CNL-14-073, 151-1 and 13-151-2 Relief Request Interval Applicability Clarification
Letter Sequence Request | |
---|---|
Initiation Administration | |
MONTHYEARCNL-13-108, Requests for Alternatives 13-ISI-1 and 13-ISI-2 to Extend the Reactor Vessel Weld Inservice Inspection Interval2013-10-15015 October 2013
[Table View]Requests for Alternatives 13-ISI-1 and 13-ISI-2 to Extend the Reactor Vessel Weld Inservice Inspection Interval Project stage: Other ML13323A4942013-11-19019 November 2013 NRR E-mail Capture - Sequoyah 1 and 2 - Acceptance Review for Requests for Alternatives 13-ISI-1 and 13-ISI-2 to Extend the Reactor Vessel Weld Inservice Inspection Interval Project stage: Acceptance Review PLA-7120, Revised Proposed Relief Requests for the Fourth Ten-Year Inservice Testing Interval for Susquehanna Units 1 and 2, PLA-71202013-12-12012 December 2013 Revised Proposed Relief Requests for the Fourth Ten-Year Inservice Testing Interval for Susquehanna Units 1 and 2, PLA-7120 Project stage: Request PLA-7148, Response to Request for Additional Information on Fourth Ten-Year Inservice Testing Interval Proposed Relief Request, PLA-71482014-03-31031 March 2014 Response to Request for Additional Information on Fourth Ten-Year Inservice Testing Interval Proposed Relief Request, PLA-7148 Project stage: Response to RAI CNL-14-073, 151-1 and 13-151-2 Relief Request Interval Applicability Clarification2014-05-0909 May 2014 151-1 and 13-151-2 Relief Request Interval Applicability Clarification Project stage: Request 2013-12-12 |
ML14132A077 | |
Person / Time | |
---|---|
Site: | Sequoyah ![]() |
Issue date: | 05/09/2014 |
From: | James Shea Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
CNL-14-073, TAC MF2900, TAC MF2901 | |
Download: ML14132A077 (2) | |
Similar Documents at Sequoyah | |
---|---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML23233A0122023-08-17017 August 2023
[Table view]Unit 1 Cycle 25 Refueling Outage - 90-Day Inservice Inspection Summary Report - Supplement ML23192A0972023-07-11011 July 2023 Unit 2 Cycle 25 Refueling Outage - 90-Day Inservice Inspection Summary Report ML23052A1662023-02-22022 February 2023 Cycle 25 Refueling Outage - 90-Day Inservice Inspection Summary Report CNL-23-011, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2023-01-18018 January 2023 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements ML22038A0942022-02-0404 February 2022 Unit 2 Cycle 24 Refueling Outage - 90-Day Inservice Inspection Summary Report CNL-21-076, Request for Alternative, 21-ISI-2, Alternative Inspection for Upper Head Injection J-groove Welds2021-09-0303 September 2021 Request for Alternative, 21-ISI-2, Alternative Inspection for Upper Head Injection J-groove Welds ML21217A2882021-08-0404 August 2021 Cycle 24 Refueling Outage - 90-Day Inservice Inspection Summary Report ML20056C7032020-02-24024 February 2020 Unit 1 Cycle 23 Refueling Outage -90-Day Inservice Inspection Summary Report ML19126A2742019-04-25025 April 2019 Unit 2 Cycle 22-180-Day Steam Generator Tube Inspection Report ML19070A0242019-03-0808 March 2019 Cycle 22 Refueling Outage -90-Day Inservice Inspection Summary Report CNL-19-012, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection Program, Request for Alternative, 18-ISI-12019-01-30030 January 2019 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection Program, Request for Alternative, 18-ISI-1 ML18213A0412018-07-31031 July 2018 Unit 1 Refueling Outage 22 - 90-Day Inservice Inspection Summary Report ML17243A0042017-08-30030 August 2017 Refueling Outage 21 - 90-Day Inservice Inspection Summary Report CNL-17-057, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Inservice Inspection (ISI) Program, Third Ten Year Interval Request for Relief for 17-ISI-12017-04-28028 April 2017 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Inservice Inspection (ISI) Program, Third Ten Year Interval Request for Relief for 17-ISI-1 ML17094A2682017-04-0303 April 2017 Refueling Outage 21 - 90-Day Lnservice Inspection Summary Report ML16076A1872016-03-11011 March 2016 Cycle 20 Refueling Outage - 90 Day Inservice Inspection Summary Report ML15230A0302015-08-13013 August 2015 Refueling Outage 20 - 90-Day Inservice Inspection Summary Report ML14342B0042014-12-0101 December 2014 Cycle 19 - 180-Day Steam Generator Tube Inspection Report ML14259A3342014-09-11011 September 2014 Cycle 19 Refueling Outage - 90-Day Inservice Inspection Summary Report CNL-14-073, 151-1 and 13-151-2 Relief Request