GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) | 6 September 2023 | In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) | |
ML22278B097 | 5 October 2022 | Fourth Ten-Year Interval Inservice Inspection Program Relief Request 4ISl-11 | |
GO2-21-107, In-Service Inspection Summary Report for the Twenty-Fifth Refueling (R25) | 26 August 2021 | In-Service Inspection Summary Report for the Twenty-Fifth Refueling (R25) | |
GO2-21-020, General Station - Fourth Ten-Year Interval Inservice Inspection (ISI) Program 4ISI-10, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 1 March 2021 | General Station - Fourth Ten-Year Interval Inservice Inspection (ISI) Program 4ISI-10, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
GO2-20-146, Erratum to Fourth Ten-Year Inservice Inspection (ISI) Program Relief Request 4ISI-09 | 17 November 2020 | Erratum to Fourth Ten-Year Inservice Inspection (ISI) Program Relief Request 4ISI-09 | |
ML20114E235 | 22 April 2020 | Columbia,Fourth Ten-Year Interval Inservice Inspection Program Relief Request 4ISI-09 | License Renewal Subsequent License Renewal |
ML20057E954 | 26 February 2020 | Fourth Ten-Year Interval Inservice Inspection Program Relief Request 4ISI-08 | Foreign Material Exclusion |
GO2-19-127, In-Service Inspection Summary Report for the Twenty-Fourth Refueling Outage (R24) | 11 September 2019 | In-Service Inspection Summary Report for the Twenty-Fourth Refueling Outage (R24) | |
GO2-17-153, Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (R23) | 12 September 2017 | Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (R23) | |
GO2-16-068, Re-Submittal of Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-07 | 26 April 2016 | Re-Submittal of Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-07 | Hydrostatic VT-2 |
GO2-16-008, Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISIS-04 | 4 February 2016 | Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISIS-04 | |
GO2-15-157, Fourth Ten-Year Interval Inservice Inspection (ISI) Program Request 4ISI-02 | 10 December 2015 | Fourth Ten-Year Interval Inservice Inspection (ISI) Program Request 4ISI-02 | VT-2 |
GO2-15-136, In-Service Inspection Summary Report for the Twenty-Second Refueling Outage (R22) | 22 September 2015 | In-Service Inspection Summary Report for the Twenty-Second Refueling Outage (R22) | |
GO2-15-055, Submittal of Fourth 10-Year Inservice Testing (IST) Program Plan | 23 April 2015 | Submittal of Fourth 10-Year Inservice Testing (IST) Program Plan | Loop seal High Radiation Area Ultimate heat sink Stroke time Probabilistic Risk Assessment Incorporated by reference Cold shutdown justification Power-Operated Valves Power Operated Valves Grace period |
GO2-15-024, Withdrawal of Inservice Inspection (ISI) Program Request 3ISI-16 | 18 February 2015 | Withdrawal of Inservice Inspection (ISI) Program Request 3ISI-16 | Enforcement Discretion Nondestructive Examination |
GO2-14-152, Erratum for Relief Requests for the Fourth Ten-Year Interval Inservice Testing Program | 23 October 2014 | Erratum for Relief Requests for the Fourth Ten-Year Interval Inservice Testing Program | |
GO2-14-017, Inservice Inspection (ISI) Program Request 3 ISI-14 | 6 February 2014 | Inservice Inspection (ISI) Program Request 3 ISI-14 | |
GO2-13-133, In-Service Inspection Summary Report for the Twenty-First Refueling Outage (R21) | 18 September 2013 | In-Service Inspection Summary Report for the Twenty-First Refueling Outage (R21) | |
ML13249A160 | 28 August 2013 | Submittal of Revision 1 of the Third Ten-Year Interval Pump and Valve Inservice Testing (IST) Program Plan | Loop seal High Radiation Area Ultimate heat sink Stroke time Probabilistic Risk Assessment Incorporated by reference Cold shutdown justification Power-Operated Valves Power Operated Valves Grace period |
GO2-11-193, In-Service Inspection Summary Report for the Twentieth Refueling Outage (R20) | 14 December 2011 | In-Service Inspection Summary Report for the Twentieth Refueling Outage (R20) | |
GO2-09-134, Inservice Inspection Summary Report for Refueling Outage R-19 | 22 September 2009 | Inservice Inspection Summary Report for Refueling Outage R-19 | Hydrostatic Anchor Darling VT-2 Liquid penetrant Dissimilar Metal Weld |
GO2-07-141, Inservice Inspection Summary Report for Refueling Outage R-18 | 18 September 2007 | Inservice Inspection Summary Report for Refueling Outage R-18 | Hydrostatic Anchor Darling VT-2 Liquid penetrant |
ML070870715 | 22 March 2007 | Response to Request for Additional Information Regarding the Third Ten-Year Interval Inservice Testing Program | |
ML063620147 | 14 December 2006 | Columbia Generating Station, Second Ten-Year Interval ISI Request 2ISI-32 | |
GO2-06-062, Correction to Third Ten-Year Interval Inservice Inspection Program Plan | 27 April 2006 | Correction to Third Ten-Year Interval Inservice Inspection Program Plan | |
GO2-05-196, Submittal of the Third Ten-Year Interval Inservice Inspection Program Plan and 10 CFR 50.55a Requests 3ISI-01 Through 3ISI-07 | 15 December 2005 | Submittal of the Third Ten-Year Interval Inservice Inspection Program Plan and 10 CFR 50.55a Requests 3ISI-01 Through 3ISI-07 | Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Scram Discharge Volume Moisture barrier Liquid penetrant Dissimilar Metal Weld |
ML052710360 | 15 September 2005 | Enclosure, Columbia Generating, Analytical Evaluation of Inservice Inspection Examination Results | Dissimilar Metal Weld |
GO2-05-153, Analytical Evaluation of Inservice Inspection Examination Results | 15 September 2005 | Analytical Evaluation of Inservice Inspection Examination Results | |
ML052580158 | 6 September 2005 | Inservice Inspection Summary Report for Refueling Outage R-17 | |
GO2-04-065, Request to Incorporate ASME Code Case N-663 in Columbia'S Second Ten-Year Interval Inservice Inspection Program Plan | 8 April 2004 | Request to Incorporate ASME Code Case N-663 in Columbia'S Second Ten-Year Interval Inservice Inspection Program Plan | Non-Destructive Examination |
GO2-03-147, Inservice Inspection Summary Report for Refueling Outage R-16 | 16 September 2003 | Inservice Inspection Summary Report for Refueling Outage R-16 | |