L-23-051, Plan, Nineteenth Inservice Inspection Summary Report | 22 June 2023 | Plan, Nineteenth Inservice Inspection Summary Report | |
L-21-282, Proposed Inservice Inspection Alternative IR-063 | 5 January 2022 | Proposed Inservice Inspection Alternative IR-063 | Time of Discovery Weld Overlay Feedwater Heater Stress corrosion cracking Subsequent License Renewal Power Uprate Thermal fatigue |
L-21-017, Eighteenth Inservice Inspection Summary Report | 29 June 2021 | Eighteenth Inservice Inspection Summary Report | |
L-21-028, 10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension | 15 January 2021 | 10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension | Pandemic Coronavirus |
L-19-143, Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements | 17 April 2020 | Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements | Weld Overlay VT-2 Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Unidentified leakage Operational leakage Thermal fatigue |
L-19-257, Submittal of Perry Nuclear Power Plant Inservice Testing Programs | 13 February 2020 | Submittal of Perry Nuclear Power Plant Inservice Testing Programs | Safe Shutdown High Radiation Area Stroke time Post Accident Monitoring Nondestructive Examination Squib Surveillance Frequency Control Program Local Leak Rate Testing Scram Discharge Volume Cold shutdown justification Power Operated Valves Scaffolding Grace period Water hammer |
L-19-119, Seventeenth Inservice Inspection Summary Report | 26 June 2019 | Seventeenth Inservice Inspection Summary Report | Weld Overlay |
L-18-104, 10 CFR 50.55a Requests in Support of the Fourth 10-Year In-Service Testing Interval | 21 June 2018 | 10 CFR 50.55a Requests in Support of the Fourth 10-Year In-Service Testing Interval | Stroke time Grace period Water hammer |
L-17-038, Submittal of Report of Facility Changes, Tests, and Experiments | 23 October 2017 | Submittal of Report of Facility Changes, Tests, and Experiments | |
L-17-072, Sixteenth Inservice Inspection Summary Report | 29 June 2017 | Sixteenth Inservice Inspection Summary Report | Nondestructive Examination VT-2 |
L-15-165, Fifteenth Inservice Inspection Summary Report | 22 July 2015 | Fifteenth Inservice Inspection Summary Report | |
L-14-105, Notification of Impracticality for the Third 10-Year Inservice Inspection Interval | 7 March 2014 | Notification of Impracticality for the Third 10-Year Inservice Inspection Interval | Scaffolding |
ML14043A108 | 12 February 2014 | Notification of Impracticality for the Third 10-Year Lnservice Inspection Interval | Scaffolding |
L-13-190, Fourteenth Inservice Inspection Summary Report | 9 August 2013 | Fourteenth Inservice Inspection Summary Report | |
L-11-260, Thirteenth Inservice Inspection Summary Report | 1 September 2011 | Thirteenth Inservice Inspection Summary Report | Hydrostatic Nondestructive Examination Squib VT-2 EVT-1 Liquid penetrant Siren |
L-11-083, Submittal of Inservice Examination Plan | 28 March 2011 | Submittal of Inservice Examination Plan | Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Intergranular Stress Corrosion Cracking Integrated leak rate test Moisture barrier Earthquake EVT-1 Liquid penetrant Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld DM weld Scaffolding Grace period Thermal fatigue |
L-11-082, Submittal of Inservice Testing Programs | 25 March 2011 | Submittal of Inservice Testing Programs | Safe Shutdown High Radiation Area Stroke time Nondestructive Examination Squib Scram Discharge Volume Stress corrosion cracking Cold shutdown justification Power Operated Valves Scaffolding Water hammer |
L-10-246, 10 CFR 50.55a Requests in Support of the Third 10-Year In-Service Inspection Interval | 24 January 2011 | 10 CFR 50.55a Requests in Support of the Third 10-Year In-Service Inspection Interval | VT-2 EVT-1 Through-Wall Leak Fire Protection Program |
L-09-197, Twelfth Inservice Inspection Summary Report | 5 August 2009 | Twelfth Inservice Inspection Summary Report | |
L-08-350, 10 CFR 50.55a Request Number PR-3, Inservice Testing Program | 18 February 2009 | 10 CFR 50.55a Request Number PR-3, Inservice Testing Program | |
L-08-270, Response to Request for Additional Information Regarding Relief Request IR-054, Revision 0 | 17 September 2008 | Response to Request for Additional Information Regarding Relief Request IR-054, Revision 0 | |
L-08-066, Inservice Inspection Program Relief Requests IR-043, Revision 1, IR-055, IR-056, and IR-057 | 20 February 2008 | Inservice Inspection Program Relief Requests IR-043, Revision 1, IR-055, IR-056, and IR-057 | High Radiation Area Nondestructive Examination VT-2 Intergranular Stress Corrosion Cracking EVT-1 Dissimilar Metal Weld Scaffolding Unidentified leakage |
ML072250365 | 7 August 2007 | Submittal of Eleventh Inservice Inspection Summary Report | Hydrostatic Nondestructive Examination Squib VT-2 Flow Accelerated Corrosion Intergranular Stress Corrosion Cracking Liquid penetrant Dissimilar Metal Weld Scaffolding |
ML052230327 | 2 August 2005 | Owners Report for Inservice Inspections as Required by the Provisions of the ASME Code Rules | Hydrostatic Coatings Nondestructive Examination VT-2 Locked High Radiation Area Integrated leak rate test |
ML032731423 | 28 August 2003 | Inservice Inspection Summary Report | Packing leak Hydrostatic Nondestructive Examination Squib VT-2 EVT-1 Liquid penetrant |