MONTHYEAR2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 2CAN052202, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) - Revision 12022-05-31031 May 2022 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) - Revision 1 ML22126A0332022-05-10010 May 2022 Review of the Spring 2021 Steam Generator Tube Inspections During Refueling Outage 1R29 2CAN022201, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28)2022-02-0808 February 2022 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) ML22034A8992022-02-0303 February 2022 Steam Generator Tube Inspection Reports in Support of TSTF-577 1CAN102104, Steam Generator Tube Inspection Report - 1R292021-10-22022 October 2021 Steam Generator Tube Inspection Report - 1R29 2CAN082103, Unit 2 - Fifth 10-Year Interval Snubber Program Plan2021-08-31031 August 2021 Unit 2 - Fifth 10-Year Interval Snubber Program Plan 1CAN072102, Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29)2021-07-19019 July 2021 Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29) 2CAN122001, Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection2020-12-0404 December 2020 Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection 2CAN112005, Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval2020-11-24024 November 2020 Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval 2CAN072001, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27)2020-07-0808 July 2020 Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27) 1CAN012004, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage2020-01-28028 January 2020 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage 2CAN091901, Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program2019-09-0303 September 2019 Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program 2CAN021906, Steam Generator Tube Inspection Report2019-02-28028 February 2019 Steam Generator Tube Inspection Report 2CAN011903, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage2019-01-23023 January 2019 Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage 1CAN101802, Submittal of 45th-Year Reactor Building Inspection Report2018-10-10010 October 2018 Submittal of 45th-Year Reactor Building Inspection Report 1CAN091802, Snubber Testing Program for Fifth Inservice Test Interval2018-09-24024 September 2018 Snubber Testing Program for Fifth Inservice Test Interval 1CAN081808, Inservice Testing Plan for the Fifth 10-Year Interval2018-08-27027 August 2018 Inservice Testing Plan for the Fifth 10-Year Interval 1CAN071802, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27)2018-07-25025 July 2018 Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27) 2CAN101701, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25)2017-10-0606 October 2017 Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25) 1CAN091703, Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval2017-09-21021 September 2017 Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval 1CAN031703, Steam Generator Tube Inspection Report - 1R262017-03-22022 March 2017 Steam Generator Tube Inspection Report - 1R26 1CAN031702, Reactor Building Inspection Summary Report - 1R262017-03-14014 March 2017 Reactor Building Inspection Summary Report - 1R26 1CAN031705, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (1R26)2017-03-14014 March 2017 Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (1R26) 1CAN111602, Fifth Ten-Year Interval Inservice Testing Program, Relief Request VRR-ANO1-2017-12016-11-16016 November 2016 Fifth Ten-Year Interval Inservice Testing Program, Relief Request VRR-ANO1-2017-1 1CAN011602, Amended Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)2016-01-18018 January 2016 Amended Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25) 1CAN051502, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)2015-05-28028 May 2015 Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25) 2CAN011503, Year Containment Building Tendon Surveillance and Concrete Inspection2015-01-16016 January 2015 Year Containment Building Tendon Surveillance and Concrete Inspection 2CAN081406, Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23)2014-08-21021 August 2014 Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23) 2CAN081404, Steam Generator Tube Inspection Report - 2R232014-08-18018 August 2014 Steam Generator Tube Inspection Report - 2R23 1CAN111301, Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)2013-11-0505 November 2013 Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) 1CAN101306, Unit 1, Steam Generator Tube Inspection Report - 1R242013-10-23023 October 2013 Unit 1, Steam Generator Tube Inspection Report - 1R24 1CAN101304, Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)2013-10-21021 October 2013 Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) 1CAN101301, Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-0232013-10-0808 October 2013 Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-023 1CAN041305, Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections2013-04-30030 April 2013 Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections 2CAN121204, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22)2012-12-13013 December 2012 Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22) 1CAN031203, Unit 1, Steam Generator Tube Inspection Report - 1R232012-03-22022 March 2012 Unit 1, Steam Generator Tube Inspection Report - 1R23 2CAN051102, Inservice Inspection Summary Report for the Twenty-First Refueling Outage2011-05-25025 