Text

j Florida Power AProgress Energy Company Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10CFR50.55a January 22, 2002 3F0102-04 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 Day Inservice Inspection (ISI) Summary Report

Dear Sir:

Florida Power Corporation (FPC) is providing the 90-Day Inservice Inspection (ISI) Summary Report as part of the attached American Society of Mechanical Engineers (ASME),Section XI, NIS-1, Owner's Report for Inservice Inspections. The report is being submitted in accordance with the requirements of the 1989 Edition of the ASME Boiler and Pressure Vessel Code,Section XI, Article IWA-6000 with no Addenda.

This Summary Report addresses the ISI examinations and Repairs/Replacements from the conclusion of Refueling Outage 11, November 13, 1999, to the conclusion of Refueling Outage 12, October 25, 2001.

This letter establishes no new regulatory commitments.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

Sincerely,

  • J~esH. Texý

"-4 ngineering Manager JHT/lvc

Attachment:

ASME,Section XI, NIS-1, Owner's Report for Inservice Inspections xc: NRR Project Manager Regional Administrator, Region II Senior Resident Inspector 15760 West Power Line Street

  • Crystal River, Florida 34428-6708 * (352) 795-6486

ATTACHMENT ASME, SECTION XI, NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS 3F0102-04 COMMERCIAL SERVICE DATE - 03/13/1977 Enclosure 1 - Crystal River Unit 3 - 90 Day Inservice Inspection Summary Report Table of Contents Summary Report Abstract of Examinations, Tests, Results and Corrective Actions (10 Pages)

Attachment 1, Inservice Inspection Report (61 Pages)

Attachment 2, NIS-2 Owner's Reports of Repair or Replacement for ASME Class 1 and Class 2 Components (86 Pages)

NIS-1 Page 1 of 2 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As Required by the Provisions of the ASME Code Rules

,\ n.. IAA.1fl C, fl,.-,.L...,. 0 2222AflAO

1. Owner Hlonia Power C~om'orauion, F.". Box ,-*,': St. 17tersoal urg ,. J_ J~*2 (Name and Address of Owner) 2:. Pl C"vtal River U nit 3 (CR-3) 15760 Power line Street Crystal River. FL. 34428-6708 (Name and Address of Plant)
3. Plant Unit Crystal River Unit 3 4. Owner Certificate of Authorization (if required) N/A 5.Commercial Service Date 3/13/1977 6. National Board Number for Unit N/A
7. Components Inspected Manufacturer or Installer Components or Manufacturer Serial No. State or Provine National Board Appurtenance or Installer No. No.

Reactor Vessel Babcock & Wilcox 620-0007-51-52 N/A N-i 17 Pressurizer Babcock & Wilcox 620-0007-59 N/A N-1 18 Steam Generator A Babcock & Wilcox 620-0007-55-1 N/A N-119 Steam Generator B Babcock & Wilcox 620-0007-55-2 N/A N-120 Various Piping, Pumps, N/A N/A N/A N/A Valves, Supports and Containment areas.

+ I I I

.4. 4 1 1 4 4 t 1 4 4 t 1 4 4 t I 4 4 + 4 4- I t 4 4- 4 5 4- 4 1-5 4- 4 +

I + I t Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size in the same as this Data Report, (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbers and the number of sheets is recorded at the top of this form.

NIS-1 Page 2 of 2 FORM NIS-1 (back)

8. Examination Dates: 11/13/99 to 10/25/2001
9. Inspection Period Identification: Period 1, 8/14/1998 to 12/13/2001 10 Inspection Interval Identification: Interval 3, 8/14/1998 to 8/13/2008 11 Applicable Edition of Section XI 1989 Addenda N/A 12 Date/Revision of Inspection Plan: 3/14/2000, Revision 3
13. Abstract of Examination and Tests. Include a list of examinations and a statement concerning status of work required for the inspection plan.

See Enclosure 1

14. Abstract of Results of Examinations and Tests.

See Enclosure 1

15. Abstract of Corrective Measures.

See Enclosure 1 We certify that a) the statements made in this report are correct b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No. (if applicable) N/A Expiration Date N/A r-.

Date 1/14/2002 Signed Florida Power Corporation By Matthew F. Denn Owner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of fioIiDA and employed by 1458 LT" of IP-"1Th(Z i (rT have inspected the components described in this Owner's Data Report during the period 1L-l3-111 to I- H -O and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Data Report in accordance with the Inspection Plan and as required by the ASME code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examination and corrective measures described in this Owner's Data Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions FL Hq5 ( -1,,c, A )

Inspector's Signature National Board, State, Province, and No.

Date JA, iJ . 2002

Enclosure 1 CRYSTAL RIVER UNIT 3 90 DAY INSERVICE INSPECTION

SUMMARY

REPORT Table of Contents

  • Attachment 1, Inservice Inspection Report
  • Attachment 2, NIS-2 Owner's Reports of Repair or Replacement for ASME Class 1 and Class 2 Components

U.S. Nuclear Regulatory Commission Abstract 3F0102-04 Page I of 10 Summary Report Abstract of Examinations, Tests, Results and Corrective Actions INTRODUCTION:

The following report documents the American Society of Mechanical Engineers (ASME)

Section XI Code, Inservice Inspection (ISI) Examinations and Repairs/Replacements performed from the conclusion of Refuel Outage 11 (November 13, 1999) to the conclusion of Refuel Outage 12 (October 25, 2001). Refueling Outage 12 (RFO12) was the second outage for the Third Inspection Interval. Examinations, Repairs and Replacements performed during this time period satisfy the requirements of the ASME Section XI Code, 1989 Edition, without Addenda.

Nuclear Regulatory Commission (NRC) regulations (10 CFR 50.55a) require that ISI examinations be performed in accordance with the latest edition and addenda of the ASME Code,Section XI, incorporated by reference, 12 months prior to the start of the 120-month interval. This report documents the examination activities conducted during this period. The detailed records of these examinations are on file and available at the plant site for review.

ASME Code Cases utilized by the Florida Power Corporation (FPC) during this period are documented within this report and have been approved for use either through inclusion in NRC Regulatory Guide 1.147, Revision 12 or by NRC approved Relief Requests.

EXAMINATIONS:

Components A summary listing of examinations conducted on ASME Class 1, 2, and 3 components is provided in Attachment 1. These examinations were conducted in accordance with the 1989 Edition without Addenda of the ASME Code,Section XI.

Steam GeneratorEddy CurrentExaminations Eddy current examination was conducted on 100% of the tubes in-service in both steam generators during RFO 12. A separate summary report for these examinations is submitted to the NRC as required in Improved Technical Specification (ITS) 5.7.2.e. This report documents these examinations as part of the NIS-1 report only.

Snubber Inspection Program The Crystal River Unit 3 (CR-3) Snubber Inspection Program implements examination/testing criteria based on the requirements of ASME Section XI, 1989 Edition, no Addenda and ASME/ANSI OM-1987, Part 4, 1988 Addenda.

U.S. Nuclear Regulatory Commission Abstract 3F0102-04 Page 2 of 10 The current CR-3 snubber population consists of 249 safety-relatedlsafety-significant snubber locations that require periodic visual examination, functional testing and service life monitoring/seal replacement. These locations are identified as accessible and inaccessible, but were considered as one population for inspection and testing during RFO112. Additionally, to help aid in Failure Mode Grouping and sample selection, all snubbers were identified in 3 separate populations - 186 small bore, 59 medium bore and 4 large bore snubbers.

For RFO 12 testing requirements, the initial 10% testing sample consisted of a combined total of 28 functional tests for the 3 populations (20 small bore, 7 medium bore and 1 large bore). For RFO 12 visual examination requirements, 100% as-found inspections were completed during the previous outage with no recorded failures, and therefore were not required this outage. Instead, as part of the service life program an augmented sample of 44 visual examinations (VT-3 as found and VT-3 as-left/pre-service) was performed on the replacement scope.

Upon completion of the RFO 12 work scope, functional testing of the initial sample detected no failures, and therefore no expansion of scope was required. Additionally, no visual failures were recorded during the augmented as-found examinations prior to snubber removal. Results of the functional tests and visual inspections are on file and available upon request and are summarized below.

U.S. Nuclear Regulatory Commission Abstract Page 3 of 10 3F0102-04 eLineType Mark No Design Model Serial No Testing Scope Test Service Life Visual Resuls Scpe Rsults Safety Large Hyd RCH-614 PP 14X4.3 16676626 Augmented Sat Rebuild Sat Safety Large Hyd RCH-620 PP 14X4.3 16676627 Initial Sample Sat Rebuild Sat Line Type Design Mark No Model Serial No Testing Scope Testing Service Life Visual Scope Scope Results Safety Medium Hyd CFH-17 PP 4X5 720105 Initial Sample Sat Replace Sat Safety Medium Hyd FWH-128 PP 5X5 760068 Initial Sample Sat Replace Sat safety

... M.edium Hyd* H, PP 4X5F 890002 Initial Sample Sat Replace Sat Safety Medium Hyd MSH-147 PP 5X5 720073 Initial Sample Sat Replace Sat Safety 'Medium Hyd MSH-167 PP 4X5 730117 Initial Sample Sat Replace Sat Safety Sig. Medium Hyd MSH-238 PP 5X5 720069 Initial Sample Sat Replace Sat Safety Sig. Medium Hyd MSH-145 PP 5X5 760067 Initial Sample Sat Replace Sat Line Type Design Mark No Model Serial No Testing Scope Testing Service Life Visual Scope Scope Results Safety Small Hyd BSH-1 5 PIP 2X5 720079 Initial Sample Sat Replace Sat Safety Small Hyd BSR-35 PP 2X5 720113 Replace Sat CFH-1 3 720137

,+

Initial Sample Sat Replace Sat Safety Small Hyd PP 2.5X5 Safety Small CFH-14 PP 2.5X5 740046 Initial Sample Sat Replace ......

.sSat .....

Hyd, Safety Small Hyd CFH-1 8 "PP2.5X5 730230 Initial Sample Sat Replace Sat 750130 Replace Sat Safety Small Hyd DCR-33E PP 1.5X5 DHH-17 730211 Replace Sat Safety Small Hyd PP 2.5X5 720139 Initial Sample Sat Replace Sat Safety Small Hyd DHH-1 9 PP 2.5X5 DHH-39 730129 Replace Sat Safety Small Hyd PP 1.5X5 DHR-24L PP ..S5 740003 Replace Sat Safety Small Hyd DHR-24U 750125 Replace Sat "Safety Small Hyd PP 1.5X5 EFH-109 PIP 1.5X5 750132 Initial Sample Sat Replace Sat Safety Small Hyd Initial Sample Sat Replace Sat Safety Small Hyd EFH-27 PP 2.5X5 730116 F*VH-140 740080 initial Sample Sat Replace Sat Safety Small Hyd PP 2.5X5 PIP 2.5X15 790006688 Replace Sat Safety Sig. Small Hyd Replace Sat Safety Sig. MSH-120 PP 2.5X15 750044 Small Hyd MSH-1 21 PP 2.5X10 740088 Replace Sat Safety Sig. Small Hyd MSH-214 PP 25 730193 Replace Sat Safety Initial Sample Sat Replace Sat Safety "Small HydI MSH-252 PIP 1.5X5 740011 0-P x.1..2.X15 Sat 760175 Initial Sample Sat Replace Safety Smal1 Hyd ITT 1.5X5 25589 Initial Sample Sat Replace Sat

'Saf~ety§Sig. Small Hyd MSH-665 SIafety Small Hyd MUH-35 IPP 1.5X5 730231 Replace Sat Hyd "MUH-39 PP 1.5X5 730150 Initial Sample Sat Replace Sat Safety* Small .......

Sat MUH-41 720126 Initial Sample Sat Replace Sat Safety Small Hyd PPi 1.5X5 Replace Small Hyd MUH-42 730222 Sat PIP 1.5X5 Initial Sample Sat Replace Safety Small Hyd MUH-43 k 760193 Sat J-PP 1.1SX1 730228 Initial Sample Sat Replace Safety Small Hyd MUH-45 Safety PP 2.X5 750081 Replace Small Hyd RCH-60 Sat Safety Small Hyd PIP 2X5 750085 initial Sa-mplei+ Sat Replace RCH-64 Sat a.e!

Safety ....+

. Small Hyd -R,C H-135" _PP 1.5X5 7501 22 Replace t ... Small Hyd ..............

.... ........ ...'..... Rep

......i...... . ....... .. ......

lac..

S... + e....

Safety RCH-73 PIP 1.5X5 730131 e Sat Sat Safety Small Hyd RCH-74 jPP 1.5X 5 730 113A1 Initial Sample Sat Replace Sat Small Hyd Safety Small Hyd 1 RCH-89 PIP 1.5X5 PIP 2X5 760181 Initial Sample Initial Sample .

Sat Sat Replace Replace

.S at....... '

Sat Safety . aS..

...S t .......

Safety . ........... 750120 ContainmentInspection Progqram The CR-3 Containment Inspection Program implements an examination/testing schedule for ISI inspection of the primary containment pressure boundary in accordance with ASME Section XI, 1989 Edition, no Addenda and incorporates the requirements of the ASME Section XI, 1992 Addenda of Subsections IWE & IWL.

Abstract U.S. Nuclear Regulatory Commission Page 4 of 10 3F0102-04 For RFO12 IWL inspection requirements, the primary containment pressure boundary (concrete containment) was inspected and included 16 designated locations that make up the complete concrete containment. Each of these areas as listed below, was visually inspected utilizing the VT-3C visual method and further investigated with VT-iC for any suspect conditions.

Upon completion of the RFO12 work scope, visual inspection resulted in six of the 16 identified locations requiring additional VT-1C inspections. Upon completion of all VT-3C and VT-iC inspections, results were evaluated and dispositioned by the Responsible Professional Engineer (structural) as satisfactory and no further scope increases were conducted. Results of the visual inspections are on file and available upon request and are summarized below.

In addition to these visual examinations, the 2 5t' year ( 7 th) tendon surveillance was performed between the dates of 8/20/01 and 1/15/2002. Due to the timing of the surveillance performance, the evaluation of the data has not been completed. The data will be evaluated and the results included in the summary report for Refueling Outage 13.

RBCN-001 Concrete Containment RBCN-002 Concrete L-A, L-.1i 1 300D to 45D 95' to 119' RB Visual, VT-3C Sat Containment RBCN-003 Concrete L-A, Ll.I 45D to 160D 95' to 119' RB Visual, VT-3C Sat Containment "RBcN-004 Concrete L-A, L1.11 250D to 300D 119' to 143' RB Visual, VT-3C Sat Containment R...Bc 0 .. concrete L-A, Li.*11 260D to 280D 119' to 129' RB Vis ual . .-..

.. Sa Containment RBCN-006 Concrete L-A, L1.11 300D to 105D 119' to 143' RB Visual, VT-3C Sat Containment R*gcN-007 c*'oncret'e.... 1400Dto 160D 118-4'to 146' RB Visual, VT-3C Sat Containment L-A, LIii RBCN-008 Concrete 2050 to 300D 143' to 167' RB Visual, VT-3C Sat containment L-A, 1-1.11 L-A, L1.11 Sat RBCN-009 IConcrete 250D to 300D 162' to 200'-4" RB Visual, VT-3C Containment 180D to 2400. 119' to 267'6" RB I Visual, v-sc Sat RBcN01l 0 Concrete Containment RcN-001 1.. Concrete D ito I00 ..

24001 167' to 267'-6" RB iVisual, wv-sc Sat Containment RBcN-o012 concrete L-A, Li.11 3000 to 300D 149' to 267'-6"1I RB Visual, VT-3C Sat Containment R4cN-0601 Concrete L-A, L1.11 00 to 60D 149' to 267'-6" RB Visual, V-sC Sat Containment R N- "1concrete... L... L2i1.1i"1 600 to 120 119' to267'-6"I RB Sat Containment Visual, VT-3C RBCN-001 5 concrete L-A, L1.11 120D to 180D 119'to267'-6" RB Sat Containment RBCN-0016 concrete L-A, L1.11 0D to 30D0 Dome 267'-6" RB Visual, VT-3C Sat Containment RBCN-00s3 Concrete 450Do 1600. t 9' o.19' RB wv-ic. Sat Containment RBcN-000 c concrete L-A, 1.12 180D to 240D 119' to 267'-6" RB VTF-1C Sat

U.S. Nuclear Regulatory Commission Abstract 3F0102-04 Page 5 of 10 Containment RBCN-001"1 Concrete L-A, l.12 240D to 0D 1670to 267'-6" RB VT-i C Sat Containment CN012 C.....oncrete k27-6" L...........3000.to...D*14' to RB V.C . Sat Containment i RBCN-0013 Concrete L-A, L1.12

.Dto60D 149' to 267'-6" RB VT-C Sat Containment "RBCN-00143 Concrete LOAD L i .12 600to 1200 119' to 267'-6" RB I. VT-iC Sat

.. . Containm ent..;

.... i . . -... ....

RC-0014 Concrete L-A, L1.12 1200 to 120D 119' to 267'-6" RB VT-iC Sat Containment

.. - C ontrain ent i............-

...... 5 o -......... o. ...................

6............VT.

. . i.... Sa RBCN-0016 Concrete L-A, L1.12 00 to 3000D oe26'6 RB VT-i C Sat Containment PressureTesting There were two (2) Class 1, twenty-three (23) Class 2, and twenty (20) Class 3 system pressure tests conducted to meet the ASME Section XI Code requirements as amended by ASME Code Case N-498-1 during RFO12. These are documented in Attachment 1. Pressure testing for applicable Repairs/Replacements of ASME Class 1 and 2 components are documented on the applicable NIS-2 form attached to this report.

Repairand Replacement There were twenty-three (23) ASME Class 1 and twenty (20) ASME Class 2 Repairs/Replacements performed since the last summary report. A summary listing of these Repairs/Replacements is provided in Table 1 of this abstract. Additionally, the NIS-2 Owners Report of Repairs and Replacements documenting these Repairs/Replacements for ASME Class 1 and Class 2 components are included with this report as Attachment 2.

A ugmented Plan Examinations One (1) High-Pressure Injection (HPI) nozzle and associated piping up to the first isolation valve was examined by both ultrasonic and radiographic techniques. These examinations were performed in accordance with Babcock & Wilcox Topical Report, "HPI/MU Nozzle Component Cracking." Additionally, one visual examination was conducted on Inconel nozzles susceptible to intergranular attack. There were no detrimental conditions identified during these examinations.

Visual examination of the 69 Control Rod Drive Mechanism Nozzles at their interface with the Reactor Pressure Vessel closure head were performed to detect signs of boric acid, which would indicate through-wall flaws. There was one nozzle that had boric acid buildup indicative of a through-wall flaw. Ultrasonic examinations (UT) were performed on this nozzle to confirm the through-wall flaw. Eight additional UT exams were performed as an expansion. The expansion exams revealed no similar flaws. The flawed weld was mechanically removed and a new pressure boundary weld was installed. The pressure testing after the repair was performed satisfactorily.

U.S. Nuclear Regulatory Commission Abstract Page 6 of 10 3F0 102-04 Two Reactor Coolant Pump Flywheels were ultrasonically examined to satisfy ITS requirements. These exams were conducted per the recommendations contained in Regulatory Guide 1.14, Positions 3, 4 and 5 of Section C.4.b. There were no detrimental conditions identified during these examinations.

CODE CASES and RELIEF REQUESTS:

This section documents all ASME Section XI Code Cases and NRC approved Relief Requests applicable to the reporting period.

Section XI Code Cases Used Code Case N-416-1, Alternative Rules for Hydrostatic Testing of Repair or Replacement of Class 2 Piping Section XI Division 1.

Code Case N-460, Alternative Examination Coverage for Class 1 and 2 Welds.

Code Case N-461, Alternative Rules for Piping Calibration Block Thickness.

Code Case N-463-1, Evaluation Procedures and Acceptance Criteria for Flaws in Class 1 Ferritic Piping That Exceed the Acceptance Standards of IWB-3514.2.

Code Case N-457, Qualification Specimen Notch Location for Ultrasonic Examination of Bolts and StudsSection XI, Division 1.

Code Case N-491-1, Alternative Rules for Examination of Class 1, 2, 3, and MC Components Supports of Light Water Cooled Power Plants.

Code Case N-498-1, Alternative Rules for 10 Year System Hydrostatic Testing for Class 1, 2, and 3 Systems.

Code Case N-508-1, Rotation of Serviced Snubbers and Pressure Relief Valves for the Purpose of Testing.

Code Case N-509, Alternative Rules for the Selection and Examination of Class 1, 2, and 3 Integrally Welded Attachments.

Code Case N-521, Alternative Rules for Deferral of Inspections of Nozzle-to Vessel Welds, Inside Radius Sections, and Nozzle-to Safe End Welds of a Pressurized Water Reactor (PWR) Vessel.

Code Case N-522, Pressure Testing of Containment Penetration Piping.

Code Case N-524, Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping.

U.S. Nuclear Regulatory Commission Abstract Page 7 of 10 3F0102-04 Code Case N-533 Alternative Requirements for VT-2 Visual Examination of Class 1 Insulated Pressure-Retaining Bolted Connections.

Code Case N-546 Alternative Requirements for Qualification of VT-2 Examination Personnel.

Code Case N-598 Alternative Requirements to Required Percentages of Examinations.

Code Case N-638 Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique.

Relief Requests 98-001-II Inside diameter Ultrasonic examination of the Core Flood Nozzles using enhanced UT as described in B&W Topical Reports BAW-2228-A and BAW-2228P.

98-002-II Surface Examination of Reactor Coolant Pump casing scroll welds. (RCP-lA only.)

98-003-11 Alternate examination criteria for the Reactor Vessel Support Skirt. Perform limited VT-3 examination on 3 areas 1200 apart on the inside surface.

98-004-II Alternate examination criteria for Control Rod Drive Mechanisms (CRDM),

examination category B-O.

98-008-II Request to use the 1989 Addenda of ASME Section XI for examination category B-G-1 for the examination of reactor vessel closure nuts; Item B6.10.

98-009-II Request to use ASME Code Case N-598, Alternate Requirements to Required Percentages of Examinations.

98-010-IT Request to use ASME Code Case N-508-1, Rotation of Serviced Snubbers and Pressure Relief Valves for the Purpose of Testing.

98-012-1I Request for relief from performing the Code required VT-3 examination on metal containment seals and gaskets. (ASME Section XI, 1992 Edition) 98-013-II Request for relief from the provisions of Paragraph IWA-2300 in accordance with CP-189 as amended by ASME Section XI. (ASME Section XI, 1992 Edition) 98-014-I Request for relief from requirement to perform pre-service inspection of new paint or coatings.

98-015-II Request for relief from performing the Code required visual examination on paint or coatings prior to removal.

U.S. Nuclear Regulatory Commission Abstract Page 8 of 10 3F0102-04 98-016-Il Request for relief from performing the VT-2 visual examination in connection with system pressure testing following repair, replacement or modification under Article IWE-5000.

98-017-11 Request for relief from the requirement of Paragraphs IWE-2420(b) and IWE 2420(c) to perform successive examinations of repairs.

98-018-I1 Request for relief from performing bolt torque or tension tests on bolted connections that have not been disassembled and reassembled during the inspection interval.

00-002-II Request to use annual training requirements contained in 10CFR50.55a(b)(2)(xiv) in lieu of the requirements specified in Subarticle VII-4240 to Appendix VII of Section XI of the Code.

01-001-Il Request to use ASME Code Case N-623 for deferral of the 50% partial examination of the RPV shell-to-flange weld to the end of the inspection interval.

98-005-PT Request to use ASME Code Case N-533, Alternative Requirements for VT-2 Visual Examination of Class 1 Insulated Pressure-Retaining Bolted Connections.

98-001-SS Request to use the 1988 Addenda to the 1987 ASME OM Code for definition of Examination Interval, Subsequent Examination Schedule and Examination Sample Size.

