistic Risk Assessment Nondestructive Examination VT-2 Large early release frequency Turbine Missile Liquid penetrant Dissimilar Metal Weld |
ML033580734 | 16 December 2003 | Inservice Inspection Program for Fourth Inspection Interval | Hydrostatic Probabilistic Risk Assessment VT-2 Incorporated by reference Through-Wall Leak Dissimilar Metal Weld DM weld |
ML032320522 | 14 August 2003 | Inservice Testing Program Project | Safe Shutdown Boric Acid Shutdown Margin Stroke time Incorporated by reference Cold shutdown justification Power Operated Valves |
ML032250165 | 6 August 2003 | 2003 Inservice Inspection (ISI) Summary Report | Boric Acid Hydrostatic Nondestructive Examination VT-2 Liquid penetrant |
ML020720547 | 22 February 2002 | Part 2 of 2, Kewaunee Nuclear Power Plant, 2001 Inservice Inspection (ISI) Summary Report | |
ML020720559 | 22 February 2002 | Part 1 of 2, Kewaunee Nuclear Power Plant, 2001 Inservice Inspection (ISI) Summary Report | Hydrostatic Nondestructive Examination VT-2 Moisture barrier Liquid penetrant Dissimilar Metal Weld |