May 2011 Inservice Inspection Summary Report for the Twenty-First Refueling Outage 2CAN011105, Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program2011-01-25025 January 2011 Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program ML1036305792010-12-29029 December 2010 Notification of Inspection (NRC Inspection Report 050-368/2011002) and Request for Information ML1022504182010-07-29029 July 2010 Steam Generator Tube Inspection Report - 1R22 1CAN061004, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (1R22)2010-06-29029 June 2010 Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (1R22) 2CAN031006, Inservice Testing Plan for the Fourth 10-Year Interval2010-03-25025 March 2010 Inservice Testing Plan for the Fourth 10-Year Interval 1CAN021002, Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests2010-02-0909 February 2010 Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests 2CAN120901, Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20)2009-12-0707 December 2009 Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20) 1CAN030907, Steam Generator Tube Inspection Report - 1R212009-03-30030 March 2009 Steam Generator Tube Inspection Report - 1R21 1CAN030902, Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21)2009-03-0404 March 2009 Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21) CNRO-2009-00002, Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval2009-03-0404 March 2009 Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval 2CAN070802, Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19)2008-07-0101 July 2008 Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19) 2023-08-10
[Table view] Category:Letter type:
MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] |
Text
V: 1 Entergy Operations, Inc.
Entergy C-)/
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4619 Dale E. James Manager, Licensing 1 CAN080701 August 13, 2007 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Inservice Inspection (ISI) Summary Report Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51
Dear Sir or Madam:
Pursuant to the requirements of 10CFR50.55a, the attached Inservice Inspection (ISI)
Summary Report for ASME Class 1, 2 and 3 pressure retaining components and their supports for Arkansas Nuclear One, Unit 1 (ANO-1) is provided for your information.
The results presented by this letter are representative of inspections performed up to and including refueling outage 1R20 during the third inspection period of the third ten-year inspection interval. This submittal is provided in accordance with ASME Section XI and Code Case N-532-1. Attachment 1 provides ASME form OAR-1 "Owner's Activity Report" plus tables that present: (1) an abstract of examinations and tests, (2) conditions requiring evaluation and (3) actions necessary for continued service.
Due to the scope and complexity of the major modifications performed in recent refueling outages, additional information remains to be incorporated into Table 1 (see Table 1, footnote 2). This summary report reflects modifications performed at ANO-1 that included replacement of both steam generators and replacement of the reactor vessel closure head, as well as other substantial design changes. As a result of the unusually large magnitude of administrative requirements associated with these modifications, and workload estimates for processing the final closure of related Entergy and vendor engineering packages, a follow-up revision to Table 1 will be necessary in order to submit the remaining information regarding the progress of examinations in certain categories for the current interval and period.
A new commitment contained in this submittal is summarized in Attachment 2.
1 CAN080701 Page 2 Should you have any questions or comments, please contact Mr. Fred Van Buskirk at (479) 858-3155.
Sincerely, DEJ/ v
Attachment:
- 1. Owner's Activity Report - OAR 1332
- 2. List of Regulatory Commitments cc: Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Alan Wang Mail Stop O-7D1 Washington, DC 20555-0001
Attachment 1 1CAN080701 Owner's Activity Report OAR-1 332
FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number OAR-1332 Owner E~nterov Arkansas, lnc./ p.O. aox 651. Little Rock. AR. 7Z203 (Name and Address of Owner) r- lan nrfldIsas uL.4dearvne 'OO. 03 lUtI~lI.Ml.IQJ (Name and Address of Plant)
Unit No. 1 Commercial service date .December 19. 1974 Refueling outage no. 1R20 (If applicable)
Current inspection Interval Third (3rd) Inspection Interval (1st, 2nd, 3rd, 4th, other)
Current inspection period Third (3nd) Inspection Period (1st, 2nd, 3rd)
Edition and Addenda of Section Xl applicable to the inspection plan 1992 Edition, Portions of 1993 Addenda for Pressure Testing Date and revision of inspection plan July 26, 2005/ Revision 304: through PCN-18 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan Same CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, test, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certificate of Authorization No. N/A Expiration Date NtA (If applicable)
Signed ;: 4 es.i / - Manager. Programs & CopnnsDate
/Ow~ler or Owner's Designee. Title OfaZ&
I CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arkansas and employed by HSBCT of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, during the period December 24, 2005 to May 12, 2007 , and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XA.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or cnected with this inspection.