01-002-RR Request to perform Reactor Pressure Vessel (RPV) Closure Head Control Rod Drive Mechanism (CRDM) nozzle penetration repairs with a remotely operated weld tool, utilizing the machine Gas Tungsten-Arc Welding (GTAW) process and the ambient temperature temper bead method with 50F minimum preheat temperature and no post weld heat.

01-003-RR Request to use worst case assumptions when evaluating flaws on Reactor Pressure Vessel (RPV) Closure Head Control Rod Drive Mechanism (CRDM) nozzle penetration welds.

U.S. Nuclear Regulatory Commission Abstract Page 9 of 10 3F0102-04 The following NIS-2 forms are attachedin compliance with the requirements of Article IWA-6220 of 1989 Edition of ASME Section XI without Addenda Class I NIS-2 Reports Work Description Repaired /

Request # Replacement 365080 REPLACED RCV-8 BY BOLTING REPLACEMENT 366665 REPLACE CRDM'S BY BOLTING. REPLACEMENT 366884 REPLACE VALVE BY BOLTING. REPLACEMENT INSTALLED CANOPY SEAL ENCLOSURE TO VALVE DHV-3 BODY AND 366978 BONNET BY WELDING per MAR #P00080301. REPLACEMENT 367235 REPLACE VALVE BY BOLTING. REPLACEMENT 367328 REPLACED VALVES BY BOLTING. REPLACEMENT REPLACED 2.5x5 POWER PIPING SNUBBER 720139 WITH LIKE-FOR-LIKE 368141 SNUBBER 720135. REPLACEMENT REPLACED 1.5"X5" POWER PIPING SNUBBER 730147 WITH LIKE-FOR-LIKE 368146 SNUBBER 730014. REPLACEMENT REPLACED 1.5"X5" POWER PIPING SNUBBER 7301 13A WITH LIKE-FOR-LIKE 368147 SNUBBER 750139. REPLACEMENT REPLACED 1.5"X5" POWER PIPING SNUBBER 730131 WITH LIKE-FOR-LIKE 368148 SNUBBER 760200. REPLACEMENT REPLACED 1.5"X5" POWER PIPING SNUBBER 750122 WITH LIKE-FOR-LIKE 368149 SNUBBER 760197. REPLACEMENT REPLACED 1.5X5 POWER PIPING SNUBBER 730228 WITH LIKE FOR-LIKE 368154 SNUBBER 750125. REPLACEMENT REPLACED 1.5"X5" POWER PIPING SNUBBER 760193 WITH LIKE-FOR-LIKE 368155 SNUBBER 750112. REPLACEMENT REPLACED 1.5X5 POWER PIPING SNUBBER 730150 WITH LIKE FOR-LIKE 368156 SNUBBER 760194. REPLACEMENT REPLACED 1.5"X5" POWER PIPING SNUBBER 730231 WITH LIKE-FOR-LIKE 368157 SNUBBER 740003. REPLACEMENT REPLACED 1.5"X5" POWER PIPING SNUBBER 730129 WITH LIKE-FOR-LIKE 368177 SNUBBER 750104. REPLACEMENT REPLACED 2.5"X5" POWER PIPING SNUBBER 730230 WITH LIKE-FOR-LIKE 368178 SNUBBER 720083. REPLACEMENT REPLACED 4"X5" POWER PIPING SNUBBER 720105 WITH LIKE-FOR-LIKE 368179 SNUBBER 730018. REPLACEMENT REPLACED 2.5"X5" POWER PIPING SNUBBER 740046 WITH LIKE-FOR-LIKE 368180 SNUBBER 740047. REPLACEMENT REPLACED 1.5"X5" POWER PIPING SNUBBER 720125 WITH LIKE-FOR-LIKE 368415 SNUBBER 720132. REPLACEMENT REPLACED 1.5"X5" POWER PIPING SNUBBER 730222 WITH LIKE-FOR-LIKE 368427 SNUBBER 730140. REPLACEMENT

U.S. Nuclear Regulatory Commission Abstract Page 10 of 10 3F0102-04 rnnnAfl NAflflTCV C*Ifl'M Y'l,7T71 g' 19 fly WFIT flING PER MAR 01-09-02-01. REPLACEMENT REPLACED 1.5"X5" POWER PIPING SNUBBER 750100 WITH LIKE-FOR-LIKE 371706 SNUBBER 750132.. REPLACEMENT Class 2 NIS-2 Reports Work Description Repaired /

Request # Replacement 357800 REPAIR SUPPORTS BY WELDING. REPAIRED 363265 REPLACED MISSING BOLTS. REPLACEMENT 367039 REPLACED SUPPORT CLAMP BOLT. REPLACEMENT 367605 REPLACE VALVE INTERNALS. REPLACEMENT REPLACED 1.5"X5" POWER PIPING SNUBBER 750120 WITH LIKE-FOR-LIKE 368144 SNUBBER 760199. REPLACEMENT REPLACED 2X5 POWER PIPING SNUBBER 760175 WITH LIKE FOR-LIKE 368159 SNUBBER 730039. REPLACEMENT REPLACED 4"X5" POWER PIPING SNUBBER 730117 WITH LIKE-FOR-LIKE 368164 SNUBBER 740036. REPLACEMENT REPLACED 5"X5" POWER PIPING SNUBBER 720073 WITH LIKE-FOR-LIKE 368165 SNUBBER 720075. REPLACEMENT REPLACED 2.5"X5" POWER PIPING SNUBBER 740080 WITH LIKE-FOR-LIKE 368171 SNUBBER 740092. REPLACEMENT REPLACED 5X5 POWER PIPING SNUBBER 760068 WITH LIKE-FOR-LIKE 368172 SNUBBER 760036.. REPLACEMENT REPLACED 2.5X5 POWER PIPING SNUBBER 730116 WITH LIKE FOR-LIKE 368173 SNUBBER 730217. REPLACEMENT REMOVED SNUBBER S/N 750125 FROM LOCATION DHR-24U AND REPLACED 368175 WITH LIKE-FOR-LIKE SNUBBER S/N 750134. REPLACEMENT REMOVED SNUBBER S/N 740003 FROM LOCATION DHR-24L AND REPLACED 368176 WITH LIKE-FOR-LIKE SNUBBER S/N 730128. REPLACEMENT REPLACED 2.5X5 POWER PIPING SNUBBER 720137 WITH LIKE FOR-LIKE 368181 SNUBBER 720138. REPLACEMENT 368182 REPLACED SNUBBER 720113 WITH LIKE FOR LIKE SNUBBER 750073. REPLACEMENT REPLACED 2"X5" POWER PIPING SNUBBER 720079 WITH LIKE-FOR-LIKE 368183 SNUBBER 730114. REPLACEMENT REPLACED 4X5 POWER PIPING SNUBBER 890002 WITH LIKE FOR-LIKE 368200 SNUBBER 760071. REPLACEMENT REPLACED 2.5"X5" POWER PIPING SNUBBER 730211 WITH LIKE-FOR-LIKE 368411 SNUBBER 720136. REPLACEMENT 368807 REPLACED VALVE BY BOLTING REPLACEMENT REMOVED AND RE-WELDED 2.5" SW LINES AND PIPE SUPPORT MU HGR TYP 371012 25 INSUPPORT OF RCP-IB SW-COOLER WORK. REPLACEMENT

ASME, SECTION XI, NIS-1 ATTACHMENT 1 Inservice Inspection Summary Report (61 Pages)

Florida Power AProgress Energy 1orr;ýn,,,n Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-A ITEM: B1.40 Summary No. Component ID Component Description System System Description B1.3.2A RCRE-1 REACTOR VESSEL FLANGE-TO-HEAD RC REACTOR COOLANT WELD MK24-TO-22 Workscope Report No. Exam Results Work Request No. Examination Rem*arks ISI UT-01-129 Sat 366472 1/3 of Weld Lengtlh Examined - Access limited from one side.

CATEGORY: B-B ITEM: B2.40 Summary No. Component ID Component Description System System Description B3.1.2A RCSG-1A OTSG TUBESHEET-TO-HEAD WELD MK7- RC REACTOR COOLANT TO-50 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-128 Sat 366464 CATEGORY: B-D ITEM: B3.110 Summary No. Component ID Component Description System System Description B2.2.3A RCT-1 PRESSURIZER MK31-TO-5 Z-W AXIS RC REACTOR COOLANT NOZZLE-TO-HEAD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-032 Sat 366464 Limited examination due to component configuration.

ITEM: B3.120 Summary No. Component ID Component Description System System Description B2.2.3B RCT-1 PRESSURIZER MK31-TO-5 Z-W AXIS RC REACTOR COOLANT NOZZLE INNER RADIUS Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-033 Sat 366464 Limited examination due to component configuration.

ITEM: B3.130 Summary No. Component ID Component Description System System Description B3.2.3 RCSG-1A OTSG MK65-7 Z-W AXIS NOZZLE-TO RC REACTOR COOLANT HEAD Workscope Report No. Exam Results Work Request No. Examination Remarks ISl UT-01-123 Sat 366464 Limited examination due to component configuration.

ITEM. B3.140 Summary No. Component ID Component Description System System Description B3.2.3.1 RCSG-1A OTSG Z-W AXIS VESSEL NOZZLE INNER RC REACTOR COOLANT RADIUS Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-124 Sat 366464 Limited examination due to component configuration.

Wednesday, January 16, 2002 PagelI of 61

SFlorida Power AProgress Energy C(orn-,any Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-E ITEM: B4.12 Summary No. Component ID Component Description System System Description B11.5.1.01 CRDM Nozzle #1 CRDM Head Penetration H-8 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-002 Sat 368781 As-Found VT-2 Examination AUG VT-01-105 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.02 CRDM Nozzle #2 CRDM Head Penetration G-7 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01 -003 Sat 368781 As-Found VT-2 Examination AUG VT-01 -106 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.03 CRDM Nozzle #3 CRDM Head Penetration G-9 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-004 Sat 368781 As-Found VT-2 Examination AUG VT-01-107 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Descriptiorn t A System escrpCon CRDM Head Penetratiron K-9 RC REACTOR COOLANT B1.5.1.04 CRDM Nozzle #4 Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01 -005 Sat 368781 As-Found VT-2 Examination AUG VT-01-108 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Descriptior SSystem System Description B1.5.1.05 CRDM Nozzle #5 CRDM Head Penetraticon K-7 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-006 Sat 368781 As-Found VT-2 Examination AUG VT-01-109 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.06 CRDM Head Penetration F-8 RC REACTOR COOLANT CRDM Nozzle #6 Workscope Report No. Exam Results Work Request No. Exami nation Remarks AUG VT-01-007 Sat 368781 As-Fo und VT-2 Examination AUG VT-01-110 Sat 368781 VT-2 Following Head Cleaning Wednesday, January 16, 2002 Page 2 of 61

Florida Power AkProgress Energy Comprrln Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-E ITEM: B4.12 Summary No. Component ID Component Description System System Description B13.5.1.07 CRDM Nozzle #7 CRDM Head Penetration H-10 RC REACTOR COOLANT Workscope Report N10. Exam Results Work Request No. Examination Remarks AUG VT-0l-0( 08 Sat 368781 As-Found VT-2 Examination AUG VT-01-1 11 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.08 CRDM Nozzle #8 CRDM Head Penetration L-8 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VE-01-019 Eval 368781 Non-Relevant UT Fabrication Indications - Acceptable AUG VT-01 -009 Sat 368781 As-Found VT-2 Examination AUG VT-01 -112 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.09 CRDM Nozzle #9 CRDM Head Penetration H-6 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-010 Sat 368781 As-Found VT-2 Examination AUG VT-01-113 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description Sst A System escnrptCon CRDM Head Penetration F-6 RC REACTOR COOLANT B11.5.1.10 CRDM Nozzle #10 Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01 -011 Sat 368781 As-Found VT-2 Examination AUG VT-01l-114 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.11 CRDM Nozzle #11 CRDM Head Penetration F-10 RC REACTOR COOLANT Workscope Report N0o. Exam Results Work Request No. Examination Remarks AUG VT-01-0 12 Sat 368781 As-Found VT-2 Examination AUG VT-01-1 15 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B11.5.1.12 CRDM Nozzle #12 CRDM Head Penetration L-1 0 RC REACTOR COOLANT Workscope Report N01. Exam Results Work Request No. Examination Remarks AUG VT-01-0 13 Sat 368781 As-Found VT-2 Examination AUG VT-01 -1 16 Sat 368781 VT-2 Following Head Cleaning Wednesday, January 16, 2002 Page 3 of 61

S Florida Power A Progress Energy Conrpany Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-E ITEM: B4.12 Summary No. Component ID Component Description System System Description B1.5.1.13 CRDM Head Penetration L-6 RC REACTOR COOLANT CRDM Nozzle #13 Workscope Report No. Exam Results Work Request No. Examiination Remarks AUG VT-01-014 Sat 368781 As-Fo und VT-2 Examination AUG VT-01 -117 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.14 CRDM Nozzle #14 CRDM Head Penetration E-7 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-015 Sat 368781 As-Found VT-2 Examination AUG VT-01-118 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.15 CRDM Nozzle #15 CRDM Head Penetration E-9 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01 -016 Sat 368781 As-Found VT-2 Examination AUG VT-01 -119 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Descriptiorn S rysemA escrCpLon CRDM Head Penetrati on G-11 RC REACTOR COOLANT B1.5.1.16 CRDM Nozzle #16 Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-017 Sat 368781 As-Found VT-2 Examination AUG VT-01-120 Sat 368781 VT-2 Following Head Cleaning Component Descriptiorn System System Description Summary No. Component ID B11.5.1.17 CRDM Nozzle #17 CRDM Head Penetraticon K-11 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01 -018 Sat 368781 As-Found VT-2 Examination AUG VT-01 -121 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.18 CRDM Nozzle #18 CRDM Head Penetration M-9 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-019 Sat 368781 As-Found VT-2 Examination AUG VT-01-122 Sat 368781 VT-2 Following Head Cleaning Wednesday, January 16, 2002 Page 4 of 61

Florida Power A Progress Energy Corrimany Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-E ITEM: B4.12 Summary No. Component ID Component Description System System Description B1.5.1.19 CRDM Nozzle #19 CRDM Head Penetration M-7 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01 -020 Sat 368781 As-Found VT-2 Examination AUG VT-01-123 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.20 CRDM Nozzle #20 CRDM Head Penetration K-5 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-021 Sat 368781 As-Found VT-2 Examination AUG VT-01-124 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.21 CRDM Nozzle #21 CRDM Head Penetration G-5 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VE-01-020 Eval 368781 Non-Relevant UT Fabrication Indications - Acceptable AUG VT-01-022 Sat 368781 As-Found VT-2 Examination AUG VT-01-125 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.22 CRDM Nozzle #22 CRDM Head Penetration D-8 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-023 Sat 368781 As-Found VT-2 Examination AUG VT-01-126 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Descriptio n System System Description B1.5.1.23 CRDM Nozzle #23 CRDM Head Penetrati on H-12 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01 -024 Sat 368781 As-Found VT-2 Examination AUG VT-01-127 Sat 368781 VT-2 Following Head Cleaning Summary No. Component I D Component Descriptio n System System Description B1.5.1.24 CRDM Nozzle #24 CRDM Head Penetrati on N-8 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-025 Sat 368781 As-Found VT-2 Examination AUG VT-01-128 Sat 368781 VT-2 Following Head Cleaning Wednesday, January 16, 2002 Page 5 of 61

Florida Power A Progress Energy Comyn Attachment 1 Inservice Inspection Report Interval 3 / Period 1 1 Refuel Cycle 12 CLASS: 1 CATEGORY: B-E ITEM: B4.12 Summary No. Component ID Component Description System System Description B13.5.1.25 CRDM Nozzle #25 CRDM Head Penetration H-4 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-026 Sat 368781 As-Found VT-2 Examination AUG VT-01-129 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.26 CRDM Nozzle #26 CRDM Head Penetration E-5 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-027 Sat 368781 As-Found VT-2 Examination AUG VT-01-130 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.27 CRDM Nozzle #27 CRDM Head Penetration E-1 1 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-028 Sat 368781 As-Found VT-2 Examination AUG VT-01-131 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description Sy Rystem DescOption B13.5.1.28 CRDM Head Penetration M-1 1 RC REACTOR COOLANT CRDM Nozzle #28 Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01 -029 Sat 368781 As-Found VT-2 Examination AUG VT-01 -132 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B13.5.1.29 CRDM Nozzle #29 CRDM Head Penetration M-5 RC REACTOR COOLANT Workscope Report No. Exam Results Work Reauest No. Examination Remarks AUG VT-01-030 Sat 368781 As-Found VT-2 Examination AUG VT-01-133 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.30 CRDM Nozzle #30 CRDM Head Penetration D-6 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-031 Sat 368781 As-Found VT-2 Examination AUG VT-01-134 Sat 368781 VT-2 Following Head Cleaning Wednesday, January 16, 2002 Page 6 of 61

Florida Power A Progress Energy Com-an' Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-E ITEM: B4.12 Summary No. Component I D Component Description System System Description B1i.5.1.31 CRDM Nozzle #31 CRDM Head Penetration D-1 0 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-032 Sat 368781 As-Found VT-2 Examination AUG VT-01-135 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.32 CRDM Nozzle #32 CRDM Head Penetration F-12 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VE-01-021 Unsat 368781 Unacceptable UT Indications - Nozzle was replaced by welding.

AUG VT-01-033 Unsat 368781 As-Found VT-2 Examination - Nozzle was replaced by welding.

AUG VT-01-136 Unsat 368781 VT-2 Following Head Cleaning - Nozzle was replaced by welding.

Summary No. Component ID Component Description System System Description B1.5.1.33 CRDM Nozzle #33 CRDM Head Penetration L-12 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-034 Sat 368781 As-Found VT-2 Examination AUG VT-01-137 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B13.5.1.34 CRDM Nozzle #34 CRDM Head Penetration N-1 0 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-035 Sat 368781 As-Found VT-2 Examination AUG VT-01-138 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.35 CRDM Nozzle #35 CRDM Head Penetration N-6 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Exami nation Remarks AUG VT-01 -036 Sat 368781 As-Foiund VT-2 Examination AUG VT-01-139 Sat 368781 VT-2 FFollowing Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.36 CRDM Nozzle #36 CRDM Head Penetration L-4 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-037 Sat 368781 As-Found VT-2 Examination AUG VT-01-140 Sat 368781 VT-2 Following Head Cleaning Wednesday, January 16, 2002 Page 7 of 61

Florida Power Cinmsn',

A Progress Energy Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-E ITEM: B4.12 Summary No. Component ID Component Description System System Description B1.5.1.37 CRDM Head Penetration F-4 RC REACTOR COOLANT CRDM Nozzle #37 Workscope Report No. Exam Results Work Request No. Exami nation Remarks AUG VT-01 -038 Sat 368781 As-Fo und VT-2 Examination AUG VT-01-141 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.38 CRDM Nozzle #38 CRDM Head Penetration C-7 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-039 Sat 368781 As-Found VT-2 Examination AUG VT-01-142 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.39 CRDM Nozzle #39 CRDM Head Penetration C-9 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-040 Sat 368781 As-Found VT-2 Examination AUG VT-01-143 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Descriptio n RETescripOOLAn ystem CRDM Head Penetrati on G-13 RC REACTOR COOLANT B13.5.1.40 CRDM Nozzle #40 Workscope Report No. Exam Results Work Reauest No. Examination Remarks AUG VE-01-022 Sat 368781 UT Examination AUG VT-01 -041 Sat 368781 As-Found VT-2 Examination AUG VT-01-144 Sat 368781 VT-2 Following Head Cleaning Component ID Component Descriptio n System System Description Summary No.

B13.5.1.41 CRDM Nozzle #41 CRDM Head Penetration K-13 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-042 Sat 368781 As-Found VT-2 Examination AUG VT-01-145 Sat 368781 VT-2 Following Head Cleaning Summary No. Component Descriptio n System System Description Component ID B13.5.1.42 CRDM Nozzle #42 CRDM Head Penetrati on 0-9 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-043 Sat 368781 As-Found VT-2 Examination AUG VT-01-146 Sat 368781 VT-2 Following Head Cleaning Wednesday, January 16, 2002 Page 8 of 61

Florida Power AProgress Energy Corr-,ny Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-E ITEM: B4.12 Summary No. Component ID Component Description System System Description B13.5.1.43 CRDM Nozzle #43 CRDM Head Penetration 0-7 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-044 Sat 368781 As-Found VT-2 Examination AUG VT-01-147 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.44 CRDM Nozzle #44 CRDM Head Penetration K-3 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-045 Sat 368781 As-Found VT-2 Examination AUG VT-01-148 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B13.5.1.45 CRDM Nozzle #45 CRDM Head Penetration G-3 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01 -046 Sat 368781 As-Found VT-2 Examination AUG VT-01-149 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B13.5.1.46 CRDM Nozzle #46 CRDM Head Penetration D-4 RC REACTOR COOLANT Workscope Report N0o. Exam Results Work Request No. Examination Remarks AUG VT-01-0.47 Sat 368781 As-Found VT-2 Examination AUG VT-01-1E50 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.47 CRDM Nozzle #47 CRDM Head Penetration D-12 RC REACTOR COOLANT Workscope Report N0o. Exam Results Work Request No. Examination Remarks AUG VT-01 -0 48 Sat 368781 As-Found VT-2 Examination AUG VT-01-1 51 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B13.5.1.48 CRDM Nozzle #48 CRDM Head Penetration N-12 RC REACTOR COOLANT Workscope Report NNo. Exam Results Work Request No. Examination Remarks AUG VT-01-0 49 Sat 368781 As-Found VT-2 Examination AUG VT-01-1 52 Sat 368781 VT-2 Following Head Cleaning Wednesday, January 16, 2002 Page 9 of 61

Florida Power A Progress Energy Chmnar,' Attachment 1 Inservice Inspection Report Interval 3 1 Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-E ITEM: B4.12 Summary No. Component ID Component Description System System Description B13.5.1.49 CRDM Head Penetration N-4 RC REACTOR COOLANT CRDM Nozzle #49 Workscope Report No. Exam Results Work Request No. Examination Remarks VT-01-050 Sat 368781 As-Found VT-2 Examination AUG VT-01-153 Sat 368781 VT-2 Following Head Cleaning AUG Summary No. Component ID Component Description System System Description B1.5.1.50 CRDM Nozzle #50 CRDM Head Penetration C-5 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01 -051 Sat 368781 As-Found VT-2 Examination AUG VT-01-154 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B13.5.1.51 CRDM Nozzle #51 CRDM Head Penetration C-11 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-052 Sat 368781 As-Found VT-2 Examination AUG VT-01-155 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Descriptiorn S E ASCTm uescnpTon CRDM Head Penetrati on E-13 RC REACTOR COOLANT B13.5.1.52 CRDM Nozzle #52 Workscope Report No. Exam Results Work Request No. Examination Remarks VE-01-023 Sat 368781 UT Examination AUG VT-01-053 Sat 368781 As-Found VT-2 Examination AUG VT-01-156 Sat 368781 VT-2 Following Head Cleaning AUG Component ID Component Descriptioin System System Description Summary No.

B13.5.1.53 CRDM Nozzle #53 CRDM Head Penetrati on M-13 RC REACTOR COOLANT Exam Results Work Request No. Examination Remarks Workscope Report N01.

