Category:Inservice/Preservice Inspection and Test Report
MONTHYEARRA-23-0045, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 262023-06-28028 June 2023 Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 26 RA-22-0308, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2022-12-16016 December 2022 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-20-0373, Submittal of IWB-3640 Analytical Evaluation of RPV Nozzle N4D Safe End to Pipe Weld Indication2021-01-19019 January 2021 Submittal of IWB-3640 Analytical Evaluation of RPV Nozzle N4D Safe End to Pipe Weld Indication RA-20-0247, Supplement to Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55a(z)(1)2020-07-30030 July 2020 Supplement to Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55a(z)(1) RA-19-0447, Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55a(z)(1)2020-06-23023 June 2020 Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55a(z)(1) RA-19-0256, Submittal of Inservice Inspection Program Owner'S Activity Report for Refueling Outage 242019-06-20020 June 2019 Submittal of Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24 RA-18-0067, Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 222018-06-28028 June 2018 Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 22 BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan2018-02-19019 February 2018 Fifth 10-Year Inservice Testing Program Plan BSEP 18-0015, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-01-23023 January 2018 Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program2018-01-10010 January 2018 Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program BSEP 17-0044, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 222017-05-25025 May 2017 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 22 BSEP 16-0037, Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 212016-05-18018 May 2016 Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 21 BSEP 15-0051, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 212015-06-29029 June 2015 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 21 BSEP 13-0089, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 202013-08-0606 August 2013 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 20 BSEP 12-0086, Inservice Inspection Program Owner'S Activity Report for Unit I Refueling Outage 182012-07-25025 July 2012 Inservice Inspection Program Owner'S Activity Report for Unit I Refueling Outage 18 BSEP 11-0060, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 192011-06-17017 June 2011 Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 19 BSEP 11-0027, Response to Request for Additional Information Regarding Proposed Alternatives for the Third 10-Year Inservice Inspection Program2011-02-28028 February 2011 Response to Request for Additional Information Regarding Proposed Alternatives for the Third 10-Year Inservice Inspection Program BSEP 11-0011, Response to Request for Additional Information - Proposed Alternatives for the Third 10-Year Inservice Inspection Program2011-01-28028 January 2011 Response to Request for Additional Information - Proposed Alternatives for the Third 10-Year Inservice Inspection Program BSEP 10-0043, Proposed Alternatives for the Third 10-Year Inservice Inspection Program2010-07-23023 July 2010 Proposed Alternatives for the Third 10-Year Inservice Inspection Program BSEP 10-0091, Inservice Inspection Program Owner'S Activity Report, Refueling Outage 172010-07-23023 July 2010 Inservice Inspection Program Owner'S Activity Report, Refueling Outage 17 BSEP 09-0125, Response to Request for Additional Information Regarding Third 10-Year Inservice Inspection Interval Request for Relief RR-462009-12-0202 December 2009 Response to Request for Additional Information Regarding Third 10-Year Inservice Inspection Interval Request for Relief RR-46 BSEP 09-0078, Submittal of Inservice Inspection Program Owner'S Activity Report, Refueling Outage 182009-07-28028 July 2009 Submittal of Inservice Inspection Program Owner'S Activity Report, Refueling Outage 18 BSEP 09-0043, Submittal of Proposed Alternative for the Third 10-Year Inservice Inspection Program2009-05-0808 May 2009 Submittal of Proposed Alternative for the Third 10-Year Inservice Inspection Program BSEP 09-0024, Proposed Alternative for the Third 10-Year Inservice Inspection Program2009-04-27027 April 2009 Proposed Alternative for the Third 10-Year Inservice Inspection Program BSEP 08-0140, Proposed Alternative for Reactor Vessel Skirt Support Examinations2008-10-10010 October 2008 Proposed Alternative for Reactor Vessel Skirt Support Examinations BSEP 08-0109, Owner'S Activity Report for Third 10-Year Inservice Inspection Program2008-08-26026 August 2008 Owner'S Activity Report for Third 10-Year Inservice Inspection Program BSEP 08-0062, Inservice Inspection Plan for the Fourth 10-Year Inspection Interval2008-05-21021 May 2008 Inservice Inspection Plan for the Fourth 10-Year Inspection Interval BSEP 07-0110, BNP-TR-014, Rev. 1, IST Program Plan Fourth Ten-Year Inspection Interval.2007-10-25025 October 2007 BNP-TR-014, Rev. 1, IST Program Plan Fourth Ten-Year Inspection Interval. BSEP-07-0063, Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 17 Owner'S Activity Report2007-07-16016 July 2007 Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 17 Owner'S Activity Report BSEP-06-0066, Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 15 Owner'S Activity Report2006-06-26026 June 2006 Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 15 Owner'S Activity Report BSEP 03-0137, Inservice Inspection Program for the Third 10-Year Interval-Refueling Outage 15 (B216R1) Owner'S Activity Report2003-10-20020 October 2003 Inservice Inspection Program for the Third 10-Year Interval-Refueling Outage 15 (B216R1) Owner'S Activity Report BSEP 02-0102, Inservice Inspection Program for Third 10-Year Interval - Evaluation of Leakage at Bolted Connections2002-05-20020 May 2002 Inservice Inspection Program for Third 10-Year Interval - Evaluation of Leakage at Bolted Connections 2023-06-28
[Table view] Category:Letter type:BSEP