Interval Applicability Clarification2014-05-0909 May 2014 151-1 and 13-151-2 Relief Request Interval Applicability Clarification ML14055A3982014-02-18018 February 2014 Refueling Outage 19 - 90-Day Inservice Inspection Summary Report ML13165A0502013-06-11011 June 2013 Cycle 18 - 180-Day Steam Generator Tube Inspection Report ML13101A1202013-04-0808 April 2013 Refueling Outage 18 - 90-Day Inservice Inspection Summary Report ML1218500062012-06-29029 June 2012 Refueling Outage 18 - 90-Day Inservice Inspection Summary Report ML11266A0102011-09-20020 September 2011 Cycle 17 - 90-Day Inservice Inspection Summary Report ML1104704052011-02-14014 February 2011 Cycle 17 - 90-Day Inservice Inspection Summary Report ML11350A2402010-10-18018 October 2010 Cycle 17, 180-Day Steam Generator Inspection Report ML1014504112010-05-19019 May 2010 Cycle 16 - 180-Day Steam Generator Inspection Report ML1005415802010-02-19019 February 2010 Submittal of Cycle 16 - 90-Day Inservice Inspection Summary Report ML0920804502009-07-24024 July 2009 Cycle 16 (U1C16) 90-Day Inservice Inspection (ISI) Summary Report ML0905008482009-02-19019 February 2009 American Society of Mechanical Engineers (ASME) Section XI Inservice Inspection (ISI) Program - Relief Requests ML0902202762008-11-21021 November 2008 Cycle 15 - 180-Day - Steam Generator Inspection Report ML0804501542008-02-12012 February 2008 Cycle 15 (U1C15) 90-Day Inservice Inspection (ISI) Summary Report ML0734505552007-12-0404 December 2007 Unit 2 Cycle 14 (U2C14) - 12-Month Steam Generator (SG) Inspection Report ML0708603842007-03-21021 March 2007 Cycle 14 (U2C14) 90-Day Inservice Inspection Summary Report ML0622800522006-08-0404 August 2006 Unit 1 Cycle 14 (U1C14) 90-Day Inservice Inspection (ISI) Summary Report ML0612101052006-04-21021 April 2006 Risk-Informed Inservice Inspection (RI-ISI) Program and Updated Inservice Inspection Program for Third 10-Year Interval ML0601302812006-01-10010 January 2006 Inservice Test (IST) Program Update and Associated Relief Requests for Third Ten-Year Interval ML0601301942006-01-0909 January 2006 Inservice Test Pressure (Ispt) Program Update and Associated Relief Requests for Third Ten-Year Interval ML0532002652005-11-10010 November 2005 ASME Boiler and Pressure Vessel Code, TVA Request to Use ASME Section XI, 2001 Edition, Through the 2003 Addenda Generically for Nondestructive Examination Procedures-GISI-4 ML0523506752005-08-10010 August 2005 Unit Cycle 13 90-Day Inservice Inspection Summary Report ML0505504132005-02-15015 February 2005 Unit 1 Cycle 13, 90-day Inservice Inspection Summary Report ML0432806252004-11-22022 November 2004 Steam Generating (SG) Tube Plugging Report - SG Tube Inspections During, Unit 1 Cycle 13 Refueling Outage ML0407003862004-02-26026 February 2004 Cycle 12 (U2C12) 90-Day Inservice Inspection (ISI) Summary Report ML0335107022003-12-12012 December 2003 Unit 2 Steam Generator (SG) Tube Plugging Report - SG Tube Inspections During Unit 2 Cycle 12 Refueling Outage ML0326608852003-09-11011 September 2003 Cycle 12 (U1C12) 90-Day Inservice Inspection (ISI) Summary Report ML0230106832002-10-25025 October 2002 Cycle 11 12-Month Steam Generator Inspection Report ML0223305952002-08-0505 August 2002 Unit 2 Cycle 11 (U2C11) 90-Day Inservice Inspection (ISI) Summary Report ML0221707052002-07-31031 July 2002 American Society of Mechanical Engineers (ASME) Section XI Inservice Inspection (ISI) Program - Revised Requests 1-ISI-20 & 2-ISI-20 ML0205901362002-02-13013 February 2002 Cycle 11 (U1C11) 90-Day Inservice Inspection (ISI) Summary Report 2023-08-17 Category:Letter type:CNL MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024
[Table view]Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-012, Revision to the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02)2023-04-11011 April 2023 Revision to the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-011, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2023-01-18018 January 2023 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-104, Correction to Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-022022-10-31031 October 2022 Correction to Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-084, Response to Request for Additional Information Regarding License Amendment Request to License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07)2022-09-16016 September 2022 Response to Request for Additional Information Regarding License Amendment Request to