AUG VT-01 -0554 Sat 368781 As-Found VT-2 Examination AUG VT-01-1E57 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description CRDM Head Penetration 0-11 RC REACTOR COOLANT B1.5.1.54 CRDM Nozzle #54 Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VE-01-024 Eval 368781 Non-Relevant UT Fabrication Indications - Acceptable AUG VT-01-055 Sat 368781 As-Found VT-2 Examination AUG VT-01-158 Sat 368781 VT-2 Following Head Cleaning Wednesday, January 16, 2002 Page 10 of 61

S Florida Power A Progress Energy r*omnw,-

Attachment 1 Inservice Inspection Report Interval 3 / Period 1 1 Refuel Cycle 12 CLASS: 1 CATEGORY: B-E ITEM: B4.12 Summary No. Component ID Component Description System System Description B1.5.1.55 CRDM Nozzle #55 CRDM Head Penetration 0-5 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-056 Sat 368781 As-Found VT-2 Examination AUG VT-01-159 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.56 CRDM Nozzle #56 CRDM Head Penetration M-3 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-057 Sat 368781 As-Found VT-2 Examination AUG VT-01 -160 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B13.5.1.57 CRDM Nozzle #57 CRDM Head Penetration E-3 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-058 Sat 368781 As-Found VT-2 Examination AUG VT-01-161 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Desciption B13.5.1.58 CRDM Nozzle #58 CRDM Head Penetration B-8 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VE-01-025 Eval 368781 Non-Relevant UT Fabrication Indications - Acceptable AUG VT-01 -059 Sat 368781 As-Found VT-2 Examination AUG VT-01 -162 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.59 CRDM Nozzle #59 CRDM Head Penetration H-14 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-060 Sat 368781 As-Found VT-2 Examination AUG VT-01-163 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.60 CRDM Nozzle #60 CRDM Head Penetration P-8 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01 -061 Sat 368781 As-Found VT-2 Examination AUG VT-01-164 Sat 368781 VT-2 Following Head Cleaning Wednesday, January 16, 2002 Page 11 of 61

Florida Power A Progress Energy ComaiWy Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-E ITEM: B4.12 Summary No. Component ID -Component Description System System Description B1.5.1.61 CRDM Head Penetration H-2 RC REACTOR COOLANT CRDM Nozzle #61 Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-062 Sat 368781 As-Found VT-2 Examination AUG VT-01-165 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.62 CRDM Nozzle #62 CRDM Head Penetration B-6 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01 -063 Sat 368781 As-Found VT-2 Examination AUG VT-01 -166 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.63 CRDM Nozzle #63 CRDM Head Penetration B-10 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VE-01-026 Eval 368781 Non-Relevant UT Fabrication Indications - Acceptable AUG VT-01-064 Sat 368781 As-Found VT-2 Examination AUG VT-01-167 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B13.5.1.64 CRDM Nozzle #64 CRDM Head Penetration F-14 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VE-01 -027 Sat 368781 UT Examination AUG VT-01-065 Sat 368781 As-Found VT-2 Examination AUG VT-01-168 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.65 CRDM Head Penetration L-14 RC REACTOR COOLANT CRDM Nozzle #65 Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01 -066 Sat 368781 As-Found VT-2 Examination AUG VT-01 -169 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.66 CRDM Nozzle #66 CRDM Head Penetration P-10 RC REACTOR COOLANT Workscope Report No. Exam Results Work Reauest No. Examination Remarks AUG VT-01-067 Sat 368781 As-Found VT-2 Examination AUG VT-01-170 Sat 368781 VT-2 Following Head Cleaning Wednesday, January 16, 2002 Page 12 of 61

Florida Power A Progress Energy Com?,any Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-E ITEM: B4.12 Summary No. Component ID Component Description System System Description B13.5.1.67 CRDM Nozzle #67 CRDM Head Penetration P-6 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01 -068 Sat 368781 As-Found VT-2 Examination AUG VT-01-171 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.68 CRDM Nozzle #68 CRDM Head Penetration L-2 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-069 Sat 368781 As-Found VT-2 Examination AUG VT-01-172 Sat 368781 VT-2 Following Head Cleaning Summary No. Component ID Component Description System System Description B1.5.1.69 CRDM Nozzle #69 CRDM Head Penetration F-2 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-070 Sat 368781 As-Found VT-2 Examination AUG VT-01-173 Sat 368781 VT-2 Following Head Cleaning CATEGORY: B-G-1 ITEM: B6.10 Summary No. Component ID Component Description System System Description B1.8.4.00 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-1 Workscope Report No. Exam Results Work Request No. Examination Remarks ISl VT-01-196 Sat 366474 Component ID Component Description System System Description Summary No.

B1.8.4.01 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-2 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-197 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.4.02 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-3 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-198 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.4.03 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-4 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-199 Sat 366474 Wednesday, January 16, 2002 Page 13 of 61

Pow er SFlorida ArProgress Energy Cam*any Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-G-1 ITEM: B6.10 Summary No. Component ID Component Description Syster System Description B1.8.4.04 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-5 Workscope Report Lo. Exam Results Work Request No. Examination Remarks ISI VT-01-2 00 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.4.05 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-6 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-201 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.4.06 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-7 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -202 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.4.07 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-8 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-203 Sat 366474 Summary No. Component ID Component Description t Rystem A escrCpton REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT B1.8.4.08 RCRE-1 26-207-9 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -204 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.4.09 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-10 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-205 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.4.10 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT RCRE-1 26-207-11 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-206 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.4.11 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-12 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-207 Sat 366474 Wednesday, January 16, 2002 Page 14 of 61

Florida Power A Progress Energy Cornr y*

Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-G-1 ITEM: B6.10 Summary No. Component ID Component Description System System Description B1.8.4.12 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-13 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-208 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.4.13 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-14 Workscope Report No. Exam Results Work Request No. Examination Remarks iSI VT-01-209 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.4.14 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-15 Workscope Report No. Exam Results Work Reauest No. Examination Remarks ISI VT-01-210 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.4.15 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-16 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-211 Sat 366474 Summary No. Component ID Component Description System System Description 11.8.4.16 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-17 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-212 Sat 366474 Summary No. Compon ent ID Component Description System System Description B11.8.4.17 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-18 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-213 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.4.18 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-19 Workscope Report No. Exam Results Work Request No. Examination Remarks iSI VT-01-214 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.4.19 RCRE-1 REACTOR VESSEL CLOSURE HEAD NUT RC REACTOR COOLANT 26-207-20 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-215 Sat 366474 Wednesday, January 16, 2002 Page 15 of 61

'. Florida Power A Progress Energy Comrrpny Attachment 1 Inservice Inspection Report Interval 3 1 Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-G-1 ITEM: B6.30 Component ID Component Description SSystem System Description Summary No.

REACTOR VESSEL CLOSURE STUD 25 RC REACTOR COOLANT B1.8.1.00 RCRE-1 207-1 Report No. Exam Results Work Request No. Examination Remarks Workscope ISI MT-01 -017 Sat 366474 ISI UT-01 -042 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.1.01 RCRE-1 REACTOR VESSEL CLOSURE STUD 25- RC REACTOR COOLANT 207-2 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01 -018 Sat 366474 IS! UT-01 -043 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.1.02 RCRE-1 REACTOR VESSEL CLOSURE STUD 25- RC REACTOR COOLANT 207-3 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-019 Sat 366474 ISI UT-01-044 Sat 366474 Summary No. Component ID Component Description t Rystem A escrlpCiorN RC REACTOR COOLANT B1.8.1.03 RCRE-1 REACTOR VESSEL CLOSURE STUD 25 207-4 Report N10. Exam Results Work Request No. Examination Remarks Workscope ISI MT-01-0 20 Sat 366474 IS! UT-01-0.45 Sat 366474 Component ID Component Description System System Description Summary No.

RC REACTOR COOLANT B1.8.1.04 RCRE-1 REACTOR VESSEL CLOSURE STUD 25 207-5 Report N0o. Exam Results Work Request No. Examination Remarks Workscope IS' MT-01-0 '21 Sat 366474 ISI UT-01-0146 Sat 366474 S System Description Summary No. Component ID Component Description RC REACTOR COOLANT B1.8.1.05 RCRE-1 REACTOR VESSEL CLOSURE STUD 25 207-6 Exam Results Work Request No. Examination Remarks Workscope Report No.

IS' MT-01-022 Sat 366474 iSI UT-01 -047 Sat 366474 Page 16 of 61 Wednesday, January 16, 2002

SFlorida Power A Progress Energy Com"sny Attachment 1 Inservice Inspection Report Interval 3 / Period 1 1 Refuel Cycle 12 CLASS: 1 CATEGORY: B-G-1 ITEM: B6.30 Summary No. Component ID Component Description System System Description B1.8.1.06 RCRE-1 REACTOR VESSEL CLOSURE STUD 25 RC REACTOR COOLANT 207-7 Workscope Report No. Exam Results Work Request No. Examination Remarks IS! MT-01 -023 Sat 366474 ISI UT-01-048 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.1.07 RCRE-1 REACTOR VESSEL CLOSURE STUD 25- RC REACTOR COOLANT 207-8 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-024 Sat 366474 isI UT-01-049 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.1.08 RCRE-1 REACTOR VESSEL CLOSURE STUD 25- RC REACTOR COOLANT 207-9 Workscope Report No. Exam Results Work Request No. Examination Remarks iSI MT-01-025 Sat 366474 ISI UT-01-050 Sat 366474 Summary No. Component ID Component Description A escr ptCon B1.8.1.09 REACTOR VESSEL CLOSURE STUD 25 RC REACTOR COOLANT RCRE-1 207-10 Workscope Report No. Exam Results Work Request No. Examination Remarks IS' MT-01-026 Sat 366474 ISI UT-01-051 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.1.10 RCRE-1 REACTOR VESSEL CLOSURE STUD 25 RC REACTOR COOLANT 207-11 Workscope Report No. Exam Results Work Request No. Examination Remarks iSI MT-01-027 Sat 366474 ISI UT-01-052 Sat 366474 Component ID Component Description System System Description Summary No.

B1.8.1.11 RCRE-1 REACTOR VESSEL CLOSURE STUD 25 RC REACTOR COOLANT 207-12 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-028 Sat 366474 is] UT-01 -053 Sat 366474 Wednesday, January 16, 2002 Page 17 of 61

Florida Power AProgress Energy Con ,rn' Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-G-1 ITEM: B6.30 Summary No. Component ID Component Description System System Description REACTOR VESSEL CLOSURE STUD 25 RC REACTOR COOLANT B1.8.1.12 RCRE-1 207-13 Workscope Report No. Exam Results Work Request No. Examination Remarks IS' MT-01-029 Sat 366474 ISI UT-01-054 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.1.13 RCRE-1 REACTOR VESSEL CLOSURE STUD 25- RC REACTOR COOLANT 207-14 Workscope Report No. Exam Results Work Request No. Examination Remarks iSI MT-01-030 Sat 366474 ISI UT-01-055 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.1.14 RCRE-1 REACTOR VESSEL CLOSURE STUD 25- RC REACTOR COOLANT 207-15 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01 -031 Sat 366474 ISI UT-01 -056 Sat 366474 Summary No. Component ID Component Description t Rystem A escnpOon REACTOR VESSEL CLOSURE STUD 25 RC REACTOR COOLANT B1.8.1.15 RCRE-1 207-16 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01 -032 Sat 366474 ISI UT-01-057 Sat 366474 Summary No. Component ID Component Description System System Description REACTOR VESSEL CLOSURE STUD 25 RC REACTOR COOLANT B1.8.1.16 RCRE-1 207-17 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-033 Sat 366474 ISI UT-01-058 Sat 366474 Summary No. Component I D Component Description System System Description REACTOR VESSEL REACTOR VESSEL RC REACTOR COOLANT B1.8.1.17 RCRE-1 CLOSURE STUD 25-207-18 Workscope Report No. Exam Results Work Request No. Examination Remarks IS' MT-01-034 Sat 366474 ISI UT-01 -059 Sat 366474 Wednesday, January 16, 2002 Page 18 of 61

'Florida Power AProgress Energy Csmsrsan.

Attachment 1 Inservice Inspection Report Interval 3 1 Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-G-1 ITEM: B6.30 Summary No. Component ID Component Description System System Description B1.8.1.18 RCRE-1 REACTOR VESSEL REACTOR VESSEL RC REACTOR COOLANT CLOSURE STUD 25-207-19 Workscope Report No. Exam Results Work Request No. Examination Remarks IS' MT-01-035 Sat 366474 ISI UT-01-060 Sat 366474 Summary No. Component ID Component Description System System Description B1.8.1.19 RCRE-1 REACTOR VESSEL REACTOR VESSEL RC REACTOR COOLANT CLOSURE STUD 25-207-20 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01 -036 Sat 366474 ISI UT-01-061 Sat 366474 ITEM: B6.40 Summary No. Component ID Component Description System System Description B13.9.1.01 RCRE-1 REACTOR VESSEL REACTOR VESSEL RC REACTOR COOLANT THREADS IN FLANGE STUD 1 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-094 Sat 366471 Summary No. Component ID Component Description System System Description B1.9.1.02 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 2 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01 -095 Sat 366471 Summary No. Component ID Component Description System System Description B13.9.1.03 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 3 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01 -096 Sat 366471 Summary No. Component ID Component Description System System Description B13.9.1.04 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 4 Workscoee Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-097 Sat 366471 Summary No. Component ID Component Description System System Description B13.9.1.05 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 5 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-098 Sat 366471 Wednesday, January 16, 2002 Page 19 of 61

Florida Power A Progress Energy Corr~Tn Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-G-1 ITEM: B6.40 Summary No. Component ID Component Description System System Description B13.9.1.06 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 6 Workscope Report r, Jo. Exam Results Work Request No. Examination Remarks ISI UT-01-0 99 Sat 366471 Summary No. Component ID Component Description System System Description B1.9.1.07 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 7 Workscope Report No. Exam Results Work Request No. Examination Remarks IS1 UT-01-100 Sat 366471 Summary No. Component ID Component Description System System Description B1.9.1.08 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 8 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-101 Sat 366471 Summary No. Component ID Component Description System System Description B1.9.1.09 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 9 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01 -102 Sat 366471 Summary No. Compon ent ID Component Description t RysteAC escrCpOLon RC REACTOR COOLANT B1.9.1.10 RCRE-1 REACTOR VESSEL THREADS IN FLANGE STUD 10 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-103 Sat 366471 Summary No. Component ID Component Description System System Description B1.9.1.11 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT RCRE-1 STUD 11 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-104 Sat 366471 Summary No. Component ID Component Description System System Description B1.9.1.12 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 12 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-105 Sat 366471 Component Description System System Description Summary No. Component I D B1.9.1.13 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 13 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-106 Sat 366471 Wednesday, January 16, 2002 Page 20 of 61

Florida Power A Progress Energy Co.om*sany Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-G-1 ITEM: B6.40 Summary No. Component ID Component Description System System Description B13.9.1.14 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 14 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-107 Sat 366471 Summary No. Component ID Component Description System System Description B1.9.1.16 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 16 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-109 Sat 366471 Summary No. Component I D Component Description System System Description B1.9.1.17 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 17 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-110 Sat 366471 Summary No. Component ID Component Description System System Description B1.9.1.18 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 18 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-111 Sat 366471 Summary No. Componnent ID Component Description System System Description B1.9.1.19 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 19 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-112 Sat 366471 Summary No. Componnent ID Component Description System System Description B1.9.1.20 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 20 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-113 Sat 366471 Summary No. Componnent ID Component Description System System Description B13.9.1.21 RCRE-1 REACTOR VESSEL THREADS IN FLANGE RC REACTOR COOLANT STUD 21 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-108 Sat 366471 Wednesday, January 16, 2002 Page 21 of 61

S Florida Power AProgress Energy Comrff,"y Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-G-1 ITEM: B6.50 Summary No. Component ID Component Description System System Description B1.10.1.01 RCRE-1 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT AND BUSHING 14/27-207-1 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-216 Sat 366474 Summary No. Component ID Component Description System System Description B1.10.1.02 RCRE-1 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT AND BUSHING 14/27-207-2 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-217 Sat 366474 Summary No. Component ID Component Description System System Description B1.10.1.03 RCRE-1 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT AND BUSHING 14/27-207-3 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-218 Sat 366474 Summary No. Component ID Component Description System System Description B1.10.1.04 RCRE-1 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT AND BUSHING 14/27-207-4 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-219 Sat 366474 Summary No. Component ID Component Description t Rystem A escCrpion REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT B1.10.1.05 RCRE-1 AND BUSHING 14/27-207-5 Workscope Report r,Jo. Exam Results Work Request No. Examination Remarks ISI VT-01-2 20 Sat 366474 Summary No. Component ID Component Description System System Description B1.10.1.06 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT RCRE-1 AND BUSHING 14/27-207-6 Workscope Report 10. Exam Results Work Request No. Examination Remarks ISI VT-01-2 21 Sat 366474 Component Description System System Description Summary No. Component I D B1.10.1.07 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT RCRE-1 AND BUSHING 14/27-207-7 Workscope Report No. Exam Results Work Request No. Examination Remarks is] VT-01 -222 Sat 366474 Summary No. Component ID Component Description System System Description B1.10.1.08 RCRE-1 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT AND BUSHING 14/27-207-8 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-223 Sat 366474 Wednesday, January 16, 2002 Page 22 of 61

S Florida Power A Progress Energy .omrny Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-G-1 ITEM: B6.50 Summary No. Component ID Component Description System System Description B11.10.1.09 RCRE-1 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT AND BUSHING 14/27-207-9 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -224 Sat 366474 Summary No. Component ID Component Description System System Description B13.10.1.10 RCRE-1 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT AND BUSHING 14/27-207-10 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-225 Sat 366474 Summary No. Component ID Component Description System System Description B1.10.1.11 RCRE-1 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT AND BUSHING 14/27-207-11 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -226 Sat 366474 Summary No. Comoonent ID Component Description System System Description B1.10.1.12 RCRE-1 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT AND BUSHING 14/27-207-12 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -227 Sat 366474 Summary No. Component ID Component Description Sys ATORem escOpTiAn REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT B1.10.1.13 RCRE-1 AND BUSHING 14/27-207-13 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-228 Sat 366474 Summary No. Component ID Component Description System System Description B1.10.1.14 RCRE-1 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT AND BUSHING 14/27-207-14 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -229 Sat 366474 Component ID Component Description System System Description Summary No.

B13.10.1.15 RCRE-1 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT AND BUSHING 14/27-207-15 Workscope Report No. Exam Results Work Request No. Examination Remarks iSI VT-01-230 Sat 366474 Summary No. Component ID Component Description System System Description B1.10.1.16 RCRE-1 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT AND BUSHING 14/27-207-16 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-231 Sat 366474 Wednesday, January 16, 2002 Page 23 of 61

Florida Power A Progress Energy Comran, Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-G-1 ITEM: B6.50 Component Description System System Description Summary No. Component ID -

RC REACTOR COOLANT B1.10.1.17 RCRE-1 REACTOR VESSEL CLOSURE WASHER AND BUSHING14/27-207-17 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-232 Sat 366474 Summary No. Component I D Component Description System System Description B13.10.1.18 RCRE-1 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT AND BUSHING 14/27-207-18 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -233 Sat 366474 Summary No. Component ID Component Description System System Description B1.10.1.19 RCRE-1 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT AND BUSHING 14/27-207-19 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-234 Sat 366474 Summary No. Component ID Component Description System System Description B13.10.1.20 RCRE-1 REACTOR VESSEL CLOSURE WASHER RC REACTOR COOLANT AND BUSHING 14/27-207-20 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -235 Sat 366474 CATEGORY: B-G-2 ITEM: B7.20 Summary No. Compon ient ID Component Description System System Description RC REACTOR COOLANT B2.5.2 RCT-1 MK75 HTR BDL TOP VESSEL BOLTS, STUDS, AND NUTS Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-102 Sat 366464 ITEM: B7.50 Summary No. Component ID Component Description System System Description FLANGE BOLTS, STUDS, AND NUTS MU MAKE-UP B4.12.1 MUHE-1C PIPING Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -254 Sat 366475 ITEM: B7.70 Summary No. Component ID Component Description System System Description MK-10 VALVE BOLTS, STUDS, AND NUTS RC REACTOR COOLANT B6.9.03 RCV-8 Workscope Report No. Exam Results Work Request No. Examination Remarks iSI VT-01-103 Sat 366464 Wednesday, January 16, 2002 Page 24 of 61

Florida Power A Progress Energy Co0po'r Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-G-2 ITEM: B7.70 Component ID Component Description System System Description Summary No.

MK-18 VALVE BOLTS, STUDS, AND NUTS MU MAKE-UP B6.9.09 MUV-161 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-251 Sat 366464 Summary No. Component ID Component Description System System Description B6.9.13 MUV-160 MK-18 VALVE BOLTS, STUDS, AND NUTS MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks iSI VT-01 -252 Sat 366475 Summary No. Component ID Component Description System System Description B6.9.23 MUV-37 MK-18 VALVE BOLTS, STUDS, AND NUTS MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks iSI VT-01-239 Sat 366468 Summary No. Component ID Component Description System System Description B6.9.27 RCV-1 1 VLV-PZR BOLTS, STUDS, AND NUTS RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -104 Sat 366464 ITEM: B7.80 Component ID Component Description System System Description Summary No.

DRRD-1 CRDM HOLD DOWN BOLT ASSEMBLY RC REACTOR COOLANT B1.11.70 1114 Workscope Report No. Exam Results Work Request No. Examination Remarks Sat 369965 Preservice Examination.

PSI VT-01 -258 Summary No. Component ID Component Description System System Description DRRD-1 CRDM FLANGE RING (SPLIT NUT) 1114 RC REACTOR COOLANT B1.11.71 Workscope Report No. Exam Results Work Request No. Examination Remarks Sat 369965 Preservice Examination.

PSI VT-01-259 Summary No. Component ID Component Description System System Description RC REACTOR COOLANT B1.11.72 DRRD-1 CRDM HOLD DOWN BOLT ASSEMBLY 1115 Workscope Report No. Exam Results Work Request No. Examination Remarks VT-01-260 Sat 369965 Preservice Examination.

PSI Wednesday, January 16, 2002 Page 25 of 61

S Florida Power A Progress Energy Comr,ý.ny Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-G-2 ITEM: B7.80 Summary No. Component ID Component Description Ssterm System Description B1.11.73 DRRD-1 CRDM FLANGE RING (SPLIT NUT) 1115 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01 -261 Sat 369965 Preservice Examination.

Summary No. Component ID Component Description System System Description B1.11.74 DRRD-1 CRDM HOLD DOWN BOLT ASSEMBLY RC REACTOR COOLANT 1116 Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01-262 Sat 369965 Preservice Examination.

Summary No. Component ID Component Description System System Description B1.11.75 DRRD-1 CRDM FLANGE RING (SPLIT NUT) 1116 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01 -263 Sat 369965 Preservice Examination.

Summary No. Component ID Component Description System System Description B1.11.76 DRRD-1 CRDM HOLD DOWN BOLT ASSEMBLY RC REACTOR COOLANT 1117 Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01-264 Sat 369965 Preservice Examination.

Summary No. Component ID Component Description System System Description B1.11.77 DRRD-1 CRDM FLANGE RING (SPLIT NUT) 1117 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01-265 Sat 369965 Preservice Examination.

Summary No. Componnent ID Component Description System System Description B1.11.78 DRRD-1 CRDM HOLD DOWN BOLT ASSEMBLY RC REACTOR COOLANT 1118 Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01 -266 Sat 369965 Preservice Examination.

Summary No. Component I D Component Description System System Description B 1.11.79 DRRD-1 CRDM FLANGE RING (SPLIT NUT) 1118 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01-267 Sat 369965 Preservice Examination.

Summary No. Compon ent ID Component Description System System Description B1.11.80 DRRD-1 CRDM HOLD DOWN BOLT ASSEMBLY RC REACTOR COOLANT 1119 Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01-268 Sat 369965 Preservice Examination.

Wednesday, January 16, 2002 Page 26 of 61

Florida Power AProgress Energy Cominany Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-G-2 ITEM: B7.80 Summary No. Component ID Component Description System System Description B1.11.81 DRRD-1 CRDM FLANGE RING (SPLIT NUT) 1119 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01 -269 Sat 369965 Preservice Examination.

Summary No. Component ID Component Description System System Description B1.11.82 DRRD-1 CRDM HOLD DOWN BOLT ASSEMBLY RC REACTOR COOLANT 1120 Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01-270 Sat 369965 Preservice Examination.

Summary No. Component ID Component Description System System Description B1.11.83 DRRD-1 CRDM FLANGE RING (SPLIT NUT) 1120 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01 -271 Sat 369965 Preservice Examination.

Summary No. Component ID Component Description System System Description B1.11.84 DRRD-1 CRDM HOLD DOWN BOLT ASSEMBLY RC REACTOR COOLANT 1121 Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01-272 Sat 369965 Preservice Examination.