J. Commissions NB-9985N ARK-1054 "A"'B "N'"I" Inspector's Signature National Board, State, Province, and Endorsements Date____ D____-_0__-__
Note 1: This OAR-1 FQrm is for the certification of a partially completed Table 1 and the completed Table's 2 and 3. Revision to Table 1 and subsequent submittal will require another form OAR-I completion.
This form (E00127) may be obtained from the Order Dept., ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300.
Entergy South/ANO-1 Page 1 of 1 TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Interval: 3 Period: 3 Examination Total Examinations Total Examinations. Total Examinations Total Examinations Category Required for The Third Credited for The Third Credited (%) for The Credited (%) To Date Interval Period Third Period for The Third Interval Remarks B-A 13 0 0% 0% Relief Request ANO-1-ISI-005 B-B Note 2 B-D Note 2 8-F 7 0 0% 57.14% Relief Request ANO-I -SI--006 B-G-1 Note 2 B-G-2 Note 2 B-J Note 2 B-K Note 2 B-L-I1 0 0 0% 0% ...............
B-L-2 0 0 0% 0%
B-M-1 0 0 0% 0%
B-M-2 1 0 0% 100%
B-N-1 3 0 0% 66.67% Relief Request ANO-I.-ISI-007 B-N-2 2 0 0% 0%
B-N-3 1 0 0% 0%
8-0 Note 2 B-P 7 2 100% 100%
B-Q 0 0 0% 0% ,.,
C-A Note 2 C-B Note 2 C-C Note 2 C-F-1 93 5 19.23% 65.00% Relief Request ANO-1-ISI-008 C-F-2 28 4 36.36% 72.00% Relief Request ANO-1-ISI-008 C-H 165 55 100% 100%
D-A Note 2 D-B 51 17 100% 100.00%
F-A Note 2 E-A 120 40 100% 100% Note 1 E-C 9 3 100% 100%
E-D 3 1 100% 100%
E-G 11 4 100% 100%
L-A 57 0 0% 100%
L-B 10 0 0% 100%
F-C 3.10-40 (Snubbers) 525 126 100% 100% Per TRM Table 5.5.1-1 F-C 3.50 (Snubbers) 103 26 100% 100% Per TRM 5.5.1.d Note 1 - Column 1 & 2 numbers increased from last cycle's OAR due to this category splitting up into smaller more manageable inspection areas.
Note 2 - Due to the large scope of modification packages and their associated administrative requirements for validation and closure, a follow-up revision to Table 1 will be required.
TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE
[ iFlaw or Relevant Condition found Examination Item During Scheduled Section XI Category Number Item Description Flaw Characterization (IWA-3300) Examination or Test (Yes or No)
F-A FI.30B3 Support HBD-20-H51 Corrosion degradation on baseplate Yes (CR-ANO-1-2007-0446) (ISI# 51-023)
Loos conectonsYes Loose connections F-A F1.30B Support HBD-2-H10 (CR-ANO-1-2004-2327) (ISI# 51-062)
F-A F1.30B Support HBD-2-HI 1 Loose connections Yes
- 1.0Spo B- I(CR-ANO-1-2004-2327) (ISI# 51-063)
F-A FI.10A Support MU-167 Excessive Wear Yes (CR-AnO-1-2007-0695) (ISI# 23-095)
F-A F.30A Support HBD-20-H51 Degradation on Baseplate Yes (CR-ANO-1-2007-0446) (ISI# 51-023)
Page 1 of 3 UNIT 1 INTERVAL 3 PERIOD 3 (For Cycle 20)
TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIRJREPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND MMI OR WO NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YESINO)
T3 Replacement Pump Replaced pump columns for P-4C No 09/30/2006 Plan # 02-2020, WO 50247275 3 Repair Pipe Repaired HCC- 16-4" pipe No 01/09/2007 Plan # 04-2004, WO 00025397 N-416-2 3 Replacement Pipe Replaced HCC- 16-4" pipe No 01/09/2007 Plan # 04-2029, WO 00035785 N-416-2)
