V: 1 Entergy Operations, Inc.

Entergy C-)/

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4619 Dale E. James Manager, Licensing 1 CAN080701 August 13, 2007 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Inservice Inspection (ISI) Summary Report Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51

Dear Sir or Madam:

Pursuant to the requirements of 10CFR50.55a, the attached Inservice Inspection (ISI)

Summary Report for ASME Class 1, 2 and 3 pressure retaining components and their supports for Arkansas Nuclear One, Unit 1 (ANO-1) is provided for your information.

The results presented by this letter are representative of inspections performed up to and including refueling outage 1R20 during the third inspection period of the third ten-year inspection interval. This submittal is provided in accordance with ASME Section XI and Code Case N-532-1. Attachment 1 provides ASME form OAR-1 "Owner's Activity Report" plus tables that present: (1) an abstract of examinations and tests, (2) conditions requiring evaluation and (3) actions necessary for continued service.

Due to the scope and complexity of the major modifications performed in recent refueling outages, additional information remains to be incorporated into Table 1 (see Table 1, footnote 2). This summary report reflects modifications performed at ANO-1 that included replacement of both steam generators and replacement of the reactor vessel closure head, as well as other substantial design changes. As a result of the unusually large magnitude of administrative requirements associated with these modifications, and workload estimates for processing the final closure of related Entergy and vendor engineering packages, a follow-up revision to Table 1 will be necessary in order to submit the remaining information regarding the progress of examinations in certain categories for the current interval and period.

A new commitment contained in this submittal is summarized in Attachment 2.

1 CAN080701 Page 2 Should you have any questions or comments, please contact Mr. Fred Van Buskirk at (479) 858-3155.

Sincerely, DEJ/ v

Attachment:

1. Owner's Activity Report - OAR 1332
2. List of Regulatory Commitments cc: Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Alan Wang Mail Stop O-7D1 Washington, DC 20555-0001

Attachment 1 1CAN080701 Owner's Activity Report OAR-1 332

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number OAR-1332 Owner E~nterov Arkansas, lnc./ p.O. aox 651. Little Rock. AR. 7Z203 (Name and Address of Owner) r- lan nrfldIsas uL.4dearvne 'OO. 03 lUtI~lI.Ml.IQJ (Name and Address of Plant)

Unit No. 1 Commercial service date .December 19. 1974 Refueling outage no. 1R20 (If applicable)

Current inspection Interval Third (3rd) Inspection Interval (1st, 2nd, 3rd, 4th, other)

Current inspection period Third (3nd) Inspection Period (1st, 2nd, 3rd)

Edition and Addenda of Section Xl applicable to the inspection plan 1992 Edition, Portions of 1993 Addenda for Pressure Testing Date and revision of inspection plan July 26, 2005/ Revision 304: through PCN-18 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan Same CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, test, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authorization No. N/A Expiration Date NtA (If applicable)

Signed  ;: 4 es.i / - Manager. Programs & CopnnsDate

/Ow~ler or Owner's Designee. Title OfaZ&

I CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arkansas and employed by HSBCT of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, during the period December 24, 2005 to May 12, 2007 , and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XA.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or cnected with this inspection.

J. Commissions NB-9985N ARK-1054 "A"'B "N'"I" Inspector's Signature National Board, State, Province, and Endorsements Date____ D____-_0__-__

Note 1: This OAR-1 FQrm is for the certification of a partially completed Table 1 and the completed Table's 2 and 3. Revision to Table 1 and subsequent submittal will require another form OAR-I completion.

This form (E00127) may be obtained from the Order Dept., ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300.

Entergy South/ANO-1 Page 1 of 1 TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Interval: 3 Period: 3 Examination Total Examinations Total Examinations. Total Examinations Total Examinations Category Required for The Third Credited for The Third Credited (%) for The Credited (%) To Date Interval Period Third Period for The Third Interval Remarks B-A 13 0 0% 0% Relief Request ANO-1-ISI-005 B-B Note 2 B-D Note 2 8-F 7 0 0% 57.14% Relief Request ANO-I -SI--006 B-G-1 Note 2 B-G-2 Note 2 B-J Note 2 B-K Note 2 B-L-I1 0 0 0% 0% ...............

B-L-2 0 0 0% 0%

B-M-1 0 0 0% 0%

B-M-2 1 0 0% 100%

B-N-1 3 0 0% 66.67% Relief Request ANO-I.-ISI-007 B-N-2 2 0 0% 0%

B-N-3 1 0 0% 0%

8-0 Note 2 B-P 7 2 100% 100%

B-Q 0 0 0% 0% ,.,

C-A Note 2 C-B Note 2 C-C Note 2 C-F-1 93 5 19.23% 65.00% Relief Request ANO-1-ISI-008 C-F-2 28 4 36.36% 72.00% Relief Request ANO-1-ISI-008 C-H 165 55 100% 100%

D-A Note 2 D-B 51 17 100% 100.00%

F-A Note 2 E-A 120 40 100% 100% Note 1 E-C 9 3 100% 100%

E-D 3 1 100% 100%

E-G 11 4 100% 100%

L-A 57 0 0% 100%

L-B 10 0 0% 100%

F-C 3.10-40 (Snubbers) 525 126 100% 100% Per TRM Table 5.5.1-1 F-C 3.50 (Snubbers) 103 26 100% 100% Per TRM 5.5.1.d Note 1 - Column 1 & 2 numbers increased from last cycle's OAR due to this category splitting up into smaller more manageable inspection areas.