Summary No. Component ID Component Description System System Description B1.11.85 DRRD-1 CRDM FLANGE RING (SPLIT NUT) 1121 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01-273 Sat 369965 Preservice Examination.

Summary No. Component I D Component Description System System Description CRDM HOLD DOWN BOLT ASSEMBLY RC REACTOR COOLANT B1.11.86 DRRD-1 1122 Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01 -274 Sat 369965 Preservice Examination.

Summary No. Component ID Component Description System System Description B1.11.87 DRRD-1 CRDM FLANGE RING (SPLIT NUT) 1122 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01-275 Sat 369965 Preservice Examination.

Summary No. Component ID Component Description System System Description B1.11.88 DRRD-1 CRDM HOLD DOWN BOLT ASSEMBLY RC REACTOR COOLANT 1123 Workscope Report No. Exam Results Work Reauest No. Examination Remarks PSI VT-01 -276 Sat 369965 Preservice Examination.

Wednesday, January 16, 2002 Page 27 of 61

SFlorida Power A Progress Energy Comrn}ny Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CA TEGOR Y: B-G-2 ITEM: B7.80 Summary No. Component ID Component Description System System Description B1.11.89 DRRD-1 CRDM FLANGE RING (SPLIT NUT) 1123 RC REACTOR COOLANT Workscope Report !*4o. Exam Results Work Request No. Examination Remarks PSI VT-01-2 77 Sat 369965 Preservice Examination.

Summary No. Component ID Component Description System System Description B1.11.90 DRRD-1 CRDM HOLD DOWN BOLT ASSEMBLY RC REACTOR COOLANT 1124 Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01-278 Sat 369965 Preservice Examination.

Summary No. Component ID Component Description System System Description B1.11.91 DRRD-1 CRDM FLANGE RING (SPLIT NUT) 1124 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01-279 Sat 369965 Preservice Examination.

Summary No. Component ID Component Description System System Description B1.11.92 DRRD-1 CRDM HOLD DOWN BOLT ASSEMBLY RC REACTOR COOLANT 1125 Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01 -280 Sat 369965 Preservice Examination.

Summary No. Component ID Component Description t RsteAC escrCptLAn B1.11.93 CRDM FLANGE RING (SPLIT NUT) 1125 RC REACTOR COOLANT DRRD-1 Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VT-01-281 Sat 369965 Preservice Examination.

CATEGORY: B-H ITEM: B8.20 Summary No. Componnent ID Component Description System System Description B2.8.1 1 RCT-1 MK126/128-3 Y-Z AXIS VESSEL RC REACTOR COOLANT INTEGRALLY WELDED ATTACHMENT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-013 Sat 366464 Access limited due to support structure.

Wednesday, January 16, 2002 Page 28 of 61

S Florida Power A Progress Energy Compny Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-J ITEM: B9.11 Summary No. Component I D Component Description System System Description B4.1.27 MK34 ON MKA32 NOZZLE-TO-SAFE END RC REACTOR COOLANT PIPING WELD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-023 Sat 366468 is] UT-01-070 Sat 366468 Summary No. Component ID Comoonent Description System System Description B4.5.192 PIPING WELD MK 32 TO 31 PIPE-TO-ELBOW RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks iSI MT-01 -046 Sat 366464 ISI UT-01 -089 Sat 366464 Summary No. Component I D Component Description System System Description B4.5.195 PIPING WELD MK24 TO 22 PIPE-TO-PIPE RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-054 Sat 366464 ISI UT-01-093 Sat 366464 Summary No. Component ID Component Description t A System esOCptOLn MK65 TO 67 NOZZLE-TO-PIPE RC REACTOR COOLANT B4.5.206 PIPING WELD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01 -056 Sat 366464 ISI UT-01-125 Sat 366464 Summary No. Component I D Component Description System System Description B4.5.207 PIPING WELD MK62 TO 57 ELBOW-TO-PIPE RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-038 Sat 366464 ISI UT-01-034 Sat 366464 Summary No. Component ID Component Description System System Description B4.5.216 PIPING WELD MK67 TO 45 PIPE-TO-ELBOW RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks is] MT-01-037 Sat 366464 ISI UT-01-126 Sat 366464 Wednesday, January 16, 2002 Page 29 of 61

Florida Power A Progress Energy CNr-,any Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-J ITEM: B9.11 Summary No. Component ID Component Description - System System Description B4.5.254 PIPING WELD DH-161 SAFE END-TO-PIPE DH DECAY HEAT Workscope Report No. Exam Results Work Request No. Examination Remarks IS[ PT-01 -024 Sat 366468 ISI UT-01-071 Sat 366468 Summary No. Component ID Component Description System System Description B4.5.64 PIPING WELD CF-9 ELBOW-TO-PIPE CF CORE FLOOD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-034 Sat 366464 ISI UT-01-119 Sat 366464 ITEM: B9.21 Summary No. Component ID Component Description System System Description B4.1.89 PIPING WELD MK 46 TO 47 NOZZLE-TO-SAFE END RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01 -022 Sat 366468 ISI UT-01-069 Sat 366468 Summary No. Component ID Component Description m Mystem esc-Upon B4.5.165 MU-395 VALVE-TO-PIPE MU MAKE-UP PIPING WELD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-026 Sat 366475 AUG UT-01 -115 Sat 366475 Single-Sided Examination.

Summary No. Component ID Component Description System System Description B4.5.166 PIPING WELD MU-247C PIPE-TO-ELBOW MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-029 Sat 366475 AUG UT-01-116 Sat 366475 Summary No. Component ID Component Description System System Description B4.5.167 PIPING WELD MU-249A PIPE-TO-PIPE MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-027 Sat 366475 AUG UT-01 -117 Sat 366475 Wednesday, January 16, 2002 Page 30 of 61

S Florida Power AProgress Energy tom ,ny Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-J ITEM: B9.21 Summary No. Component ID Component Description System System Description B4.5.168 PIPING WELD MU-250D PIPE-TO-ELBOW MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-030 Sat 366475 AUG UT-01 -118 Sat 366475 Summary No. Component ID Component Description System System Description B4.5.169 PIPING WELD MU-251B ELBOW-TO-PIPE MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-015 Sat 366468 AUG UT-01-037 Sat 366468 Summary No. Component ID Component Description System System Description B4.5.170 PIPING WELD MU-251A PIPE-TO-ELBOW MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01 -016 Sat 366468 AUG UT-01-038 Sat 366468 Summary No. Component ID Component Description System System Description B4.5.171 PIPING WELD MU-252A PIPE-TO-ELBOW MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01 -017 Sat 366468 AUG UT-01-039 Sat 366468 Summary No. Component ID Component Description System System Description B4.5.172 PIPING WELD MU-253A TEE-TO-PIPE MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks iSI PT-01-033 Sat 366468 Summary No. Component ID Component Description System System Description B4.5.306 PIPING WELD MU-402 VALVE-TO-PIPE MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-018 Sat 366468 AUG UT-01 -040 Sat 366468 Single-Sided Examination.

Summary No. Component ID Component Description System System Description B4.5.319 PIPING WELD MU-403 BRANCH-TO-TEE MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01 -032 Sat 366468 Wednesday, January 16, 2002 Page 31 of 61

Florida Power AProgress Energy Comsnan,,,

Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-J ITEM: B9.21 Summary No. Component ID Component Description System System Description B4.5.534 PIPING WELD MK 64 TO 1 NOZZLE-TO-ELBOW RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-011 Sat 366468 Summary No. Component ID Component Description System System Description B4.5.556 PIPING WELD MK 2 TO 3 - W7 TEE-TO-REDUCER RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-014 Sat 366464 Summary No. Component ID Component Description System System Description B4.5.614 PIPING WELD MU-90-173 SAFE END-TO-PIPE MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-020 Sat 366468 AUG UT-01 -036 Sat 366468 Summary No. Component ID Component Description System System Description B4.5.646 PIPING WELD MU-90-172 PIPE-TO-PIPE MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks iSI PT-01-019 Sat 366468 AUG UT-01 -091 Sat 366468 ITEM: B9.31 Summary No. Component ID Component Description System System Description B4.6.1 PIPING WELD MK31 TO 34 ELBOW-TO-NOZZLE RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-055 Sat 366468 ISI UT-01-120 Sat 366468 Summary No. Component ID Component Description System System Description B4.6.3 PIPING WELD MK23 TO 25 PIPE-TO-NOZZLE RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01 -051 Sat 366464 ISI UT-01-121 Sat 366464 Wednesday, January 16, 2002 Page 32 of 61

S Florida Power A Progress Energy Corr~wrr.,

Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-J ITEM: B9.32 Summary No. Component ID Component Description System System Description B4.1.71 PIPING WELD MK64 TO MKA63 DRAIN PIPE-TO-NOZZLE RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01 -028 Sat 366468 ITEM: B9.40 Summary No. Component ID Component Description System System Description B4.5.591 PIPING WELD RCP-1 B SEAL COOLER PIPE-TO-ELBOW RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks SI PT-01-012 Sat 366464 Summary No. Component ID Component Description System System Description B4.5.595 PIPING WELD RCP-1B SEAL COOLER PIPE-TO-ELBOW RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-013 Sat 366464 CATEGORY: B-K-1 ITEM: B10.10 Summary No. Component ID Component Description System System Description B4.9.14 PIPING INTEGRAL RCH-68 INTEGRAL ATTACHMENT RC REACTOR COOLANT ATTACHMENT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-021 Sat 366464 CATEGORY: B-M-1 ITEM: B12.30 Summary No. Component ID Component Description System System Description B6.6.02.01 RCV-11 VALVE BODY-TO-FLANGE WELD RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01 -009 Sat 366464 Summary No. Component ID Component Description System System Description B6.6.02.02 RCV-1 1 VALVE BODY-TO-FLANGE WELD RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-010 Sat 366464 Wednesday, January 16, 2002 Page 33 of 61

Florida Power A Progress Energy Com'any Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-M-1 ITEM: B12.40 Summary No. Component ID Component Description System System Description B6.6.7 DHV-3 VALVE BODY-TO-CANOPY WELD DH DECAY HEAT Workscope Report No. Exam Results Work Request No. Examination Remarks PSI VE-01 -032 Sat 366978 PT Examination PSI VE-01 -033 Sat 366978 UT Examination PSI VE-01 -076 Sat 366978 UT Examination CATEGORY: B-N-1 ITEM: B13.10 Summary No. Component ID Component Description System System Description B1.15.1.A RCRE-1 EXPOSED REACTOR VESSEL INTERIOR RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-174 Sat 366471 CATEGORY: B-P ITEM: B15.00.BP Summary No. Component ID Component Description System System Description B15.100.1A RCT-1 VESSEL MANWAY BOLTED CONNECTION RC REACTOR COOLANT Workscope Report No. Exam Results Work Reauest No. Examination Remarks ISI VT-01-072 Sat 366483 Performed Using SP-204 Summary No. Component ID Component Description SRtem System Description B15.100.1B RCRE-1 VESSEL HEAD FLANGE BOLTED RC REACTOR COOLANT CONNECTION Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -084 Sat 366483 Performed Using SP-204 Summary No. Component ID Component Description System System Description B15.100.1C RCSG-1 B VESSEL LOWER INSPECTION COVER RC REACTOR COOLANT BOLTED CONNECTION Workscope Report r, Jo. Exam Results Work Request No. Examination Remarks ISI VT-01-0 AF; Unsat 366483 Performed Using SP-204 Summary No. Component ID Component Description System System Description B15.100.1D RCSG-1B VESSEL LOWER MANWAY BOLTED RC REACTOR COOLANT CONNECTION Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-073 Sat 366483 Performed Using SP-204 Wednesday, January 16, 2002 Page 34 of 61

Florida Power A Progress Energy Corr'*npa Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-P ITEM: B15.00.BP Component 11 Component Description System System Description Summary No.

B15.100.1E VESSEL UPPER HAND HOLE BOLTED RC REACTOR COOLANT RCSG- 1B CONNECTION Workscope Report No. Exam Results Work Request No. Examination Rem arks ISI VT-01-074 Sat 366483 Performed Using SP-204 Summary No. Component ID Component Description System System Description B15.100.1F RCSG-1B VESSEL UPPER MANWAY BOLTED RC REACTOR COOLANT CONNECTION Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-079 Sat 366483 Performed Using SP-204 Summary No. Component ID Component Description System System Description B15.100.1G RCSG-1A LOWER INSPECTION COVER BOLTED RC REACTOR COOLANT CONNECTION Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-086 Sat 366483 Performed Using SP-204 Summary No. Component ID Component Description System System Description B15.100.1H RCSG-1A LOWER MANWAY BOLTED CONNECTION RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-087 Sat 366483 Performed Using SP-204 Summary No. Component ID Component Description RCst em Sr escrlpCOLn RC REACTOR COOLANT B15.100.11 RCSG-1A VESSEL UPPER HAND HOLE BOLTED CONNECTION Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-075 Sat 366483 Performed Using SP-204 Summary No. Component ID Component Description SCstem System Description RCSG-1A VESSEL UPPER MANWAY BOLTED RC REACTOR COOLANT B15.100.1J CONNECTION Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-080 Sat 366483 Performed Using SP-204 Summary No. Component ID Component Description System System Description B15.100.1L VALVE FLANGE BOLTED CONNECTION RC REACTOR COOLANT RCV-10 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -077 Sat 366483 Performed Using SP-204 Summary No. Component ID Component Description System System Description B15.100.1M VALVE FLANGE BOLTED CONNECTION RC REACTOR COOLANT RCV-11 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-078 Sat 366483 Performed Using SP-204 Wednesday, January 16, 2002 Page 35 of 61

Florida Power AProgress Energy Company Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: B-P ITEM: B15.00.BP Summary No. Component ID Component Description System System Description B15.100.1N RCT-1 HEATER BUNDLE BOLTED CONNECTIONS RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-088 Sat 366483 Performed Using SP-204 Summary No. Component ID Component Description System System Description B15.100.1P RCV-38 VALVE BONNET BOLTED CONNECTION RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-089 Sat 366483 Performed Using SP-204 Summary No. Component ID Component Description System System Description B15.100.2 ALL CLASS 1 CLASS 1 SYSTEM LEAKAGE TEST RC REACTOR COOLANT PRESSURE RETAINING COMPONENTS Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-065 Sat 366485 Performed during Mode 3 SP-204 CATEGORY: B-Q ITEM: B16.10 Summary No. Component ID Component Description System System Description B16.10.1 RCSG-1A ONCE-THROUGH STEAM GENERATOR RC REACTOR COOLANT TUBES Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-074 Sat 367494 ET Examination Summary No. Component ID Component Description System System Description B1 6.10.2 RCSG-1B ONCE-THROUGH STEAM GENERATOR RC REACTOR COOLANT TUBES Workscope Report No. Exam Results Work Reauest No. Examination Remarks ISI VE-01-075 Sat 367494 ET Examination CATEGORY: F-A ITEM: F1.1OA Summary No. Component ID Component Description System System Description MUH-8 COMPONENT SUPPORT ROD MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-255 Sat 366476 Wednesday, January 16, 2002 Page 36 of 61

)j Florida Power A Progress Energy Comsany Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 1 CATEGORY: F-A ITEM: F1.1OB Summary No. Component ID Component Description SSystem System Description RCH-578 COMPONENT SUPPORT GUIDE RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks IS[ VT-01-256 Sat 366468 Summary No. Component ID Component Description System System Description RCH-TYP-123-2 COMPONENT SUPPORT RESTRAINT RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -253 Sat 366464 ITEM: F1.10C Summary No. Component ID Component Description System System Description CFH-1 1 COMPONENT SUPPORT SPRING CAN CF CORE FLOOD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-185 Sat 366464 Summary No. Component ID Component Description System System Description CFH-1 9 COMPONENT SUPPORT SNUBBER CF CORE FLOOD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-066 Sat 366464 Performed Using SP-201 Summary No. Component ID Component Description System System Description SNUBBER MU MAKE-UP MUH-80 COMPONENT SUPPORT Workscope Report No. Exam Results Work Request No. E:xamination Remarks ISI VE-01-034 Sat 366468 F'erformed Using SP-201 Summary No. Component ID Component Description System System Description RCH-72 COMPONENT SUPPORT CONSTANT RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-184 Sat 366464 PSI VT-01 -282 Sat 367656 Wednesday, January 16, 2002 Page 37 of 61

Florida Power A Progress Energy Cormawn, Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 2 CATEGORY: C-A ITEM: C1.10 Summary No. Component ID Component Description System System Description C1.1.11 RCSG-1A OTSG MK3-TO-2 SHELL-TO-NOZZLE BELT MS MAIN STEAM WELD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-114 Sat 366464 CATEGORY: C-B ITEM: C2.21 Summary No. Component ID Component Description System System Description C1.2.1A RCSG-1A OTSG MK14-3 X-Y AXIS VESSEL NOZZLE- MS MAIN STEAM TO-SHELL WELD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-012 Sat 366464 ISI UT-01 -028 Sat 366464 ITEM: C2.22 Summary No. Component I D Component Description System System Description C1.2.1B RCSG-1A OTSG MK14-3 X-Y AXIS VESSEL NOZZLE MS MAIN STEAM INNER RADIUS Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-029 Sat 366464 CATEGORY: C-C ITEM: C3.10 Summary No. Component ID Component Description System System Description C1.3.1.1 RCSG-1A OTSG MK152/153-TO-1 VESSEL FW FEEDWATER INTEGRAL ATTACHMENT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01 -042 Sat 366464 Summary No. Component ID Component Description System System Description C1.3.1.2 RCSG-1A OTSG MK152/153-TO-1 VESSEL FW FEEDWATER INTEGRAL ATTACHMENT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-041 Sat 366464 ITEM: C3.20 Summary No. Component ID Component Description System System Description C2.5.10 PIPING INTEGRAL MSH-153 INTEGRAL ATTACHMENT MS MAIN STEAM ATTACHMENT Workscope Report No. Exam Results Work Reauest No. Examination Remarks ISI MT-01-049 Unsat 366476 Fabrication Blemishes - See MT-01-053 following Surface Prep.

ISI MT-01-053 Sat 366476 Wednesday, January 16, 2002 Page 38 of 61

S Florida Power AProgress Energy Com--any Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 2 CATEGORY: C-C ITEM: C3.20 Summary No. Component ID Component Description System System Description PIPING INTEGRAL FWH-148 INTEGRAL ATTACHMENT FW FEEDWATER C2.5.30 ATTACHMENT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-002 Sat 366478 Summary No. Component ID Component Description System System Description C2.5.56 PIPING INTEGRAL EFH-540 INTEGRAL ATTACHMENT EF EMERGENCY FEEDWATER ATTACHMENT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01 -005 Sat 366478 CATEGORY: C-D ITEM: C4.40 Summary No. Component ID Component Description System System Description C4.2.1 MSV-413 VALVE STUD STUD 97-01 MS MAIN STEAM Workscope Report No. Exam Results Work Request No. Examination Remarks

]SI UT-01-021 Sat 366479 Summary No. Component ID Component Description System System Description C4.2.2 MSV-413 VALVE STUD STUD 97-02 MS MAIN STEAM Workscope Report No. Exam Results Work Request No. Examination Remarks iSI UT-01-022 Sat 366479 Summary No. Component ID Component Description Ss m System Description STUD 97-03 MS MAIN STEAM C4.2.3 MSV-413 VALVE STUD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-023 Sat 366479 CATEGORY: C-F-1 ITEM: AUG7.1 Summary No. Component ID Component Description System System Description DH DECAY HEAT C2.1.174 PIPING WELD DH-59C ELBOW-TO-PIPE Workscope Report !Lo. Exam Results Work Request No. Examination Remarks AUG UT-01-0 13 Sat 366494 Summary No. Component ID Component Description System System Description C2.1.36 DH-60E ELBOW-TO-PIPE DH DECAY HEAT PIPING WELD Workscope Report No. Exam Results Work Request No. Examination Remarks AUG UT-01-014 Sat 366494 Wednesday, January 16, 2002 Page 39 of 61

S Florida Power A Progress Energy Cmarrm, Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 2 CATEGORY: C-F-1 ITEM: AUG7.1 Summary No. Component ID

  • Component Description SSystem System Description C2.1.551 PIPING WELD DH-86 PIPE-TO-ELBOW DH DECAY HEAT Workscope Report PNo. Exam Results Work Request No. Examination Remarks AUG UT-01 -0)15 Sat 366494 Summary No. Component ID Component Description System System Description C2.1.57 PIPING WELD DH-97A FLANGE-TO-REDUCER DH DECAY HEAT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG UT-01 -081 Sat 366487 Single-Sided Examination.

Summary No. Component ID Component Description System System Description C2.1.581 PIPING WELD DH-1 04C TEE-TO-PIPE DH DECAY HEAT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG UT-01-011 Sat 366487 Summary No. Comoonent ID Component Description System System Description C2.1.582 PIPING WELD DH-104B TEE-TO-ELBOW DH DECAY HEAT Workscope Report No. Exam Results Work Reauest No. Examination Remarks AUG UT-01-012 Sat 366487 Summary No. Component ID Component Description System System Descnption C2.1.817 PIPING WELD DH-63A PIPE-TO-PIPE DH DECAY HEAT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG UT-01-016 Sat 366494 ITEM: C5.11 Summary No. Component I D Component Description System System Description C2.1.162 PIPING WELD DH-27 PIPE-TO-TEE DH DECAY HEAT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01 -083 Sat 366487 ISI VE-01-005 Sat 366487 PT Examination NQC Report #2001-0171 Summary No. Component ID Component Description System System Description C2.1.212 PIPING WELD MU-94A REDUCER-TO-PIPE MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01 -003 Sat 366494 ISI UT-01-020 Sat 366494 Wednesday, January 16, 2002 Page 40 of 61

S Florida Power A Progress Energy Cor*any Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 2 CATEGORY: C-F-1 ITEM: C5.11 Summary No. Component ID Component Description System System Description C2.1.45 PIPING WELD DH-21D PIPE-TO-ELBOW DH DECAY HEAT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-082 Sat 366487 ISI VE-01-004 Sat 366487 PT Examination NQC Report #2001-0171 Summary No. Component ID Component Description System System Description C2.1.507 PIPING WELD DH-39 FLANGE-TO-REDUCER DH DECAY HEAT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01 -084 Sat 366487 Single-Sided Examination.

ISI VE-01-006 Sat 366487 PT Examination NQC Report #2001-0171 Summary No. Component ID Component Description System System Description C2.1.526 PIPING WELD DH-46A FLANGE-TO-PIPE DH DECAY HEAT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01 -008 Sat 366492 Single-Sided Examination.

ISI VE-01-012 Sat 366492 PT Examination NQC Report #2001-0105 Summary No. Component I D Component Description SSystem HescriptTon C2.1.527 DH-46B PIPE-TO-FLANGE DH DECAY HEAT PIPING WELD Workscope Report l' 0o. Exam Results Work Request No. Examination Remarks ISI UT-01-0 09 Sat 366492 Single-Sided Examination.

ISI VE-01-0 13 Sat 366492 PT Examination NQC Report #2001-0105 Summary No. Component ID Component Description System System Description C2.1.542 PIPING WELD DH-74 REDUCER-TO-VALVE DH DECAY HEAT Workscope Report rNo. Exam Results Work Request No. Examination Remarks ISI UT-01 -0 10 Sat 366492 Single-Sided Examination.

ISI VE-01-0 14 Sat 366492 PT Examination NQC Report #2001-0105 Summary No. Component ID Component Description System System Description C2.1.600 PIPING WELD DH-1 O0A FLANGE-TO-REDUCER DH DECAY HEAT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-080 Sat 366487 Single-Sided Examination.

ISI VE-01-003 Sat 366487 PT Examination NQC Report #2001-0171 Wednesday, January 16, 2002 Page 41 of61

C) Florida Power A Progress Energy Compare, Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 2 CATEGORY: C-F-1 ITEM: C5.21 Component ID Component Description System System Description Summary No.

