RA-23-0064, Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval | 24 April 2023 | Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval | Safe Shutdown Boric Acid Mission time Stroke time Nondestructive Examination Incorporated by reference FLEX Large early release frequency Operability Determination Cold shutdown justification Maintenance Rule Program Power Operated Valves Grace period Manual Operator Action |
RA-20-0329, Proposed Alternative for Inservice Inspection of the Containment Metallic Liner and Moisture Barriers | 7 September 2021 | Proposed Alternative for Inservice Inspection of the Containment Metallic Liner and Moisture Barriers | Coatings Locked High Radiation Area Moisture barrier Commercial Grade Scaffolding |
RA-21-0056, Refueling Outage 32 Steam Generator Tube Inspection Report | 26 May 2021 | Refueling Outage 32 Steam Generator Tube Inspection Report | Non-Destructive Examination |
RA-19-0393, Refuel 32 (R2R32) Inservice Inspection Program Ninety Day Owner'S Activity Report | 8 March 2021 | Refuel 32 (R2R32) Inservice Inspection Program Ninety Day Owner'S Activity Report | Coatings |
RA-19-0138, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections | 23 July 2019 | Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections | Hydrostatic Stress corrosion cracking License Renewal Through-Wall Leak Through Wall Leak Dissimilar Metal Weld DM weld Affidavit |
RA-19-0106, Relief Requested in Accordance with 10 CFR 50.55a(z)(1) for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head | 10 July 2019 | Relief Requested in Accordance with 10 CFR 50.55a(z)(1) for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head | Boric Acid VT-2 Stress corrosion cracking |
RA-19-0094, Refuel 31 (R231) Owner'S Activity Report, Fifth 10-Year Inservice Inspection Interval | 20 February 2019 | Refuel 31 (R231) Owner'S Activity Report, Fifth 10-Year Inservice Inspection Interval | Boric Acid Coatings Moisture barrier |
RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report | 18 September 2017 | Refueling Outage 30 Steam Generator Tube Inspection Report | Non-Destructive Examination |
RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report | 29 June 2017 | Submittal of Nine Day Inservice Inspection Summary Report | Boric Acid Mission time |
RNP-RA/15-0081, Submittal of Ninety-Day Inservice Inspection Summary Report | 17 September 2015 | Submittal of Ninety-Day Inservice Inspection Summary Report | Boric Acid |
RNP-RA/15-0063, Submittal of Ninety Day Inservice Inspection Summary Report - Supplement | 8 July 2015 | Submittal of Ninety Day Inservice Inspection Summary Report - Supplement | |
RNP-RA/14-0061, Submittal of Snubber Examination and Testing Program | 29 May 2014 | Submittal of Snubber Examination and Testing Program | Safe Shutdown Maintenance Rule Program |
RNP-RA/14-0040, Relief Request (RR)-10 for Expanded Applicability for Use of ASME Code Case N-532-4, Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, Per 10 CFR 50.55(a)(3)(i) | 9 May 2014 | Relief Request (RR)-10 for Expanded Applicability for Use of ASME Code Case N-532-4, Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, Per 10 CFR 50.55(a)(3)(i) | |
RNP-RA/14-0014, Submittal of Ninety Day Inservice Inspection Summary Report | 30 January 2014 | Submittal of Ninety Day Inservice Inspection Summary Report | Non-Destructive Examination Hydrostatic Coatings Anchor Darling VT-2 Moisture barrier Liquid penetrant Dissimilar Metal Weld Eddy-Current Testing |
RNP-RA/12-0119, Supplemental Response to Request for Additional Information Related to Relief Request (RR)-07 from Immediate ASME Code Repair of Refueling Water Storage Tank Drain Valve (SI-837) for Fifth Ten-Year Inservice Inspection Program... | 11 November 2012 | Supplemental Response to Request for Additional Information Related to Relief Request (RR)-07 from Immediate ASME Code Repair of Refueling Water Storage Tank Drain Valve (SI-837) for Fifth Ten-Year Inservice Inspection Program... | Siren |
RNP-RA/12-0067, Response to the NRC Request for Additional Information Regarding Inservice Inspection Program Plan for the Fifth Ten-Year Interval | 19 June 2012 | Response to the NRC Request for Additional Information Regarding Inservice Inspection Program Plan for the Fifth Ten-Year Interval | Scaffolding |
RNP-RA/12-0063, Submittal of 90 Day Inservice Inspection Summary Report | 15 June 2012 | Submittal of 90 Day Inservice Inspection Summary Report | Non-Destructive Examination Hydrostatic Past operability Coatings Anchor Darling VT-2 Liquid penetrant Eddy-Current Testing |