MONTHYEARBSEP 19-0012, Submittal of 2018 Sea Turtle Annual Report2019-01-17017 January 2019 Submittal of 2018 Sea Turtle Annual Report BSEP 18-0052, Annual Radiological Environmental Operating Report - 20172018-05-10010 May 2018 Annual Radiological Environmental Operating Report - 2017 BSEP 18-0051, Annual Radioactive Effluent Release Report - 20172018-04-26026 April 2018 Annual Radioactive Effluent Release Report - 2017 BSEP 18-0045, Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time2018-04-25025 April 2018 Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time BSEP 18-0054, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential.2018-04-24024 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential. BSEP 18-0048, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-04-11011 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-04-11011 April 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0046, Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-04-10010 April 2018 Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0047, Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test2018-04-0505 April 2018 Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test BSEP 18-0041, Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-04-0404 April 2018 Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 18-0043, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-03-31031 March 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0035, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-29029 March 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0042, Cycle 22 Core Operating Limits Report (COLR)2018-03-27027 March 2018 Cycle 22 Core Operating Limits Report (COLR) BSEP 18-0040, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test2018-03-23023 March 2018 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test BSEP 18-0039, Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D2018-03-19019 March 2018 Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D BSEP 18-0034, Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-16016 March 2018 Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0032, Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-14014 March 2018 Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0026, Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2018-03-0707 March 2018 Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan2018-02-19019 February 2018 Fifth 10-Year Inservice Testing Program Plan BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure2018-02-0505 February 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure BSEP 18-0017, Revision to Radiological Emergency Response Plan and Implementing Procedure2018-01-30030 January 2018 Revision to Radiological Emergency Response Plan and Implementing Procedure BSEP 18-0015, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-01-23023 January 2018 Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-23023 January 2018 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 18-0001, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements BSEP 18-0012, Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.32018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 BSEP 18-0009, 2017 Sea Turtle Annual Report2018-01-15015 January 2018 2017 Sea Turtle Annual Report BSEP 17-0098, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-01-10010 January 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program2018-01-10010 January 2018 Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-0404 January 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 17-0110, Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2017-12-20020 December 2017 Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination BSEP 17-0120, Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension..2017-12-12012 December 2017 Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension.. BSEP 17-0118, Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel..2017-12-0707 December 2017 Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel.. BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..2017-12-0606 December 2017 Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources.. BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of ..2017-12-0404 December 2017 Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of .. BSEP 17-0104, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2017-11-29029 November 2017 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0109, Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And.2017-11-24024 November 2017 Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And. BSEP 17-0108, Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-22022 November 2017 Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0017, Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2017-11-15015 November 2017 Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material BSEP 17-0100, Fifth 10-Year Inservice Testing Interval2017-11-0202 November 2017 Fifth 10-Year Inservice Testing Interval BSEP 17-0089, Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0093, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 BSEP 17-0076, Registration for Use of General License Spent Fuel Casks2017-09-0606 September 2017 Registration for Use of General License Spent Fuel Casks BSEP 17-0081, Revision to Radiological Emergency Response Plan Implementing Procedures2017-09-0505 September 2017 Revision to Radiological Emergency Response Plan Implementing Procedures BSEP 17-0039, Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements2017-08-15015 August 2017 Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements BSEP 17-0071, ISFSI - Registration for Use of General License Spent Fuel Casks2017-08-15015 August 2017 ISFSI - Registration for Use of General License Spent Fuel Casks BSEP 17-0064, Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N92017-07-10010 July 2017 Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N9 BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-06-29029 June 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. 2019-01-17
[Table view] |
Text
Brunswick Nuclear Plant e(-,DUKE P.O. Box 10429
~ ENERGY Southport, NC 28461 May 18, 2016 Serial: BSEP 16-0037 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit No. 1 Renewed Facility Operating License No. DPR-71 Docket No. 50-325 lnservice Inspection Program Owner's Activity Report for Unit 1 Refueling Outage 21 Ladies and Gentlemen:
Duke Energy Progress, Inc., is enclosing an American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code,Section XI, Form OAR-1 Owner's Activity Report, for the Brunswick Steam Electric Plant (BSEP), Unit No. 1. The report covers inspection activities
- performed during Brunswick Unit 1 Refueling Outage 21 (i.e., designated as B121 R1) for the third inspection period of the fourth inservice inspection interval.