MU-82 PIPE-TO-VALVE MU MAKE-UP C2.1.1067 PIPING WELD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01 -004 Sat 366493 ISI UT-01 -087 Sat 366493 Single-Sided Examination.

Summary No. Component ID Component Description System System Description C2.1.1084 PIPING WELD MU-86 VALVE-TO-REDUCER MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks SI PT-01 -005 Sat 366493 ISI UT-01-085 Sat 366493 Single-Sided Examination.

Summary No. Component ID Component Description System System Description C2.1.1092 PIPING WELD MU-65B PIPE-TO-ELBOW MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01 -025 Sat 366494 ISI UT-01-074 Sat 366494 Summary No. Component ID Component Description m Mystem escrUpton MU-88 PIPE-TO-VALVE MU MAKE-UP C2.1.1096 PIPING WELD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-001 Sat 366494 ISI UT-01-077 Sat 366494 Single-Sided Examination.

Summary No. Component ID Component Description System System Description MU-85-104 PIPE-TO-ELBOW MU MAKE-UP C2.1.1127 PIPING WELD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-002 Sat 366494 ISI UT-01-086 Sat 366494 Component ID Component Description System System Description Summary No.

MU-153 VALVE-TO-PIPE MU MAKE-UP C2.1.1223 PIPING WELD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-007 Sat 366494 ISI UT-01 -076 Sat 366494 Single-Sided Examination.

Page 42 of 61 Wednesday, January 16, 2002

Florida Power A Progress Energy Cormry Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 2 CATEGORY: C-F-1 ITEM: C5.21 Summary No. Component I D Component Description System System Description C2.1.1229 PIPING WELD MU-95K ELBOW-TO-PIPE MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-008 Sat 366494 ISI UT-01 -075 Sat 366494 Summary No. Component ID Component Description System System Description C2.1.1351 PIPING WELD MU-90-214 PIPE-TO-TEE MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks IS1 PT-01 -035 Sat 366487 ISI UT-01-078 Sat 366487 Summary No. Component ID Component Description System System Description C2.1.1490 PIPING WELD DH-101F TEE-TO-PIPE DH DECAY HEAT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-079 Sat 366487 ISI VE-01-002 Sat 366487 PT Examination NOC Report #2001-0171 Summary No. Component ID Component Description m Mystem esc-Upon C2.1.2073 MU-44D ELBOW-TO-FLANGE MU MAKE-UP PIPING WELD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-092 Sat 366487 Single-Sided Examination.

ISI VE-01-007 Sat 366487 PT Examination NQC Report #2001-0152 Summary No. Component ID Component Description System System Description C2.1.2078 PIPING WELD MU-32D ELBOW-TO-FLANGE MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01 -006 Sat 366493 ISI UT-01-088 Sat 366493 Single-Sided Examination.

Summary No. Component ID Component Description System System Description 02.1.2084 PIPING WELD MU-393 PENETRATION-TO-PIPE MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI PT-01-031 Sat 366475 ISI UT-01-122 Sat 366475 Wednesday, January 16, 2002 Page 43 of 61

S Florida Power A Progress Energy Company Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 2 CATEGORY: C-F-1 ITEM: C5.30 Summary No. Component I D Component Description System System Description C2.1.1360 PIPING WELD 3497-MU-18 VALVE-TO-PIPE MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks IS1 VE-01 -008 Sat 366487 PT Examination NQC Report #2001-0153 ITEM: C5.41 Summary No. Component ID Component Description System System Description C2.1.1345 PIPING WELD MU-73A PIPE-TO-COUPLING MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-009 Sat 366487 PT Examination NQC Report #2001-0154 CATEGORY: C-F-2 ITEM: C5.51 Summary No. Component ID Component Description System System Description C2.1.1 PIPING WELD MS-1 NOZZLE-TO-ELBOW MS MAIN STEAM Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01 -039 Sat 366464 ISI UT-01-127 Sat 366464 Summary No. Component ID Component Description MS MSystem Description C2.1.107 MS-6A PIPE-TO-ELBOW MS MAIN STEAM PIPING WELD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-008 Sat 366478 ISI UT-01-017 Sat 366478 Summary No. Component ID Component Description System System Description C2.1.108 PIPING WELD MS-288 ELBOW-TO-PIPE MS MAIN STEAM Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01 -009 Sat 366478 iSI UT-01 -018 Sat 366478 Summary No. Component ID Component Description System System Description C2.1.109 PIPING WELD MS-287 PIPE-TO-VALVE MS MAIN STEAM Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-006 Sat 366478 ISI UT-01-019 Sat 366478 Single-Sided Examination.

Wednesday, January 16, 2002 Page 44 of 61

Florida Power A Progress Energy (omrany Attachment 1 Inservice Inspection Report Interval 3 1 Period 1 / Refuel Cycle 12 CLASS: 2 CATEGORY: C-F-2 ITEM: C5.51 Summary No. Component ID Component Description System System Description C2.1.111 PIPING WELD MS-1 0 NOZZLE-TO-ELBOW MS MAIN STEAM Workscope Report No. Exam Results Work Request No. Examination Remarks ISI UT-01-066 Sat 366464 Summary No. Component ID Component Description System System Description C2.1.112 PIPING WELD MS-12 PIPE-TO-ELBOW MS MAIN STEAM Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01 -047 Sat 366476 ISI UT-01 -062 Sat 366476 Summary No. Component ID Component Description System System Description C2.1.113 PIPING WELD MS-15A PIPE-TO-ELBOW MS MAIN STEAM Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-050 Sat 366476 iSI UT-01-064 Sat 366476 Summary No. Component ID Component Description System System Description C2.1.123 PIPING WELD FW MK123 TO FW MK127 PIPE-TO-CAP FW FEEDWATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01 -040 Sat 366464 ISI UT-01 -025 Sat 366464 Summary No. Component ID Component Descridtion W F ystem esEriWAT Rl FW-10 ELBOW-TO-TEE FW FEEDWATER C2.1.124 PIPING WELD Workscope Report N0o. Exam Results Work Request No. Examination Remarks ISI MT-01-0 43 Sat 366464 ISI UT-01-0 24 Sat 366464 Summary No. Component ID Component Description System System Description C2.1.126 PIPING WELD FW-102C PIPE-TO-ELBOW FW FEEDWATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01 -048 Unsat 366476 ISI MT-01-052 Sat 366476 ISI UT-01 -063 Sat 366476 Wednesday, January 16, 2002 Page 45 of 61

'Florida Power A Progress Energy Cornpa' Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 2 CATEGORY: C-F-2 ITEM: C5.51 Summary No. Component ID Component Description System System Description C2.1.127 FW-333 VALVE-TO-ELBOW FW FEEDWATER PIPING WELD Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-011 Sat 366478 ISI UT-01 -035 Sat 366478 Single-Sided Examination.

Summary No. Component ID Component Description System System Description C2.1.128 PIPING WELD FW-330 ELBOW-TO-PIPE FW FEEDWATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-004 Sat 366478 ISI UT-01-072 Sat 366478 Summary No. Component ID Component Description System System Description C2.1.129 PIPING WELD FW-329 ELBOW-TO-PIPE FW FEEDWATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-003 Sat 366478 ISI UT-01 -073 Sat 366478 Summary No. Component ID Component Description Sse *System Descnption C2.1.143 PIPING WELD FW-178E ELBOW-TO-PIPE EF EMERGENCY FEEDWATER TO OTSG "A" Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-014 Sat 366464 ISI UT-01 -065 Sat 366464 Summary No. Component ID Component Description System System Description FW-178B PIPE-TO-ELBOW EF EMERGENCY FEEDWATER C2.1.144 PIPING WELD TO OTSG "A" Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-015 Sat 366464 ISI UT-01-026 Sat 366464 Summary No. Component ID Component Description System System Description FW-178A ELBOW-TO-PIPE EF EMERGENCY FEEDWATER C2.1.145 PIPING WELD TO OTSG "A" Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-010 Sat 366464 ISI UT-01-027 Sat 366464 Wednesday, January 16, 2002 Page 46 of 61

S Florida Power A Progress Energy Cotrrany Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 2 CATEGORY: C-F-2 ITEM: C5.51 Summary No. Component ID Component Description System System Description C2.1.146 PIPING WELD FW-177A PIPE-TO-ELBOW EF EMERGENCY FEEDWATER TO OTSG "A" Workscope Report N01. Exam Results Work Request No. Examination Remarks ISI MT-01 -0 44 Sat 366476 ISI UT-01-0,30 Sat 366476 Summary No. Component ID Component Description System System Description C2.1.147 PIPING WELD FW-175A PIPE-TO-ELBOW EF EMERGENCY FEEDWATER TO OTSG "A' Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-045 Sat 366464 iSI UT-01 -031 Sat 366464 Summary No. Component ID Component Description System System Description C2.1.319 PIPING WELD FW-9 REDUCER-TO-PIPE FW FEEDWATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-016 Sat 366464 ISI UT-01-090 Sat 366464 ITEM: C5.81 Summary No. Component I D Component Description System System Description C2.1.372 PIPING WELD FW-1 13D WELDOLET-TO-PIPE FW FEEDWATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-001 Sat 366479 Summary No. Component ID Component Description System System Description C2.3.14 PIPING WELD MS-6F PIPE-TO-SWEEPOLET MS MAIN STEAM Workscope Report No. Exam Results Work Request No. Examination Remarks ISI MT-01-007 Sat 366478 CATEGORY: C-H ITEM: C7.00.CH Summary No. Component ID Component Description System System Description C7.100.10 SFRS-1 SYSTEM SF Pen. 347 Expansion Chamber SF SPENT FUEL PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01 -035 Sat 360312 VT-2 Examination Using SP-206 Wednesday, January 16, 2002 Page 47 of 61

Florida Power Eergy Corm*y AProgresn Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 2 CATEGORY: C-H ITEM: C7.00.CH Summary No. Component ID Component Description System System Description C7.100.12 DHP-1B SYSTEM Decay Heat Pump 1B DH DECAY HEAT PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-036 Sat 360315 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description C7.100.14 MUP-1B SYSTEM Make-Up Pump 1B MU MAKE-UP PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01 -037 Sat 360320 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description C7.100.15 MUP-lC SYSTEM Make-Up Pump 1C MU MAKE-UP PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-038 Sat 360321 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description C7.100.16 CFT-1B SYSTEM Core Flood Tank 1B CF CORE FLOOD PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01 -079 Sat 360328 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description C7.100.18 BSP-1B SYSTEM Building Spray Pump 1B BS BUILDING SPRAY PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-039 Sat 360330 VT-2 Examination Using SP-206 Summary No. Component ID Component Description Sstem System Description C7.100.19 MUP-1A SYSTEM Make-Up Pump 1A MU MAKE-UP PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-090 Sat 360319 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description C7.100.21 SW SYSTEM LETDOWN COOLERS SW SUPPLY/ SW NUCLEAR CLOSED CYCLE PRESSURE TEST RETURN COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01 -088 Sat 366462 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description C7.100.22 SWV-35 SYSTEM SW TO AHFIA SW NUCLEAR CLOSED CYCLE PRESSURE TEST COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-015 Sat 366462 VT-2 Examination Using SP-206 Wednesday, January16, 2002 Page 48 of 61

SFlorida Power A Progress Energy Gon-any Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 2 CATEGORY: C-H ITEM: C7.00.CH Component ID Component Description System System Description Summary No.

C7.100.23 "A" TRAIN DH TO RB DH DECAY HEAT DHV-5 SYSTEM PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks iSI VE-01 -010 Sat 367295 'T-2Examination Using SP-206 Summary No. Component ID Component Description System System Description C7.100.24 DHV-6 SYSTEM "B" TRAIN DH TO RB DH DECAY HEAT PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-070 Sat 367296 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description C7.100.25 DHV-4 SYSTEM DH DROPLINE TO DHP-1A DH DECAY HEAT PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-071 Sat 366468 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description C7.100.26 DHV-4 SYSTEM DH DROPLINE TO DHP-1B DH DECAY HEAT PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-072 Sat 367296 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description C7.100.27 RCSG-1A SYSTEM INTERMEDIATE BUILDING MAIN STEAM MS MAIN STEAM PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-001 Sat 366478 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System DescriptiYn EF TO RCSG-1A EF EMERGENCY FEEDWATER C7.100.28 FWV-44 SYSTEM PRESSURE TEST Workscope Report No. Exam Results Work Request No. EExamination Remarks ISI VE-01-077 Sat 364803 (T-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description FWV-43 SYSTEM EF TO RCSG-1B EF EMERGENCY FEEDWATER C7.100.29 PRESSURE TEST Workscope Report No. Exam Results Work Request No. EExamination Remarks ISI VE-01-078 Sat 368652 IT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description EFV-56 SYSTEM "A" TRAIN EF (EFP-2) EF EMERGENCY FEEDWATER C7.100.30 PRESSURE TEST Workscope Report No. Exam Results Work Request No. :xamination Remarks VE-01-080 Sat N/A /T-2 Examination Using SP-206 ISI Wednesday, January 16, 2002 Page 49 of 61

Vj Florida Power Progress A% Energy Crmonw.,

Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 2 CATEGORY: C-H ITEM: C7.00.CH Summary No. Component ID Component Description System System Description C7.100.31 EFV-55 SYSTEM "B" TRAIN EF (EFP-2) EF EMERGENCY FEEDWATER PRESSURE TEST Workscope Report No. Exam Results Work Request No. EExamination Remarks

]SI VE-01-081 Sat N/A V'T-2 Examination Using SP-206 Summary No. Component I D Component Description System System Description C7.100.32 EFV-58 SYSTEM "A' TRAIN EF (EFP-3) EF EMERGENCY FEEDWATER PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-084 Sat N/A VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description C7.100.33 EFV-57 SYSTEM 'B"TRAIN EF (EFP-3) EF EMERGENCY FEEDWATER PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-085 Sat N/A VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description C7.100.37 DHV-91 SYSTEM DHV-91 TO DHV-93 DH DECAY HEAT PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-018 Sat 367295 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description C7.100.38 SWV-37 SYSTEM SW TO AHF-1B SW NUCLEAR CLOSED CYCLE PRESSURE TEST COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-016 Sat 366462 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description C7.100.39 SWV-39 SYSTEM SW TO AHF-1C SW NUCLEAR CLOSED CYCLE COOLING PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-014m17 Sat 366462 VT-2 Examination Using SP-206 Summary No. Component ID Component Descriptio n stem System Description C7.100.6 SW SYSTEM SW Cooling for Contro I1Rod Drive SW NUCLEAR CLOSED CYCLE PRESSURE TEST Mechanisms COOLING Workscope Report No. Exam Results Work Request No. Examinatic n Remarks ISI VE-01-089 Sat 366462 VT-2 Exarr ination Using SP-206 Wednesday, January 16, 2002 Page 50 of 61

S Florida Power A Progress Energy Comav9ny Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 2 CATEGORY: F-A ITEM: F1.20A Component ID Component Descdption System System Description Summary No.

DHH-547 RESTRAINT DH DECAY HEAT COMPONENT SUPPORT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-177 Sat 366487 Summary No. Component ID Component Description System System Description DHR-22 COMPONENT SUPPORT STRUT DH DECAY HEAT Workscope Report No. Exam Results Work Reauest No. Examination Remarks ISI VT-01-181 Sat 366487 Summary No. Component ID Component Description System System Description DHR-29 COMPONENT SUPPORT STRUT DH DECAY HEAT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-247 Sat 366494 NQC Report #2001-0024 Summary No. Component ID Component Description System System Description MUH-509 COMPONENT SUPPORT ROD MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -237 Sat 366494 NQC Report #2001-0024 Summary No. Component ID Component Description System System Description MUH-516 COMPONENT SUPPORT ROD MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-179 Sat 366494 Summary No. Component I D Commonent Description System System Description MUH-806 COMPONENT SUPPORT STRUT MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -236 Sat 366494 Summary No. Component ID Component Description System System Description SWH-281 RIGID ROD SW NUCLEAR CLOSED CYCLE COMPONENT SUPPORT COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-186 Sat 366462 Component Description System Description Summary No. Component ID COMPONENT SUPPORT STRUT SW NUCLEAR CLOSED CYCLE SWR-316 COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-191 Sat 366462 Wednesday, January 16, 2002 Page 51 of 61

Florida Power AProgress Energy CGomrrsny Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 2 CATEGORY: F-A ITEM: F1.20A Summary No: Component ID -Component Description System System Description SWR-324 COMPONENT SUPPORT STRUT SW NUCLEAR CLOSED CYCLE COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-192 Sat 366462 ITEM: F1.20B Summary No. Component ID Component Description System System Description MUH-884 COMPONENT SUPPORT ANCHOR MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-180 Sat 366494 Summary No. Component ID Component Description System System Description MUH-977 COMPONENT SUPPORT RESTRAINT MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-083 Sat 366494 Summary No. Component ID Component Description System System Description SWH-382 COMPONENT SUPPORT U-BOLT SW NUCLEAR CLOSED CYCLE COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks iSI VT-01-188 Sat 366462 ITEM: F1.20C Summary No. Component ID Component Description Sstem System Description DHH-543 COMPONENT SUPPORT SPRING CAN DH DECAY HEAT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-178 Sat 366487 Summary No. Component ID Component Description System System Description DHH-549 COMPONENT SUPPORT SPRING CAN DH DECAY HEAT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-176 Sat 366487 Summary No. Component ID Component Description System System Description EFH-115 COMPONENT SUPPORT SPRING CAN EF EMERGENCY FEEDWATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-187 Sat 366476 Wednesday, January16, 2002 Page 52 of 61

Florida Power AProgress Energy Camrany Attachment 1 Inservice Inspection Report Interval 3 / Period 1 1 Refuel Cycle 12 CLASS: 2 CATEGORY: F-A ITEM: F1.20C Component ID Component Description System System Description Summary No.

FWH-134 COMPONENT SUPPORT SPRING CAN FW FEEDWATER Workscope Report No. Exam Results Work Request No. Examination Remarks Is] VT-01-257 Sat 366464 Summary No. Component ID Component Description System System Description FWH-75 COMPONENT SUPPORT SPRING CAN FW FEEDWATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-194 Sat 366478 Summary No. Component ID Component Description System System Description FWH-80 COMPONENT SUPPORT SPRING CAN FW FEEDWATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-193 Sat 366478 Summary No. Component ID Component Description System System Description MSH-153 COMPONENT SUPPORT SPRING CAN MS MAIN STEAM Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-091 Sat 367070 / 366476 NQC Report #2001-0283 Summary No. Cc rmponent ID Component Description System Description C()MPONENT SUPPORT SPRING CAN MS MAIN STEAM MSH-154 Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-092 Sat 367070 / 366476 NQC Report #2001-0284 Summary No. Cc)mponent ID Component Description System System Description MUH-517 C OMPONENT SUPPORT SPRING CAN MU MAKE-UP Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -250 Sat 366492 NOC Report #2001-0107 ITEM: F1.40 Summary No. Component ID Component Description System System Description SUPPORT DH DECAY HEAT DHP-1A COMPONENT SUPPORT Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-175 Sat 366487 Wednesday, January 16, 2002 Page 53 of 61

Florida Power AProgress Energy rComrny Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 3 CATEGORY: D-A ITEM: D1.10 Summary No. Component ID Component DescriPtion -- System System Description D1.100.10 MUV-50 SYSTEM LETDOWN ISOLATION SYSTEM MU MAKE-UP PRESSURE TEST COMPONENTS Workscope Report i'Jo. Exam Results Work Request No. Examination Remarks ISI VE-01-0 40 Sat 360321 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.15 CHP-1A SYSTEM CH COOLING FOR CONTROL COMPLEX CH CHILLED WATER PRESSURE TEST EFIC ROOMS Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01 -042 Sat 360336 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.16 PEN-321 SYSTEM SW SUPPLY / RETURN LETDOWN SW NUCLEAR CLOSED CYCLE PRESSURE TEST COOLERS COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks iSI VE-01-043 Sat 368985 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.17 SWP-1A SYSTEM SWP-1A SYSTEM COMPONENTS SW NUCLEAR CLOSED CYCLE PRESSURE TEST COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks iSI VE-01-044 Sat 368989 VT-2 Examination Using SP-206 Summary No. Component ID Component Descrption Sse System uesciption D1.100.21 EFP-1A SYSTEM SW TO EFP-1 SW NUCLEAR CLOSED CYCLE PRESSURE TEST COOLING Workscope Report N10. Exam Results Work Request No. Examination Remarks iSI VE-01-0G 48 Sat 368985 VT-2 Examination Using SP-206 System System Description Summary No. Component ID Component Description D1.100.24 SW TO CONTROL COMPLEX HEAT SW NUCLEAR CLOSED CYCLE CCHE-1A SYSTEM COOLING PRESSURE TEST EXCHANGERS Workscope Report No. Exam Results Work Request No. Examination Fremarks ISI VE-01-051 Sat 368985 VT-2 Examina tion Using SP-206 Summary No. Component ID Component Description System System Description D1.100.25 SW NUCLEAR CLOSED CYCLE SWP-1C SYSTEM SWP-1C SYSTEM COMPONENTS COOLING PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01 -052 Sat 368985 VT-2 Examination Using SP-206 Summary No. Component I D Component Description System System Description D1.100.27 RWP-1 SYSTEM RW TO SW HEAT EXCHANGERS RW NUCLEAR SERVICES SEA PRESSURE TEST WATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-054 Sat 368992 VT-2 Examination Using SP-206 Wednesday, January 16, 2002 Page 54 of 61

S Florida Power A Progress Energy Comrrn. Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 3 CATEGORY: D-A ITEM: D1.10 Summary No. QComponent Component ID Description System System Description D1.100.30 RWP-3B SYSTEM RWP-3B TO DCHE-1B RW NUCLEAR SERVICES SEA PRESSURE TEST WATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-057 Sat 368995 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.31 RWP-2B SYSTEM RWP-2B TO RWV-35 RW NUCLEAR SERVICES SEA PRESSURE TEST WATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01 -058 Sat 368996 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.33 DHV-93 SYSTEM DECAY HEAT TO RC (RCT-1) DH DECAY HEAT PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01 -011 Sat 367295 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.36 EFP-3 SYSTEM EFP-3 DIESEL JACKET COOLING DJ DIESEL JACKET COOLANT PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-060 Sat 368999 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.37 EGDG-1A SYSTEM EGDG-1A JACKET COOLING DJ DIESEL JACKET COOLANT PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01 -068 Sat 368919 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.38 EGDG-1B SYSTEM EGDG-1B JACKET COOLANT DJ DIESEL JACKET COOLANT PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-069 Sat 368922 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.39 EFP-2 SYSTEM EFP-2 EF SYSTEM COMPONENTS EF EMERGENCY FEEDWATER PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-061 Sat N/A VT-2 Examination Using SP-206 Summary No. Component ID Compnent Description System System Description D1.100.40 EFV-11 SYSTEM EFP-2 EF SYSTEM COMPONENTS EF EMERGENCY FEEDWATER PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01 -082 Sat N/A VT-2 Examination Using SP-206 Wednesday, January 16, 2002 Page 55 of 61

Florida Power AProgress Energy Coreramr Attachment 1 Inservice Inspection Report Interval 3 / Period 1 1 Refuel Cycle 12 CLASS: 3 CATEGORY: D-A ITEM: D1.10 Summary No. Component ID Component Description System System Description D1.100.41 EFV-32 SYSTEM EFP-2 EF SYSTEM COMPONENTS EF EMERGENCY FEEDWATER PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-083 Sat N/A VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.42 EFP-3 SYSTEM EFP-3 EF SYSTEM COMPONENTS EF EMERGENCY FEEDWATER PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-062 Sat N/A VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.43 EFV-14 SYSTEM EFP-3 EF SYSTEM COMPONENTS EF EMERGENCY FEEDWATER PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-086 Sat N/A VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.44 EFV-33 SYSTEM EFP-3 EF SYSTEM COMPONENTS EF EMERGENCY FEEDWATER PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-087 Sat N/A VT-2 Examination Using SP-206 ITEM: D1.20 Summary No. Component ID Component Description System System Description D2.5.7 SWH-557 PIPING INTEGRAL ATTACHMENT SW NUCLEAR CLOSED CYCLE ATTACHMENT COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-245 Sat 366492 NQC Report #2001-0107 ITEM: D1.20B Summary No. Component ID Component Description System System Description D2.5.87 DCT-1A VESSEL INTEGRAL ATTACHMENT DC DECAY HEAT CLOSED ATTACHMENT CYCLE COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-240 Sat 366487 NQC Report #2001-0031 CATEGORY: D-B ITEM: D1.10 Summary No. Component ID Component Description System System Description D1.100.18 SWP-1B SYSTEM SWP-1 B SYSTEM COMPONENTS SW NUCLEAR CLOSED CYCLE COOLING PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-045 Sat 368990 VT-2 Examination Using SP-206 Wednesday, January 16, 2002 Page 56 of 61