T3 Replacement Cooling Coil Replaced cooling coil VUC-7A No 11/13/2006 Plan # 05-2058, WO 00033101 2 Repair/ Pump Welded repair to build up wear area, No 12/06/2005 Plan # 05-2060, WO 00047637 Replacement replaced suction/discharge fasteners 2 Replacement Valve Replaced valve CA-62 disc No 05/25/2006 Plan# 05-2073, WO 00044170 2 Replacement Valve Replaced valve BW-1 Body to Bonnet No 05/11/2007 Plan # 05-2083, WO 00029205 studs 2 Replacement Valve Replaced valve BW-1 Body to Bonnet No 05/11/2007 Plan # 05-2132, WO 00075600 nuts 2 Repair Pump Seal welded threaded plug on P-36A No 0 1/16/2006 Plan # 06-2003, WO 00080080 T3 Replacement Valve Replaced valve CV-6036 No 12/21/2006 Plan # 06-2005, WO 00080047 T3 Replacement Pump Replaced pump columns for P-4B No 04/24/2006 Plan # 06-2012, WO 00060981 T3 Replacement Support Replaced support HBD-2-H 10 sway strut Yes 04/12/2006 Plan # 06-2013, WO 00054615 rod ends T3 Replacement Support Replaced support HBD-2-H! I sway strut Yes 04/23/2006 Plan # 06-2014, WO 00060981 rod ends T3 Replacement Support Replaced HCD- 123.-H3 support member No 04/24/2006 Plan # 06-2016. WO 00060981 T3 Replacement Support Replaced HCD-123-HI support member No 04/18/2006 Plan # 06-2017, WO 00056924 T3 Replacement Pipe Shortened .HBD-21-18 piping No 04/26/2006 Plan # 06-2066, WO 00060981 T3 Replacement Valve Replaced valve CV-6034 No 12/08/2006 Plan # 06-2082, WO 00041081 2 Replacement Support Install clamp spacer in supports MS-143, No 05/08/2007 Plan # 07-2001, WO 00079275 MS- 144, MS-147 & MS-148 1__ Replacement Valve Replaced valve PSV-1001 No 05/11/2007 Plan # 07-2005, WO 51031225
Page 2 of 3 UNIT 1 INTERVAL 3 PERIOD 3 (For Cycle 20)
CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND MEASURE MAI OR WO NUMBER DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YES/NO)
I Replacement Valve Replaced valve MU-45A No 05/11/2007 Plan # 07-2008, WO 00084059 1 Replacement Steam Replaced upper manway fasteners on No 05/11/2007 Plan # 07-2009, WO 00101391 Generator E-24A T3 Replacement Pipe Modified EBD-6-4" Pipe run. No 05/11/2007 Plan # 07-2018, WO 00090264 N-416-2 T3 Replacement Pipe Modified EBD-6-2" & 4" Pipe run. No 05/11/2007 Plan # 07-2019, WO 00090264
__ N-416-2 T3 Replacement Support Modify support I-MS-I 18-H8 No 05/11/2007 Plan #_07-2020, WO 00090264 T3 Replacement Support Modify support 1-MS-I 18-H 12 No 05/11/2007 Plan # 07-202 1, WO 00090264 T3 Replacement Support Install new support I-MS-I 18-H27 No 05/11/2007 Plan # 07-2022, WO 00090264 T3 Replacement Support Install new support I-MS-. 18-H28 No 05/11/2007 Plan # 07-2023, WO 00090264 T3 Replacement Support Install new support I -MS-I18-H29 No 05/11/2007 Plan # 07-2024, WO 00090264 T3 Replacement Support Install new support I-MS-I 18-H30 No 05/11/2007 Plan # 07-2025, WO 00090264 T3 Replacement Support Install new support I-MS-I 18-H31 No 05/I 1/2007 Plan # 07-2026, WO 00090264 T3 Replacement Support Install new support I-MS-.I 18-H32 No 05/11/2007 Plan # 07-2027, WO 00090264 T3 Replacement Support Install new support I-MS-I 18-H33 No 05/11/2007 Plan # 07-2028, WO 00090264 T3 Replacement Support Install new support I-MS-I 18-H34 No 05/11/2007 Plan # 07-2029, WO 00090264 T3 Replacement Support Install new support I-MS- 118-H35 No 05/11/2007 Plan # 07-2030, WO 00090264 T3 Replacement Support Install new support I-MS-I 18-H36 No 05/11/2007 Plan # 07-203.1, WO 00090264 T3 Replacement Support Install new support I-MS- I 18-H37 No 05/11/2007 Plan # 07-2032, WO 00090264 I Repair Nozzle Structural weld overlay on Pressurizer No 05/I 1/2007 Plan # 07-2033, WO 00082249 ERV nozzle.
