Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections10 October 2023Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius SectionsFinite Element Analysis
Aging Management
License Renewal
Subsequent License Renewal
ML23235A17223 August 2023Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report
ML22019A26011 January 2022Transmittal of 2021 Owner'S Activity Report for the R. E. Ginna Nuclear Power Plant
ML21055A02019 February 2021Transmittal of 2020 Owner'S Activity ReportSafe Shutdown
Unanalyzed Condition
Anticipated operational occurrence
Safe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
Flow Induced Vibration
ML20036C5935 February 2020R. E. Ginna Nuclear Power Plant - Submittal of the Program Plan for the Lnservice Testing (IST) Program for the Sixth 10-Year IntervalSafe Shutdown
Boric Acid
Packing leak
High Radiation Area
Stroke time
Hydrostatic
Squib
Incorporated by reference
Surveillance Frequency Control Program
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Coast down
ML19178A01327 June 2019R. E. Ginna Nuclear Power Plant - Submittal of Relief Requests Associated with the Sixth Lnservice Inspection (ISI) IntervalBoric Acid
Finite Element Analysis
Aging Management
Weak link
ML19025A08018 January 2019Transmittal of 2018 Owner'S Activity Report
ML18347B03613 December 2018Relief Requests Associated with Sixth Ten-Year Lnservice Testing IntervalStroke time
Surveillance Frequency Control Program
ML16015A43514 January 2016Transmittal of 2015 Owner'S Activity ReportBoric Acid
Aging Management
Moisture barrier
ML14232A28112 August 2014Transmittal of 2014 Owner'S Activity Report for the R. E. Ginna Nuclear Power Plant
ML13070A0516 March 2013R. E. Ginna - Report of Facility Changes, Test, and Experiments Conducted Without Prior Commission ApprovalLicense Renewal
Flow Induced Vibration
ML12285A3595 October 2012R. E. Ginna Nuclear Power Plant - Response to Request for Additional Information Regarding Relief Request ISI-08 Examination of Reactor Pressure Vessel Upper Head Penetration NozzlesBoric Acid
Pressure Boundary Leakage
Pressure boundary leak
ML12117048124 April 2012Plant, Fifth Interval Inservice Inspection Program Submittal of 10 CFR 50.55a Relief Request Number ISI-06Nondestructive Examination
Aging Management
EVT-1
ML11255A12730 August 2011Transmittal of 2011 Owner'S Activity Report for the R. E. Ginna Nuclear Power Plant
ML11215A01229 July 2011Response to Request for Additional Information Fourth Interval Inservice Inspection Program Relief Requests Nos. ISI-02 and ISI-03Dissimilar Metal Weld
ML10362010516 December 2010CFR 50.55a Request ISI-02 and ISI-03: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR50.55a(g)(5)(iii) for the Fourth Interval Inservice Inspection (ISI) ProgramVT-2
Dissimilar Metal Weld
ML10005003430 December 2009Fifth Ten-Year Inservice Inspection Plan and Request for Approval of Alternative (Relief Request) to American Society of Mechanical Engineers Code, Section XIBoric Acid
Weld Overlay
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Incorporated by reference
Aging Management
Large early release frequency
Liquid penetrant
Dissimilar Metal Weld
ML09349100110 December 2009R. E. Ginna - Transmittal of 2009 Owner'S Activity Report for the Refueling Outage Conducted
ML0931400915 November 2009R. E. Ginna Nuclear Power Plant, Withdrawal of Relief Request VR-03 from the Fifth Ten-Year Inservice Test Program for Safety-Related Pumps and Valves
ML09275008528 September 2009R. E. Ginna Nuclear Power Plant - Withdrawal of License Amendment Request: Reporting of Reactor Vessel In-Service Inspection Information and Analysis in Support of Code Relief Request for Extension of Reactor Vessel In-Service Inspection In
ML09261043511 September 2009R. E. Ginna - Fifth Ten-Year Inservice Test Program for Safety-Related Pumps and ValvesSafe Shutdown
Boric Acid
High Radiation Area
Stroke time
Incorporated by reference
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Coast down
ML09153024822 May 2009Submittal of Fourth Interval Inservice Inspection Program, 10 CFR 50.55a Request Number 24Boric Acid
Fuel cladding
Pressure Boundary Leakage
ML0822702096 August 2008Transmittal of 2008 Owners Activity Report for the Refueling Outage Conducted in 2008
ML08140072210 May 2008Fourth Ten-Year Interval Inservice Inspection Program, Submittal of Relief Request Numbers 18, 19, 20, and 21Probabilistic Risk Assessment
Large early release frequency
Dissimilar Metal Weld
ML0920907894 January 2008Fourth Interval Inservice Inspection (ISI) Program, Rev. 7Boric Acid
Loop seal
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Aging Management
Moisture barrier
B.5.b Mitigating Strategies
Earthquake
Liquid penetrant
Dissimilar Metal Weld
Scaffolding
ML07038026130 January 2007R. E. Ginna Nuclear - Transmittal of Inservice Inspection Report for the Fourth Interval (2000-2009), Second Period, Third Outage (2006) - ISI and First Interval (1997-2008), Third Period, First Outage (2006) - Iwe/IwlBoric Acid
VT-2
Moisture barrier
Liquid penetrant
ML0519301151 July 2005Transmittal of Inservice Inspection Report for the Fourth Interval (2000-2009), Second Period, Second Outage (2005) - ISI and First Interval (1997-2008), Second Period, Third Outage (2005) - Iwe/IwlBoric Acid
Packing leak
VT-2
Moisture barrier
Liquid penetrant
ML05109025514 April 2005Supplemental Information Regarding Outage 2003 Inservice Inspection Report R.E. Ginna Nuclear Power Plant
ML04022018513 January 2004Transmittal of Inservice Inspection Report for the Fourth Interval (2000-2009), Second Period, First Outage (2003) - ISI and First Interval (1997-2008), Second Period, Second Outage (2003) - Iwe/Iwl R.E. Ginna Nuclear Power PlantBoric Acid
Weld Overlay
Hydrostatic
VT-2
Liquid penetrant
ML0322603388 August 2003Submittal of Relief Request VR-8 Related to Requirements of 10CFR50.55a(f), Inservice Testing Requirements.Incorporated by reference
Cold shutdown justification
ML0301404029 January 2003Inservice Testing Program Relief Request PR-2Incorporated by reference
ML0219602579 July 2002Inservice Inspection Report for Fourth Interval (2000-2009), First Period, Second Outage (2002) - ISI & First Interval (1997-2008), Second Period, First Outage (2002) Iwe/IwlBoric Acid
VT-2
Liquid penetrant