S Florida Power n A Progress Energy Cornr, Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 3 CATEGORY: D-B ITEM: D1.10 Summary No. Component ID Component Description System System Description D1.100.19 PEN-368 SYSTEM SW SUPPLY / RETURN-TO-RB FANS SW NUCLEAR CLOSED CYCLE COOLING PRESSURE TEST Workscope Report I'No. Exam Results Work Request No. Examination Remarks ISI VE-01-0 46 Sat 368985 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D-1.100.20 MUP-1A SYSTEM SW-TO-MUP-1A SW NUCLEAR CLOSED CYCLE PRESSURE TEST COOLING Workscope Report No. Exam Results Work Reauest No. Examination Remarks ISI VE-01-047 Sat 368985 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.26 DOV-116 SYSTEM DO TO RW PUMPS DO DOMESTIC WATER PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-053 Sat 368991 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.28 RWP-2A SYSTEM RWP-2A-TO-RWV-38 RW NUCLEAR SERVICES SEA PRESSURE TEST WATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-055 Sat 368993 VT-2 Examination Using SP-206 Summary No. Component ID Component Description Sse yStem uescnipuon D1.100.29 RWP-3A SYSTEM RWP-3A TO DCHE-1A RW NUCLEAR SERVICES SEA WATER PRESSURE TEST Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-056 Sat 368994 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.34 DCT-1 SYSTEM "A"TRAIN DC SYSTEM DC DECAY HEAT CLOSED SYSLE COOLING PRESSURE TEST Workscope Report r, Exam Results Work Request No. Examination Remarks ISI VE-01-0 Sat 368997 VT-2 Examination Using SP-206 Summary No. Component ID Component Description SCstem System Description D1.100.35 "B"TRAIN DC SYSTEM DC DECAY HEAT CLOSED DCT-1B SYSTEM PRESSURE TEST SYSLE COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-C 59 Sat 368998 VT-2 Examination Using SP-206 Wednesday, January 16, 2002 Page 57 of 61

Power SFlorida A Progress Energy Comrsný,, Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 3 CATEGORY: D-C ITEM: D1.10 Summary No. Component ID Component Description System System Description D1.100.22 SFHE-1A ALL SW TO SFHE-1A SW NUCLEAR CLOSED CYCLE PRESSURE RETAINING COOLING COMPONENTS Workscope Report No. Exam Results Work Request No. Examination Remarks iSI VE-01 -049 Sat 368985 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.23 SFHE-1 B ALL SW TO SFHE-1 B SW NUCLEAR CLOSED CYCLE PRESSURE RETAINING COOLING COMPONENTS Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-050 Sat 368985 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.5 SFP-1 A ALL PRESSURE SFP-1A SYSTEM COMPONENTS SF SPENT FUEL RETAINING COMPONENTS Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VE-01-063 Sat 360312 VT-2 Examination Using SP-206 Summary No. Component ID Component Description System System Description D1.100.6 SFP-1B ALL PRESSURE SFP-1B SYSTEM COMPONENTS SF SPENT FUEL RETAINING COMPONENTS Workscope Report No. Exam Results Work Request No. Examination Remarks iSI VE-01-064 Sat 360313 VT-2 Examination Using SP-206 CATEGORY: F-A ITEM: F1.30A Summary No. Component ID Component Description System System Description DCH-150 COMPONENT SUPPORT ROD DC DECAY HEAT CLOSED CYCLE COOLING Workscope Report No. Exam Results Work Reauest No. Examination Remarks ISI VT-01 -242 Sat 366487 NQC Report #2001-0028 Summary No. Component ID Component Description System System Description EFH-133 COMPONENT SUPPORT ROD EF EMERGENCY FEEDWATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-071 Sat 366479 Summary No. Component ID Component Description System System Description RWH-48 COMPONENT SUPPORT ROD RW NUCLEAR SERVICES SEA WATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -243 Sat 366487 Wednesday, January 16, 2002 Page 58 of 61

SFlorida Power A Progress Energy to -any Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 3 CATEGORY: F-A ITEM: F1.30A Summary No. Component ID Component Description - System System Description RWH-77 COMPONENT SUPPORT STRUT RW NUCLEAR SERVICES SEA WATER Workscope Report No. Exam Results Work Request No. EExamination Remarks ISI VT-01-248 Sat 366494 QC Report #2001-0025 Summary No. Component ID Component Description System System Description SWH-177 COMPONENT SUPPORT ROD SW NUCLEAR CLOSED CYCLE COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-249 Sat 366494 NQC Report #2001-0026 Summary No. Component ID Component Description System System Description SWH-52 COMPONENT SUPPORT ROD SW NUCLEAR CLOSED CYCLE COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-244 Unsat 366494 NQC Report #2001-0103, Component is Operable WR370460 written to correct.

Summary No. Component ID Component Description System System Description SWR-1 11 COMPONENT SUPPORT STRUT SW NUCLEAR CLOSED CYCLE COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01 -082 Sat 366494 Summary No. Component ID Component Description System System uescription SWR-199 COMPONENT SUPPORT STRUT SW NUCLEAR CLOSED CYCLE COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-081 Sat 366494 Summary No. Component ID Component Description System System Description SWR-492 COMPONENT SUPPORT STRUT SW NUCLEAR CLOSED CYCLE COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks iSI VT-01 -246 Sat 366494 NQC Report #2001-0104 ITEM: F1.30C Summary No. Component ID Component Description System System Description DCH-109A COMPONENT SUPPORT SPRING CAN DC DECAY HEAT CLOSED CYCLE COOLING Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-241 Sat 366487 NQC Report #2001-0029 Wednesday, January16, 2002 Page 59 of 61

S Florida Power A Progress Energy Com.s,-ny Attachment 1 Inservice Inspection Report Interval 3 / Period 1 / Refuel Cycle 12 CLASS: 3 CATEGORY: F-A ITEM: F1.30C Summary No. Component ID Component Description System System Description EFH-53 RESTRAINT EF EMERGENCY FEEDWATER COMPONENT SUPPORT Workscope Report P 0o. Exam Results Work Request No. EExamination Remarks ISI VT-01-1 95 Sat 366478 Summary No. Component I D Component Description System System Description MSH-178 COMPONENT SUPPORT SPRING CAN MS MAIN STEAM Workscope Report No. Exam Results Work Request No. Examination Remarks SI VT-01-001 Sat 366479 ITEM: F1.40 Summary No. Component ID Component Description System System Description EFH-615 COMPONENT SUPPORT ANCHOR EF EMERGENCY FEEDWATER Workscope Report No. Exam Results Work Request No. Examination Remarks iSI VT-01-182 Sat 366495 NQC Report #2001-0129 Summary No. Component ID Component Description System System Description EFH-616 COMPONENT SUPPORT ANCHOR EF EMERGENCY FEEDWATER Workscope Report No. Exam Results Work Request No. Examination Remarks ISI VT-01-183 Sat 366495 NQC Report #2001-0130 CLASS: AUG CATEGORY: AUG ITEM: AUG7.3 Summary No. Component ID Component Description System System Description XO.3.4 B-2 HPI THERMAL SLEEVE MU MAKE-UP MUV-37 THERMAL SLEEVE Workscope Report No. Exam Results Work Request No. Examination Remarks AUG UT-01-041 Eval 366468 AUG VE-01-029 Sat 366468 RT Examination NQC Report #2001-0248 ITEM: AUG7.5 Summary No. Component ID Component Description System System Description X009 RCT-1 PRESSURIZER VENT NOZZLE MK # 78 RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VT-01-238 Sat 366464 Wednesday, January 16, 2002 Page 60 of 61

Florida Power A Progress Energy Cn*amny Attachment 1 Inservice Inspection Report Interval 3 / Period 1 1 Refuel Cycle 12 CLASS: AUG CATEGORY: AUG ITEM: AUG7.6 Summary No. Component ID Component Description System System Description B5.10.1 RCP-1A REACTOR COOLANT PUMP FLYWHEEL RC REACTOR COOLANT Workscope Report No. Exam Results Work Request No. Examination Remarks AUG VE-01-030 Sat 366460 Summary No. Component ID Component Description System System Description B5.10.3 RCP-1B REACTOR COOLANT PUMP FLYWHEEL RC REACTOR COOLANT Workscope Report No. Exam Results Work Reauest No. Examination Remarks AUG VE-01 -031 Sat 366461 Wednesday, January 16, 2002 Page 61 of 61

ATTACHMENT 2 NIS-2 Owner's Reports of Repair or Replacement for ASME Class 1 and Class 2 Components (86 Pages)

NIS-2 OWNER'S REPORT OF REPAIR OR Florida Power AProgress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI DATE OWNER Florida Power Corporation 11/09/2001

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 RV (NAMFII rPAI41lRARPAZrANI7ATIrlM P I1 I1 A I NI IM

-11 -R -rF ,TC WnRIC PFRFnRmpIf

3. FLORIDA POWER CORPORATION WR 368411 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM
4. DECAY HEAT REMOVAL (DH)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSIB31.1 1967 N/A / N/A APPLICABLE EDITION OF SECTION Xl UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 720136 N/A DHH-17 N/A REPLACEMENT X i + i I T I I - rI

+ + t I I-r I-FI t I-F-

.4- .4- F F -f F

_____________ 4 .4- 1 F + F I-F-F F I t T F IF F F t t t F

______________ F F I F -I- F t-F-I i I I I I I j i -I t- F -

I___________ I i4 iF it- F F F I I F F I. i I* t t-t-F F 1 4 F t IF I

______________________________ [ _______________________________________

__________________________________ .1_____________________

1 ___________________________________

RET: Life of Rant RESP: Nudear Enoineerina 900 431 P.,, 111QA

NIS-2 CONTINUATION Page 2 of 2 WR# 368411 DESCRIPTION OF WORK REPLACED 2.5"X5" POWER PIPING SNUBBER 730211 WITH LIKE-FOR-LIKE SNUBBER 720136, WHICH WAS

7. REBUILT UNDER WR 369621.

8 TESTS CONDUCTED PRESSURE TEST TEMP.

N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 9 CERTIFICATE OF COMPLIANCE of the We certify that the statements made in this report are correct and this Replacement Conforms to Section XI ASME Code.

CERTIFICATE OF INSPECTION i, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA THE HARTFORD STEAM BOILER I & I COMPANY of employed by naeinspcre J= me HARTFORD, CT have Inspected the components described in this Owner's Report during the period Z-E-o I to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

IN*CTOR'S SIGNATURE DATE

Florida NIS-2 OWNER'S REPORT OF REPAIR OR Power REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE SECTION XI NIS-2.FRM OWNER DATE Florida Power Corporation 4/12/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WCRIK PFIFO)PMFI) RY (NAMFT RFPAIR C)R(,ANI7ATIC)N P n NIIMRFR. WlR NIIMRFP. FTC
3. FLORIDA POWER CORPORATION WR 368807 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM SDECAY HEAT CLOSED CYCLE COOLING (DC)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A / N/A APPLICABLE EDITION OF SECTION XIUTILIZED FOR REPAiRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A

6. Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED VALVE AGCO N/A N/A DHV-69 N/A REPLACEMENT X F 4 + 1- 1 t t t F F + + I +/-

+ +/- 1 P T T

______________ L 4 + + I P fT F 4 -t 1 t TT I 4 1- 1- i i F r -

F 4 + + +/- t F-I-4 + I- + + F-I-L 4 + h 1- 1- rr F -t F t- -i- r r F 4 + F t t F F-

_ __ _ _ I__ I -1 F P i -i F F I 1- 1- rr F I I- I- 1 I F 4 F F F F F 4 F F F F r-r-F 4 F t F F F

______________ I _______________ .1__________________ I. __________ I ________________ ____ I ____

Rev. 11/94 RET:Life of Plant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368807 DESCRIPTION OF WORK REPLACED VALVE BY BOLTING 7.

PRESSURE TESTTEMP.

8. TESTS CONDUCTED 0

N/A N/A ps N/A F DPrAAPV'q (INIrl IIre NAANt I AMTI z nATA QPPCMT Mi INAPM? IP APPI I'ARI P\

)PD, DHV-69 ISA VACUUM RELIEF VALVE, HYDORSTATIC OR PRESSURE TESTING WAS NOT PERFORMED.

9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNERS DESIGNE * *E-M--TL DATE Patrick M, Peter TITLE ISI Specialist 4/12/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed THE HARTFORD STEAM BOILER I & I COMPANY of by HARTFORD, CT have inspected the components described in this Owner's Report during the period 3 - o oI to 4--Z3-071 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XA.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD. STATE,PROVINCE OR ENDORSEMENTS)

DT /

DATE 900 431 Page 2 Rev. 11/94

Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 1/10/02 "1. P.O. Box 14042 St. Petersburg, FL 33733-4042

2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WCt)R PrRF:iOCIP Ff RY INAMfMl:% RFP.RIR (`Rt*MIT1T] P rl M11JARF1R \V JII, RF FT1
3. FLORIDA POWER CORPORATION WR 371012 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. EL 34428-6708 IDENTIFICATION OF SYSTEM
4. NUCLEAR SERVICES CLOSED CYCLE COOLING .SW)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A I N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I N416-1 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO PIPE N/A N/A N/A SW0028-29 N/A REPLACEMENT X

_____________I ___________ I_________________I_____I ___J_______I_______ ___I .I _______________

4 + I 1 4 1 4 4 4-4 4 4 t 1 1 t I 1t

+ t 1 1 t 1 1t 4 + 4 4 t 4 4 t 1 _________________________ { .1________________ 1 ___________________________ 1 _______ 1 _______________________________ ______

Rev. 1110,4 RET: Life of Rant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 371012 DESCRIPTION OF WORK CUT AND RE-WELDED 2.5" PIPE IN SUPPORT OF RCP-1 B SW COOLER WORK.

7.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED NOMINAL OPERATING PRESSURE 135 psi 82 OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNOEYATURE TITLE DATE Patrick M. Peter~soL_- Project Analyst 1/10/02 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by HSB CT of HARTFORD, CT have inspected the components described in this Owner's Report during the period i-o-o/ to 1_-o_0ý__ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARDi, STATE, PROVINCE OR ENDORSEMENTS)

DATE 900 431 Page 2 Rev. 11194

Florida NIS-2 OWNER'S REPORT OF REPAIR OR 40 Power CORPORATION REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE SECTION XI NIS-2.FRM OWNER DATE 1 14042Corporation P.O. BoxPower Florida 10/05/2000 St. Petersburg, FL 33733-4042

2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WORK PERFORMED BY (NAME) REPAIR ORGANIZATION, P.O. NUMBER, WR NUMBER, ETC.
3. FLORIDA POWER CORPORATION WR 365080 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM
4. REACTOR COOLANT (RC)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A / N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A

6. Identification of Components Repaired or Replaced And Replacement Components NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CH COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO VALVE DRESSER BL-8899 N/A RCV-8 N/A REPLACEMENT X

__ _ __ _ _ _I __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. I _ _ _ _ I I I i 4 t I I 4 4 + I I I t-r-1 4 + .4 t I

______________ 1 4 4- .4 4-4 1-1--

4 4 1- 1 1-1 r-r-4 4 +/- 1 1 r-r-4 4 + I (-4 4 4 4- + 4 4 I-I-4 i 1- t I I I1

_________ __________ ____________ ______ I __________ ___ _____________

Rev. 11/94 RET: Life of Plant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 365080 DESCRIPTION OF WORK REPLACED RCV-8 BY BOLTING 7.

PRESSURE TES

8. TESTS CONDUCTED 2155 Psi 532 TF NOMINAL OPERATING PRESSURE REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

TITLE DATE OWNER OR OWNER'S DESIGNEE Patrick M. Peterso-------- ISI Specialist 10/05/2000 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period q -0 to l0-zG-,0oO , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATEi PROVINCE OR ENDORSEMENTS;5,,

DATE 900 431 Page 2 Rev. 11/94

NIS-2 OWNER'S REPORT OF REPAIR OR RFlorida AProgress EnergyPower Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI DATE OWNER Florida Power Corporation 11/1/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 T1: PAIR C P rl
  • PrN.ITi7ATICMI 1III -R MI IIMARF WArFP -r' WnPIk PrRizlMprn RY waruirt
3. FL ORIDA POWER CORPORATION WR 366665 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM
4. REACTOR COOLANT MCI EDITION ADDENDA, CODE CASES APPLICABLE CONSTRUCTION CODE 5a. ASME SECTION 111 1971 WINTER 1971 1 NA APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I NA
6. Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED COMPONENT

'YES NO CRDM DIAMOND 570 354 G13/1114 1977 REPLACEMENT X POWER CRDM DIAMOND 218 356 L8/1116 1977 REPLACEMENT X POWER CRDM DIAMOND 595 357 E13/1117 1977 REPLACEMENT X POWER CRDM DIAMOND 159 358 B10/1118 1977 REPLACEMENT X POWER CRDM DIAMOND 230 359 011/1119 1977 REPLACEMENT X POWER CRDM DIAMOND 228 360 F14/1120 1977 REPLACEMENT X POWER CRDM DIAMOND 231 361 G5/1121 1977 REPLACEMENT X POWER CRDM DIAMOND 167 365 B8/1125 1977 REPLACEMENT X POWER

________ J_________ I __________ ______ [ _________ I ___ I RET: Life of Plant RESP: Nudear Engineering 900 431 Rev. 11/94

NIS-2 CONTINUATION Page 2 of 2 WR# 366665 DESCRIPTION OF WORK REPLACE CRDM'S BY BOLTING.

7.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED 0

NOMINAL OPERATING PRESSURE 2130 psi 532 F REMARKS IINCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section Xl of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGN TITLE DATE JOHN A. WALKER ,44j/I, NUCLEAR PROJECT 11/1/01 SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORID,CT have inspected the components described in this Owner's Report during the period _ __ ___ ___to

/?-4,-- / , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

AW4 COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

INSPE&TOR'S SIGNATURE DATE Rev. 11/94 900 431 Page 2

NIS-2 OWNER'S REPORT OF REPAIR OR rid a Powe r A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI DATE OWNER Florida Power Corporation 10/29/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042 2 PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 RFPAIR (IAN)117ATION P n Mi IMARFR WP NI IARFR P:-T*

WCRP( PrRF*P*AFrM RVt It&AMFM

3. FLORIDA POWER CORPORATION WR 366884 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. Fl 34428-6708 IDENTIFICATION OF SYSTEM
4. REACTOR COOLANT (R,)

EDITION ADDENDA, CODE CASES APPLICABLE CONSTRUCTION CODE 5a. ANSI B31.1 1967 NA / NA APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I NA 6, Identification of Components Repaired or Replaced And Replacement Components ASME MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE NAME OF NAME OF IDENTIFICATION BUILT OR REPLACEMENT STAMPED COMPONENT MANUFACTURER SERIAL NUMBER BD. NO.

YES NO DRESSER BU03148 NA RCV-9 NA REPLACEMENT X VALVE RET: ULfeof Rant RESP: Nuclear Engineering 900 431 Rev. 11/94

NIS-2 CONTINUATION Page 2 of 2 WR# 366884 DESCRIPTION OF WORK REPLACE VALVE BY BOLTING.

7.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED NOMINAL OPERATING PRESSURE 2130 psi 532 OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGNATURE TITLE DATE JOHN A. WALKER  %'/ NUCLEAR PROJECT 10/29/01 aeýýIlt4SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period /0-2z o0' to

/0-__0-0/ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11194 900 431 Page 2

NIS-2 OWNER'S REPORT OF REPAIR OR Florida Power A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE SECTION XI NIS-2.FRM OWNER DATE

1. Florida Power Corporation 6/13/01 P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WORK PFPIF'RMF') RY (NAMF) PFPAIR OPGAN7ATION. P.n. NIIMRFP. WI NIIMRFI. FTC.
3. FLORIDA POWER CORPORATION WR 366978 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM
4. DECAY HEAT REMOVAL SYSTEM (DH)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA. CODE CASES 5a. ASME III 1989 N/A / N/A FOR REPAIRS OR REPLACEMENTS APPLICABLE EDITION OF SECTION XI UTILIZED ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N-416-1

6. Identification of Components Repaired or Replaced And Replacement Components NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO VALVE WALWORTH N/A N/A DHV-3 N/A REPLACEMENT X Rev. 11/94 RET:Life of Plant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 366978 DESCRIPTION OF WORK INSTALLED CANOPY SEAL ENCLOSURE TO VALVE DHV-3 BODY AND BONNET BY WELDING per MAR #P00080301.

7.

8. TESTSCONDUCTED PRESSURE TESTTEMP.

NOMINAL OPERATING PRESSURE 2150 psi 532 'F DP?,AAIR l1KN'lI inrP MAlMI FACTI IPFIM. frATA OrPPlDT MI IMRP I.PAPPI IrARI F\

9.

[,SME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XA of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGP M=-, TITLE DATE Patrick M. Peterso*, J*

  • '-- Project Analyst 6/13/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed THE HARTFORD STEAM BOILER I & I COMPANY of by HARTFORD, CT have inspected the components described in this Owner's Report during the period 4__8-o/ to

_ --i_-oi , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XA.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

1qf-9 INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE.PROVINCE OR ENDORSEMENTS)

D-/3-<T DATE Rev. 11/94 900 431 Page 2

Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 10/29/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 W PrprnpMur kPI( Ry ii P,rpMiF,,

IR RnOrC.&Iu7TITlN P m NIIMRPP WP NitIMRFR rTt'

3. FLORIDA POWER CORPORATION WR 367235 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM 4- REACTOR COOLANT (IC)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5 ANSI B31.1 1967 NA NA APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / NA 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO VALVE DRESSER BL-08900 NA RCV-8 NA REPLACEMENT X Rev. 11194 RET: Life of Plant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 367235 DESCRIPTION OF WORK REPLACE VALVE BY BOLTING.

7.

PRESSURE TEST TEMP.

8 TESTS CONDUCTED NOMINAL OPERATING PRESSURE 2130 psi 532 OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section Xl of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGNATR~ TITLE DATE JOHN A. WALKER /~, ~NUCLEAR PROJECT 10/29/01 SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of

_____________HARTFORD, CT nave inspected tne components described in this Owner's Report during the period i5-zsr- a1 to

___-_" ___ _ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

.z'*J,

.#.*

  • F '¢.C,/+/-'4c4 2 INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11/94 900431 Page 2

e Forida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 10/29/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WARIk PFpPF*C:PFArf R' INy MP PrFPAIR 1R(M*MI7ATThIn P n .IIM.PW -,A lIIMPnp , T,
3. FLORIDA POWER CORPORATION WR 367328 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM
4. REACTOR C00LANT (RC)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5.ANSI B31.1 1967I NA I NA APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / NA 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO VALVE DRESSER BL08901 NA RCV-1 0 NA REPLACEMENT X VALVE VELAN 5156 NA RCV-1 1 NA REPLACEMENT X

  • 11/94 RET: Ufe of Rant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 367328 DESCRIPTION OF WORK REPLACED VALVES BY BOLTING.

7.

