Special Report 08-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refuel Outage 15
ML081550284
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/30/2008
From: Cahill S
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0508-03, Special Report 08-01
Download: ML081550284 (112)


Text

k Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 50.36 May 30, 2008 3F0508-03 U.S. Nuclear Regulatory Commission Attn. Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Special Report 08-01: Results of the Once-Through Steam Generator Tube (OTSG) Inservice Inspection Conducted During Refuel Outage 15

Dear Sir:

Florida Power Corporation (FPC), doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR3) Special Report 08-01, "Results of the Once-Through Steam Generator (OTSG) Tube Inservice Inspection Conducted During Refuel Outage 15."

This submittal fulfills the requirements of CR3 Improved Technical Specification (ITS) 5.7.2.c, which requires submittal of this report to the Nuclear Regulatory Commission within 180 days after initial entry into MODE 4 following completion of the inspection. Entry into MODE 4 following the CR3 Refuel Outage 15 occurred on December 3, 2007. One hundred eighty days from this date is May 31, 2008.

As required by ITS 5.7.2.c, Special Report 08-01 (the attachment to this document) provides the following information:

1. The scope of inspections performed on each OTSG,
2. Active degradation mechanisms found,
3. Nondestructive examination techniques utilized for each degradation mechanism,
4. Location, orientation (if linear), and measured sizes (if available) of service induced indications,
5. Number of tubes plugged or repaired during the inspection outage for each active degradation mechanism,
6. Total number and percentage of tubes plugged or repaired to date,
7. The results of condition monitoring, including the results of tube pulls and in-situ testing,
8. The effective plugging percentage for all plugging and tube repairs in each OTSG,
9. Repair method utilized and the number of tubes repaired by each repair method, Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428

U.S. Nuclear Regulatory Commission Page 2 of 2 3F0508-03

10. Location, bobbin coil amplitude, and axial and circumferential extent (if determined) for each first span Intergranular Attack (IGA) indication, and as assessment of growth for indications in the first span of OTSG B, and
11. Number of as-found and as-left tubes with tube end crack (TEC) indications, number of as-found and as-left TEC indications, the number of as-found and as-left TEC indications as a function of tubesheet radius, the as-found, as-left, probability of detection and new TEC leakage for upper and lower tubesheet indications. The projected accident leakage and an assessment of growth for TEC indications will be provided. An assessment of the adequacy of the predictive methodology in Addendum C to Topical Report BAW-2346P, Revision 0, including assessing the distribution of indications found in each OTSG to ensure the assumption regarding the similarity of the distribution of indications remain consistent from one cycle to the next and that the assumption of a linear increase in leak rate remain valid. Corrective actions in the event that the assessment indicates the assumptions can not be fully supported.

Additionally, FPC is providing an evaluation of primary-to-secondary leakage following a Large Break Loss of Coolant Accident based on the as-found condition of the CR3 steam generators.

This letter establishes no new regulatory commitments.

If you have any questions regarding this submittal, please contact Mr. Dennis Herrin, Acting Supervisor, Licensing and Regulatory Programs at (352) 563-4633.

Sincerely, Stephen J. Cahill Engineering Manager SJC/dar

Attachment:

Special Report 08-01: Results of the Once-Through Steam Generator (OTSG)

Tube Inservice Inspection Conducted During Refuel Outage 15 xc: NRR Project Manager Regional Administrator, Region II Senior Resident Inspector

PROGRESS ENERGY FLORIDA, INC.

CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302/LICENSE NUMBER DPR-72 ATTACHMENT SPECIAL REPORT 08-01 RESULTS OF THE ONCE-THROUGH STEAM GENERATOR (OTSG)

TUBE INSERVICE INSPECTION CONDUCTED DURING REFUEL OUTAGE 15 Table of Contents Attachment Special Report 08-01: Results of the Once-Through Steam Generator (OTSG)

Tube Inservice Inspection Conducted During Refuel Outage 15 Appendix 1 Tubes Left In-Service With Through-Wall Indications 1%-39%

Appendix 2 First Span IGA in OTSG-B Appendix 3 Service Induced Indications - Plugged in 15R Appendix 4 Service Induced Indications - Rerolled in 15R Appendix 5 OTSG-B First Span IGA Graphs

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 1 of 20 SPECIAL REPORT 08-01 RESULTS OF THE ONCE-THROUGH STEAM GENERATOR (OTSG) TUBE INSERVICE INSPECTION CONDUCTED DURING REFUEL OUTAGE 15 Introduction Inservice inspection (ISI) of the Crystal River Unit 3 (CR3) Once-Through Steam Generator (OTSG) tubes was performed during Refuel Outage 15 (15R), November 3 through December 7, 2007. In accordance with Improved Technical Specifications (ITS) Section 5.7.2.c, Reporting Requirements, Progress Energy is submitting Special Report 08-01. A diagram of an OTSG is attached in Figure 9.

ITS Section 5.7.2.c states:

A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.6.2.10, Steam Generator (OTSG)

Program. The report shall include:

1. The scope of inspectionsperformed on each OTSG,
2. Active degradationmechanismsfound,
3. Nondestructive examination techniques utilizedfor each degradationmechanism,
4. Location, orientation (if linear), and measured sizes (if available)of service induced indications,
5. Number of tubes plugged or repairedduring the inspection outage for each active degradation mechanism,
6. Total number andpercentage of tubes plugged or repairedto date,
7. The results of condition monitoring,including the results of tube pulls and in-situ testing,
8. The effective pluggingpercentagefor allplugging and tube repairsin each OTSG,
9. Repair method utilized and the number of tubes repairedby each repairmethod,
10. Location, bobbin coil amplitude, and axial and circumferential extent (if determined)for each first span IGA indication,and as assessment of growthfor indications in the first span of OTSG B, and I/. Number of as-found and as-left tubes with TEC indications,number of as-found and as-left TEC indications,the number of as-found and as-left TEC indications as a function of tubesheet radius, the as-found, as-left, probabilityof detection and new TEC leakagefor upper and lower tubesheet indications. The projected accident leakage and an assessment of growth for TEC indications will be provided. An assessment of the adequacy of the predictive methodology in Addendum C to Topical Report BA W-2346P, Revision 0, including assessing the distribution of indications found in each OTSG to ensure the assumption regarding the similarity of the distribution of indications remain consistent from one cycle to the next and that the assumption of a linear increase in leak rate remain valid. Corrective actions in the event that the assessment indicates the assumptions can not be fully supported.

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 2 of 20 Additionally, CR3 is providing the primary-to-secondary leakage following a Large Break Loss of Coolant Accident (LBLOCA) evaluation.

Demonstrate that the primary-to-secondaryleakage following a LBLOCA, as described in Appendix A to Topical Report BA W-2374, Revision 1 is acceptable based on the as-found condition of the steam generators.

The following information is presented to satisfy ITS Section 5.7.2.c requirements:

1. The scope of inspections Performedon each OTSG The bobbin coil was used to examine the following specific areas:

100% of the tubes in service from the secondary-side face of the upper tubesheet (UTS) to the secondary-side face of the lower tubesheet (LTS) in both OTSGs (15,021 tubes in OTSG-A, 14,513 in OTSG-B), excluding the UTS sleeved tubes (159 sleeves in OTSG-A and 156 in OTSG-B) which were examined from the LTS to the lower sleeve end.

  • 80% of the tubes in service in the LTS (LTS to lower tube end [LTE]) of OTSG-A.
  • 100% of the tubes (indications) in OTSG-B identified with first span Intergranular Attack (IGA).

(Note that these types of indications do not apply to OTSG-A.)

  • 100% of the new reroll repairs.

Indications identified using the bobbin coil were further characterized using motorized rotating pancake coil (MRPC, containing 0.115" pancake coil and a +Pointm" coil). MRPC is qualified to detect the known and potential degradation mechanisms, primary water stress corrosion cracking (PWSCC), IGA, and outside diameter stress corrosion cracking (ODSCC) in the tubesheet regions and sleeved tubes.

MRPC was used to examine the following specific areas:

0 100% UTS from the upper tube end (UTE) to the secondary-side face (UTE/UTS).

  • 100% lower tubesheet from the LTE to the secondary-side face in OTSG-B (LTE/LTS).
  • 20% lower tubesheet from the tube end to the secondary-side face (LTE/LTS) in OTSG-A.
  • 100% LTE region (LTE plus three inches) in OTSG-A.
  • 20% LTS sludge pile in the kidney region.
  • 34% tubes in the lane and wedge region (UTS and fifteenth Support Plate).
  • 34% sleeved tubes (roll regions UTE and fifteenth Support Plate).
  • 100% previously identified dents above 12S tube support plate (TSP).
  • 100% new dents in any region of the OTSG.
  • 20% of dents > 5 volts below 12S TSP.
  • 100% of Alloy 600 rolled plugs.
  • Further characterization of indications identified by the bobbin coil exam (Special Interest).

0 100% of the tubes (indications) in OTSG-B identified with first span IGA.

  • 100% of the new reroll repairs.