Relief Request ANO I-R&R-0 10 Repair Nozzle Structural weld overlay on Pressurizer No 05/11/2007 Plan # 07-2034, WO 00082248 Safety valve PSV-1001 nozzle.
Relief Request ANO1-R&R-010
Page 3 of 3 UNIT 1 INTERVAL 3 PERIOD 3 (For Cycle 20)
CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND MAI OR WO NUMBER MEASURE DURING SCHEDULED SECTIONXI EXAMINATION OR TEST(YESINO)
Repair Nozzle Structural weld overlay on Pressurizer No 05/11/2007 Plan # 07-2035, WO 00082247 Safety valve PSV- 1002 nozzle.
Relief Request ANO I-R&R-0 10 Repair Nozzle Structural weld overlay on Pressurizer No 05/11/2007 Plan # 07-2036, WO 00082246 Spray nozzle and safe end.
Relief Request ANO I-R&R-0 10 Repair Nozzle Structural weld overlay on Pressurizer No 05/11/2007 Plan# 07-2037, WO 00082233 Surge nozzle.
.__Relief Request ANO I-R&R-0 10 Repair Nozzle Structural weld overlay on Steam No 05/11/2007 Plan# 07-2038, WO 00082378 Generator "A" Hot Leg Surge nozzle.
Relief Request ANO I-R&R-0 10 2 Replacement Valve Replaced valve MS-I I No 05/11/2007 Plan # 07-2041, WO 00093324 N-416-2 I Replacement Valve Replace Inlet flange fasteners for No 05/11/2007 Plan # 07-2043, WO 51031225 PSV-1001 I Replacement Valve Replace Inlet flange fasteners for No 05/11/2007 Plan # 07-2044, WO 00082247 PSV- 1002 T3 Replacement Support Modify support I-MS-188-H13 No 05/11/2007 Plan # 07-2045. WO 00090264 I Replacement Steam Replaced upper hand hole fasteners on No 05/04/2007 Plan # 07-2052, WO 00101443 Generator E-24A I Replacement Steam Replaced upper hand hole fasteners on No 05/07/2007 Plan # 07-2053, WO 00101407 Generator E-24B T3 Replacement Valve Replaced valve SW-604A No 05/01/2007 Plan # 07-2054, WO 00086544 N-416-2 2 Replacement Pipe Install spacer on discharge of PSV-1001 No 05/11/2007 Plan # 07-2055, WO 51031225 Replacement CRDM Replaced CRDM F4 Hold Down No 05/11/2007 Plan # 07-2057, WO 51031152 r_1_____ _ _ _ _Fasteners I I_._I Note: Table 3 is an abstract of all Repair/Replacement activities performed during cycle 20 to comply with site procedural requirements.
Attachment 2 1CAN080701 List of Regulatory Commitments
List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE SCHEDULED COMMITMENT (Check one) COMPLETION DATE (If Required)
ONE-TIME CONTINUING ACTION COMPLIANCE Entergy will submit a revision to Table 1 depicting X November 13, the final abstract of examinations and tests 2007 associated with this summary report.