8 TESTS CONDUCTED PRESSURE TEST TEMP.

NOMINAL OPERATING PRESSURE 2130 psi 532 OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 2__-___

0_ to 6-5*. J , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section X1.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTfl'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

//-&-

DATE cs--- ji-s-Di Rev. 11/94 900 431 Page 2

Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR AProgress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation

1. P.O. Box 14042 11/150 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WnRIk PFPIR*MFI;A RV I IJANAFI ePrPIR ArANI: 7ATInNC P ' N1 IMR:R WP KI11 IMRPR FýrT(
3. FLORIDA POWER CORPORATION WR 368141 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM 4._ DECAY HEAT REMOVAL (DH)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. NSI 31.1 1967 N/A I N/A APPLICABLE EDITION OF SECTION X1 UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A

6. Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 720135 N/A DHH-19 N/A REPLACEMENT X I I + I F T I I + 1 1 F

_____________ I L -I. I 1 _____________ L L .1- 1 + I-I-

+ I. *t* I 1T rr I I. + I 1 Rev. 11/94 RET: Ufe of Plant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368141 DESCRIPTION OF WORK REPLACED 2.5x5 POWER PIPING SNUBBER 720139 WITH LIKE-FOR-LIKE SNUBBER 720135, WHICH WAS

7. REBUILT PER WR 368278.

8 TESTS CONDUCTED PRESSURE TEST TEMP.

N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section Xl of the ASME Code.

OWNER OR OWNER'S DESIGNEE S URE TITLE DATE Patrick M. Peters Project Analyst 11/15/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period z-8 -0 I to

/____- __ _ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector. nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTOR'S SIGNATURE COMMISSIOrIS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11194 900431 Page 2

NIS-2 OWNER'S REPORT OF REPAIR OR Florida Power A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE SECTION XI NIS-2.FRM OWNER DATE Florida Power Corporation P.O. Box 14042 11/09/2001 St. Petersburg, FL 33733-4042

2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WORK PERFORMED BY (NAMEI REPAIR ORGANIZATION. P.O. NUMBER. WR NUMBER. ETC.
3. FLORIDA POWER CORPORATION WR 368146 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM
4. REACTOR COOLANT (RC)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A / N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A

6. Identification of Components Repaired or Replaced And Replacement Components NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED ASME COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 730014 N/A RCH-76 N/A REPLACEMENT X

__ 11 1 liii

NIS-2 CONTINUATION Page 2 of 2 WR# 368146 DESCRIPTION OF WORK REPLACED 1.5"X5" POWER PIPING SNUBBER 730147 WITH LIKE-FOR-LIKE SNUBBER 730014, WHICH WAS

7. REBUILT UNDER WR 368404.

8 TESTS CONDUCTED PRESSURE TEST TEMP.

N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER. IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGNATURE TITLE DATE JOHN A. WALKER NUCLEAR PROJECT 11/09/2001 SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period Z / to

______- __ _ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

IN4PECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTSI DATE

Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 11/8/01 1 P.O. Box 14042 St. Petersburg, FL 33733-4042

2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WnRI( PFRFIrMIfl RY INtMrl RrpPAIp nfrA.J1NI7ATIn*N Pn MI
  • 1RFR WR NI IMRPP F'Tr
3. FLORIDA POWER CORPORATION WR 368147 ADDRESS 1 5760 W- POWER LINE STREET. CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM
4. REACTOR COOLANT APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSIB31.1 1967 N/A / N/A APPLICABLE EDITION OF SECTION X1 UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A
6. Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 730139 N/A RCH-74 N/A REPLACEMENT X

_____________ I _______________ I__________________ I __________I ________________ I ____ I __________________

Rev. 11194 RET: Life of Rant RESP: Nudear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368147 DESCRIPTION OF WORK REPLACED 1.5"X5" POWER PIPING SNUBBER 730113A WITH LIKE-FOR-LIKE SNUBBER 750139, WHICH WAS

7. REBUILT UNDER WR 368296.
8. TESTS CONDUCTED PRESSURE TEST TEMP.

N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section Xl of the ASME Code.

TITLE DATE OWNER OR OWNER'S DESIGNE5IG NATURE Patrick M. Peters PROJECT ANALYST 11/8/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 2., 8-0 to j/,/Lo7" , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

BOARD, STATE, PROVINCE OR ENDORSEMENTS)

COMMISSIONS (N0ATIONAL INSPECTOR'S SIGNATURE

/i-/#AT /

DATE 900 431 Page2 Rev. 11194

NIS-2 OWNER'S REPORT OF REPAIR OR l Florida Power A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI DATE OWNER Florida Power Corporation 11/09/2001 P.O. Box 14042 St. Petersburg, FL 33733-4042

2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WnRK ppFRh::*C~rl Iy IIdAMF* R7pAII flp*AN7AITIAMl P rl IJIINARF1 WR 111I?MR:R -"'
3. FLORIDA POWER CORPORATION WR 368148 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM
4. REACTOR COOLANT (RC)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSIB31.1 1967 N/A / N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED SNUBBER POWER PIPING 760200 N/A RCH-73 N/A REPLACEMENT

+ t I 1 1 11 4 4 *1- 1 1-1 1 I + i X -I-i

+ 1 1 1 11 4 t 1 1 1 11 4 +/- I 1 1

-* 41-1 R*-- I ifA nf PRant RESP- Nuwrn- Pnninrinn qW 4.11

NIS-2 CONTINUATION WR# 368148 IPage 2 of 2 DESCRIPTION OF WORK REPLACED 1.5"X5" POWER PIPING SNUBBER 730131 WITH LIKE-FOR-LIKE SNUBBER 760200, WHICH WAS

7. REBUILT UNDER WR 368397.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGNATURE TITLE DATE John A. Walker NUCLEAR PROJECT 11/09/2001

,6 SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD. CT have inspected the components described in this Owner's Report during the period z. -&0 to

_ _-__ _ _ _ _ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

i'NSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE

NIS-2 OWNER'S REPORT OF REPAIR OR e FloridaEnergy Power A Progress Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI DATE OWNER Florida Power Corporation 11/8/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 ARrAM7ATAnr P0 lNiIINARPR WR MJIIMRPU ;:Tr Wr)I( PFRFnRM~rn RV IFJAMFIPFAI
3. FLORIDA POWER CORPORATION WR 368149 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. Fl 34428-6708 IDENTIFICATION OF SYSTEM
4. REACTOR COOLANT (RC)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANsI B21.1 1967 N/A / N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED COMPONENT YES NO SNUBBER POWER PIPING 760197 N/A RCH-65 N/A REPLACEMENT X

NIS-2 CONTINUATION Page 2 of 2 WR# 368149 DESCRIPTION OF WORK REPLACED 1.5"X5" POWER PIPING SNUBBER 750122 WITH LIKE-FOR-LIKE SNUBBER 760197, WHICH WAS

7. REBUILT UNDER WR 369629.

8 TESTS CONDUCTED PRESSURE TEST TEMP.

N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE(

9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section Xl of the ASME Code.

TITLE DATE OWNER OR OWNER'S DESIGNEE SIGNATURE JOHN A. WALKER NUCLEAR PROJECT 11/8/01 SPECIALI ST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 8-01 to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

INSPECTOR'S SIGNATURE DATE

Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION Xl OWNER DATE Florida Power Corporation 11/15/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 Wnpic pF:R P M Fi: R uFn" im u*M j FPAIR )(R1&ltII7ATIIOM P II U11 F1R WIR II IIMR:F:R -TI
3. FLORIDA POWER CORPORATION WR 368154 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM
4. MAKE UP & PURIFICATION (MU)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A I N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 750125 N/A MUH-45 N/A REPLACEMENT X

___________________ 1.1.1

_________________ 11 -I 4 t 1- 1 1 T1 I { + t I 4 t T I I I r

______________________ .1 1 Rev. 11194 RET: Life of Rant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368154 DESCRIPTION OF WORK REPLACED 1.5X5 POWER PIPING SNUBBER 730228 WITH LIKE FOR-LIKE SNUBBER 750125, WHICH WAS RE

7. BUILT PER WR 368303.

PRESSURE TEST TEMP.

8 TESTS CONDUCTED N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE S, R TITLE DATE Patrick M. PetersQ_ Project Analyst 11/15/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 2-*,-0/ to

//__-/( __C__/ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the-Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

[WiECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11/94 900 431 Page 2

NIS-2 OWNER'S REPORT OF REPAIR OR Florida Power A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI DATE OWNER Florida Power Corporation 1 1/8/01

1. P.O. Box 14042 St. Petersburg, FL 337334042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 r:PAIR t1A1g(lAM17TAT[lN P NIMRPP W- NI IMR:: PTCP WnPK P:Prr0MFP:r) RY INAMFI
3. FLORIDA POWER CORPORATION WR 368155 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. EL 34428-6708 IDENTIFICATION OF SYSTEM
4. MAKE UP & PURIFICATION (MU)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A / N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED COMPONENT YES NO SNUBBER POWER PIPING 750112 N/A MUH-43 N/A REPLACEMENT X F F 1 1 1 1 11

_______________________ F I I I I I 1 1 I F I I I I I I i i 1- I i F F t 1- 11 11 II i +/- 1 1 i I

______________ I I F + I I 11 I I I + I I t RET: Life of Plant RESP: Nudear Engineering 900 431 Rev. 11194

NIS-2 CONTINUATION Page 2 of 2 WR# 368155 DESCRIPTION OF WORK REPLACED 1.5"X5" POWER PIPING SNUBBER 760193 WITH LIKE-FOR-LIKE SNUBBER 750112, WHICH WAS

7. REBUILT UNDER WR 368394.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A N/A psi N/A 'F REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 2.8-oi to

___-__- ____ _ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11194 900 431 Page 2

0 Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation

1. P.O. Box 14042 1 5/01 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 wnOp: PFrFfP4r AFfn 4 RY IN &AFI j p,,,nCrt FPAIR I7IA TIfNIM Pp l wIRp l /NIIMRR Am F'ýTC
3. FLORIDA POWER CORPORATION WR 368156 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM
4. MAKEUP & PURIFICATION (MU)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSIB31.1 1967 N/A L N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 760194 N/A MUH-39 N/A REPLACEMENT X L .4 4 *4 + 4 1 I 4 4 I 4 4 1-1

.4 4 *4 11 *41

_______________________ L 1 4 .4 4-4 1 4 t I. *4 + 4 I I 11 I. 4 4 .4 4-4 4 I 4 4 I t-t i-1 I. .4 4 .4 4 t 11 I. 4 4 1 4 t 11 I. 4 4 .4 4-4 4 I 4 4 .4 4 t 1-i-

.4 4 1 4 1 4 1

______________ [ ________________ I .

Rev. 11194 REr: Life of Plant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368156 DESCRIPTION OF WORK REPLACED 1.5X5 POWER PIPING SNUBBER 730150 WITH LIKE FOR-LIKE SNUBBER 760194, WHICH WAS RE

7. 3UILT PER WR 368396.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIG TITLE DATE Patrick M. PetersorV___ .- .--- Project Analyst 11/15/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 9-OJ to

//-__--__/_ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11194 900 431 Paae 2

NIS-2 OWNER'S REPORT OF REPAIR OR Florida Power A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI DATE OWNER Florida Power Corporation 11/8/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Une Street Page 1 of 2 Crystal River, FL 34428-6708 flR(IANI 7ATIC)N P n mi irAMRPR wA Nil INARp .Tr' lAIrIRl PFRPrKnR Fn LY INM-I AFPVIRG WR 368157
3. FLORIDA POWER CORPORATION ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM
4. MAKE UP & PURIFICATION (MU)

EDITION ADDENDA, CODE CASES APPLICABLE CONSTRUCTION CODE 5a. IANSI B3R1 -1 1967 N/A I N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE NAME OF BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED COMPONENT MANUFACTURER SERIAL NUMBER YES NO 740003 N/A MUH-35 N/A REPLACEMENT X SNUBBER POWER PIPING

__I__ I. I F F

4. 4 1 I t- TT 4 4 1 1 1t TT

________I. I I 4F Ft I I I t-t TT I 4 1 i-f tT I_______ I I 4i i- t tI

__________ ____________ ______ .1.

NIS-2 CONTINUATION Page 2 of 2 WR# 368157 DESCRIPTION OF WORK REPLACED 1.5"X5" POWER PIPING SNUBBER 730231WITH LIKE-FOR-LIKE SNUBBER 740003, WHICH WAS

7. REBUILT UNDER WR 363025.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGNATURE TITLE DATE JOHN A. WALKER ~y ~NUCLEAR PROJECT 11/8/01 0ý4 SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period z--Zo I to

//-Z7-cý / , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

C /M v' IONAL 0ARD, S , V O R INSPECI*OR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

//- 27-0 1 DATE

NIS-2 OWNER'S REPORT OF REPAIR OR Florida Power A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE SECTION XI NIS-2.FRM OWNER DATE Florida Power Corporation 11/09/2001

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WORK PERFORMED BY (NAME) REPAIR ORGANIZATION. P.O. NUMBER. WR NUMBER. ETC.
3. FLORIDA POWER CORPORATION WR 368177 ADDRESS 1 5760 W. POWER LINE STREET, CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM
4. DECAY HEAT REMOVAL (DH)

APPUCABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A / N/A APPLICABLE EDITION OF SECTION X1 UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A

6. Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 750104 N/A DHH-39 N/A REPLACEMENT X

______________ I_______________ 1 __________________ 1 __________ .1.

________________ I--1 __________________ 1-1-I I I 1 1t 11 I. + i-i-I I + +/- I I 11

_______________________ I _________________________ I. _____________________________ I ________________ +/- __________________________ I _______ +/-

NIS-2 CONTINUATION Page 2 of 2 WR# 368177 DESCRIPTION OF WORK REPLACED 1.5"X5" POWER PIPING SNUBBER 730129 WITH LIKE-FOR-LIKE SNUBBER 750104, WHICH WAS

7. REBUILT UNDER WR 368405.
8. TESTS CONDUCTED PRESSURE TEST TEMP.

N/A N/A psi N/A °F REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER. IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGNATURE TITLE DATE JOHN A. WALKER ~ / ,4 '/NUCLEAR PROJECT 11/09/2001 67f~~M 'I-4Y SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period Z-8-a 1 to 113-o01 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

9A 2Ac>4J INSPECTOR'S SIGNATURE COMMISSIONS (PlATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE

Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation

1. P.O. Box 14042 11/8/01 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WIr)k* Prp~nRhtA!rn Fty njf*4i ,RPaIRnfRC.I,iI7ATIINh Pn MI iMRP1 W- M11MI II :PP -r.
3. FLORIDA POWER CORPORATI WR 368178 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM
4. CORE FLOOD (CF)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A I N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 720083 N/A CFH-1 8 N/A REPLACEMENT X Rev. 11194 RET: Life of Rant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION WR# 368178 IPage 2 of 2 DESCRIPTION OF WORK REPLACED 2.5"X5" POWER PIPING SNUBBER 730230 WITH LIKE-FOR-LIKE SNUBBER 720083, WHICH WAS

7. REBUILT UNDER WR 368273.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGNATURE TITLE DATE JOHN A. WALKER ~~7NUCLEAR PROJECT 11/8/01 4:2 SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 2-9-0 ( to

.I-41-O I , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

/Al II*PECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DAE /

DATE Rev. 11194 900 431 Page 2

Horida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 11/8/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WnPI( Prv: RnhArF RV INlMPI jMPPPAIP frIPr.AML7tTICINI P rl kIIIMRFI:R WR NI IMRIPR iTr'
3. FLORIDA POWER CORPORATION WR 368179 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. Fl 34428-6708 IDENTIFICATION OF SYSTEM
4. CORE FLOOD (CF)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSIB31.1 1967 N/A I N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I N/A

6. Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 730018 N/A CFH-17 N/A REPLACEMENT X Rev. 11194 RET: Life of Rant RESP: Nuclear Eigineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368179 DESCRIPTION OF WORK REPLACED 4"X5" POWER PIPING SNUBBER 720105 WITH LIKE-FOR-LIKE SNUBBER 730018, WHICH WAS

7. REBUILT UNDER WR 356198.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A N/A psi N/A °F REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section Xl of the ASME Code.

CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 2-- P to I1-,*-0 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSrECTOR'S SIGNATURE COMMISSIONS [NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11194 900 431 Page 2

OfRorida Power NIS-2 OWNER'S REPORT OF REPAIR OR AProgress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation

1. P.O. Box 14042 11/8/01 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Une Street Page 1 of 2 Crystal River, FL 34428-6708 WnRk PFPRF:RKMF F' (NA&:FI RV rFPAIPR Cr4PrAMl7ATI1I)J P (4 NIPA1 FP1;1W"R MI tIRF=rP r'I'r,
3. FLORIDA POWER CORPORATION WR 368415 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM
4. MAKE UP & PURIFICATION (MU)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31,1 1967 N/A I N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA. CODE CASES 5b. 1989 NO ADDENDA / N/A

6. Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 720132 N/A MUH-41 N/A REPLACEMENT X

____ __ ____ _ _ ___ I 4 I. 4 .4 I. f -I-I-Rev. 11194 RET: Life of Rant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368415 DESCRIPTION OF WORK REPLACED 1.5"X5" POWER PIPING SNUBBER 720125 WITH LIKE-FOR-LIKE SNUBBER 720132, WHICH WAS

7. REBUILT UNDER WR 368395.
8. TESTS CONDUCTED PRESSURE TEST TEMP.

N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGNATR TITLE DATE JOHN A. WALKER NUCLEAR PROJECT 11/8/01 SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 2-e-cl to fl-*--1 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPEO'TIOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11/94 900 431 Page 2

NIS-2 OWNER'S REPORT OF REPAIR OR Florida Power AProgress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE SECTION XI NIS-2.FRM OWNER DATE Florida Power Corporation 10/30/01 P.O. Box 14042 St. Petersburg, FL 33733-4042

2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WORK PERFORMED BY (NAME) REPAIR ORGANIZATION. P.O. NUMBER, WR NUMBER, ETC.
3. FLORIDA POWER CORPORATION WR 368180 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM
4. CORE FLOOD (CF)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A / N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A

6. Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 740047 N/A CFH-14 N/A REPLACEMENT X Rev. 11194 RET:Ufe of Plant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368180 DESCRIPTION OF WORK REPLACED 2.5"X5" POWER PIPING SNUBBER 740046 WITH LIKE-FOR-LIKE SNUBBER 740047, WHICH WAS

7. REBUILT UNDER WR 368275.

. TESTS CONDUCTED PRESSURE TEST TEMP.

N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER. IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SrAjTUeAREls TITLE DATE Patrick M. Pee Project Analyst 10/30/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period le-o -0,-o to

//*- ,/[ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective meas ures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

h0c INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTSI DATE 900431 Page 2 Rev. 11/94

Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR AProgress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 11/8/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WAnAk PFRFA*AFri RV IMek rl RFP11IP APtAIMI7&TIANk P n III 1IRCr W11 MI IWRPM :Tr,
3. FLORIDA POWER CORPORATION WR 368427 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM
4. MAKE UP & PURIFICATION (MUI APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A I N/A APPLICABLE EDITION OF SECTION X1 UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 730140 N/A MUH-42 N/A REPLACEMENT X Rev. 11/94 RET: Life of Rant RESP: Nudear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368427 DESCRIPTION OF WORK REPLACED 1.5"X5" POWER PIPING SNUBBER 730222 WITH LIKE-FOR-LIKE SNUBBER 730140, WHICH WAS 7.REBUILT UNDER WR 368403.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section Xl of the ASME Code.

OWNER OR OWNERS DESIGNEE SIGN / TITLE DATE JOHN A. WALKER NUCLEAR PROJECT 11/8/01 U' SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period /2.14-o0 to l-i4-+oi , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DAiT-o /

DATE Rev. 11/94 900 431 Page 2

Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR AProgress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 12/11/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042 PLANT Florida Power Corporation
2. Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WnPK PFrpFPmrtl Ry tIaMF* [PPI-I f AM7AtlITI 1pP C) NIIfARF:R WR MIL1NARPF1 tC
3. FLORIDA POWER CORPORATION WR 370040 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. EL 34428-6708 IDENTIFICATION OF SYSTEM
4. REACTOR COOLANT (RC)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ASMF SECTION III 196F5 THU AUMER 1967 / NA APPLICABLE EDITION OP SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I N-416-1 N-638

6. Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO REACTOR BABCOCK & 620-0007-51-52 N-117 RCRE-1 1971 REPLACEMENT X VESSEL WILCOX Rev- 11/94 RET: Life of Plant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 370040 DESCRIPTION OF WORK MODIFY CRDM NOZZLE # 32 BY WELDING PER MAR 01-09-02-01.

7.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED NOMINAL OPERATING PRESSURE 2125 psi 532 OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE)

RELIEF REQUESTS 01-0002-RR AND 01-0003-RR FOR THIS MODIFICATION WERE APPROVED BY THE NRC.

9. (NRC to FPC LETTER 3N1201-04)

-I ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIC.UAT--..F- TITLE DATE Patrick M. Peters&q - -7 Project Analyst 12/11/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by HSB CT of HARTFORD, CT have inspected the components described in this Owner's Report during the period 10-3-0 1 to S- Lo- C'L , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS) l-1o- oZ.

DATE Rev. 111g4 900 431 Page 2

FRorida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 1 1/8/0 1

1. *P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WrfPI( PPPrAF PKM:l RV INAM FIF Rj:FPAIIR CI1R(AIMI7ATT]i7 P rl IMIF, III 11 III/IR1::PIF -Tr AIIP
3. FLORIDA POWER CORPORATION WR 371706 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM
4. REACTOR COOLANT (RC)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967I N/A I N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 750132 N/A RCH-81 N/A REPLACEMENT X 4 -I- + 4 4 4 1 ______________ _______________ 4- 4 4 4-4 4 4 +/- 4 1 7 7 1T 4 4- 4 4 4 4 4 4- + + 4 t 4 4- 4 4 4 4 4 4- t t-t 4 - + 4 t r-t 77 4 4- 4 4 7t

______________ 4- 4 4 4-4 4 4 + t 4 7 7T 4 4- 4 + 4 4 t-4 Rev. 11194 RET: Life of Plant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION WR# 371706 Page 2 of 2 DESCRIPTION OF WORK REPLACED 1.5"X5" POWER PIPING SNUBBER 750100 WITH LIKE-FOR-LIKE SNUBBER 750132, WHICH WAS

7. REBUILT UNDER WR 368304.
8. TESTS CONDUCTED PRESSURE TEST TEMP.

N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGNATURE TITLE DATE JOHN A. WALKER Z4 NUCLEAR PROJECT 11/8/01 SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period /o-1-21/ to

________ _ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section X1.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSýPtECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11/94 900431 Page2

, Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR AProgress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 1 0/31/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 Wn KRI(

PrRFPPPA:r RV INAMF 1pPA&IR lPCr1ANI,7ATICth P n MI I IMRFR W tNI IMItlPR *T

3. FLORIDA POWER CORPORATION WR 357800 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM 4, 1MAKEUP & PURIFICATION (MU)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5 ANSI B31.1 1967 NA NA APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I NA 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SUPPORT NA NA NA MUH-587 NA REPAIRED X SUPPORT NA NA NA MUH-590 NA REPAIRED SUPPORT NA NA NA MUH-609 NA REPAIRED SUPPORT NA NA NA MUH-763 NA REPAIRED Rev- 11194 RET: Ufe of Plant RESP: Nudear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 357800 DESCRIPTION OF WORK REPAIR SUPPORTS BY WELDING.