No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 457-2487.
Sincerely,
Director - Organizational Effectiveness Brunswick Steam Electric Plant
(.. ..l U.S. Nuclear Regulatory Commission Page 2of2 WRM/wrm
Enclosure:
Form OAR-1 Owner's Activity Report cc (with enclosure):
U.S. Nuclear Regulatory Commission, Region II ATTN: Ms. Catherine Haney, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission ATIN: Mr. Andrew Hon (Mail Stop OWFN 8G9A) (Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 U.S. Nuclear Regulatory Commission ATIN: Ms. Michelle P. Catts, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Mr. Cliff Dautrich, Bureau Chief North Carolina Department of Labor Boiler Safety Bureau 1101 Mail Service Center Raleigh, NC 27699-1101
Form OAR-1 OWNER'S ACTIVITY REPORT Plant: -----~B~ru=n~s""'w..:...i=c"--"k-'S"""'t=e=a:...:.m~E'"""le=c'"'"'tr"""ic"--'-P'"""la=n=t_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Unit No.: _ _ _. . :.1_ __ Commercial Service Date: -~M~a~rc~h~1~9~7~7__ Refueling Outage No.:_~B~1-=2=1_R~1~---
Current Inspection lnterval: _ __,F'-o=u"'-'rt,,_h,___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Current Inspection Period: ___T~h"""ir-=d_,P-'e""'r""'io=--'d=-=o..:...f~th-"e=--'-'-F-=o-=u:.:..rt:::..h.:....:..:.ln=t=-e:...:rv:...::a::.:.I_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Edition and Addenda of Section XI applicable to the inspection plans: 2001 Edition with 2003 Addenda Date and Revision of Inspection Plans: Fourth Interval Revision 4 12/18/2014 Edition and Addenda of Section XI applicable to Repair/Replacement activities, if different than the Inspection Plans: None Code Cases used: -~N-'--~4-=-60~*~N~-...-5~1-=-3-_3~, _ '"""N-'-5~3=2'--4~*~N""'""--=-61~3~-~1~*N'"""-.-6--'4__ 8-'-1~,-'-N'--6~6~3~,__a"-'n=d-'N~---6__ 9=5_ _ _ _ _ _ __
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the Repair/Replacement activities and evaluations supporting the completion of _-=B"-1,_,2"-1,_,R_,_,_1_____
(Refueling Outage Number) conform to the requirements of Section XI.
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by The HSB Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
""'""~~""""""~==*
"""~~......,&-""""""_.,~'""""'~""""""------CommissionsdB~9J.!b rig~
A.1'1/.I B; .Js C- ,j~# J~ ..71.::.
Nftion"al ~card, Sta1'e, Province, and Endorsements Date: .:;,-_Jo -.:2..01<:,
. (~
FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Item Description Evaluation Description Number Evaluation 402978 - through wall leak in 30" 1-SW-103-30-157 Service Water line per Service Water System Piping requirements of Code Case Category D-B I Item D2.10 Spool 1-SW-103-30-157 N-513-3.
