Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23068A107 | 8 March 2023 | End of Cycle 21 Steam Generator Tube Inspection Report Supplement | |
ML22300A100 | 27 October 2022 | End of Cycle 21 Steam Generator Tube Inspection Report | Nondestructive Examination |
ML22213A120 | 19 August 2022 | Inservice Inspection Program - Owner'S Activity Report, Refueling Outage 21 | |
ML21336A625 | 1 December 2021 | Inservice Inspection Program, Owner'S Activity Report, Refueling Outage 27 | Moisture barrier |
ML21014A226 | 21 December 2020 | Inservice Inspection Program Owner'S Activity Report, Refueling Outage 20 | |
ML20268A225 | 23 September 2020 | ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Third Period of the Fourth 10-Year Inspection Interval | VT-2 Through-Wall Leakage |
ML20198M682 | 15 July 2020 | Alternate Request RR-05-06 - Inspection Interval Extension for Steam Generator Pressure Retaining Welds and Full-Penetration Welded Nozzles | Finite Element Analysis |
ML20076A549 | 14 March 2020 | Alternative Request IR-4-03 for Use of an Alternative Non-Code Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping | Mission time Weld Overlay Internal Flooding Code Reconciliation Through-Wall Leak |
ML20049A088 | 17 February 2020 | ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Second Period of the Third 10-Year Inspection Interval | VT-2 Liquid penetrant Through-Wall Leakage |
ML20048A006 | 11 February 2020 | ASME Section XI Inservice Inspection Program: Relief Request for Limited Coverage Examinations Performed in the Second Period of the Fourth 10-Year Inspection Interval | VT-2 Through-Wall Leak |
ML19275D254 | 19 September 2019 | End of Cycle 19 Steam Generator Tube Inspection Report | Nondestructive Examination |
ML19211B167 | 23 July 2019 | Inservice Inspection Program - Owner'S Activity Report, Refueling Outage 19 | |
ML19100A126 | 19 March 2019 | Inservice Inspection Program Interval Change | |
ML19023A024 | 11 January 2019 | Submittal of Inservice Inspection Program - Owner'S Activity Report, Refueling Outage 25 | Boric Acid |
ML18114A105 | 19 April 2018 | End of Cycle 18 Steam Generator Tube Inspection Report | Nondestructive Examination |
ML18066A078 | 1 March 2018 | In-service Testing Program for Pumps, Valves, & Snubbers Fifth & Fourth 10-Year Interval Updates for Units 2 & 3 | Safe Shutdown Unanalyzed Condition Boric Acid Time of Discovery Stroke time Temporary Modification Incorporated by reference Locked High Radiation Area Cold shutdown justification Earthquake Power Operated Valves Fire Protection Program Grace period Downpower |
ML18031A093 | 24 January 2018 | Inservice Inspection Program - Owner'S Activity Report, Refueling Outage 18 | |
ML17269A030 | 18 September 2017 | End of Cycle 24 Steam Generator Tube Inspection Report | Nondestructive Examination |
ML17187A136 | 27 June 2017 | Inservice Inspection Program, Owner'S Activity Report, Refueling Outage 24 | |
ML16222A351 | 2 August 2016 | Submittal of End of Cycle 17 Steam Generator Tube Inspection Report | Nondestructive Examination |
ML16214A243 | 25 July 2016 | Inservice Inspection Program, Owner'S Activity Report, Refueling Outage 17 | |
ML16033A471 | 22 January 2016 | Inservice Inspection Program, Owner'S Activity Report, Refueling Outage 23 | |
ML15356A375 | 14 December 2015 | End-of-Cycle 23 Steam Generator Tube Inspection Report | Nondestructive Examination |
ML15049A293 | 9 February 2015 | Inservice Inspection Program - Owner'S Activity Report, Refueling Outage 16 | |
ML15050A041 | 9 February 2015 | End of Cycle 16 Steam Generator Tube Inspection Report | Nondestructive Examination |
ML15033A373 | 26 January 2015 | Response to Second Request for Addition Information Regarding Aging Management Program Description: Inservice Inspection - Reactor Vessel Internals, License Renewals Commitment #13 | Aging Management |