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 3 of 20

2. Active degradationmechanisms found The inspection in the 15R outage identified the following forms of active or existing steam generator tubing degradation mechanisms:

0 Upper bundle axial ODSCC/IGA Axial ODSCC/IGA in the UTS Crevice

  • Axial ani circumierential F"WSU in roll expansion regions
  • General volumetric degradation
  • Wear at tube support locations
  • Volumetric degradation in the first span Alternate Repair Criteria (ARC) region, OTSG-B
  • Tube end cracks (TECs) confined exclusively to the depth of the tubesheet clad
3. Nondestructive examination techniques utilized for each detradationmechanism CR3 15R Eddv Current Technioues for each Degradation Mechanism Site Industry Qualification Damage Demonstrated Extended Technique Mechanism Applicability Applicability Drill TSP, Possible Bobbin' Areva Document Wear Broach TSP Loose Parts (PLP) 77-5011531-00 Wear, Tube-To-Tube Wear Examination Technical Lower Tubesheet 2 Bobbin Specification Sheet IGA Upper Tubesheet Crevice Outside (ETSS) 96009.1, Rev. 7 Kidney Region Areva Documents 3 51-5000276-00 OTSG-B First None 77-1258722-00 Span 77-5002925-06 ETSS 96007.1, Rev. 11 Freespan, Broach ETSS 96008.1, Rev. 14 Axial TSP, Drill TSP, 3 Bobbin Areva Documents ODSCC Eggcrate TSP, None 77-1258722-00 77-5002925-06 Sludge Pile 4 Bobbin ETSS 96002.1, Rev. 11 Impingement Broach TSP None ETSS 96910.1, Rev. 10 Drill TSP, PLP Wear, 5 +PointTM Areva Document Wear Broach TSP Tube-To-Tube Wear, 51-5019220-02 General Volumetric Degradation Broach TSP, Drill TM Circ Expansion TSP, Freespan, Sludge

+Point ETSS 20510.1, Rev. 7 PWSCC Transition Pile, Tubesheet Crevice, Tube Roll, Plug Broach TSP, Drill tTM ETSS 20511.1, Rev. 8 Axial Expansion TSP, Freespan, Sludge 6 +Point ETSS 96703.1, Rev. 17 PWSCC Transition, Dent Pile, Tubesheet Crevice, Tube Roll, Plug

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 4 of 20 Site Industry Qualification Damage Demonstrated Extended Technique Mechanism Applicability Applicability Broach TSP, Drill 7 +PointTM ETS ETSSS 21410.1, 22842.3, Rev.

Rev. 65 Circ ODSCC Expansion Transition, Dent TSP, Freespan, Sludge Pile, Tubesheet Crevice, Tube Roll Broach TSP, Drill Rev. 5 ,Axial TSP, Freespan,

+Point TM ETSS 21409.1, ETSS 22401.1, Rev. 4 ODSCC Sludge Pile, Tube Roll Tubesheet Crevice, Dent Sleeve ETSS 96912.1, Rev. 11 Axial and Sleeve/Parent 8 +PointTM ETSS 96912.2, Rev. 11 Circ ODSCC Tubing None Sleeve Same as Tube 9 Bobn Bobbin Same as Tube Bobbin Various Bobb Bobbin None ETSS 20400, Rev. 5 Axial and ETSS 20402, Rev. 5 Circ Expansion ETSS 20403, Rev. 5 ODSCC, Transitions, Tubesheet Crevice, 10 X-Probe ETSS 20500, Rev. 4 Axial and Support Structures, Sludge Pile (77-ETSS 20501, Rev. 4 Circ Freespan, Dented 5013521-00)

ETSS 20502, Rev. 4 PWSCC, Support Structures ETSS 24998.1, Rev. 1 TSP Wear

4. Location, orientation (if linear), and measuredsizes (if available) of service induced indications The eddy current sizing techniques used during the 15R inspection are qualified to determine wear percent through-wall degradation (TWD) at TSPs and at OTSG-B first span IGA indications. A complete list of inspection results for in-service tubes with wear indications 1% to 39% through-wall in OTSG-A and OTSG-B is provided in Appendix 1 of this Attachment. No tubes were found with

> 40% through-wall degradation at any TSP location. Additionally, a complete listing of tubes with first span IGA indications in OTSG-B is provided in Appendix 2. No IGA tubes were found with

_ 40% through-wall indications.

The remaining service-induced indications include the repairable "I-Code" indications. This includes codes for single axial indication (SAI), single circumferential indication (SCI), single volumetric indication (SVI), multiple axial indication (MAI), multiple circumferential indication (MCI), and multiple volumetric indication (MVI). Appendix 3 lists the tubes with service induced indications that were plugged during 15R. Appendix 4 lists the tubes with service induced indications that were reroll repaired during 15R. Both Appendix 3 and Appendix 4 identify the type of indication and, therefore, the orientation of the indication. For example, a SCI code would mean that the indication was circumferentially orientated and a SAI code means it is axially orientated. The measured sizes used for the condition monitoring assessment (length in the axial or circumferential direction and percent through-wall) are also given.

5. Number of tubes plugged or repaired during the inspection outage for each active degradation mechanism No new tubes were sleeved during the 15R outage. The number of tubes plugged or repaired (rerolled) during the 15R outage for each active degradation mechanism is presented below:

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 5 of 20 Tubes Plugged by Degradation Mechanism Damage Mechanism Number of Tubes Plugged OTSG-A OTSG-B Upper Bundle Axial ODSCC/IGA 22 31 Axial ODSCC/IGA in the Upper Tubesheet Crevice 0 3 Axial and Circumferential PWSCC In Roll Expansion Regions 3 20 General Volumetric Degradation 7 3 Wear at Tube Support Locations 0 0 Volumetric Degradation in the First Span ARC Region, B Steam 0 0 Generator TECs confined exclusively to the depth of the tubesheet clad 71 9 Total Tubes Plugged for Service Induced Degradation 103 66*

  • The number of unique tubes plugged is actually 65 because one tube was plugged for an indication in both the upper bundle and in the upper tubesheet crevice region.

Tubes Repair Rolled by Degradation Mechanism Damage Mechanism Number of Tubes Rerolled OTSG-A OTSG-B Upper Bundle Axial ODSCC/IGA 0 0 Axial ODSCC/IGA in the Upper Tubesheet Crevice 0 1 Axial and Circumferential PWSCC In Roll Expansion Regions 15 18 General Volumetric Degradation 1 2 Wear at Tube Support Locations 0 0 Volumetric Degradation in the First Span ARC Region, B Steam 0 0 Generator TECs confined exclusively to the depth of the tubesheet clad (Not 14 118 including Axial TECs (SAA and MAA))

Total Tubes Rerolled for Service Induced Degradation 30 7 139*

  • The number of unique tubes rerolled is actually 138 because one tube was repaired by reroll for an indication in both the upper tubesheet crevice region and the tube end clad region.

Tubes identified with unacceptable indications were plugged with Alloy 690 plugs roll-expanded into both ends of the tube. Tubes were stabilized, as needed, based on the latest Areva stabilization criteria.

6. Total number and Percentageof tubes plugged or repairedto date At the conclusion of the 15R outage, the following total number and percentage of plugs and in-service repairs (sleeves and rerolls) are installed in each steam generator. Each percentage number is based on 15,531 tubes per steam generator for plugs and sleeves. The reroll percentage is based on each tube end with 15,531 tubes.

OTSG-A OTSG-B Number of Plugs or Repairs Percent of Number of Plugs or Repairs Percent of Total Tubes Total Tubes Plugs = 455 2.9% Plugs = 928 6.0%

In-Service Sleeves = 159 1.0% In-Service Sleeves = 156 1.0%

In-Service Upper Rerolls = 1,100 7.1% In-Service Upper Rerolls = 2,057 13.2%

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 6 of 20 In-Service Lower Rerolls = 125 0.8% In-Service Lower Rerolls= 13 0.1%

7. The results of condition monitoring, includingi the results of tube pulls and in-situ testing During the 15R (2007) outage, a condition monitoring assessment was performed to verify that the OTSG as-found structural and leakage integrity performance criteria requirements were demonstrated for the previous operating cycle.

The results of the primary-to-secondary induced total leakage calculation were determined to be acceptable. The condition monitoring leakage was 0.410 gallons per minutes (gpm) for OTSG-B and 0.393 gpm for OTSG-B. This is compared to an allowable accident-induced leakage limit of 0.699 gpm.

All tubing inspections were evaluated by eddy current testing methods and the results were analyzed.

All indications, except for three indications of degradation, passed the analytical evaluation for structural integrity. The three indications that did not pass the initial screening for integrity (burst) were later verified to be acceptable based on in-situ testing at worst case pressures. No tubes were pulled during the 15R outage.

The results of the in-situ pressure tests follow. Note - The test pressures were increased to include corrections for the temperature conditions of the test and the potential inaccuracy of the pressure test gauge.

1.) Tube 5-36 in OTSG-A was in-situ pressure tested due to freespan axial indications below the fifteenth TSP.

Indication Details

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 7 of 20 OTGS-A Tube/Defect/Location 5-36 SAI@ 15S- 1.04 MAI@ 15S-4.92 Pressure Hold Target Pressure Hold Time Maximum Average Points (pounds per Obtained (psi) (minutes) Leak Rate Pressurization square inch [psi]) (gpm) Rate (psi/sec)

Normal Operating Differential Pressure 1500 2 0 26 (NODP) = 1500 Main Steamline Break 3000 2 0 56 (MSLB) = 2950 MSLB + 500 =3450 3500 2 0 25 MSLB + 1000 =3950 4000 2 0 17 3 X NODP = 4300 4300 2 0 19 Post In-Situ Results Indication Volts Max % TW Length SAI @ 15S-1.04" 0.44 46 0.34" MAI @ 15S-3.86" 1.16 20 4.93" The in-situ test was performed on the full length of the tube and in accordance with the Electric Power Research Institute (EPRI) In-Situ Pressure Test Guidelines. The testing demonstrated that the CR3 limiting condition of 3 x NODP minimum burst strength limit was met as well as the accident-induced leakage integrity. The tube was plugged and stabilized after the test.