NCR 2002959 was originated on 2/19/2016. The piping was replaced during B121R1 outage under W/O 12274010-08.
. ,_ ~
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Date Repair/Replacement Code Class Item Description Description of Work Completed Plan Number Rebuild Valve Due To LLRT 1 1-E51-F008 3/12/2016 20062193-01 Failure Adjust Support Setting to Meet 1 1-821-lCHl 3/21/2016 13472405-05 Original Design Replace Valve Stem/Disc 1 1-B21-F028C 3/22/2016 13506849-01 Assembly Replace Valve Stem/Disc 1 1-B21-F022B 3/12/2016 13506852-01 Assembly Replace Valve Stem/Disc 1 1-B21-F022A 3/18/2016 13506858-01 Assembly Replace Valve Stem/Disc 1 1-B21-F028A 3/22/2016 13506860-01 Assembly Replace Bolting on T-Quencher 2 1-821-11-10-304 3/20/2016 13368383-01 Support Replace Bolting on T-Quencher 2 1-821-20-10-304 3/20/2016 13368448-01 Support Replace Bolting on T-Quencher 2 1-B21-26-10-304 3/22/2016 13368632-01 Support Replace Section of Piping Due to 3 1-SW-103-30-157 3/17/2016 12274010-08 Through wall Leak Weld Repair Strainer Leak and 1-SW-lB-CONV-3 Replace Necessary Pressure 10/09/2014 13442338-04 PMP-STR Retaining Part Weld Repair Strainer Leak and 1-SW-lB-CONV-3 Replace Necessary Pressure 5/11/2015 13519970-01 PMP-STR Retaining Part Install Tube Sheet Plug by 3 1-VA-lB-FCU-RB 3/13/2016 13527361-13 Welding Weld Repair Strainer Leak and 1-SW-lB-CONV-3 Replace Necessary Pressure 7/14/2015 13543292-01 PMP-STR Retaining Part Replace valve Due To Leak By 3 1-SW-V18 3/22/2016 13369647-01 Pass valve 1-SW-lA-CONV- Restore Strainer Shell To 3 11/6/2014 13426295-01 PMP-STR Original Wall Thickness Repair Wasted Areas on Channel 3 1-VA-lB-FCU-RB 3/13/2016 13527361-12 Head By Welding
Brunswick Nuclear Plant e(-,DUKE P.O. Box 10429
~ ENERGY Southport, NC 28461 May 18, 2016 Serial: BSEP 16-0037 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit No. 1 Renewed Facility Operating License No. DPR-71 Docket No. 50-325 lnservice Inspection Program Owner's Activity Report for Unit 1 Refueling Outage 21 Ladies and Gentlemen:
Duke Energy Progress, Inc., is enclosing an American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code,Section XI, Form OAR-1 Owner's Activity Report, for the Brunswick Steam Electric Plant (BSEP), Unit No. 1. The report covers inspection activities
- performed during Brunswick Unit 1 Refueling Outage 21 (i.e., designated as B121 R1) for the third inspection period of the fourth inservice inspection interval.
No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 457-2487.
