AEP-NRC-2018-47, Submittal of Form OAR-1, Owner'S Activity Report

From kanterella
Jump to navigation Jump to search
Submittal of Form OAR-1, Owner'S Activity Report
ML18214A322
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/2018
From: Lloyd M
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2018-47
Download: ML18214A322 (6)


Text

Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 A unit ofAmerican Electric Power lndianaMichiganPower.com July 31, 2018 AEP-NRC-2018-47 10 CFR 50.55a Docket No.: 50-316 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Unit 2 Form OAR-1, Owner's Activity Report This letter provides a copy of Form OAR-1, Owner's Activity Report, for inservice inspection activities perform"ed at Donald C. Cook Nuclear Plant Unit 2 through the completion of the Unit 2 Cycle 24 Refueling Outage. This report meets the requirements of the American Society of Mechanical Engineers (ASME) Code Case N-532-5, "Alternative Requirements to Repair and Replacement Documentation Requirements and lnservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1." This code case is used as an alternative to the requirements of the ASME Boiler and Pressure Vessel Code,Section XI, Article IWA-6000, as approved by Regulatory Guide 1.147, "lnservice Inspection Code Case Acceptability, ASME Section XI, Division 1," Revision 18, for the current inspection interval.

The Authorized Code Inspection Company is OneCIS Insurance Co., of Lynn, Massachusetts. The Authorized Nuclear Inspector is Timothy H. Merchant.

There are no new or revised commitments in this letter. Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Director, at (269) 466-2649.

Sincerely, lfJ(Jiy Mark Lloyd Engineering Vice President KMH/mll

Enclosure:

Form OAR-1, Owner's Activity Report for Donald C. Gook Nuclear Plant Unit 2 Cycle 24 Refueling Outage

U.S. Nuclear Regulatory Commission AEP-NRC-2018-4 7 Page2 c: R. J. Ancona - MPSC, w/o enclosure A. W. Dietrich- NRC Washington DC MDEQ - RMD/RPS, w/o enclosure NR.C Resident Inspector K. S. West - NRC Region Ill A. J. Williamson -AEP Ft. Wayne, w/o enclosure

ENCLOSURE TO AEP-NRC-2018-47 FORM OAR-1, OWNER'S ACTIVITY REPORTFOR DONALD C. COOK NUCLEAR PLANT UNIT 2 CYCLE 24 REFUELING OUTAGE

D. C. Cook Nuclear Unit 2 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number 2-2018-4-3-01 Plant Donald C. Cook Nuclear Plant, One Cook Place, Bridgman, Michigan 49106 Unit No. 2 Commercial service date 7/1/1978 Refueling outage no. U2C24 (if applicable)

Current inspection interval 4th for Components and Supports (C&S) and 2nd for Containment ISi (CISI) Program (1st, 2nd, 3rd, 4th, other)

Current inspection period 3rd for C&S and 3rd for CISI (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans

  • 2004 Edition/No Addenda Date and revision of inspection plans 12/18/2016 Revision 8 for C&S; and 12/29/2017 Revision 6 for CISI Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plan_s_ _ _ _ _ _ _ _ _ _ __

Edition and Addenda are the same as the Inspection Plans Code Cases used for inspection and evaluation: _N_-_5_6_6-_2_a_n_d_N_-_7_2_2_-1_f_o_r_C_&_S_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

(If applicable, including cases modified by Case N-532 and later revisions)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion U2C24 conform to the requirements of Section XI. (refueling outage number)

Signed , ISi Program Owner Date 7( 11..{ 2.o1e Owners or Owne~s Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by OneCIS Insurance Co of Lynn, MA have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

11 Commissions t,.{fJ ('={ 3 8 8 ,l .I.

--~~---------------------- Nation aI Board Number and Endorsement Date 7-(J--J.o< 8 Page 1 of 3

D. C. Cook Nuclear Unit 2 Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination CateQory and Item Number Item Description Evaluation Description None None None Page 2 of 3

D. C. Cook Nuclear Unit 2 Table 2 Abstract of Repair/replacement Activities Required for Continued Service Code Class Item Description Description of Work Date Completed Repair/Replacement Plan Number 2-GRC-R-500, Reactor Coolant Replace pipe clamp on support found with 1 System 4 Inch Rigid Pipe missing fastener. Reference AR 2018-2789. 3/29/2018 55515128-01 Support Examination Category: B-N-3, 213 core baffle former bolts were removed, new Item No.: 813.70 counter bores were milled and new bolts were 1 Parts Examined: Core Support installed in 210 bolt locations. 4/11/2018 55498405-17 Structure 0ME-1, Baffle Former Plate Bolting Turbine driven auxiliary Replace portion of piping with external corrosion feedwater pump (2-PP-4) found below design limits. Reference AR 2016-4/13/2018 55503764-06 discharge pipe on ISO 2-FW- 13865.

3 20 West motor driven auxiliary Replace portion of piping with external corrosion feedwater pump (2-PP-3W) found below design limits. Reference AR 2016-4/1/2018 55503764-02 discharge pipe on ISO 2-FW- 13865.

3 32 Page 3 of 3