2.) Tube 51-124 in OTSG-B was in-situ pressure tested due to freespan axial indications below the fifteenth TSP.

Indication Details Indication Volts Max % TW Length MAI@ 15S-1.38" 0.97 28 1.50" OTGS-B Tube/Defect/Location 51-124 MAI 0 15S- 1.38 Maximum Average Pressure Hold Target Pressure Hold Time LakiRateAPerato Points (psi) Obtained (psi) (minutes) (gpm) Rate (psi/sec)

NODP = 1500 1500 2 0 32 MSLB = 2950 2950 2 0 40 MSLB + 500 =3450 3450 2 0 17 MSLB + 1000 =3950 3950 2 0 13 3 x NODP = 4300 4300 2 0 11

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 8 of 20 Post In-Situ Results Indication Volts Max % TW Length MAI 14S+33.65" 2.5 84 1.57" The in-situ test was performed on the full length of the tube and in accordance with the EPRI In-Situ Pressure Test Guidelines. The testing demonstrated that the CR3 limiting condition of 3 x NODP minimum burst strength limit was met as well as the accident-induced leakage integrity.

The tube was plugged and stabilized after the test.

3.) Tube 140-68 in OTSG-B was in-situ pressure tested due to a single freespan axial indication below the tenth TSP.

Indication Details Indication Volts Max % TW Length SAI@ 1OS-3.04" 0.73 25 2.39" OTGS-B Tube/Defect/Location 140-88 SAI @ 10S- 3.04 Pressure Hold Target Pressure Hold Time Maximum Average Leak Rate Pressurization Points (psi) Obtained (psi) (minutes) (gpm) Rate (psi/sec)

NODP = 1500 1500 2 0 37 MSLB = 2950 2950 2 0 43 MSLB + 500 =3450 3450 2 0 50 MSLB + 1000 =3950 3950 2 0 26 3 x NODP = 4300 4300 2 0 12 Post In-Situ Results Indication Volts Max % TW Length SAI @ 09S+36.48" 0.91 53 2.34" The in-situ test was performed on the full length of the tube and in accordance with the EPRI In-Situ Pressure Test Guidelines. The testing demonstrated that the CR3 limiting condition of 3 x NODP minimum burst strength limit was met as well as the accident-induced leakage integrity.

The tube was plugged and stabilized after the test.

8. The effective pluj-iinm percentawe for all pluzzinz and tube repairsin each OTSG Effective plugging, to date, includes the effect of in-service sleeves in addition to the number of tubes plugged in the steam generator.

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 9 of 20

9. Repair method utilized and the number of tubes repairedby each repairmethod The only approved CR3 steam generator tube repair methods are sleeving and rerolls. The number and type of repairs performed during the 15R outage are given below:

15R Repair Type OTSG-A OTSG-B Sleeving 0 0 Upper Tube End Reroll 293 703 Lower Tube End Reroll 0 0

10. Location, bobbin coil amplitude, and axial and circumferentialextent (if determined)for each first span IGA indication, and an assessment ofgrowth for indications in the first span of OTSG B First span IGA is a degradation mechanism specific to OTSG-B, as identified in ITS 5.6.2.10.c.l.

Following the 2005 (14R) inspection, 164 tubes with first span IGA were returned to service. As a result of the 2007 (15R) inspection, no new IGA indications were detected, nor were any first span IGA tubes plugged for any plugging criteria. Therefore, the same 164 tubes (316 indications) in OTSG-B were returned to service with first span IGA indications. Appendix 2 contains the list of tubes in OTSG-B with first span IGA. The list identifies the location, bobbin coil amplitude (volts),

and change in through-wall percentage from 1997, or earliest detected indication, to 2007.

The axial and circumferential extents were not determined for every first span IGA indication, but they were determined for any indication that was new (none detected in 2007) or showed a 5% or greater change (increase) in through-wall dimension from the 1997 or earliest detected indication to the 2007 inspection. The table below provides the required information.

15R First Span IGA Indications with > 5% Through-Wall Increase Location Row Col TW % above LTS Volts Circ. Extent (Inch) Ax. Extent (Inch) 42 34 30 8.71" 0.20 0.24 0.30 42 47 31 10.98" 0.14 0.12 0.11 49 56 23 6.18" 0.13 0.19 0.19 56 53 26 14.43" 0.16 0.21 0.16 57 89 30 7.10" 0.12 0.14 0.16 61 27 36 9.82" 0.24 0.28 0.22 65 37 20 6.82" 0.09 0.18 0.14 66 34 29 12.58" 0.14 0.14 0.17 69 42 33 13.87" 0.26 0.18 0.24 70 38 30 13.94" 0.24 0.20 0.16 83 100 22 5.96" 0.10 0.20 0.17 83 100 29 10.9" 0.28 0.16 0.16 84 98 21 10.18" 0.13 0.16 0.16 89 89 30 8.40" 0.24 0.16 0.16 95 47 29 10.34" 0.55 0.21 0.19 100 66 30 9.98" 0.10 0.16 0.17 101 47 28 15.28" 0.14 0.16 0.14 103 37 26 23.93" 0.12 0.16 0.19 106 74 20 14.08" 0.07 0.16 0.16

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 10 of 20 Location Row Col TW % above LTS Volts Circ. Extent (Inch) Ax. Extent (Inch) 107 66 26 6.64" 0.11 0.16 0.14 110 40 28 12.95" 0.34 0.21 0.19 114 43 31 7.43 0.25 0.16 0.14 CR3 is also providing additional information regarding the axial distribution, percent TW distribution, and percent TW growth distribution of first span IGA in OTSG-B in Appendix 5. The Appendix 5 "% TW Growth Distribution" graph is based on the difference between the oldest indications (typically 1997) and the most recent (2007).

The average growth of the first span IGA indications is essentially zero. The data shows that some indications appeared to decrease and some increased in depth which is similar to trends in previous outages. An additional review of all the indications that have increased by > 5% TW since the first readings (1997) were performed. The largest increase from that population was an increase of only 2% TW during the last operating cycle since the 2005 (14R) outage. Therefore, the data continues to support the conclusion that the growth of first span IGA indications is essentially stagnant.

Additionally, there were no first span IGA tubes that exhibited a morphology change to crack-like indications.

11. Number of as-found and as-left tubes with TEC indications, number of as-found and as-left TEC indications,the number of as-found and as-left TEC indications as a function of tubesheet radius, the as-found, as-left, probability of detection and new TEC leakage for upper and lower tubesheet indications. The projected accident leakage and an assessment of growth for TEC indications will be provided. An assessment of the adequacy of the predictive methodoloffy in Addendum C to Topical Report BA W-2346P, Revision 0, including assessing the distribution of indications found in each OTSG to ensure the assumption regardingthe similarity of the distribution of indications remain consistent from one cycle to the next and that the assumption of a linear increase in leak rate remain valid. Corrective actions in the event that the assessment indicates the assumptions can not be fully supported.
  • Number of as-found and as-left tubes with TEC indications, number of as-found and as-left TEC indications:

Summary of TEC ARC Tubes/Indications for SG-A As-Found As-Left Number of Number of Number of Number of Numcarion Indications Tubes Left Leftin Tubes 15R Outage Found Found in Service Left in Service Upper Tube 1734 2441 1460 1848 End Lower Tube 11 16 9 13 End Totals 1745 2457 1469 1861

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 11 of 20 Summary of TEC ARC Tubes/Indications for SG-B As-Found As-Left Number of Number of Ndte Number of Tubes Ndicatiof Number of Tubes Found Fond Left in Service In Sric e 15R Outage Found in Service Upper Tube End 1056 1450 471 526 Lower Tube End 180 199 178 197 Totals

  • 1236/1157 1649 *649/634 723
  • There were 79 as-found and 15 as-left tubes that were duplicates between the upper and lower TEC tubes for 15R, resulting in 1157 distinct tubes found and 634 distinct tubes left in service.

The number of as-found and as-left TEC indications as afunction of tubesheet radius:

The number of as-found and as-left TEC indications is plotted in Figures 1 through 4. The applicable indications are grouped into radial zones that represent the same zones used for the upper tubesheet region from the original TEC ARC in License Amendment Number 188 and Addendum A. These zones are no longer used to group indications for leakage determination because CR3 is currently implementing License Amendment Number No. 222. The current method allows the use of a probabilistic methodology and a separate radius for each tube/indication. However, the indications are presented this way because the zones represent areas of similar TEC leakage rates and can also be used for trending. The zones and associated radius used for each graph are identified below:

Zone Definition for CR3 TEC Indications Zone Designation Radius (inch)

Zone 1 >3, < 39 Zone 2 >39, < 49 Zone 3 >49, < 53 Zone 4 >53, <55 Zone 5 >55, < 56 Zone 6 >56

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 12 of 20 Figure 1 Zone Distribution for OTSG-A Upper TEC Indications (Zones not used for leakage calculations)

A-OTSG Upper TEC Indications RFO-1 5 2007 1000 900 800 0 700 600

. 500 0

400__,

,.o E 300 z 200 100 0

1 2 3 4 5 6 Radial Zone

[EA-OTSG Upper As-Found RFO-15 [MA-OTSG Upper As-Left RFO-15i Figure 2 Zone Distribution for OTSG-A Lower TEC Indications (Zones not used for leakage calculations)

A-OTSG Lower TEC Indications RFO-15 2007 8

7 (an6 0

C4 0

w3 1

0 1 2 3 4 5 Radial Zone 101A-OTSG Lower As-Found RFO-1 5 [II A-OTSG Lower As-Left REQ-is5

