L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report | 31 July 2023 | 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report | Through-Wall Leakage |
L-MT-23-024, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Inspection (ISI) Interval, RR-002 (L-MT-23-024) | 11 July 2023 | 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Inspection (ISI) Interval, RR-002 (L-MT-23-024) | |
L-MT-22-030, Sixth Interval Inservice Testing (1ST) Plan | 6 September 2022 | Sixth Interval Inservice Testing (1ST) Plan | Safe Shutdown Packing leak Stroke time Water Inventory Control Squib Incorporated by reference Locked High Radiation Area Abnormal operational transient Surveillance Frequency Control Program Scram Discharge Volume Breakaway torque Cold shutdown justification Earthquake Power Operated Valves Scaffolding |
ML22067A084 | 7 March 2022 | 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-28 (LMT-22-007) | Incorporated by reference |
L-MT-22-006, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006) | 18 February 2022 | 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006) | |
L-MT-21-051, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-22 (L-MT-21-051) | 23 December 2021 | 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-22 (L-MT-21-051) | Safe Shutdown |
ML21305A067 | 1 November 2021 | Clone of 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing (IST) Ten-Year Interval PR-02 (L-MT-21-054) | |
ML21278A185 | 5 October 2021 | 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-02 (LMT-21-049) | Stroke time Scaffolding |
L-MT-21-041, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-05 (L-MT-21-041) | 31 August 2021 | 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-05 (L-MT-21-041) | Power-Operated Valves |
L-MT-21-038, 2021 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report | 17 August 2021 | 2021 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report | |
L-MT-20-004, 10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval | 14 February 2020 | 10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval | Non-Destructive Examination Water Inventory Control Flow Induced Vibration |
L-MT-20-001, 10 CFR 50.55a(z)(1) Request Vr 05: Request for Approval of an Alternative for Pressure Isolation Valve Testing | 16 January 2020 | 10 CFR 50.55a(z)(1) Request Vr 05: Request for Approval of an Alternative for Pressure Isolation Valve Testing | Power-Operated Valves |
L-MT-19-028, 2019 Refueling Outage 90-Day Lnservice Inspection (ISI) Summary Report; Second Steam Dryer Inspection Summary | 9 August 2019 | 2019 Refueling Outage 90-Day Lnservice Inspection (ISI) Summary Report; Second Steam Dryer Inspection Summary | Hydrostatic VT-2 Earthquake |
L-MT-17-059, 2017 Refueling Outage 90-Day Lnservice Inspection (ISI) Summary Report | 9 August 2017 | 2017 Refueling Outage 90-Day Lnservice Inspection (ISI) Summary Report | Nondestructive Examination Pressure Boundary Leakage Through-Wall Leak |
L-MT-15-064, Cycle 27 Inservice Inspection Summary Report | 26 August 2015 | Cycle 27 Inservice Inspection Summary Report | |
ML14212A071 | 30 July 2014 | 10 CFR 50.55a Request No. Vr 05: Proposed Alternative to Lnservice Testing Requirements Pursuant to 10 CFR 50.55a(a)(3)(ii) | Safe Shutdown Packing leak Stroke time |
L-MT-14-037, CFR 50.55a Request No. 009: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fifth Ten-Year Lnservice Inspection Interval | 6 June 2014 | CFR 50.55a Request No. 009: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fifth Ten-Year Lnservice Inspection Interval | Nondestructive Examination VT-2 Aging Management Pressure Boundary Leakage |
L-MT-14-021, Proposed Alternative in Accordance with 10 CFR 50.55a Request RR-008 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval | 28 February 2014 | Proposed Alternative in Accordance with 10 CFR 50.55a Request RR-008 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval | Flow Induced Vibration |
ML13308B219 | 11 October 2013 | Enclosure 3 - MNGP Evaluation EC-22537 - 2013 H8-H9 Shroud Support Structure Indications Update | EVT-1 |
ML13308B218 | 8 October 2013 | Enclosure 2- BWRVIP Inspection Summary Report | EVT-1 |
ML13308B217 | 8 October 2013 | Enclosure 1 - Cycle No. 26 and 1R26 2013 Refueling Outage Inservice Inspection: Interval 4, Period 3 and Interval 5, Period 1, Owner'S Activity Report (OAR-1) | |
L-MT-13-060, Response to Request for Additional Information Regarding Fifth 10-Year Inservice Inspection Program Plan Review | 17 July 2013 | Response to Request for Additional Information Regarding Fifth 10-Year Inservice Inspection Program Plan Review | |
L-MT-12-094, In-service Testing (IST) Program Plan for Safety Related Seismic Restraints (Snubbers) for the Fifth 10-Year Interval | 30 November 2012 | In-service Testing (IST) Program Plan for Safety Related Seismic Restraints (Snubbers) for the Fifth 10-Year Interval | Safe Shutdown Incorporated by reference Abnormal operational transient Earthquake |
L-MT-12-019, CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval | 28 February 2012 | CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval | Fuel cladding Grace period |
L-MT-12-017, CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Inspection Interval | 28 February 2012 | CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Inspection Interval | Weld Overlay Hydrostatic VT-2 |
L-MT-12-020, Fifth Ten-Year Lnservice Testing Plan | 28 February 2012 | Fifth Ten-Year Lnservice Testing Plan | Safe Shutdown Stroke time Squib Scram Discharge Volume Breakaway torque Power-Operated Valves Fuel cladding Grace period |
