Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections | 10 October 2023 | Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections | Finite Element Analysis Aging Management License Renewal Subsequent License Renewal |
ML23235A172 | 23 August 2023 | Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report | |
ML22019A260 | 11 January 2022 | Transmittal of 2021 Owner'S Activity Report for the R. E. Ginna Nuclear Power Plant | |
ML21055A020 | 19 February 2021 | Transmittal of 2020 Owner'S Activity Report | Safe Shutdown Unanalyzed Condition Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis Flow Induced Vibration |
ML20036C593 | 5 February 2020 | R. E. Ginna Nuclear Power Plant - Submittal of the Program Plan for the Lnservice Testing (IST) Program for the Sixth 10-Year Interval | Safe Shutdown Boric Acid Packing leak High Radiation Area Stroke time Hydrostatic Squib Incorporated by reference Surveillance Frequency Control Program Cold shutdown justification Power-Operated Valves Power Operated Valves Coast down |
ML19178A013 | 27 June 2019 | R. E. Ginna Nuclear Power Plant - Submittal of Relief Requests Associated with the Sixth Lnservice Inspection (ISI) Interval | Boric Acid Finite Element Analysis Aging Management Weak link |
ML19025A080 | 18 January 2019 | Transmittal of 2018 Owner'S Activity Report | |
ML18347B036 | 13 December 2018 | Relief Requests Associated with Sixth Ten-Year Lnservice Testing Interval | Stroke time Surveillance Frequency Control Program |
ML16015A435 | 14 January 2016 | Transmittal of 2015 Owner'S Activity Report | Boric Acid Aging Management Moisture barrier |
ML14232A281 | 12 August 2014 | Transmittal of 2014 Owner'S Activity Report for the R. E. Ginna Nuclear Power Plant | |
ML13070A051 | 6 March 2013 | R. E. Ginna - Report of Facility Changes, Test, and Experiments Conducted Without Prior Commission Approval | License Renewal Flow Induced Vibration |
ML12285A359 | 5 October 2012 | R. E. Ginna Nuclear Power Plant - Response to Request for Additional Information Regarding Relief Request ISI-08 Examination of Reactor Pressure Vessel Upper Head Penetration Nozzles | Boric Acid Pressure Boundary Leakage Pressure boundary leak |
ML121170481 | 24 April 2012 | Plant, Fifth Interval Inservice Inspection Program Submittal of 10 CFR 50.55a Relief Request Number ISI-06 | Nondestructive Examination Aging Management EVT-1 |
ML11255A127 | 30 August 2011 | Transmittal of 2011 Owner'S Activity Report for the R. E. Ginna Nuclear Power Plant | |
ML11215A012 | 29 July 2011 | Response to Request for Additional Information Fourth Interval Inservice Inspection Program Relief Requests Nos. ISI-02 and ISI-03 | Dissimilar Metal Weld |
ML103620105 | 16 December 2010 | CFR 50.55a Request ISI-02 and ISI-03: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR50.55a(g)(5)(iii) for the Fourth Interval Inservice Inspection (ISI) Program | VT-2 Dissimilar Metal Weld |
ML100050034 | 30 December 2009 | Fifth Ten-Year Inservice Inspection Plan and Request for Approval of Alternative (Relief Request) to American Society of Mechanical Engineers Code, Section XI | Boric Acid Weld Overlay Internal Flooding Hydrostatic Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Aging Management Large early release frequency Liquid penetrant Dissimilar Metal Weld |
ML093491001 | 10 December 2009 | R. E. Ginna - Transmittal of 2009 Owner'S Activity Report for the Refueling Outage Conducted | |
ML093140091 | 5 November 2009 | R. E. Ginna Nuclear Power Plant, Withdrawal of Relief Request VR-03 from the Fifth Ten-Year Inservice Test Program for Safety-Related Pumps and Valves | |
ML092750085 | 28 September 2009 | R. E. Ginna Nuclear Power Plant - Withdrawal of License Amendment Request: Reporting of Reactor Vessel In-Service Inspection Information and Analysis in Support of Code Relief Request for Extension of Reactor Vessel In-Service Inspection In | |
ML092610435 | 11 September 2009 | R. E. Ginna - Fifth Ten-Year Inservice Test Program for Safety-Related Pumps and Valves | Safe Shutdown Boric Acid High Radiation Area Stroke time Incorporated by reference Cold shutdown justification Power-Operated Valves Power Operated Valves Coast down |
ML091530248 | 22 May 2009 | Submittal of Fourth Interval Inservice Inspection Program, 10 CFR 50.55a Request Number 24 | Boric Acid Fuel cladding Pressure Boundary Leakage |
ML082270209 | 6 August 2008 | Transmittal of 2008 Owners Activity Report for the Refueling Outage Conducted in 2008 | |
ML081400722 | 10 May 2008 | Fourth Ten-Year Interval Inservice Inspection Program, Submittal of Relief Request Numbers 18, 19, 20, and 21 | Probabilistic Risk Assessment Large early release frequency Dissimilar Metal Weld |
ML092090789 | 4 January 2008 | Fourth Interval Inservice Inspection (ISI) Program, Rev. 7 | Boric Acid Loop seal Hydrostatic Coatings Nondestructive Examination VT-2 Aging Management Moisture barrier B.5.b Mitigating Strategies Earthquake Liquid penetrant Dissimilar Metal Weld Scaffolding |
ML070380261 | 30 January 2007 | R. E. Ginna Nuclear - Transmittal of Inservice Inspection Report for the Fourth Interval (2000-2009), Second Period, Third Outage (2006) - ISI and First Interval (1997-2008), Third Period, First Outage (2006) - Iwe/Iwl | Boric Acid VT-2 Moisture barrier Liquid penetrant |
ML051930115 | 1 July 2005 | Transmittal of Inservice Inspection Report for the Fourth Interval (2000-2009), Second Period, Second Outage (2005) - ISI and First Interval (1997-2008), Second Period, Third Outage (2005) - Iwe/Iwl | Boric Acid Packing leak VT-2 Moisture barrier Liquid penetrant |
ML051090255 | 14 April 2005 | Supplemental Information Regarding Outage 2003 Inservice Inspection Report R.E. Ginna Nuclear Power Plant | |
ML040220185 | 13 January 2004 | Transmittal of Inservice Inspection Report for the Fourth Interval (2000-2009), Second Period, First Outage (2003) - ISI and First Interval (1997-2008), Second Period, Second Outage (2003) - Iwe/Iwl R.E. Ginna Nuclear Power Plant | Boric Acid Weld Overlay Hydrostatic VT-2 Liquid penetrant |
ML032260338 | 8 August 2003 | Submittal of Relief Request VR-8 Related to Requirements of 10CFR50.55a(f), Inservice Testing Requirements. | Incorporated by reference Cold shutdown justification |
ML030140402 | 9 January 2003 | Inservice Testing Program Relief Request PR-2 | Incorporated by reference |
ML021960257 | 9 July 2002 | Inservice Inspection Report for Fourth Interval (2000-2009), First Period, Second Outage (2002) - ISI & First Interval (1997-2008), Second Period, First Outage (2002) Iwe/Iwl | Boric Acid VT-2 Liquid penetrant |