License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07) CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-053, Response to Request for Additional Information Regarding Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Second Partial Response to Additional Requ2022-08-22022 August 2022 Response to Request for Additional Information Regarding Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Second Partial Response to Additional Reques CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-080, Request for Enforcement Discretion from the Requirements of Technical Specification 3.5.2, ECCS - Operating2022-07-22022 July 2022 Request for Enforcement Discretion from the Requirements of Technical Specification 3.5.2, ECCS - Operating CNL-22-081, Supplement to Sequoyah Nuclear Plant, Unit 1, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-122022-07-21021 July 2022 Supplement to Sequoyah Nuclear Plant, Unit 1, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-12 CNL-22-079, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-122022-07-20020 July 2022 American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-12 CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-069, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.2022-07-0101 July 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. CNL-22-070, Status Regarding the Improved Flood Mitigation System Project2022-06-30030 June 2022 Status Regarding the Improved Flood Mitigation System Project CNL-22-062, Response to Request for Additional Information Regarding American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-022022-06-28028 June 2022 Response to Request for Additional Information Regarding American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-22-034, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2022-05-13013 May 2022 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) CNL-22-027, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 40 - Annual Update and Proposed Changes to Revision 402022-04-28028 April 2022 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 40 - Annual Update and Proposed Changes to Revision 40 CNL-22-023, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf2022-04-28028 April 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf 2024-01-17 |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-14-073 May 9, 2014 10 CFR 50.4 10 CFR 50.55a ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
Subject:
5equoyah 13-151-1 and 13-151-2 Relief Request Interval Applicability Clarification (TAC Nos. MF2900 and MF2901)
References:
- 1. Letter to NRC, "Requests for Alternatives 13-ISI-1 and 13-ISI-2 to Extend the Reactor Vessel Weld lnservice Inspection Interval," dated October 15, 2013 (ADAMS Accession No. ML13291A006)
- 2. Westinghouse Report WCAP-16168-NP-A, Revision 3, "Risk-Informed Extension of the Reactor Vessel In-Service Inspection Interval,"
October 25, 2011 (ADAMS Accession No. ML113060207)
By letter dated October 15, 2013 (Reference 1), Tennessee Valley Authority (TVA) requested that the Nuclear Regulatory Commission (NRC) approve the proposed inservice inspection (lSI) alternatives 13-ISI-1 and 13-ISI-2.
Specifically, these proposed alternatives requested a one-time ten-year extension to selected ASME Examination Category B-A reactor vessel welds and selected ASME Examination Category B-D reactor vessel nozzle welds and reactor vessel inside radius sections for each unit.
Based on a May 5, 2014 discussion with Mr. Andrew Hon, the Sequoyah NRC Project Manager, TVA clarifies that the extension request for 13-ISI-1 and 13-ISI-2 examination exemptions are for the 3rd lSI Interval, which is currently from June 1, 2006, to April 30, 2016. With the NRC approval, the 3rd lSI interval will be extended to April 30, 2026, for the examinations listed in Reference 1.
U.S. Nuclear Regulatory Commission Page 2 May 9, 2014 The requested "Duration of Proposed Alternative" in Reference 1 (Enclosures 1 and 2, Page 4 of 6) should have only referred to the 3rd interval. The alternatives will not affect the duration of the 41h interval. This approach is in line with the wording in WCAP-16168-NP-A (Reference 2).
There are no new regulatory commitments contained in this letter. Please address any questions regarding this submittal to Henry Lee at (423) 751-2683.
Respectf~
J. VV. She~~
Vice President, Nuclear Licen cc:
NRC Regional Administrator- Region II NRC SQN Senior Resident Inspector NRC SQN Project Manager- Andrew.Hon@nrc.gov