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 13 of 20 Figure 3 Zone Distribution for OTSG-B Upper TEC Indications (Zones not used for leakage calculations)

B-OTSG Upper TEC Indications RFO-15 2007 600 500 cý400 300 200 1 2 3 4 56 6 Radial Zone 0 B-OTSG Upper As-Found RFO-15 ME B-OTSG Upper As-Left RFO-1 5 Figure 4 Zone Distribution for OTSG-B Lower TEC Indications (Zones not used for leakage calculations)

B-OTSG Lower TEC Indications RFO-15 2007 90 80 70 j 0

60 50 o 40 E

Z 20-10-0-

1 2 3 4 5 Radial Zone 10 B-OTSG Lower As-Found RFO-15 INB-OTSG Lower As-Left RFO-151

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 14 of 20

  • The as-found, as-left, probability of detection and new TEC leakage for upper and lower tubesheet indications:

Summary of TEC ARC Leakage for SG-A As-Found As-Left Probability of New Trend 15R Outage Leakage Leakage Dection (POD) Leakage Leakage (gpm) (gpm) Leakage (gpm) (gpm) (gpm)

Upper Tube End 0.282 0.165 0.054 0.094 0.000 Lower Tube End 0.020 0.019 0.004 0.010 0.007 Totals 0.302 0.184 0.058 0.104 0.007 Projected for 16R 0.353 gpm Summary of TEC ARC Leakage for SG-B As-Found As-Left Trend 15R Outage Leakage Leakage POD Leakage New Leakage Leakage

( (gpm) (gpm) (gpm)

Upper Tube End 0.265 0.047 0.050 0.120 0.075 Lower Tube End 0.062 0.059 0.012 0.011 0.000 Totals 0.327 0.106 0.062 0.131 0.075 Projected for 16R 0.374 gpm

  • An assessment of the adequacy of the predictive methodology in Addendum C to Topical Report BA W-2346P, Revision 0, including assessing the distribution of indicationsfound in each OTSG to ensure the assumption of indications remain consistentfrom one cycle to the next and that the assumption of a linear increase in leak rate remain valid. Corrective actions in the event that the assessment indicates the assumptions can not be fully supported:

The predictive methodology from Addendum C to BAW-2346P provides a way to conservatively predict the total amount of TEC assigned leakage at the end of the next operating cycle. The methodology is based on combining the leakage from the following sources:

1. Leakage from detected indications that are left in service (As-left TEC leakage)
2. Leakage from indications that may not have been detected (POD leakage)
3. Leakage increase as a result of the difference between the as-left leakage from the previous outage and the as-found leakage in the current outage (New leakage)
4. Any leakage increase as a result of an increase in the rate of new leakage (Trend leakage)

The inputs to the projected TEC leakage are based on the assumption that the TEC leakage rates will remain relatively consistent or will be increased if an increasing rate is observed. This is based on data from previous outages and a limited number of equivalent data points. When the latest TEC leakage information from 15R (2007) is compared to the previous information, overall similar leakage rates are observed.

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 15 of 20 There was no unexpected increase in the number of "new" TEC indication leakage for OTSG-A, but there was an increase for OTSG-B. For example, from 14R (2005) to 15R (2007) the new TEC leakage for OTSG-A increased only slightly from 0.098 gpm in 2005 to 0.104 gpm in 2007.

For the same time period, the new TEC leakage for OTSG-B increased from 0.058 gpm to 0.131 gpm. However, the long term trend (below) shows that a more normal "new" leakage for OTSG-B has resumed.

New TEC Leakage for RFO-12 through RFO-15 0.14 0.12 -

- 0.1 E 0.08 4) 0.06 0.04 0.02 0

12 13 14 15 RFO A OTSG Upper TEC New Leakage ---- A OTSG Lower TEC New Leakage B OTSG Upper TEC New Leakage --9-- B OTSG Lower TEC New Leakage As the figure shows, the "new" leakage has been fairly consistent except for the reduced leakage for OTSG-B in 14R. The "new" OTSG-B leakage for 15R is back to where previous outages have been.

An assessment of the predicted TEC leakage from 14R was performed and compared to the actual 15R TEC leakage. The 14R projected TEC leakage for OTSG-A was 0.351 gpm compared to an actual as-found of 0.302 gpm showing that the prediction was conservative. The 14R projected TEC leakage for OTSG-B was 0.296 gpm compared to an actual as-found of 0.327 gpm which is 0.031 gpm higher than expected. Note that even though the actual TEC leakage was slightly higher than expected, the overall condition monitoring leakage was still less than the leakage performance criteria. The under-prediction for OTSG-B is most likely due to the low "new" leakage in 14R which was used to predict the 15R TEC leakage. The reason for the low 14R "new" upper TEC leakage is unknown, but the 15R "new" leakage is back up to where it has been historically.

To address the under-prediction of TEC leakage in OTSG-B, a large number of tubes with TEC indications were reroll repaired in the upper tube end to remove the TEC indication and associated leakage from the as-left condition of the OTSG. For example, in the 15R outage there were 263 in-service tubes rerolled in OTSG-A to reduce projected TEC leakage while there were 566 in-service tubes rerolled in OTSG-B to reduce the projected TEC as-left leakage. Even with

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 16 of 20 the large number of rerolls and low as-left TEC leakage CR3 applied the equation for projected TEC leakage, including the high "trend" leakage to predict a more conservative leakage value for the upcoming 16R outage.

Therefore, the corrective actions for OTSG-B were to perform several hundred additional reroll repairs to remove TEC indications and associated leakage from service. A review of the historical trends shows that the "new" 15R TEC leakage is back where it has been historically and then combined with the very low as-left leakage will ensure the 16R actual leakage is within its expected range. Additionally, it is also verified that there is sufficient margin in the overall operational assessment leakage even if the TEC leakage were to be under-predicted by a similar amount in 16R.

The radial distribution of the as-found number of indications for the 14R (2005) and 15R (2007) eddy current inspections are shown in the following figures. There are graphs for upper and LTE indication in both steam generators. The graphs are again shown using the same upper radial zones as in the original TEC license amendment. For example, Zone 1 is the inner most area of the tubesheet and Zone 6 is the outer most (periphery area) of the tubesheet. The graphs show a similar trend in the radial location of the as-found TEC indications. OTSG-A upper tubesheet has a higher number of indications located towards the center of the tubesheet that generally decreases as the zones (radius) increases. The 15R number of indications is greater than the 14R indications for Zones 1 through 4 because most of those indications remained in service from previous inspections due to their lower postulated leakage value. In 15R, the number of indications in Zones 5 and 6 are small because the TEC's in these areas are normally repaired (re-rolled) first to reduce the overall postulated TEC leakage. OTSG-A lower tubesheet has only a small number of indications and shows little change. The trend in the number of TEC indications in OTSG-B is similar from 14R to 15R for both upper and lower indications, although the indications are more concentrated in Zones 2 and 3 (upper), and Zones 3 and 4 (lower). The number of as-found indications in Zone 6 of OTSG-B was greater than previous and reflects the same trend as seen in the previous graph of "new" leakage. However, even though the indication trend in Zone 6 has increased from 14R it is back to its previous historical trend and is not unexpected. There are very minor differences in the radial distribution of TEC indications from the previous outage to the current outage, but the overall impact of these differences is not significant. As shown in Figure 3 above, corrective actions for OTSG-B included the removal (reroll) of all TEC indications in Zones 4, 5 and 6 along with most indications in Zone 3. This provides a large margin for future leakage. Therefore, the assumptions used for predicting future TEC leakage based on previous cycle experience and the predictive methodology from Licensing Amendment No. 222 are still considered valid.

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 17 of 20 Figure 5 1000 900 800 700

-o,*600 C

5 00 0

~00 z 300 200 100 0

zonel1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 0]14R Outage 1015.30utage Figure 6 "A" OTSG As-Found Lower TEC Indications - 14R & 15R M6 CU

-0 2

1-7E'I C -

Zone I Zone 2 Zone 3 Zone 4 Zone5 Zone 6 El 14R Outage 1915ROutage

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 18 of 20 Figure 7 "B" OTSG As-Found Upper TEC Indications - 14R & 15R 800 7 700 600 o 7 20D-100 Zone I Zone 2 Zone 3 Zone4 Zone 5 Zone 6 E314R Outage 9 15ROutage Figure 8 90 "B" OTSG 4 As-Found Lower TEC Indications - 14R & 15R 80 70

.6U, C.

"o 50 4-2O 10 0

Zone I Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 OLVROutage M15ROutage

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 19 of 20 Best-Estimate Leakage Following a LBLOCA Demonstrate that the primary-to-secondaryleakagefollowing a LBLOCA, as described in Appendix A to Topical Report BA W-23 74, Revision 1 is acceptable based on the as-found condition of the steam generators.

Mechanism and Number of LB OTSG Region LOCA Leaking Leakage, gpm Indications UTE Circ PWSCC 33 2.09 LTE Circ PWSCC 132 6.65 A Total 165 8.74 UTE Circ PWSCC 97 5.58 LTE Circ PWSCC 6 0.31 B Total 103 5.89 Following the 15R inspection of the Upper and Lower Tubesheet roll region, the best-estimate leakage following a LBLOCA that could occur from as-found circumferential cracking near the tubesheet rolls has been determined to be 8.74 gpm in OTSG-A and 5.89 gpm in OTSG-B. This estimated leakage has been evaluated and would not exceed the offsite dose limits of 10 CFR 100 and 10 CFR 50.67 when compared to existing assumptions in the CR3 Final Safety Analysis Report (FSAR) Chapter 14 Safety Analysis. This is based on a review of the Steam Generator Tube Rupture (SGTR) accident assumptions.