7.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A NA Ps' NA OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Repair Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGNATURE TITLE DATE JOHN A. WALKER NUCLEAR PROJECT 10/31/01 SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period i8-7-0o to 11 Oi , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECT61R'S SIGNATURE COMMISSIONS INATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11/94 900 431 Page 2

Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR AProgress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 11/16/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WnRkpiFR1F: RV ImAmFI [7*eIn AAII7ATIMlI

-A1 P 11 MIJ)INAPFRl W- NI IMRPR -rt

3. FLORIDA POWER CORPORATION WR 363265 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. EL 34428-6708 IDENTIFICATION OF SYSTEM
4. FUEL HANDLING (FH)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ASME SECTION 111 19 65 1967 1 N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A

6. Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO FUEL N/A N/A N/A FHX-1A N/A REPLACEMENT X TRANSFER TUBE 4- 4 - t tt 4- 4 F F tt tt 4- 4 F F -t F t-t-4- 4 T t t-r-4- 4 - f 4- 4 F F 1- F F-F-4- 4 T t TT

_____________ 4 4- 4 F F 4--F t-F-4- 4 t-r-

+/- 4 F t tF 4- 4 F F -t--F F-F-4- 4 F F -F-F I-F-4- 4 r r __

_____________ A. -, ,. __________

RET: Ufe of Rant RESF: Nudear Egineenng 900 431 Rev.

Rev 11194 11194 RET: Life of Plant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 363265 DESCRIPTION OF WORK REPLACED MISSING BOLTS.

7.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED 0F N/A N/A psi N/A REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section Xl of the ASME Code.

OWNER OR OWNER'S DESIGNEE 3eN-AT-1RE"*I'* TITLE DATE Patrick M. Peter sn. . Project Analyst 11/16/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period  ?- g-9/ to

/i__*_ I , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

z /9'c/1)

INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11194 900 431 Page 2

Florida NIS-2 OWNER'S REPORT OF REPAIR OR Power C RORP0RATION REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE SECTION XI NIS-2.FRM OWNER DATE 1 14042Corporation P.O. BoxPower Florida 12/13/2000 St. Petersburg, FL 33733-4042

2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WORK PERFORMED BY (NAME) REPAIR ORGANIZATION, P.O. NUMBER, WR NUMBER, ETC.
3. FLORIDA POWER CORPORATION WR 367039 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM
4. EMERGENCY FEEDWATER (EF)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A / N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 1- NO ADDENDA I N/A

6. Identification of Components Repaired or Replaced And Replacement Components NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED cAW COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SUPPORT POWER PIPING N/A N/A EFH-70 N/A REPLACEMENT X 1 4 1 1 -i II I 4 4 + 1- 14

_ __ _ _ I__ I I +I - f i 4 + -I- 1 1 7-r-4 4 1- 1- 1t t-r-4 4 + 1- i-t t-t-

______________ 4 F + 1 t-t-4 4 F + I I t-t-

-I 4 1 I 1 1 1 1

_____________ I ______________ I _________ ____

Rev. 11/94 RET: Life of Plant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 367039 DESCRIPTION OF WORK REPLACED ONE CLAMP BOLT.

7.

PRESSURE TESTTEMP.

8. TESTS CONDUCTED N/A N/A Psi N/A TF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class,91i CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

TITLE DATE OWNER OR OWNER'S DESIGNEE SIC Patrick M. Peterson T. ISI Specialist 12/13/2000 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period /O- 0-.- ew to

/2-1i - 0 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

INSPECTOR'S SIGNATURE DATE 900 431 Page 2 Rev. 11194

NIS-2 OWNER'S REPORT OF REPAIR OR Florida Power A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE SECTION XI NIS-2.FRM OWNER DATE Power FloridaBox 14042 Corporation 10/25/01

1. P.O.

St. Petersburg, FL 33733-4042

2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WORK PERFORMED BY (NAME) REPAIR ORGANIZATION. P.O. NUMBER. WR NUMBER, ETC.
3. FLORIDA POWER CORPORATION WR 367605 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM
4. MAIN STEAM (MS)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSIB31.1 1967 NA / NA APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / NA

6. Identification of Components Repaired or Replaced And Replacement Components ASME NATIONAL OTHER YEAR REPAIRED, REPLACED CODE NAME OF NAME OF MANUFACTURER'S COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO VALVE NA NA NA MSV-26 NA REPLACEMENT X Rev. 11/94 RET:Ufe of Plant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 367605 DESCRIPTION OF WORK REPLACE VALVE INTERNALS.

7.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A NA psi NA OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER. IF APPLICABLEI 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGNATURE TITLE DATE JOHN A. WALKER NUCLEAR PROJECT 10/25/01

-1 6SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 2--e--1 to

_______ _, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Rep ort in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner' s Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11/94 900431 Page2

Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 11/9/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 wnfkw PFpFrPmrI: RPmI1MFP RF=P*IR ( .'1p l,(17ATICMNP l NI IMRF=R WPAR M IMRFR F'l T'
3. FLORIDA POWER CORPORATION WR 368144 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM
4. NUCLEAR SERVICES CLOSED CYCLE COOLING (SW)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A / N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 760199 N/A SWR-423 N/A REPLACEMENT X

.1- 4 4- .4. -I-

+/- 1- -F -F t 4- + + 1- 1-4- -I- + 1- 1-4- 4 1- 4- T T rT 4- 4 4- + +1-Rev. 11194 RET: Life of Plant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368144 DESCRIPTION OF WORK REPLACED 1.5"X5" POWER PIPING SNUBBER 750120 WITH LIKE-FOR-LIKE SNUBBER 760199, WHICH WAS

7. REBUILT UNDER WR 368402.
8. TESTS CONDUCTED PRESSURE TEST TEMP.

N/A N/A JSI N/A °F REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGNATURE ,~, TITLE DATE JOHN A. WALKER NUCLEAR PROJECT 11/09/2001 SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 2 -.1-.-O to 11/1.-/321 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

11SPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE

c Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 11/15/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WNRIK PFRRFCI MFR RV hilAMF rFPPIR AeI71IATTrlN PrI N 1111MPrR W-I NI IMRFP F-r.
3. FLORIDA POWER CORPORATION WR 368159 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM 4_ MAIN STEAM (MS)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5,ANSI B31.1 1967 N/A I N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 730039 N/A MSH-581 N/A REPLACEMENT X I

______ I

  • t-t 11 L .4 4- t 1 ______________ L .4 4- ____

Rev. 11194 RET: Life of Plant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368159 DESCRIPTION OF WORK REPLACED 2X5 POWER PIPING SNUBBER 760175 WITH LIKE FOR-LIKE SNUBBER 730039, WHICH WAS RE BUILT PER WR 368261.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A N/A psi N/A OF REMARKS INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE

  • TITLE DATE Patrick M. Peters)n, Project Analyst 11/15/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 2-.L -' I to P _-46-01 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTOR'S SIGNATURE COMMISSIONS NATIONAL BOORD, STATE, PROVINCE OR ENDORSEMENTS)

-a /

DAW Rev. 11/94 900 431 Page 2

Rorida Power F NIS-2 OWNER'S REPORT OF REPAIR OR AProgress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 11/09/2001 P.O. Box 14042 St. Petersburg, FL 33733-4042

2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 Wnpk" P:rPrMnpur RY IMAMFi P:PPIR 1R(I)MI7ATIOInm P n MIImIPPR R ..AMIIMRF:p
'r
3. FLORIDA POWER CORPORATION WR 368164 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM
4. MAIN STEAM (MS)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A / N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 740036 N/A MSH-167 N/A REPLACEMENT X 4

4

__________ I

-I-1 1

__________________ ii

NIS-2 CONTINUATION Page 2 of 2 WR# 368164 DESCRIPTION OF WORK REPLACED 4"X5" POWER PIPING SNUBBER 730117 WITH LIKE-FOR-LIKE SNUBBER 740036, WHICH WAS

7. REBUILT UNDER WR 368280.

PRESSURE TEST TEMP.

8 TESTS CONDUCTED N/A pJsi N/A OF N/A REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNERS DESIGNEE SIGNATURE TITLE DATE JOHN A. WALKER NUCLEAR PROJECT 11/09/2001 SSPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period z____ __a_-0to 111-/4- , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

-INSPECTOR'S SIGNATURE DATE

Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 11/8/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WCRIK PFRPrnMPfl1RY l.AAMPI PrPA1P riPrl'NJI7ATI*TI1t P n NIIM1PF IMJP MIIIARFR :TC
3. FLORIDA POWER CORPORATION WR 368165 ADDRESS 115760 W. POWER LINE STREET. CRYSTAL RIVER. EL 34428-6708 IDENTIFICATION OF SYSTEM
4. MAIN STEAM (MS)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B331.1 1967I N/A I N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 720075 N/A MSH-147 N/A REPLACEMENT X Rev. 11194 RET: Life of Rant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION WR# 368165 Page 2 of 2 DESCRIPTION OF WORK REPLACED 5"X5" POWER PIPING SNUBBER 720073 WITH LIKE-FOR-LIKE SNUBBER 720075, WHICH WAS

7. REBUILT UNDER WR 368394.
8. TESTS CONDUCTED PRESSURE TEST TEMP.

N/A N/A Psi N/A OF REMARKS INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

JOHN A. WALKER NUCLEAR PROJECT 11/8/01 OWNER OR OWNER'S DESIGNEE SIGNTR , ý TITLE DATE C~.'..'U.~'(SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY Of HARTFORD, CT have inspected the components described in this Owner's Report during the period Z. 8-01 to 2.01 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTOR'S SIGNATURE COMMISSIONS INATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTSI DATE Rev. 11/94 900 431 Page 2

Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 11/8/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WnRI( PrP:rRM F fY tl INIAMZM: RFPAIP rflltAN7AITITIlM PI P NI IMRF:R WP NI IM4RPR P-Tr
3. FLORIDA POWER CORPORATION WR 368171 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM 4_ r-FEFDWATER (FW)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSIB31.1 1967 N/A I N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 740092 N/A FWH-140 N/A REPLACEMENT X

__ _ _ _ _ _ _[I _ _ _ _ _ _ _ I __ _ _ _ _ _ _ _ _I __ _ _ _ I _ _ _ _ _ _I_ _ I_ _ _ _ _ _ _ _ _ I__ _

NIS-2 CONTINUATION Page 2 of 2 WR# 368171 DESCRIPTION OF WORK REPLACED 2.5"X5" POWER PIPING SNUBBER 740080 WITH LIKE-FOR-LIKE SNUBBER 740092, WHICH WAS

7. REBUILT UNDER WR 368268.
8. TESTS CONDUCTED PRESSURE TEST TEMP.

N/A 0F N/A N/A psi REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNERS DESIGNEE SIGNATURE TITLE DATE JOHN A. WALKER NUCLEAR PROJECT 11/8/01 C/w SPECIALIST CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD. CT have inspected the components described in this Owner's Report during the period 2 _e-0 / to

,//_/.____:;_/ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE

e Rorida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 11/15/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WoRi PrRF:nphllrl RY iNrMIFI P:PAIR nRrAKIJ7ATI(hiP P )N IMi R:RFR WJRK1 IMRFR FTr.
3. FLORIDA POWER CORPORATION WR 368172 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM
4. FEEDWATER (FW)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A I N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 760036 N/A FWH-1 28 N/A REPLACEMENT X Rev. 11194 RET: Ufe of Rant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368172 DESCRIPTION OF WORK REPLACED 5X5 POWER PIPING SNUBBER 760068 WITH LIKE-FOR-LIKE SNUBBER 760036, WHICH WAS RE

7. BUILT PER WR 368292.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A N/A psi N/A OF REMARKS fINCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNE **E TITLE DATE Patrick M. Peero Project Analyst 11/1 5/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 2-g-o) to

/__-- _____-_ _ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTOR'S SIGNATURE COMMISSIONS ýNATVONZLBOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11194 900 431 Page 2

Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation

1. P.O. Box 14042 11/15/01 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 wnpik PrpFORpmrf Ry mamI RF:PAIR flRJCrAI7ATIMN P () 1,l IMPFR W"P MI PI4RF:P PTt
3. FLORIDA POWER CORPORATION WR 368173 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER. EL 34428-6708 IDENTIFICATION OF SYSTEM
4. EMERGENCY FEEDWATER (EE)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSIBR21 ý1 1967 N/A I N/ZA APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I N/A

6. Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 730217 N/A EFH-27 N/A REPLACEMENT X

+ I.- I *I I I 1 1 4 I 4 4 4 1 I. 4 .4 4 .4 I I I I 1 1 11 4 *4 + 4 .4 I I 1 1 1 1 11 I I 4 4 4 .4

______________________ I _________________________ I _____________________________ I ________________ .1___________________________ +/- _______ +/- _______________________________

Rev. 11194 RET: Life of Plant RESP: Nudear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368173 DESCRIPTION OF WORK REPLACED 2.5X5 POWER PIPING SNUBBER 730116 WITH LIKE FOR-LIKE SNUBBER 730217, WHICH WAS RE

7. BUILT PER WR 368269.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A N/A Psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section X1 of the ASME Code.

OWNER OR OWNER'S DESIGNEES - . TITLE DATE Patrick M. PetersProject Analyst11/15/01 CERTIFICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 2..-1/ to

_____________/_ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSfECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11/94 900 431 Page 2

"Florida NIS-2 OWNER'S REPORT OF REPAIR OR Power CORPORATION REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE SECTION XI NIS-2.FRM OWNER DATE Florida Power Corporation 5/28/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Crystal River Corporation Florida PowerUnit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WORK PF#FC)IMFr RY (NAMF) IFPAIR CIIrANI7ATICrN P n NI IMRFI? WP NI IMRFR FTC.
3. FLORIDA POWER CORPORATION WR 368175 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM SDECAY HEAT REMOVAL SYSTEM (DH)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A / N/A APPLICABLE EDITION OF SECTION XIUTILIZEDFOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A

6. Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO COMPONENT POWER PIPING 750134 N/A DHR-24U N/A REPLACEMENT X SUPPORT Rev. 11/94 RET:Life of Plant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368175 DESCRIPTION OF WORK REMOVED SNUBBER S/N 750125 FROM LOCATION DHR-24U AND REPLACED WITH LIKE-FOR-LIKE SNUBBER S/N

7. 750134, WHICH WAS REBUILT UNDER WORK REQUEST 359852.

PRESSURE TESTTEMP.

8. TESTSCONDUCTED N/A N/A psi N/A 'F D NAAf)Vq fNiril 1 II11 *AANII I*A TI IIom-'z nATA DPrDIT Nil INAP1iD 19 ADDI I ApI I=

9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGNA D- 1

  • TITLE DATE Patrick M. Peterso rKý ýJ. Sr, Project Analyst 5/28/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed THE HARTFORD STEAM BOILER I & I COMPANY of by HARTFORD, CT have inspected the components described in this Owner's Report during the period 2-6-cl to

'-6 -of , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

IN§PECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE.PROVINCE OR ENDORSEMENTS)

DATE Rev. 11/94 900 431 Page 2

Florida NIS-2 OWNER'S REPORT OF REPAIR OR SPower REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE SECTION XI NIS-2.FRM OWNER DATE Florida Power Corporation 5/28/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WnP(K PFPF()RMFI) RY(NAMFP 1FPAIR CRCANI7ATIC)N P ( NI IMRFR WR NIIMRFP FTC.
3. FLORIDA POWER CORPORATION WR 368176 ADDRESS 15760 W. POWER LINE STREET, CRYSTAL RIVER, FL 34428-6708 IDENTIFICATION OF SYSTEM
4. DECAY HEAT REMOVAL SYSTEM (DH)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA. CODE CASES 5a. ANSI B31.1 1967 N/A / N/A APPLICABLE EDITION OF SECTION XI UTILIZEDFOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A

6. Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO COMPONENT POWER PIPING 730128 N/A DHR-24L N/A REPLACEMENT X SUPPORT Rev. 11/94 RET:Life of Plont RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368176 DESCRIPTION OF WORK REMOVED SNUBBER S/N 740003 FROM LOCATION DHR-24L AND REPLACED WITH LIKE-FOR-LIKE SNUBBER S/N

7. 730128, WHICH WAS REBUILT UNDER WORK REQUEST 359800, PRESSURE TESTTEMP.
8. TESTS CONDUCTED N/A N/A psi N/A -F Dr1\AADkWR(lNCrIlI IFP UAANIIPA(-TI IDPPI'q nATA DrPP f)T Nil INAPPIDIp APPI IrARI rý 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XAof the ASME Code.

OWNER OR OWNER'S DESIGNEE SIG TURE TITLE DATE Patrick M. Peterson Sr. Project Analyst 5/28/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed THE HARTFORD STEAM BOILER I & I COMPANY of by HARTFORD, CT have inspected the components described in this Owner's Report during the period 2- 3-0/ to 6.//-0 / , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD. STATE.PROVINCE OR ENDORSEMENTS)

DATE Rev. 11/94 900 431 Page 2

e Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR A Progress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION Xl OWNER DATE Florida Power Corporation 11/15/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 W41R4( PrFRF( AAF:* RV tNAMMF RFI:PAIR r1R1Ir.A 1I'7ATI(3MiP 1NI I NIRFP1 N IRI:ARF WR I FT r,
3. FLORIDA POWER CORPORATION WR 368181 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM
4. CORE FLOOD (CE)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5 ANSI B31.1 1967 N/A I NIA APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 720138 N/A CFH-13 N/A REPLACEMENT X

______________ _______________ .1.__________________ 1 __________ ________________ 1 1

____ i-I-4 4 4 + 4 1 + t 1 1 4 + 4 4 1 11 4 + I I I-I-

+/- 4- 4 4 + 4 4 + t t 4 1 T 1 Rev. 11/94 RET: Ufe of Rant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368181

. DESCRIPTION OF WORK REPLACED 2.5X5 POWER PIPING SNUBBER 720137 WITH LIKE FOR-LIKE SNUBBER 720138, WHICH WAS RE

7. BUILT PER WR 368271.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A N/A psi N/A OF REMARKS INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLEJ 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section Xl of the ASME Code.

OWNER OR OWNER'S DESIGNEE TITLE DATE Patrick M. Peterson Project Analyst 11/15/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period Z-. I to l//-/6- 0/ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

IISPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11194 900 431 Page 2

NI S-2 OWNER'S REPORT OF REPAI R OR fRorida Power A Progress Energy Company REPLACEMENT AS REQUI RED BY THE PROVI SI ONS OF ASME CODE SECTI ON XI NIS-ZFI OVNER DATE Florida Power Corporation 8/6/01 P.O. Box 14042 St. Petersburg, FL 33733-4042

2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WORK PERFORMED BY (NAME) REPAIR ORGANIZATION, P.O. NUMBER. WR NUMBER ETC,
3. FLORi DA POWER CORPORATI ON WR 368182 ADDRESS 15760 W. POWER LI NE STREET, CRYSTAL RI VER, FL 34428-6708 IDENTI R CATlON OF SYSTEM
4. REACTOR BUI LDI NG SPRAY (BS)

APPU CABLE CONSTRUCTION CODE EDITION ADDENDA CODE CASES 5a. ANSI B31.1 1967 N/A I N/A APPUCABLE EDITION OF SECTION YJ UTIUZED FOR REPAIRS OR REPLACEMENTS ADDENDA CODE CASES 5 b. 1989 NO ADDENDA I N/A

6. Identification of Components Repaired or Replaced And Replacement Components ASM E NAME OF NAME OF MANUFACTURER'S NATI ONAL OTHER YEAR REPAI RED, REPLACED CODE COMPONENT MANUFACTURER SERI AL NUMBER BD. NO. I DENTI Fl CATI ON BUILT OR REPLACEMENT STAMPED YES NO SUPPORT/ POWER PI PI NG 750073 N/A BSR-35 N/A REPLACEMENT X SNUBBER 4 4 4 4 *I 4-4--

+ 4* 4- 4 4- 4 1.-i--

4 .4- 4- 4 + +

Rev. 11/94 RET: Ufe of Rant RESP: Nudear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368182 DESCRIPTION OF WORK REPLACED SNUBBER 720113 VV]TH LIKE FOR LIKE SNUBBER 750073.

7.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A N/A psi N/A TF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section Xl of the ASME Code.

OWNER OR OWNER'S DESIGNEE S -F - ' TITLE DATE Patrick M. Peterso TITE Project Analyst 8/6/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 2-8-0 to

- 7-of1 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

,--z-N (1ATINAL B,4)

INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS) 8-7-c1 DATE 900431 Page2 Rev. 11/94

NIS-2 OWNER'S REPORT OF REPAIR OR FRorida Power AProgress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 1 1/8/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 W()P* PrCPMPflP :l* RV INAMFl: RPPPAIP Cr1Pn.AMI7ATII' P 1) MI I11RFP:11WP NI IFAP:R -r,
3. FLORIDA POWER CORPORATION WR 368183 ADDRESS 15760 W. POWER LINE STREET- CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM
4. REACTOR BUILDING SPRAY (BS)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. NSIB311 1967 N/A / N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA I N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 730114 N/A BSH-1 5 N/A REPLACEMENT X Rev. 11194 RET: Ufe of Rant RESP: Nuclear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368183 DESCRIPTION OF WORK REPLACED 2"X5" POWER PIPING SNUBBER 720079 WITH LIKE-FOR-LIKE SNUBBER 730114, WHICH WAS

7. REBUILT UNDER WR 369625.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE SIGNATURE TITLE DATE JOHN A. WALKER NUCLEAR PROJECT 11/8/01 1ýý* SPECIALIST CERTIFICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 2 6-0i to

-i4-41-/ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

______/______/2,7__,

C,(

INSPECTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11/94 900 431 Paqe 2

S Florida Power NIS-2 OWNER'S REPORT OF REPAIR OR AProgress Energy Company REPLACEMENT AS REQUIRED BY THE PROVISIONS OF ASME CODE NIS-2.FRM SECTION XI OWNER DATE Florida Power Corporation 11/15/01

1. P.O. Box 14042 St. Petersburg, FL 33733-4042
2. PLANT Florida Power Corporation Crystal River Unit 3 15760 W. Power Line Street Page 1 of 2 Crystal River, FL 34428-6708 WOPI( PFRFORIPFrI RY INAUAFI: R=PAIR ArPrAII7ATIOM*I P ) NI IMFRPR W1 MI IMRPFP PTCr,
3. FLORIDA POWER CORPORATION WR 368200 ADDRESS 15760 W. POWER LINE STREET. CRYSTAL RIVER. FL 34428-6708 IDENTIFICATION OF SYSTEM 4, FEEDWATER (FW)

APPLICABLE CONSTRUCTION CODE EDITION ADDENDA, CODE CASES 5a. ANSI B31.1 1967 N/A I N/A APPLICABLE EDITION OF SECTION XI UTILIZED FOR REPAIRS OR REPLACEMENTS ADDENDA, CODE CASES 5b. 1989 NO ADDENDA / N/A 6, Identification of Components Repaired or Replaced And Replacement Components ASME NAME OF NAME OF MANUFACTURER'S NATIONAL OTHER YEAR REPAIRED, REPLACED CODE COMPONENT MANUFACTURER SERIAL NUMBER BD. NO. IDENTIFICATION BUILT OR REPLACEMENT STAMPED YES NO SNUBBER POWER PIPING 760071 N/A FWH-147A N/A REPLACEMENT X Rev. 11194 RET: Life of Rant RESP: Nudear Engineering 900 431

NIS-2 CONTINUATION Page 2 of 2 WR# 368200 DESCRIPTION OF WORK REPLACED 4X5 POWER PIPING SNUBBER 890002 WITH LIKE FOR-LIKE SNUBBER 760071, WHICH WAS RE

7. BUILT PER WR 369616.

PRESSURE TEST TEMP.

8. TESTS CONDUCTED N/A N/A psi N/A OF REMARKS (INCLUDE MANUFACTURER'S DATA REPORT NUMBER, IF APPLICABLE) 9.

ASME Code Class 2 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and this Replacement Conforms to Section XI of the ASME Code.

OWNER OR OWNER'S DESIGNEE ý"-, TITLE DATE Patrick M. Peters* Project Analyst 11/1 5/01 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FLORIDA employed by THE HARTFORD STEAM BOILER I & I COMPANY of HARTFORD, CT have inspected the components described in this Owner's Report during the period 2.-6-ci to

_______,__ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

OI ( 4N VA1/ T INSP*CTOR'S SIGNATURE COMMISSIONS (NATIONAL BOARD, STATE, PROVINCE OR ENDORSEMENTS)

DATE Rev. 11194 900 431 Page 2