 Issue dateTitleTopic
GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)6 September 2023In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)
ML22278B0975 October 2022Fourth Ten-Year Interval Inservice Inspection Program Relief Request 4ISl-11
GO2-21-107, In-Service Inspection Summary Report for the Twenty-Fifth Refueling (R25)26 August 2021In-Service Inspection Summary Report for the Twenty-Fifth Refueling (R25)
GO2-21-020, General Station - Fourth Ten-Year Interval Inservice Inspection (ISI) Program 4ISI-10, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI1 March 2021General Station - Fourth Ten-Year Interval Inservice Inspection (ISI) Program 4ISI-10, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XIIncorporated by reference
GO2-20-146, Erratum to Fourth Ten-Year Inservice Inspection (ISI) Program Relief Request 4ISI-0917 November 2020Erratum to Fourth Ten-Year Inservice Inspection (ISI) Program Relief Request 4ISI-09
ML20114E23522 April 2020Columbia,Fourth Ten-Year Interval Inservice Inspection Program Relief Request 4ISI-09License Renewal
Subsequent License Renewal
ML20057E95426 February 2020Fourth Ten-Year Interval Inservice Inspection Program Relief Request 4ISI-08Foreign Material Exclusion
GO2-19-127, In-Service Inspection Summary Report for the Twenty-Fourth Refueling Outage (R24)11 September 2019In-Service Inspection Summary Report for the Twenty-Fourth Refueling Outage (R24)
GO2-17-153, Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (R23)12 September 2017Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (R23)
GO2-16-068, Re-Submittal of Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-0726 April 2016Re-Submittal of Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-07Hydrostatic
VT-2
GO2-16-008, Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISIS-044 February 2016Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISIS-04
GO2-15-157, Fourth Ten-Year Interval Inservice Inspection (ISI) Program Request 4ISI-0210 December 2015Fourth Ten-Year Interval Inservice Inspection (ISI) Program Request 4ISI-02VT-2
GO2-15-136, In-Service Inspection Summary Report for the Twenty-Second Refueling Outage (R22)22 September 2015In-Service Inspection Summary Report for the Twenty-Second Refueling Outage (R22)
GO2-15-055, Submittal of Fourth 10-Year Inservice Testing (IST) Program Plan23 April 2015Submittal of Fourth 10-Year Inservice Testing (IST) Program PlanLoop seal
High Radiation Area
Ultimate heat sink
Stroke time
Probabilistic Risk Assessment
Incorporated by reference
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Grace period
GO2-15-024, Withdrawal of Inservice Inspection (ISI) Program Request 3ISI-1618 February 2015Withdrawal of Inservice Inspection (ISI) Program Request 3ISI-16Enforcement Discretion
Nondestructive Examination
GO2-14-152, Erratum for Relief Requests for the Fourth Ten-Year Interval Inservice Testing Program23 October 2014Erratum for Relief Requests for the Fourth Ten-Year Interval Inservice Testing Program
GO2-14-017, Inservice Inspection (ISI) Program Request 3 ISI-146 February 2014Inservice Inspection (ISI) Program Request 3 ISI-14
GO2-13-133, In-Service Inspection Summary Report for the Twenty-First Refueling Outage (R21)18 September 2013In-Service Inspection Summary Report for the Twenty-First Refueling Outage (R21)
ML13249A16028 August 2013Submittal of Revision 1 of the Third Ten-Year Interval Pump and Valve Inservice Testing (IST) Program PlanLoop seal
High Radiation Area
Ultimate heat sink
Stroke time
Probabilistic Risk Assessment
Incorporated by reference
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Grace period
GO2-11-193, In-Service Inspection Summary Report for the Twentieth Refueling Outage (R20)14 December 2011In-Service Inspection Summary Report for the Twentieth Refueling Outage (R20)
GO2-09-134, Inservice Inspection Summary Report for Refueling Outage R-1922 September 2009Inservice Inspection Summary Report for Refueling Outage R-19Hydrostatic
Anchor Darling
VT-2
Liquid penetrant
Dissimilar Metal Weld
GO2-07-141, Inservice Inspection Summary Report for Refueling Outage R-1818 September 2007Inservice Inspection Summary Report for Refueling Outage R-18Hydrostatic
Anchor Darling
VT-2
Liquid penetrant
ML07087071522 March 2007Response to Request for Additional Information Regarding the Third Ten-Year Interval Inservice Testing Program
ML06362014714 December 2006Columbia Generating Station, Second Ten-Year Interval ISI Request 2ISI-32
GO2-06-062, Correction to Third Ten-Year Interval Inservice Inspection Program Plan27 April 2006Correction to Third Ten-Year Interval Inservice Inspection Program Plan
GO2-05-196, Submittal of the Third Ten-Year Interval Inservice Inspection Program Plan and 10 CFR 50.55a Requests 3ISI-01 Through 3ISI-0715 December 2005Submittal of the Third Ten-Year Interval Inservice Inspection Program Plan and 10 CFR 50.55a Requests 3ISI-01 Through 3ISI-07Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Scram Discharge Volume
Moisture barrier
Liquid penetrant
Dissimilar Metal Weld
ML05271036015 September 2005Enclosure, Columbia Generating, Analytical Evaluation of Inservice Inspection Examination ResultsDissimilar Metal Weld
GO2-05-153, Analytical Evaluation of Inservice Inspection Examination Results15 September 2005Analytical Evaluation of Inservice Inspection Examination Results
ML0525801586 September 2005Inservice Inspection Summary Report for Refueling Outage R-17
GO2-04-065, Request to Incorporate ASME Code Case N-663 in Columbia'S Second Ten-Year Interval Inservice Inspection Program Plan8 April 2004Request to Incorporate ASME Code Case N-663 in Columbia'S Second Ten-Year Interval Inservice Inspection Program PlanNon-Destructive Examination
GO2-03-147, Inservice Inspection Summary Report for Refueling Outage R-1616 September 2003Inservice Inspection Summary Report for Refueling Outage R-16