The LBLOCA best estimate leakage is less than the FSAR assumptions for SGTR which assumed a flow rate to the secondary side of the affected steam generator to be 435 gpm. The conservative SGTR accident leak rate and assumptions for degraded fuel cladding only result in a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> integrated accident dose a the exclusion area boundary of 0.139 Rem compared to a limit of 2.5 Rem. Therefore, the estimated LBLOCA leakage is bounded by the FSAR evaluation.

15R Inspection - Conclusion The Operational Assessment (OA) evaluated the degradation mechanisms of the CR3 OTSG tubes. The evaluation concluded that the tubes would maintain structural and leakage integrity with reasonable assurance throughout the current operating cycle. This is based on the inspection results and worst-case Monte Carlo type simulations. Additionally, this was the sixth consecutive 100% bobbin coil and UTS MRPC inspection of the in-service tubes and the third MRPC inspection of the LTS.

Therefore, based on inspection results and the OA of the structural and leakage integrity of the remaining in-service OTSG tubing, the OTSG will meet all EPRI Steam Generator Guideline requirements as well as CR3 Technical Specifications for the next operating cycle.

Future Plans CR3 currently plans to replace both OTSGs in the Fall of 2009 during the 16R refueling outage. The OTSGs will be manufactured by B&W Canada and will incorporate tubing made from thermally treated Alloy 690 material. These new OTSGs are expected to provide a long term reliability of the tubes by the replacement of the original Alloy 600 stress relieved tubing with the Alloy 690 material.

U.S. Nuclear Regulatory Commission Attachment 3F0508-03 Page 20 of 20 Figure 9 ONCE-THROUGH STEAM GENERATOR Primary Inlet Nozzle Upper Tubesheet AFW Header

& Nozzles (7)

Tube Support Plate Steam Outlet Nozzle Main Feedwater Risers Main Feedwater Nozzles (32) 4External Main Feedwater Header Downcomer Temperature Sensing Connection (2)

Tubes 4 Shell Primary Outlet

PROGRESS ENERGY FLORIDA, INC.

CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302/LICENSE NUMBER DPR-72 APPENDIX 1 TO SPECIAL REPORT 08-01 TUBES LEFT IN-SERVICE WITH THROUGH-WALL INDICATIONS 1%-39%

Appendix 1 Location Acronyms 01S First Support Plate 02S Second Support Plate 03S Third Support Plate 04S Fourth Support Plate 05S Fifth Support Plate 06S Sixth Support Plate 07S Seventh Support Plate 08S Eighth Support Plate 09S Ninth Support Plate 10S Tenth Support Plate 11S Eleventh Support Plate 12S Twelfth Support Plate 13S Thirteenth Support Plate 14S Fourteenth Support Plate 15S Fifteenth Support Plate

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 1 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location A 1 2 0.27 40 6 07S +0.76 1 A 1 2 0.38 37 8 07S -0.83 1 A 1 11 0.49 56 12 12S +0.64 2 A 1 13 0.32 153 8 11S +0.67 3 A 2 8 0.66 109 12 12S +0.64 4 A 2 9 0.26 87 6 12S +0.60 5 A 4 28 0.28 104 7 12S +0.69 6 A 4 28 0.34 126 8 08S +0.69 6 A 5 27 0.23 120 6 08S -0.78 7 A 5 34 0.45 90 10 12S +0.62 8 A 5 36 0.52 50 11 12S +0.67 9 A 5 38 0.25 30 6 08S +0.67 10 A 5 41 0.4 68 10 12S +0.67 11 A 6 7 0.26 105 6 12S +0.74 12 A 6 10 0.44 50 9 12S +0.67 13 A 6 25 0.55 136 13 09S +0.60 14 A 6 26 0.52 92 11 09S +0.62 15 A 6 26 0.33 135 8 08S +0.74 15 A 6 39 0.22 93 6 08S +0.65 16 A 6 44 0.21 112 5 08S +0.65 17 A 6 51 0.34 121 9 13S +0.62 18 A 7 21 0.48 72 10 11S +0.72 19 A 7 24 0.74 51 13 07S -0.81 20 A 7 25 1 50 19 09S +0.65 21 A 7 26 1.18 62 22 09S +0.65 22 A 7 26 0.93 63 18 08S +0.69 22 A 7 26 0.73 98 15 08S -0.74 22 A 7 26 0.38 62 9 04S +0.60 22 A 7 26 0.75 28 15 04S -0.80 22 A 7 27 0.6 73 14 09S -0.76 23 A 7 27 0.25 70 7 09S +0.67 23 A 7 27 0.92 75 20 08S +0.62 23 A 7 27 0.32 58 8 08S -0.72 23 A 7 27 0.45 135 11 07S -0.74 23 A 7 29 0.21 123 5 09S +0.67 24 A 7 30 0.34 143 9 07S +0.65 25 A 7 44 0.26 141 7 04S +0.65 26 A 7 52 0.53 46 13 10S +0.67 27 A 8 7 0.18 111 4 12S +0.67 28 A 8 21 0.64 73 13 07S +0.73 29 A 8 22 0.6 76 11 07S +0.09 30 A 8 23 0.38 68 8 12S +0.69 31 A 8 25 0.44 47 10 09S +0.60 32 A 8 27 0.54 89 12 07S -0.71 33 A 8 29 0.52 83 12 07S -0.69 34 A 8 30 0.62 55 15 08S +0.60 35 A 8 30 0.53 168 13 08S -0.67 35 A 8 30 0.47 65 12 07S +0.69 35 A 8 30 0.54 75 13 07S -0.81 35

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 2 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Cunt OTSG Tube Row Volts Deg BoTWnLocation

% TW Count A 8 30 0.33 68 9 06S +0.30 35 A 8 30 0.4 71 10 09S +0.69 35 A 8 41 0.7 22 15 07S +0.67 36 A 8 45 0.27 132 6 07S +0.69 37 A 8 46 0.36 80 9 07S +0.65 38 A 8 47 0.21 75 5 07S +0.62 39 A 8 50 0.23 105 6 07S +0.62 40 A 8 51 0.34 123 8 12S +0.65 41 A 8 51 0.22 79 5 08S +0.67 41 A 9 24 0.36 81 7 07S +0.72 42 A 9 28 0.68 20 13 12S +0.66 43 A 9 34 0.23 66 6 12S +0.65 44 A 9 42 0.25 102 6 08S +0.65 45 A 9 53 0.32 107 8 07S +0.65 46 A 9 55 0.32 107 8 03S +0.71 47 A 9 61 0.23 97 7 12S +0.66 48 A 10 6 0.46 86 11 12S +0.67 49 A 10 7 0.18 133 4 07S -0.76 50 A 10 8 0.46 107 10 07S -0.76 51 A 10 33 0.52 52 12 01S +0.07 52 A 10 38 0.3 46 8 12S +0.67 53 A 10 51 0.19 62 4 07S +0.62 54 A 10 57 0.29 92 7 07S +0.65 55 A 10 58 0.32 61 8 07S +0.60 56 A 11 1 0.42 87 10 12S +0.72 57 A 11 2 0.33 91 8 12S +0.69 58 A 11 2 0.28 95 7 07S +0.76 58 A 11 7 0.72 83 15 12S +0.67 59 A 11 14 0.37 52 7 08S +0.71 60 A 11 15 0.2 76 5 09S +0.69 61 A 11 15 0.21 83 5 08S +0.67 61 A 11 15 0.11 71 3 07S +0.67 61 A 11 24 0.25 69 6 08S +0.69 62 A 11 58 0.46 32 11 12S +0.71 63 A 11 60 0.28 112 7 12S +0.74 64 A 11 61 0.24 88 7 07S +0.72 65 A 11 68 0.35 110 8 12S +0.72 66 A 12 1 0.34 117 8 09S -0.74 67 A 12 7 0.46 134 11 07S -0.70 68 A 12 9 0.31 88 8 12S +0.67 69 A 12 10 0.33 126 8 07S -0.67 70 A 12 11 0.31 128 7 07S -0.74 71 A 12 14 0.15 35 4 07S +0.67 72 A 12 17 0.3 156 6 07S -0.74 73 A 12 18 0.39 155 9 07S +0.69 74 A 12 18 0.42 114 10 07S -0.74 74 A 12 28 0.36 87 8 08S +0.67 75 A 12 61 0.42 94 11 07S +0.69 76 A 12 70 0.85 55 21 10S +0.62 77