ML14220A016 | 1 August 2014 | Inservice Inspection Program - Owner'S Activity Report, Refueling Outage 22 | |
ML14206A837 | 21 July 2014 | Response to Request for Additional Information Regarding Aging Management Program Description: Inservice Inspection - Reactor Vessel Internals, License Renewal Commitment #13 (MF3402) | Aging Management EVT-1 Power change |
ML14188B190 | 26 June 2014 | End of Cycle 22 Steam Generator Tube Inspection Report | Non-Destructive Examination Nondestructive Examination |
ML14143A408 | 20 May 2014 | Examination Summary and Coverage Results ASME Section XI Inservice Inspection Program Alternative Request RR-04-15, Limited One-Sided Ultrasonic Examination Technique | |
ML14051A109 | 7 February 2014 | Response to Request for Additional Information Regarding ASME Section XI Inservice Inspection Program Alternative Request RR-04-15, Limited One-Sided Ultrasonic Examination Technique | Dissimilar Metal Weld |
ML13284A065 | 2 October 2013 | End of Cycle 15 Steam Generator Tube Inspection Report | Nondestructive Examination |
ML13218A264 | 31 July 2013 | Information in Support of License Renewal Commitment #13 Program Description for Reactor Vessel Internals Inspections | Aging Management EVT-1 Flow Induced Vibration |
ML13045A486 | 5 February 2013 | Inservice Inspection Program-Owner's Activity Report, Refueling Outage 21 | |
ML12151A359 | 7 June 2012 | End of Cycle 20 Steam Generator Tube Inservice Inspection Report Review | |
ML12109A044 | 6 April 2012 | End of Cycle 14 Steam Generator Tube Inspection Report | Nondestructive Examination |
ML11207A464 | 18 July 2011 | Inservice Inspection Program - Owner'S Activity Report, Refueling Outage 20 | |
ML110250259 | 20 January 2011 | Request for Additional Information Regarding Relief Requests for Limited Coverage Examinations Performed in the Second 10-Year Inspection Interval | Boric Acid Hydrostatic Nondestructive Examination VT-2 Liquid penetrant |
ML102220527 | 5 August 2010 | Fourth 10-Year Interval Inservice Inspection Program | Weld Overlay Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld |
ML102580204 | 29 July 2010 | Fourth 10-Year Interval Inservice Inspection Program and Associated Proposed Alternatives and Relief Request | Boric Acid High Radiation Area Weld Overlay Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld |
ML102150071 | 25 July 2010 | Inservice Inspection Program - Owner'S Activity Report | Coatings |
ML100640456 | 5 March 2010 | CFR50.55a Relief Request IR-3-14, Update to the Risk-Informed Inservice Inspection Program for the Third 10-Year Inspection Interval | Mission time Internal Flooding Probabilistic Risk Assessment Nondestructive Examination VT-2 Significance Determination Process Large early release frequency |
ML100501163 | 4 February 2010 | Inservice Inspection Program - Owner'S Activity Report for Refueling Outage 19 | |
ML091310666 | 28 April 2009 | Third 10-year Interval Inservice Inspection Program and Associated Proposed Alternatives and Relief Requests | Boric Acid High Radiation Area Safe Shutdown Earthquake Weld Overlay Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld DM weld Scaffolding Weak link |
ML090850344 | 13 March 2009 | Submittal of End of Cycle 12 Steam Generator Tube Inspection Report | Nondestructive Examination |
ML090570048 | 13 February 2009 | Submittal of Inservice Inspection Program - Owner'S Activity Report for 05/20/07 Through Refueling Outage 12, 11/24/08 | |
ML082410415 | 7 August 2008 | Submittal of Inservice Inspection Program - Owner'S Activity Report | Boric Acid |
ML081140138 | 11 April 2008 | Submittal of 2007 Steam Generator Tube Inspection Report | Nondestructive Examination |
ML073531256 | 7 December 2007 | Inservice Testing Program 10-Year Interval End Date Changes | |
ML072260428 | 3 August 2007 | Inservice Inspection Program - Owner'S Activity Report for Refueling Outage 11 | Weld Overlay VT-2 Dissimilar Metal Weld |