Sincerely,
Director - Organizational Effectiveness Brunswick Steam Electric Plant
(.. ..l U.S. Nuclear Regulatory Commission Page 2of2 WRM/wrm
Enclosure:
Form OAR-1 Owner's Activity Report cc (with enclosure):
U.S. Nuclear Regulatory Commission, Region II ATTN: Ms. Catherine Haney, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission ATIN: Mr. Andrew Hon (Mail Stop OWFN 8G9A) (Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 U.S. Nuclear Regulatory Commission ATIN: Ms. Michelle P. Catts, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Mr. Cliff Dautrich, Bureau Chief North Carolina Department of Labor Boiler Safety Bureau 1101 Mail Service Center Raleigh, NC 27699-1101
Form OAR-1 OWNER'S ACTIVITY REPORT Plant: -----~B~ru=n~s""'w..:...i=c"--"k-'S"""'t=e=a:...:.m~E'"""le=c'"'"'tr"""ic"--'-P'"""la=n=t_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Unit No.: _ _ _. . :.1_ __ Commercial Service Date: -~M~a~rc~h~1~9~7~7__ Refueling Outage No.:_~B~1-=2=1_R~1~---
Current Inspection lnterval: _ __,F'-o=u"'-'rt,,_h,___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Current Inspection Period: ___T~h"""ir-=d_,P-'e""'r""'io=--'d=-=o..:...f~th-"e=--'-'-F-=o-=u:.:..rt:::..h.:....:..:.ln=t=-e:...:rv:...::a::.:.I_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Edition and Addenda of Section XI applicable to the inspection plans: 2001 Edition with 2003 Addenda Date and Revision of Inspection Plans: Fourth Interval Revision 4 12/18/2014 Edition and Addenda of Section XI applicable to Repair/Replacement activities, if different than the Inspection Plans: None Code Cases used: -~N-'--~4-=-60~*~N~-...-5~1-=-3-_3~, _ '"""N-'-5~3=2'--4~*~N""'""--=-61~3~-~1~*N'"""-.-6--'4__ 8-'-1~,-'-N'--6~6~3~,__a"-'n=d-'N~---6__ 9=5_ _ _ _ _ _ __
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the Repair/Replacement activities and evaluations supporting the completion of _-=B"-1,_,2"-1,_,R_,_,_1_____
(Refueling Outage Number) conform to the requirements of Section XI.
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by The HSB Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
""'""~~""""""~==*
"""~~......,&-""""""_.,~'""""'~""""""------CommissionsdB~9J.!b rig~
A.1'1/.I B; .Js C- ,j~# J~ ..71.::.
Nftion"al ~card, Sta1'e, Province, and Endorsements Date: .:;,-_Jo -.:2..01<:,
. (~
FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Item Description Evaluation Description Number Evaluation 402978 - through wall leak in 30" 1-SW-103-30-157 Service Water line per Service Water System Piping requirements of Code Case Category D-B I Item D2.10 Spool 1-SW-103-30-157 N-513-3.
NCR 2002959 was originated on 2/19/2016. The piping was replaced during B121R1 outage under W/O 12274010-08.
. ,_ ~
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Date Repair/Replacement Code Class Item Description Description of Work Completed Plan Number Rebuild Valve Due To LLRT 1 1-E51-F008 3/12/2016 20062193-01 Failure Adjust Support Setting to Meet 1 1-821-lCHl 3/21/2016 13472405-05 Original Design Replace Valve Stem/Disc 1 1-B21-F028C 3/22/2016 13506849-01 Assembly Replace Valve Stem/Disc 1 1-B21-F022B 3/12/2016 13506852-01 Assembly Replace Valve Stem/Disc 1 1-B21-F022A 3/18/2016 13506858-01 Assembly Replace Valve Stem/Disc 1 1-B21-F028A 3/22/2016 13506860-01 Assembly Replace Bolting on T-Quencher 2 1-821-11-10-304 3/20/2016 13368383-01 Support Replace Bolting on T-Quencher 2 1-821-20-10-304 3/20/2016 13368448-01 Support Replace Bolting on T-Quencher 2 1-B21-26-10-304 3/22/2016 13368632-01 Support Replace Section of Piping Due to 3 1-SW-103-30-157 3/17/2016 12274010-08 Through wall Leak Weld Repair Strainer Leak and 1-SW-lB-CONV-3 Replace Necessary Pressure 10/09/2014 13442338-04 PMP-STR Retaining Part Weld Repair Strainer Leak and 1-SW-lB-CONV-3 Replace Necessary Pressure 5/11/2015 13519970-01 PMP-STR Retaining Part Install Tube Sheet Plug by 3 1-VA-lB-FCU-RB 3/13/2016 13527361-13 Welding Weld Repair Strainer Leak and 1-SW-lB-CONV-3 Replace Necessary Pressure 7/14/2015 13543292-01 PMP-STR Retaining Part Replace valve Due To Leak By 3 1-SW-V18 3/22/2016 13369647-01 Pass valve 1-SW-lA-CONV- Restore Strainer Shell To 3 11/6/2014 13426295-01 PMP-STR Original Wall Thickness Repair Wasted Areas on Channel 3 1-VA-lB-FCU-RB 3/13/2016 13527361-12 Head By Welding