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 3 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location A 13 3 0.24 111 6 09S -0.63 78 A 13 6 0.38 99 9 07S -0.77 79 A 13 7 0.34 112 8 07S -0.75 80 A 13 9 0.35 64 8 07S -0.76 81 A 13 17 0.18 113 4 07S +0.69 82 A 13 19 0.19 121 5 07S -0.76 83 A 13 59 0.25 122 6 08S +0.71 84 A 13 61 0.28 172 7 07S +0.60 85 A 13 69 0.32 80 7 08S +0.70 86 A 13 69 0.32 53 7 07S +0.63 86 A 13 71 0.32 50 7 09S -0.88 87 A 14 1 0.32 60 8 11S +0.65 88 A 14 4 0.16 102 4 08S +0.64 89 A 14 8 0.29 56 7 08S -0.79 90 A 14 8 0.57 101 13 07S -0.73 90 A 14 32 0.33 58 7 12S +0.60 91 A 14 68 0.36 37 10 04S +0.74 92 A 14 70 0.39 84 11 10S +0.72 93 A 14 70 0.39 146 11 08S +0.65 93 A 14 70 0.37 33 11 07S +0.69 93 A 15 8 0.28 94 7 07S -0.78 94 A 15 30 0.98 80 17 06S +0.67 95 A 15 64 0.32 73 7 07S -0.78 96 A 15 71 0.21 66 5 08S +0.67 97 A 15 76 0.49 111 14 10S +0.65 98 A 16 5 0.28 118 7 07S -0.76 99 A 16 6 0.22 87 6 08S -0.79 100 A 16 7 0.28 136 7 07S -0.69 101 A 16 8 0.24 85 6 07S -0.77 102 A 16 9 0.33 77 8 07S -0.83 103 A 16 75 0.45 36 10 08S +0.70 104 A 16 76 0.36 70 10 08S +0.62 105 A 16 76 0.36 32 11 10S +0.74 105 A 16 77 0.36 78 8 09S -0.81 106 A 17 7 0.31 128 8 07S -0.77 107 A 17 8 0.49 92 11 07S -0.80 108 A 17 9 0.2 78 5 08S -0.84 109 A 17 9 0.31 135 8 07S -0.77 109 A 17 70 0.39 101 11 07S +0.69 110 A 17 71 0.38 70 8 07S +0.61 111 A 17 72 0.6 140 16 07S +0.62 112 A 17 72 0.42 22 12 07S -0.71 112 A 17 75 0.5 62 11 08S +0.53 113 A 17 76 0.37 59 11 08S +0.67 114 A 18 7 0.33 124 8 07S -0.71 115 A 18 9 0.23 73 6 08S -0.79 116 A 18 9 0.38 115 9 07S -0.74 116 A 18 25 0.51 141 10 09S +0.65 117 A 18 74 0.55 87 12 06S +0.63 118

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 4 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location A 19 3 0.56 80 13 12S +0.70 119 A 19 7 0.26 57 6 12S +0.70 120 A 19 8 0.2 75 5 08S -0.76 121 A 19 30 0.19 63 4 03S +0.69 122 A 19 33 0.35 113 8 09S +0.49 123 A 19 68 0.39 27 9 09S +0.76 124 A 19 75 0.44 56 10 07S +0.58 125 A 19 76 0.56 77 15 07S +0.69 126 A 19 84 0.29 32 9 08S -0.76 127 A 20 65 0.28 80 7 03S +0.69 128 A 20 73 0.76 36 16 08S +0.61 129 A 20 77 0.49 120 11 08S +0.68 130 A 20 77 0.72 42 15 07S +0.56 130 A 20 78 0.29 64 9 08S +0.65 131 A 20 82 0.23 19 7 08S +0.76 132 A 21 1 0.19 52 5 11S +0.61 133 A 21 6 0.16 95 4 08S -0.79 134 A 211 60 0.33 78 8 04S +0.72 135 A 21 84 0.39 28 11 07S +0.63 136 A 21 86 0.44 37 12 07S +0.66 137 A 22 11 0.2 64 5 08S -0.76 138 A 22 59 0.35 93 8 1OS +0.71 139 A 22 82 0.28 41 8 07S +0.65 140 A 22 84 0.45 352 13 08S +0.65 141 A 22 86 0.5 25 14 08S +0.65 142 A 23 8 0.22 93 6 08S -0.76 143 A 23 84 0.25 42 8 07S +0.72 144 A 23 86 0.34 99 10 08S +0.63 145 A 23 86 0.42 61 12 07S +0.67 145 A 23 91 0.41 100 12 08S -0.76 146 A 24 6 0.17 92 4 08S -0.81 147 A 24 7 0.39 82 9 12S +0.65 148 A 24 7 0.26 96 7 08S -0.79 148 A 24 8 0.23 93 6 08S -0.79 149 A 24 82 0.35 57 10 02S +0.58 150 A 24 85 0.22 143 5 07S +0.68 151 A 24 86 0.21 116 7 07S +0.67 152 A 24 88 0.45 84 12 08S +0.56 153 A 24 88 0.56 88 15 08S -0.72 153 A 24 88 0.48 52 13 07S +0.65 153 A 24 89 0.24 96 6 08S +0.63 154 A 24 89 0.34 57 8 07S +0.68 154 A 24 90 0.49 41 13 08S +0.63 155 A 24 90 0.37 123 11 08S -0.74 155 A 24 90 0.16 76 5 07S +0.67 155 A 24 90 0.11 112 4 07S -0.67 155 A 24 92 0.41 48 12 08S +0.67 156 A 24 93 0.31 88 7 08S +0.63 157 A 25 7 0.31 93 8 08S -0.82 158

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 5 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location A 25 8 0.22 37 5 08S -0.88 159 A 25 89 0.49 104 11 08S +0.68 160 A 25 89 0.22 100 5 07S +0.61 160 A 25 90 0.35 123 10 08S +0.67 161 A 25 90 0.25 108 8 07S +0.65 161 A 25 92 0.27 58 8 08S +0.63 162 A 25 92 0.26 58 8 08S -0.81 162 A 25 92 0.22 74 7 07S +0.69 162 A 25 94 0.48 138 13 08S -0.74 163 A 25 96 0.39 150 11 1OS +0.58 164 A 26 90 0.46 86 10 09S +0.68 165 A 26 90 0.62 83 13 08S +0.58 165 A 26 90 0.34 100 8 07S +0.68 165 A 26 92 0.45 59 13 09S -0.83 166 A 26 92 0.4 116 11 08S +0.70 166 A 26 94 0.23 93 5 08S +0.63 167 A 26 94 0.47 39 10 08S -0.82 167 A 26 95 0.6 81 16 08S -0.74 168 A 26 96 0.5 62 11 08S -0.80 169 A 26 97 0.46 62 13 08S -0.76 170 A 27 4 0.26 81 6 08S -0.72 171 A 27 89 0.96 42 22 04S -0.60 172 A 27 93 0.51 110 14 08S +0.58 173 A 27 93 0.29 117 9 07S +0.71 173 A 27 94 0.34 92 8 07S +0.54 174 A 27 97 0.33 97 10 08S -0.79 175 A 27 98 0.44 85 10 08S -0.70 176 A 28 8 0.23 81 6 07S -0.69 177 A 28 9 0.34 112 8 07S -0.63 178 A 28 55 0.46 53 10 03S +0.67 179 A 28 64 0.2 102 4 07S +0.67 180 A 29 98 0.31 100 7 12S +0.61 181 A 29 104 0.6 94 14 11S +0.70 182 A 29 104 0.41 160 10 09S -0.81 182 A 30 103 0.45 77 11 08S -0.79 183 A 31 11 0.61 128 14 09S +0.58 184 A 31 32 1.27 84 21 10S +0.74 185 A 31 49 0.25 78 6 07S +0.67 186 A 31 104 0.34 52 8 08S -0.76 187 A 32 101 0.48 80 13 04S +0.74 188 A 33 4 0.56 159 13 08S -0.62 189 A 33 19 0.2 64 5 02S +0.79 190 A 33 104 0.47 35 11 08S -0.82 191 A 34 86 0.42 178 12 15S +0.64 192 A 34 106 0.21 80 5 09S +0.67 193 A 35 7 0.14 121 4 05S +0.78 194 A 35 11 0.5 79 12 12S +0.71 195 A 35 86 0.55 65 13 03S +0.70 196 A 35 108 0.31 110 8 08S +0.62 197

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 6 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg %TW Location A 36 9 0.21 87 5 07S +0.72 198 A 36 73 0.58 189 12 03S +0.62 199 A 36 113 0.4 58 10 02S -0.82 200 A 37 59 0.33 46 7 07S +0.62 201 A 37 113 1.09 73 21 11S +0.70 202 A 37 114 0.29 118 7 11S +0.70 203 A 38 3 0.24 106 7 08S -0.69 204 A 38 5 0.29 105 8 08S -0.71 205 A 38 94 0.42 74 10 04S +0.70 206 A 38 110 0.26 78 7 08S +0.65 207 A 38 115 0.29 127 7 11S -0.79 208 A 39 3 0.22 130 6 09S +0.69 209 A 39 8 0.23 148 6 06S -0.69 210 A 39 93 0.23 101 7 04S -0.74 211 A 40 7 0.25 67 7 08S -0.70 212 A 40 115 0.38 67 9 09S +0.60 213 A 40 116 0.31 80 8 08S +0.67 214 A 40 117 0.29 94 7 08S -0.77 215 A 41 58 0.41 21 8 03S +0.67 216 A 41 116 0.65 86 15 12S +0.67 217 A 41 116 0.61 109 14 11S -0.74 217 A 43 2 0.1 129 3 09S +0.77 218 A 43 6 0.15 109 4 09S +0.72 219 A 43 8 0.24 110 7 09S +0.74 220 A 43 118 0.27 100 7 12S +0.67 221 A 44 1 0.55 88 14 08S -0.69 222 A 44 8 0.12 83 3 09S +0.70 223 A 45 8 0.15 51 5 09S +0.74 224 A 45 65 0.35 75 7 04S +0.71 225 A 45 115 0.58 52 13 07S +0.65 226 A 45 116 0.41 52 10 07S +0.65 227 A 46 24 0.48 139 11 03S +0.75 228 A 46 112 0.56 51 13 08S +0.51 229 A 46 114 0.47 113 11 08S +0.56 230 A 46 117 0.2 89 5 08S +0.62 231 A 47 4 0.3 79 8 11S +0.68 232 A 48 8 0.14 128 4 09S +0.37 233 A 49 4 0.08 128 2 09S +0.68 234 A 49 7 0.28 104 8 09S +0.76 235 A 50 4 0.16 176 4 09S +0.65 236 A 50 5 0.3 81 8 09S +0.67 237 A 50 6 0.13 36 3 09S +0.72 238 A 50 7 0.25 75 7 09S +0.71 239 A 50 116 0.32 40 8 08S +0.41 240 A 50 117 0.26 101 6 08S +0.65 241 A 50 118 0.4 58 10 08S +0.63 242 A 51 6 0.08 101 2 09S +0.79 243 A 52 5 0.25 105 7 09S +0.72 244 A 52 6 0.44 81 12 09S +0.74 245