RNP-RA/12-0064, Response to NRC Request for Additional Information Related to Relief Requests (RR)-2 for the Fifth Ten-Year Interval Inservice Testing Program Plan | 4 June 2012 | Response to NRC Request for Additional Information Related to Relief Requests (RR)-2 for the Fifth Ten-Year Interval Inservice Testing Program Plan | Safe Shutdown Boric Acid Stroke time Incorporated by reference Locked High Radiation Area B.5.b Local Leak Rate Testing Operability Determination Cold shutdown justification Power Operated Valves Grace period |
RNP-RA/12-0056, Response to NRC Request for Additional Information for the Fifth Ten-Year Interval Inservice Testing Program Plan | 10 May 2012 | Response to NRC Request for Additional Information for the Fifth Ten-Year Interval Inservice Testing Program Plan | Safe Shutdown Boric Acid Stroke time Incorporated by reference Locked High Radiation Area Local Leak Rate Testing Operability Determination Cold shutdown justification Power Operated Valves Manual Operator Action |
RNP-RA/12-0017, Inservice Testing Program Plan for the Fifth-Ten Year Interval | 16 March 2012 | Inservice Testing Program Plan for the Fifth-Ten Year Interval | Safe Shutdown Boric Acid Stroke time Incorporated by reference Locked High Radiation Area B.5.b Local Leak Rate Testing Operability Determination Cold shutdown justification Power Operated Valves Manual Operator Action |
RNP-RA/12-0023, Inservice Inspection Program for the Fifth Ten-Year Interval | 14 March 2012 | Inservice Inspection Program for the Fifth Ten-Year Interval | Boric Acid Non-Destructive Examination Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Aging Management Flow Accelerated Corrosion Stress corrosion cracking Eddy Current Testing License Renewal Commercial Grade Liquid penetrant Dissimilar Metal Weld Scaffolding Backfit Operability Assessment Thermal fatigue |
ML110330085 | 27 January 2011 | H. B. Robinson, Unit 2 - Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xi, for the Fourth Ten-Year Inservice Inspection Program Program Interval (Relief Request No. RR-23) | Probabilistic Risk Assessment License Renewal |
RNP-RA/10-0091, Submittal of 90 Day Inservice Inspection Summary Report | 22 September 2010 | Submittal of 90 Day Inservice Inspection Summary Report | Boric Acid Non-Destructive Examination Hydrostatic Coatings VT-2 License Renewal Eddy-Current Testing |
RNP-RA/09-0010, Submittal of 90 Day Inservice Inspection Summary Report for Refueling Outage 25 | 11 February 2009 | Submittal of 90 Day Inservice Inspection Summary Report for Refueling Outage 25 | Hydrostatic Coatings VT-2 License Renewal Liquid penetrant Dissimilar Metal Weld Eddy-Current Testing |
RNP-RA/08-0047, Response to NRC Request for Additional Information on the Steam Generator Inservice Inspection Results | 30 April 2008 | Response to NRC Request for Additional Information on the Steam Generator Inservice Inspection Results | Eddy Current Testing |
RNP-RA/07-0077, Submittal of 90 Day Inservice Inspection Summary Report | 2 August 2007 | Submittal of 90 Day Inservice Inspection Summary Report | Hydrostatic Anchor Darling VT-2 Liquid penetrant |
RNP-RA/06-0001, Submittal of 90 Day Inservice Inspection Summary Report | 16 January 2006 | Submittal of 90 Day Inservice Inspection Summary Report | Boric Acid Hydrostatic Coatings Anchor Darling VT-2 Liquid penetrant Eddy-Current Testing |
RNP-RA/04-0110, Submittal of 90 Day Inservice Inspection Summary Report | 26 August 2004 | Submittal of 90 Day Inservice Inspection Summary Report | |
RNP-RA/03-0034, Revision to Inservice Testing Program Relief Request IST-RR-3 for Containment Spray Pump Comprehensive Pump Test Requirements | 15 April 2003 | Revision to Inservice Testing Program Relief Request IST-RR-3 for Containment Spray Pump Comprehensive Pump Test Requirements | Liquid penetrant |
RNP-RA/03-0018, Submittal of 90 Day Inservice Inspection Summary Report | 11 February 2003 | Submittal of 90 Day Inservice Inspection Summary Report | Weld Overlay Hydrostatic VT-2 Liquid penetrant |
RNP-RA/02-0065, Relief Request Number RR-12 for the Fourth Ten-Year Interval Inservice Inspection Program | 14 May 2002 | Relief Request Number RR-12 for the Fourth Ten-Year Interval Inservice Inspection Program | Hydrostatic VT-2 Scaffolding |
ML020570311 | 20 February 2002 | Revision 1 to Inservice Testing Program Plan - Fourth Interval. | Safe Shutdown Boric Acid Stroke time Incorporated by reference Locked High Radiation Area Local Leak Rate Testing Power Operated Valves Manual Operator Action |