NG-18-0137, Inservice Inspection Report | 11 December 2018 | Inservice Inspection Report | |
NG-17-0042, Fifth Inservice Inspection Interval Program Plan | 7 March 2017 | Fifth Inservice Inspection Interval Program Plan | Non-Destructive Examination Nondestructive Examination VT-2 Incorporated by reference Aging Management Liquid penetrant Through-Wall Leak Dissimilar Metal Weld |
NG-17-0011, Submittal of Inservice Inspection Report | 27 January 2017 | Submittal of Inservice Inspection Report | |
NG-16-0128, Inservice Testing Program for the Fifth Ten-Year Interval | 15 June 2016 | Inservice Testing Program for the Fifth Ten-Year Interval | |
NG-15-0020, Inservice Inspection Report | 19 February 2015 | Inservice Inspection Report | Coatings |
NG-15-0003, Fifth Ten-Year Interval Inservice Testing Program Relief Requests | 30 January 2015 | Fifth Ten-Year Interval Inservice Testing Program Relief Requests | Stroke time VT-2 Excess Flow Check Valve Maintenance Rule Program Fuel cladding Grace period |
NG-13-0060, Inservice Inspection Report | 21 February 2013 | Inservice Inspection Report | |
NG-11-0320, Fourth 10-Year Inservice Inspection Plan | 31 August 2011 | Fourth 10-Year Inservice Inspection Plan | Safe Shutdown Weld Overlay Internal Flooding Hydrostatic Nondestructive Examination VT-2 Finite Element Analysis Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Scaffolding |
NG-11-0201, Report of Facility Changes, Tests and Experiments, Fire Plan Changes, and Commitment Changes | 8 June 2011 | Report of Facility Changes, Tests and Experiments, Fire Plan Changes, and Commitment Changes | Temporary Modification Fire Watch |
NG-11-0058, Inservice Inspection Report for Cycle 22 and Refueling Outage No. 22 of the Fourth 10-Year ISI Interval | 3 March 2011 | Inservice Inspection Report for Cycle 22 and Refueling Outage No. 22 of the Fourth 10-Year ISI Interval | Weld Overlay |
NG-09-0413, Submittal of Inservice Inspection Report | 29 May 2009 | Submittal of Inservice Inspection Report | Squib |
NG-08-0141, Transmittal of Corrected Sections of the Fourth Ten Year Inservice Inspection Summary Report for Refueling Outage 20 | 28 February 2008 | Transmittal of Corrected Sections of the Fourth Ten Year Inservice Inspection Summary Report for Refueling Outage 20 | Hydrostatic VT-2 Liquid penetrant |
NG-08-0137, Request to Allow Use of the Provisions of IWA-4132 for Remainder of the Fourth Ten-Year Inservice Inspection Interval | 28 February 2008 | Request to Allow Use of the Provisions of IWA-4132 for Remainder of the Fourth Ten-Year Inservice Inspection Interval | Incorporated by reference |
NG-08-0135, Request for NRC Approval of Alternative to Nozzle to Vessel Weld and Inner Radius Examinations | 28 February 2008 | Request for NRC Approval of Alternative to Nozzle to Vessel Weld and Inner Radius Examinations | |
NG-07-0492, Inservice Inspection Report | 12 June 2007 | Inservice Inspection Report | Non-Destructive Examination Weld Overlay Hydrostatic Coatings Anchor Darling Nondestructive Examination VT-2 Liquid penetrant |
NG-07-0255, Withdrawal of Relief Request to Use the Provisions of Appendix Viii, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment | 15 March 2007 | Withdrawal of Relief Request to Use the Provisions of Appendix Viii, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment | |
NG-06-0866, Responses to Requests for Additional Information and Revised Relief Requests NDE-R005 and NDE-R007 - Fourth 10-Year Inservice Inspection Program | 21 December 2006 | Responses to Requests for Additional Information and Revised Relief Requests NDE-R005 and NDE-R007 - Fourth 10-Year Inservice Inspection Program | Non-Destructive Examination Internal Flooding Probabilistic Risk Assessment Nondestructive Examination VT-2 Large early release frequency Through-Wall Leak |
NG-06-0439, Fourth 10-Year Inservice Inspection Plan | 30 June 2006 | Fourth 10-Year Inservice Inspection Plan | Safe Shutdown Non-Destructive Examination Weld Overlay Internal Flooding Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Pressure Boundary Leakage Scaffolding |
NG-06-0005, Fourth Ten-Year Interval Inservice Testing Program Relief Requests | 4 January 2006 | Fourth Ten-Year Interval Inservice Testing Program Relief Requests | Maintenance Rule Program |
NG-05-0427, Inservice Testing Program, Fourth Ten-Year Interval Update | 1 August 2005 | Inservice Testing Program, Fourth Ten-Year Interval Update | Reactor Vessel Water Level Stroke time Squib Scram Discharge Volume Power-Operated Valves |
NG-05-0420, Inservice Inspection Report | 29 July 2005 | Inservice Inspection Report | Weld Overlay Hydrostatic Coatings Anchor Darling Nondestructive Examination Squib VT-2 EVT-1 Dissimilar Metal Weld |
NG-03-0577, Evaluation of Indication in Dollar Weld HCC-B002 | 7 August 2003 | Evaluation of Indication in Dollar Weld HCC-B002 | Finite Element Analysis |
NG-03-0509, Inservice Inspection Report | 18 July 2003 | Inservice Inspection Report | Non-Destructive Examination Weld Overlay Hydrostatic Coatings Nondestructive Examination Squib VT-2 EVT-1 |
NG-02-0259, Submittal of Proposed Risk Informed Inservice Inspection Program for the Duane Arnold Energy Center | 29 March 2002 | Submittal of Proposed Risk Informed Inservice Inspection Program for the Duane Arnold Energy Center | Probabilistic Risk Assessment Nondestructive Examination VT-2 Large early release frequency |