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 7 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location A 52 11 0.31 67 8 03S +0.69 246 A 52 98 0.33 37 8 11S -0.90 247 A 53 4 0.19 77 5 09S +0.68 248 A 53 4 0.18 82 5 09S -0.70 248 A 53 5 0.28 84 8 09S +0.74 249 A 53 6 0.12 123 3 07S +0.79 250 A 53 93 0.47 36 10 05S -0.95 251 A 53 106 0.27 63 7 15S -0.83 252 A 53 119 0.34 107 8 08S +0.67 253 A 53 120 0.24 69 6 08S +0.65 254 A 54 4 0.24 106 6 09S +0.70 255 A 54 122 0.43 116 10 08S +0.63 256 A 54 124 0.45 45 11 08S -0.90 257 A 54 127 0.4 45 10 08S -0.79 258 A 55 2 0.35 98 9 09S -0.72 259 A 55 96 0.85 70 19 03S +0.67 260 A 55 115 0.27 73 7 04S +0.67 261 A 55 119 0.38 74 9 08S +0.70 262 A 55 121 0.26 44 7 08S -0.83 263 A 57 1 0.15 146 4 08S -0.69 264 A 57 1 0.55 102 14 10S -0.69 264 A 57 1 0.35 119 9 10S +0.71 264 A 57 2 0.7 96 16 08S +0.84 265 A 57 127 1.06 113 21 lOS +0.70 266 A 57 127 0.22 118 6 08S -0.77 266 A 58 1 0.16 123 5 09S -0.73 267 A 58 6 0.39 87 10 09S +0.64 268 A 58 60 0.27 61 6 14S +0.89 269 A 58 127 0.34 129 8 15S +0.72 270 A 58 128 0.4 82 10 lOS +0.60 271 A 59 2 0.58 97 14 08S +0.74 272 A 59 5 0:24 106 7 07S -0.69 273 A 59 5 0.16 123 5 09S +0.73 273 A 59 42 0.3 111 9 09S +0.81 274 A 59 65 0.4 50 10 11S +0.86 275 A 59 120 0.22 63 6 08S +0.60 276 A 59 124 0.25 145 6 13S -0.67 277 A 59 124 0.32 76 8 08S -0.79 277 A 60 1 0.42 95 11 loS +0.80 278 A 60 3 0.31 77 8 07S -0.67 279 A 60 4 0.26 115 7 09S +0.67 280 A 60 4 0.26 70 7 09S -0.73 280 A 60 42 0.37 88 11 09S +0.81 281 A 60 84 0.12 82 3 04S -0.32 282 A 60 124 0.3 77 8 08S +0.55 283 A 61 5 0.42 92 11 07S -0.40 284 A 61 5 0.18 41 5 05S +0.72 284 A 61 124 0.21 84 5 11S +0.65 285 A 61 124 0.27 91 7 08S -0.81 285

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 8 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin. Tube Count OTSG Tube Row Volts Deg %TW Location A 61 124 1.24 95 24 loS +0.12 285 A 62 2 0.23 123 7 1OS +0.57 286 A 62 4 0.28 110 8 07S -0.73 287 A 62 5 0.31 92 8 07S -0.72 288 A 62 7 0.31 79 8 10S +0.81 289 A 62 124 0.65 94 15 08S +0.67 290 A 62 126 0.15 51 4 07S -0.75 291 A 62 128 0.55 99 13 10S +0.57 292 A 62 128 0.5 95 12 10S -0.72 292 A 62 128 0.41 85 10 08S -0.81 292 A 63 5 0.33 97 9 07S -0.65 293 A 63 6 0.12 32 3 09S +0.79 294 A 63 121 0.24 133 6 08S +0.53 295 A 63 124 0.29 102 7 08S -0.55 296 A 63 124 0.36 110 9 07S -0.72 296 A 63 128 0.63 86 14 lOS +0.62 297 A 63 128 0.28 81 7 08S -0.81 297 A 64 8 0.27 87 7 lOS +0.81 298 A 64 9 0.18 81 5 08S +0.74 299 A 64 61 0.46 70 10 08S +0.77 300 A 64 114 0.29 107 7 04S +0.00 301 A 65 87 0.45 98 11 04S +0.70 302 A 65 122 0.32 113 8 08S +0.46 303 A 65 123 0.15 97 4 07S +0.74 304 A 65 123 0.34 74 8 07S +0.14 304 A 65 128 0.31 83 8 11S +0.63 305 A 65 128 0.23 87 6 11S -0.79 305 A 65 128 0.32 84 8 08S -0.79 305 A 65 129 0.28 110 7 08S -0.90 306 A 65 129 0.45 87 10 10S +0.64 306 A *66 1 0.36 70 10 10S -0.74 307 A 66 6 0.35 86 9 10S +0.79 308 A 66 14 0.39 94 10 11S +0.77 309 A 66 17 0.41 89 12 11S +0.73 310 A 66 86 0.38 65 8 14S -0.54 311 A 66 126 0.33 98 8 07S -0.77 312 A 66 127 0.39 81 9 15S -0.87 313 A 66 128 0.28 82 7 08S -0.87 314 A 66 128 0.15 57 4 07S +0.58 314 A 67 6 0.34 91 9 10S +0.81 315 A 67 6 0.16 159 4 09S +0.75 315 A 67 8 0.25 69 7 10S +0.84 316 A 67 8 0.33 44 9 10S -0.58 316 A 67 13 0.36 82 9 11S +0.79 317 A 67 62 0.64 91 13 10S +0.82 318 A 67 118 0.28 80 7 05S +0.72 319 A 67 128 0.17 66 4 07S +0.67 320 A 67 129 0.25 100 6 11S -0.79 321 A 67 129 0.5 96 12 lOS +0.67 321

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 9 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B OTSG Tube Row Volts Deg %BToube TW Location A 67 129 0.23 93 6 08S -0.79 321 A 68 3 0.42 100 11 11S +0.68 322 A 68 12 0.35 88 9 11S +0.79 323 A 68 13 0.29 86 8 11S +0.77 324 A 68 15 0.42 109 12 llS +0.80 325 A 68 16 0.54 80 12 11S +0.77 326 A 68 22 0.34 86 8 12S +0.74 327 A 68 34 0.26 97 6 12S +0.76 328 A 68 42 0.21 88 6 09S +0.79 329 A 68 60 0.38 55 11 04S +0.74 330 A 68 65 0.31 62 8 12S +0.84 331 A 68 73 0.26 89 6 06S -0.83 332 A 68 127 0.24 105 6 08S -0.75 333 A 68 129 0.4 94 10 loS +0.57 334 A 68 129 0.4 99 10 09S +0.55 334 A 68 130 0.39 91 9 11S -0.85 335 A 68 130 0.3 112 7 1OS +0.59 335 A 68 130 0.31 79 8 08S -0.81 335 A 68 131 0.16 74 4 12S -0.72 336 A 68 131 0.24 132 6 12S +0.60 336 A 69 4 0.74 97 17 11S +0.67 337 A 69 5 0.46 94 13 11S +0.71 338 A 69 14 0.29 129 7 11S +0.69 339 A 69 30 0.3 80 9 12S +0.67 340 A 69 70 0.12 96 3 04S +0.76 341 A 69 129 0.2 87 5 08S -0.45 342 A 69 131 0.21 116 5 12S -0.84 343 A 69 131 0.18 61 5 11S -0.83 343 A 69 131 0.39 108 9 lOS +0.63 343 A 69 131 0.18 79 5 08S -0.81 343 A 70 4 0.33 111 9 11S +0.67 344 A 70 5 0.57 108 13 11S +0.69 345 A 70 5 0.35 109 8 07S -0.76 345 A 70 7 0.49 122 12 10S +0.76 346 A 70 10 0.25 105 7 11S +0.71 347 A 70 13 0.18 136 5 11S +0.66 348 A 70 13 0.15 97 4 10S +0.73 348 A 70 14 0.44 117 12 11S +0.73 349 A 70 16 0.38 106 11 11S +0.62 350 A 70 30 0.31 90 8 11S +0.70 351 A 70 55 0.2 49 6 11S +0.79 352 A 70 59 0.46 38 12 11S +0.79 353 A 70 128 0.22 94 6 lOS -0.79 354 A 70 128 0.19 82 5 1OS +0.50 354 A 70 130 0.24 128 6 11S -0.79 355 A 70 130 0.34 140 8 10S +0.58 355 A 70 130 0.21 104 5 08S -0.81 355 A 71 6 0.32 102 9 11S +0.74 356 A 71 13 0.53 92 13 11S +0.62 357