Note 2 - Due to the large scope of modification packages and their associated administrative requirements for validation and closure, a follow-up revision to Table 1 will be required.

TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE

[ iFlaw or Relevant Condition found Examination Item During Scheduled Section XI Category Number Item Description Flaw Characterization (IWA-3300) Examination or Test (Yes or No)

F-A FI.30B3 Support HBD-20-H51 Corrosion degradation on baseplate Yes (CR-ANO-1-2007-0446) (ISI# 51-023)

Loos conectonsYes Loose connections F-A F1.30B Support HBD-2-H10 (CR-ANO-1-2004-2327) (ISI# 51-062)

F-A F1.30B Support HBD-2-HI 1 Loose connections Yes

- 1.0Spo B- I(CR-ANO-1-2004-2327) (ISI# 51-063)

F-A FI.10A Support MU-167 Excessive Wear Yes (CR-AnO-1-2007-0695) (ISI# 23-095)

F-A F.30A Support HBD-20-H51 Degradation on Baseplate Yes (CR-ANO-1-2007-0446) (ISI# 51-023)

Page 1 of 3 UNIT 1 INTERVAL 3 PERIOD 3 (For Cycle 20)

TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIRJREPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND MMI OR WO NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YESINO)

T3 Replacement Pump Replaced pump columns for P-4C No 09/30/2006 Plan # 02-2020, WO 50247275 3 Repair Pipe Repaired HCC- 16-4" pipe No 01/09/2007 Plan # 04-2004, WO 00025397 N-416-2 3 Replacement Pipe Replaced HCC- 16-4" pipe No 01/09/2007 Plan # 04-2029, WO 00035785 N-416-2)

T3 Replacement Cooling Coil Replaced cooling coil VUC-7A No 11/13/2006 Plan # 05-2058, WO 00033101 2 Repair/ Pump Welded repair to build up wear area, No 12/06/2005 Plan # 05-2060, WO 00047637 Replacement replaced suction/discharge fasteners 2 Replacement Valve Replaced valve CA-62 disc No 05/25/2006 Plan# 05-2073, WO 00044170 2 Replacement Valve Replaced valve BW-1 Body to Bonnet No 05/11/2007 Plan # 05-2083, WO 00029205 studs 2 Replacement Valve Replaced valve BW-1 Body to Bonnet No 05/11/2007 Plan # 05-2132, WO 00075600 nuts 2 Repair Pump Seal welded threaded plug on P-36A No 0 1/16/2006 Plan # 06-2003, WO 00080080 T3 Replacement Valve Replaced valve CV-6036 No 12/21/2006 Plan # 06-2005, WO 00080047 T3 Replacement Pump Replaced pump columns for P-4B No 04/24/2006 Plan # 06-2012, WO 00060981 T3 Replacement Support Replaced support HBD-2-H 10 sway strut Yes 04/12/2006 Plan # 06-2013, WO 00054615 rod ends T3 Replacement Support Replaced support HBD-2-H! I sway strut Yes 04/23/2006 Plan # 06-2014, WO 00060981 rod ends T3 Replacement Support Replaced HCD- 123.-H3 support member No 04/24/2006 Plan # 06-2016. WO 00060981 T3 Replacement Support Replaced HCD-123-HI support member No 04/18/2006 Plan # 06-2017, WO 00056924 T3 Replacement Pipe Shortened .HBD-21-18 piping No 04/26/2006 Plan # 06-2066, WO 00060981 T3 Replacement Valve Replaced valve CV-6034 No 12/08/2006 Plan # 06-2082, WO 00041081 2 Replacement Support Install clamp spacer in supports MS-143, No 05/08/2007 Plan # 07-2001, WO 00079275 MS- 144, MS-147 & MS-148 1__ Replacement Valve Replaced valve PSV-1001 No 05/11/2007 Plan # 07-2005, WO 51031225

Page 2 of 3 UNIT 1 INTERVAL 3 PERIOD 3 (For Cycle 20)

CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND MEASURE MAI OR WO NUMBER DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YES/NO)

I Replacement Valve Replaced valve MU-45A No 05/11/2007 Plan # 07-2008, WO 00084059 1 Replacement Steam Replaced upper manway fasteners on No 05/11/2007 Plan # 07-2009, WO 00101391 Generator E-24A T3 Replacement Pipe Modified EBD-6-4" Pipe run. No 05/11/2007 Plan # 07-2018, WO 00090264 N-416-2 T3 Replacement Pipe Modified EBD-6-2" & 4" Pipe run. No 05/11/2007 Plan # 07-2019, WO 00090264