L-MT-12-018, Fifth Ten-Year Lnservice Inspection Plan | 28 February 2012 | Fifth Ten-Year Lnservice Inspection Plan | Anchor Darling Nondestructive Examination Incorporated by reference Aging Management Scram Discharge Volume Dissimilar Metal Weld Scaffolding |
L-MT-12-011, Supplement to 10CFR50.55a Requests Associated with the Fourth and Fifth Lnservice Lnspection Ten-Year Intervals | 15 February 2012 | Supplement to 10CFR50.55a Requests Associated with the Fourth and Fifth Lnservice Lnspection Ten-Year Intervals | |
L-MT-11-046, Cycle 25 Inservice Inspection Summary Report | 23 August 2011 | Cycle 25 Inservice Inspection Summary Report | Hydrostatic EVT-1 Through-Wall Leakage |
L-MT-09-078, Submittal of Cycle No. 24 Inservice Inspection Summary Report for Inservice Inspection and ASME Section Xl Repairs and Replacements | 7 August 2009 | Submittal of Cycle No. 24 Inservice Inspection Summary Report for Inservice Inspection and ASME Section Xl Repairs and Replacements | Stroke time Weld Overlay Hydrostatic Anchor Darling Nondestructive Examination VT-2 EVT-1 Liquid penetrant Pressure Boundary Leakage |
L-MT-07-058, Cycle No. 23 Lnservice Inspection Summary Report for Lnservice Inspection and ASME Section XI Repairs and Replacements | 27 July 2007 | Cycle No. 23 Lnservice Inspection Summary Report for Lnservice Inspection and ASME Section XI Repairs and Replacements | Stroke time Hydrostatic Coatings Nondestructive Examination VT-2 Scram Discharge Volume Code Reconciliation EVT-1 Liquid penetrant Scaffolding |
L-MT-05-088, 10 CFR 50.55a Request No. 13: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection Interval | 27 September 2005 | 10 CFR 50.55a Request No. 13: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection Interval | Nondestructive Examination VT-2 |
L-MT-05-078, Summary Report for Inservice Inspections and ASME Section XI Repairs and Replacements | 12 July 2005 | Summary Report for Inservice Inspections and ASME Section XI Repairs and Replacements | Stroke time Hydrostatic Nondestructive Examination Squib VT-2 EVT-1 Liquid penetrant Pressure Boundary Leakage |
L-MT-05-039, Fourth Interval Inservice Inspection Examination Plan. Revision 3 | 26 April 2005 | Fourth Interval Inservice Inspection Examination Plan. Revision 3 | |
L-MT-04-050, Fourth Interval Inservice Inspection Examination Plan, Revision 2 | 16 September 2004 | Fourth Interval Inservice Inspection Examination Plan, Revision 2 | Hydrostatic Probabilistic Risk Assessment Nondestructive Examination VT-2 Large early release frequency Scaffolding |
L-MT-03-056, Summary Report for Inservice Inspections and ASME Section XI Repairs and Replacements | 25 August 2003 | Summary Report for Inservice Inspections and ASME Section XI Repairs and Replacements | Stroke time Hydrostatic Nondestructive Examination Squib VT-2 EVT-1 Liquid penetrant Pressure Boundary Leakage |
L-MT-03-023, Response to Request for Additional Information Regarding Fourth 10-Year Interval Inservice Testing Program Relief Request Number No.VR-01 | 29 April 2003 | Response to Request for Additional Information Regarding Fourth 10-Year Interval Inservice Testing Program Relief Request Number No.VR-01 | Scram Discharge Volume |
ML023520591 | 6 December 2002 | to Engineering Work Instruction EWI-09.04.01, Inservice Testing Program. | High Radiation Area Stroke time Squib Scram Discharge Volume Breakaway torque Power-Operated Valves Power Operated Valves |
ML023380683 | 22 November 2002 | Part 2 of 2, Monticello, Request for Review and Approval of Relief Request Associated with Fourth 10-Year Interval Inservice Testing Program Plan Submittal | |
ML023370107 | 22 November 2002 | Part 1 of 2, Monticello, Request for Review and Approval of Relief Request Associated with Fourth 10-Year Interval Inservice Testing Program Plan Submittal | Safe Shutdown Stroke time Hydrostatic Squib Scram Discharge Volume Breakaway torque Power-Operated Valves Power Operated Valves |
ML021710227 | 6 June 2002 | Inservice Testing Program for Engineering Work Instruction, Revision 8 | High Radiation Area Stroke time Squib Scram Discharge Volume Breakaway torque Power-Operated Valves Power Operated Valves |
ML021190531 | 1 April 2002 | Revision 7 to EWI-09.04.01, Inservice Testing Program. | High Radiation Area Stroke time Squib Scram Discharge Volume Breakaway torque Power-Operated Valves Power Operated Valves |
ML020860348 | 12 March 2002 | Part 1 of 4, Monticello Nuclear Generating Plant, Summary Report for Inservice Inspections & ASME Section XI Repairs & Replacements | |
ML020860551 | 12 March 2002 | Part 2 of 4, Monticello Nuclear Generating Plant, Summary Report for Inservice Inspections & ASME Section XI Repairs & Replacements, Owner'S Report for Repairs or Replacements - Form NIS-2, Revision 4 to 3613 | Hydrostatic Squib VT-2 |
ML020860676 | 12 March 2002 | Part 3 of 4, Monticello Nuclear Generating Plant, Summary Report for Inservice Inspections & ASME Section XI Repairs & Replacements, Owner'S Report for Repairs or Replacements - Form NIS-2, Revision 4 to 3613 | Hydrostatic VT-2 |
ML020860693 | 12 March 2002 | Part 4 of 4, Monticello Nuclear Generating Plant, Summary Report for Inservice Inspections & ASME Section XI Repairs & Replacements, Owner'S Report for Repairs or Replacements - Form NIS-2, Revision 4 to 3613 | Hydrostatic Squib VT-2 EVT-1 |
ML020320366 | 11 January 2002 | Inservice Inspection Plan Submittal of Relief Request Number 14 for the Third Ten Year Interval | |