AEP-NRC-2015-65, Form OAR-1, Owner'S Activity Report

From kanterella
Jump to navigation Jump to search
Form OAR-1, Owner'S Activity Report
ML15203B080
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/21/2015
From: Lies Q
American Electric Power, Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2015-65
Download: ML15203B080 (6)


Text

INDIANA Indiana Michigan Power MICHIGAN Cook Nuclear Plant POWERr One Cook Place Bridgman, MI 49106 A unit of American Electric Power Indiana Michigan Power.com July 21, 2015 AEP-NRC-2015-65 10 CFR 50.55a Docket No.: 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Unit 2 Form OAR-i, Owner's Activity Report This letter provides a copy of Form OAR-i, Owner's Activity Report, for inservice inspection activities performed at Donald C. Cook Nuclear Plant Unit 2 through the completion of the Unit 2 Cycle 22 refueling outage. This report meets the requirements of the American Society of Mechanical Engineers (ASME) Code Case N-532-4, "Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission," Section Xl, Division 1.

This code case is used as an alternative to the requirements of the ASME Boiler and Pressure Vessel Code, Section Xl, Article IWA-6000, as approved by Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability, ASME Section Xl, Division 1," Revision 17, for the current inspection interval.

The Authorized Code Inspection Company is OneCIS Insurance Co., of Lynn, Massachusetts. The Authorized Nuclear Inspector is Reuel Schenck.

There are no new or revised commitments in this letter. Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.

Sincerely, Q e Lies Engineering Vice President RAW/rdw

Enclosure:

Form OAR-i, Owner's Activity Report for the Donald C. Cook Nuclear Plant Unit 2 Cycle 22 Refueling Outage AC-1+7

U. S. Nuclear Regulatory Commission AEP-NRC-2015-65 Page 2 c: A. W. Dietrich - NRC Washington DC C. D. Pederson - NRC Region III J. T. King - MPSC, w/o enclosure MDEQ - RMD/RPS, w/o enclosure NRC Resident Inspector A. J. Williamson - AEP Ft. Wayne, w/o enclosure

ENCLOSURE TO AEP-NRC-2015-65 FORM OAR-i, OWNER'S ACTIVITY REPORT FOR THE DONALD C. COOK NUCLEAR PLANT UNIT 2 CYCLE 22 REFUELING OUTAGE

D. C. Cook Nuclear Unit 2 Form OAR-1 Owner's Activity Report Report Number 2-2015-4-2-02 Plant Donald C Cook Nuclear Plant, One Cook Place, Bridgman, Michigan 49106 (Name and Address of Plant)

Unit No. 2 Commercial Service Date 7/1/1978 Refueling Outage No. U2C22 (if applicable)

Current Inspection Interval 4th for Components and Supports (C&S) and 2nd for Containment ISI (CISI) Program (1st. 2nd, 3rd, 4th, other)

Current Inspection Period 2nd for C&S and 2nd for CISI (1st. 2nd, 3rd)

Edition and Addenda of Section Xl applicable to the inspection plans 2004 Edition/No Addenda Date and Revision of inspection plans 6/17/2014; Revision 4 for C&S, and 4/8/2014, Revision 3 for CISI Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans Edition and Addenda are the same as the Inspection Plans Code Case used: N-526, N-566-2, N-624, N-716, N-722-1, for C&S and N-649 for CISI (If applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/re lace nt activities and evaluations supporting the completion of U2C22 conform to the requirements of ection Xl. (Refueling Outage Number)

Signed .=., I**.)';Z ýqj% -t..C,,C Q__ Date___" (* Z-0t Owners or Ownersr".eSg , Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by One CIS Insurance Co. of Lynn, MA have inspected the items described in this Owners ActivityReport, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

1 e-.LAC CP V.- cheot,.' k/7z/4IL. Commissions Michigan 300959, NB 11412, Endorsements: A, N, I, NS, IS, & B Inspectors Signature National Board, State, Province, and Endorsements Date 0 __

Pagel of 3

D. C. Cook Nuclear Unit 2 Table I Items with flaws or relevant conditions that required evaluation for continued service Examination Item Number Item Description Evaluation Description Category The extension piece for snubber 2-GCCW-S843 has a coupler in the middle and the two pieces of the extension piece have a slight bend/skew angle (approximately 5 F-A F1.30WS 2-GCCW-S843, Snubber with extension arm piece degrees) between them. This slight bend is not reflected in the design drawing; hence the discrepancy is that the installed support configuration does not match the design drawing. Acceptable.

Page 2 of 3

D. C. Cook Nuclear Unit 2 Table 2 Abstract of repair/replacement activities required for continued service Code Class Item Description Description of Work Date Complete Repair/Replacement Plan Number 2 Piping Isometric 2-NSW-1 10 Sheet 2 Weld repair of localized thinning 4/4/15 Work Order Task 55459585-11 Page 3 of 3