__ N-416-2 T3 Replacement Support Modify support I-MS-I 18-H8 No 05/11/2007 Plan #_07-2020, WO 00090264 T3 Replacement Support Modify support 1-MS-I 18-H 12 No 05/11/2007 Plan # 07-202 1, WO 00090264 T3 Replacement Support Install new support I-MS-I 18-H27 No 05/11/2007 Plan # 07-2022, WO 00090264 T3 Replacement Support Install new support I-MS-. 18-H28 No 05/11/2007 Plan # 07-2023, WO 00090264 T3 Replacement Support Install new support I -MS-I18-H29 No 05/11/2007 Plan # 07-2024, WO 00090264 T3 Replacement Support Install new support I-MS-I 18-H30 No 05/11/2007 Plan # 07-2025, WO 00090264 T3 Replacement Support Install new support I-MS-I 18-H31 No 05/I 1/2007 Plan # 07-2026, WO 00090264 T3 Replacement Support Install new support I-MS-.I 18-H32 No 05/11/2007 Plan # 07-2027, WO 00090264 T3 Replacement Support Install new support I-MS-I 18-H33 No 05/11/2007 Plan # 07-2028, WO 00090264 T3 Replacement Support Install new support I-MS-I 18-H34 No 05/11/2007 Plan # 07-2029, WO 00090264 T3 Replacement Support Install new support I-MS- 118-H35 No 05/11/2007 Plan # 07-2030, WO 00090264 T3 Replacement Support Install new support I-MS-I 18-H36 No 05/11/2007 Plan # 07-203.1, WO 00090264 T3 Replacement Support Install new support I-MS- I 18-H37 No 05/11/2007 Plan # 07-2032, WO 00090264 I Repair Nozzle Structural weld overlay on Pressurizer No 05/I 1/2007 Plan # 07-2033, WO 00082249 ERV nozzle.

Relief Request ANO I-R&R-0 10 Repair Nozzle Structural weld overlay on Pressurizer No 05/11/2007 Plan # 07-2034, WO 00082248 Safety valve PSV-1001 nozzle.

Relief Request ANO1-R&R-010

Page 3 of 3 UNIT 1 INTERVAL 3 PERIOD 3 (For Cycle 20)

CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND MAI OR WO NUMBER MEASURE DURING SCHEDULED SECTIONXI EXAMINATION OR TEST(YESINO)

Repair Nozzle Structural weld overlay on Pressurizer No 05/11/2007 Plan # 07-2035, WO 00082247 Safety valve PSV- 1002 nozzle.

Relief Request ANO I-R&R-0 10 Repair Nozzle Structural weld overlay on Pressurizer No 05/11/2007 Plan # 07-2036, WO 00082246 Spray nozzle and safe end.

Relief Request ANO I-R&R-0 10 Repair Nozzle Structural weld overlay on Pressurizer No 05/11/2007 Plan# 07-2037, WO 00082233 Surge nozzle.

.__Relief Request ANO I-R&R-0 10 Repair Nozzle Structural weld overlay on Steam No 05/11/2007 Plan# 07-2038, WO 00082378 Generator "A" Hot Leg Surge nozzle.

Relief Request ANO I-R&R-0 10 2 Replacement Valve Replaced valve MS-I I No 05/11/2007 Plan # 07-2041, WO 00093324 N-416-2 I Replacement Valve Replace Inlet flange fasteners for No 05/11/2007 Plan # 07-2043, WO 51031225 PSV-1001 I Replacement Valve Replace Inlet flange fasteners for No 05/11/2007 Plan # 07-2044, WO 00082247 PSV- 1002 T3 Replacement Support Modify support I-MS-188-H13 No 05/11/2007 Plan # 07-2045. WO 00090264 I Replacement Steam Replaced upper hand hole fasteners on No 05/04/2007 Plan # 07-2052, WO 00101443 Generator E-24A I Replacement Steam Replaced upper hand hole fasteners on No 05/07/2007 Plan # 07-2053, WO 00101407 Generator E-24B T3 Replacement Valve Replaced valve SW-604A No 05/01/2007 Plan # 07-2054, WO 00086544 N-416-2 2 Replacement Pipe Install spacer on discharge of PSV-1001 No 05/11/2007 Plan # 07-2055, WO 51031225 Replacement CRDM Replaced CRDM F4 Hold Down No 05/11/2007 Plan # 07-2057, WO 51031152 r_1_____ _ _ _ _Fasteners I I_._I Note: Table 3 is an abstract of all Repair/Replacement activities performed during cycle 20 to comply with site procedural requirements.

Attachment 2 1CAN080701 List of Regulatory Commitments

List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE SCHEDULED COMMITMENT (Check one) COMPLETION DATE (If Required)

ONE-TIME CONTINUING ACTION COMPLIANCE Entergy will submit a revision to Table 1 depicting X November 13, the final abstract of examinations and tests 2007 associated with this summary report.