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 10 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin~ Tube Count OTSG Tube Row Volts Deg B TW Location A 71 14 0.26 133 8 11S +0.67 358 A 71 17 0.31 121 7 11S +0.65 359 A 71 22 0.35 116 9 11S +0.63 360 A 71 34 0.36 141 9 12S +0.79 361 A 71 45 0.39 118 10 11S +0.75 362 A 71 126 0.26 90 7 08S +0.12 363 A 71 128 0.45 88 10 15S -0.72 364 A 71 128 0.42 90 10 loS -0.51 364 A 71 129 0.56 89 13 09S +0.29 365 A 71 129 0.51 91 12 10S +0.63 365 A 71 130 0.35 78 8 08S -0.83 366 A 71 131 0.24 81 6 10S +0.65 367 A 72 2 0.25 65 6 14S +0.72 368 A 72 3 0.57 91 12 12S +0.67 369 A 72 10 0.47 123 12 11S +0.66 370 A 72 12 0.46 98 12 11S +0.66 371 A 72 13 0.46 106 11 11S +0.67 372 A 72 15 0.31 133 7 11S +0.67 373 A 72 23 0.26 87 8 07S +0.74 374 A 72 29 0.24 84 7 11S +0.74 375 A 72 31 0.51 111 12 12S +0.77 376 A 72 37 0.33 127 8 12S +0.75 377 A 72 38 0.34 108 10 11S +0.74 378 A 72 57 0.55 107 14 10S +0.69 379 A 72 58 0.77 88 17 llS +0.72 380 A 72 61 0.32 72 9 09S -0.74 381 A 72 91 0.22 143 5 04S +0.49 382 A 72 127 0.65 94 15 10S -0.65 383 A 72 127 0.25 98 6 07S +0.62 383 A 73 14 0.2 104 6 13S -0.40 384 A 73 20 0.37 136 9 12S +0.71 385 A 73 22 0.38 119 9 11S +0.62 386 A 73 41 0.47 117 12 12S +0.77 387 A 73 57 0.32 138 8 10S +0.79 388 A 73 61 0.45 88 11 07S +0.77 389 A 73 128 0.79 93 17 10S -0.79 390 A 73 128 0.53 97 13 09S +0.46 390 A 73 128 0.31 94 8 08S -0.73 390 A 73 129 0.21 79 5 11S -0.87 391 A 73 130 0.25 84 6 10S +0.60 392 A 74 16 0.18 89 4 11S +0.63 393 A 74 34 0.3 130 7 14S +0.74 394 A 74 46 0.22 115 6 14S +0.79 395 A 74 122 0.23 71 6 lOS +0.62 396 A 74 123 0.26 110 6 llS -0.07 397 A 74 123 0.31 111 8 lOS -0.70 397 A 74 123 0.37 91 9 08S -0.17 397 A 74 124 0.34 94 8 lOS +0.56 398 A 74 124 0.37 126 9 08S -0.70 398

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 11 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg %TW Location A 75 16 0.25 69 6 14S +0.47 399 A 75 29 0.59 98 13 07S -0.76 400 A 75 42 0.37 139 9 07S -0.72 401 A 75 62 0.33 142 8 04S +0.71 402 A 75 73 0.51 67 11 07S -0.73 403 A 75 89 0.29 97 7 04S +0.67 404 A 75 123 0.48 94 11 11S -0.49 405 A 75 123 0.6 86 13 loS -0.65 405 A 75 124 0.35 107 9 1OS -0.65 406 A 75 124 0.48 73 11 11S +0.63 406 A 75 124 0.39 102 10 11S -0.79 406 A 76 122 0.44 104 15 09S +0.55 407 A 77 6 0.32 58 8 11S -0.73 408 A 77 17 0.51 101 12 07S -0.83 409 A 77 65 0.31 99 7 09S +0.69 410 A 77 65 0.25 140 6 09S -0.80 410 A 77 74 0.26 55 7 07S -0.81 411 A 77 76 0.84 59 22 07S -0.79 412 A 77 80 0.55 156 16 09S -0.82 413 A 77 80 0.47 42 15 05S +0.67 413 A 77 80 0.27 144 9 05S -0.80 413 A 77 80 0.49 91 15 04S -0.66 413 A 77 80 0.46 22 14 04S +0.57 413 A 77 85 0.24 142 7 04S +0.66 414 A 77 86 0.33 159 11 04S +0.68 415 A 77 123 0.23 116 9 08S +0.57 416 A 77 123 0.12 101 5 08S -0.75 416 A 78 74 0.2 160 6 04S +0.71 417 A 78 76 0.41 127 13 07S -0.82 418 A 78 123 0.66 96 15 08S -0.71 419 A 78 125 0.36 70 9 10S -0.69 420 A 78 125 0.55 69 13 09S -0.58 420 A 78 125 0.48 90 12 09S +0.35 420 A 79 19 0.28 92 7 06S +0.84 421 A 79 19 0.34 91 8 10S -0.73 421 A 79 19 0.21 99 6 04S +0.77 421 A 79 27 0.33 82 9 loS -0.70 422 A 79 29 0.42 77 12 10S -0.70 423 A 79 31 0.32 103 9 10S -0.70 424 A 79 32 0.29 103 8 10S -0.70 425 A 79 35 0.41 89 11 10S -0.68 426 A 79 37 0.21 140 6 09S -0.70 427 A 79 38 0.29 95 8 10S -0.70 428 A 79 39 0.32 128 8 10S -0.68 429 A 79 41 0.25 138 7 10S -0.68 430 A 79 42 0.21 82 6 10S -0.63 431 A 79 43 0.21 110 6 10S -0.65 432 A 79 47 0.31 142 8 09S -0.68 433 A 79 79 0.15 25 4 04S +0.71 434

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 12 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location A 79 83 0.24 150 7 06S +0.69 435 A 79 92 0.44 30 10 09S +0.79 436 A 79 95 0.38 80 11 04S +0.73 437 A 79 128 0.74 100 17 10S +0.64 438 A 79 128 0.35 66 9 10S -0.71 438 A 79 129 0.22 96 8 10S -0.84 439 A 79 129 0.45 97 15 11S -0.90 439 A 80 5 0.25 99 7 10S -0.71 440 A 80 17 0.4 80 10 10S -0.72 441 A 80 29 0.4 91 10 10S -0.65 442 A 80 30 0.28 115 8 10S -0.63 443 A 80 35 0.21 106 6 10S -0.70 444 A 80 35 0.25 127 7 12S -0.53 444 A 80 36 0.33 142 8 05S -0.75 445 A 80 37 0.23 121 6 10S -0.63 446 A 80 39 0.28 100 8 10S -0.68 447 A 80 39 0.27 94 8 11S +0.79 447 A 80 42 0.28 144 7 11S +0.75 448 A 80 43 0.34 88 9 11S +0.74 449 A 80 49 0.21 113 6 10S -0.63 450 A 80 51 0.25 101 7 lOS -0.60 451 A 80 55 0.19 67 5 08S -0.72 452 A 80 58 0.3 126 8 08S -0.63 453 A 80 65 0.2 94 5 11S -0.76 454 A 80 66 0.33 100 8 07S -0.71 455 A 80 127 0.13 109 5 07S +0.68 456 A 80 130 0.5 136 12 11S -0.87 457 A 80 131 0.34 115 12 11S -0.81 458 A 81 4 0.17 82 5 10S -0.70 459 A 81 17 0.18 108 6 10S -0.71 460 A 81 18 0.38 113 9 10S -0.72 461 A 81 21 0.29 117 8 10S -0.82 462 A 81 22 0.38 116 10 10S -0.70 463 A 81 25 0.35 122 10 10S -0.65 464 A 81 26 0.31 108 8 10S -0.72 465 A 81 29 0.45 96 12 10S -0.65 466 A 81 30 0.38 90 10 10S -0.70 467 A 81 33 0.25 97 7 10S -0.67 468 A 81 34 0.32 106 8 10S -0.61 469 A 81 34 0.27 60 7 11S +0.70 469 A 81 37 0.35 43 10 10S -0.65 470 A 81 42 0.27 84 7 10S -0.63 471 A 81 46 0.31 120 8 10S -0.58 472 A 81 48 0.35 73 9 10S -0.63 473 A 81 51 0.38 83 10 08S -0.76 474 A 81 52 0.31 66 8 10S -0.65 475 A 81 53 0.34 119 9 08S -0.69 476 A 81 53 0.21 93 6 10S -0.60 476 A 81 55 0.28 102 8 08S -0.62 477

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 13 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Tube Row Volts Deg  % TW Location Count OTSG A 81 59 0.23 57 6 08S -0.74 478 A 81 63 0.18 46 5 09S -0.72 479 A 81 73 0.22 105 5 09S -0.80 480 A 81 84 0.3 156 8 04S +0.75 481 A 81 130 0.29 108 7 los -0.81 482 A 81 130 0.44 108 10 11S -0.76 482 A 81 130 0.21 110 5 09S +0.64 482 A 81 130 0.11 83 3 08S -0.88 482 A 81 131 0.17 114 6 loS -0.77 483 A 82 13 0.15 123 4 11S -0.64 484 A 82 19 0.14 161 4 08S -0.73 485 A 82 43 0.33 90 9 08S -0.74 486 A 82 45 0.29 127 8 1OS +0.72 487 A 82 50 0.27 88 8 1OS +0.74 488 A 82 51 0.24 108 6 08S -0.65 489 A 82 52 0.23 117 7 10S +0.74 490 A 82 53 0.27 53 8 08S -0.74 491 A 82 53 0.38 91 11 10S +0.79 491 A 82 54 0.25 72 7 10S -0.69 492 A 82 54 0.18 74 6 10S +0.79 492 A 82 55 0.18 81 5 10S -0.65 493 A 82 58 0.37 84 10 10S +0.74 494 A 82 60 0.24 86 7 10S +0.74 495 A 82 90 0.34 24 10 04S +0.69 496 A 82 94 0.28 95 8 04S +0.69 497 A 82 127 0.19 102 7 07S +0.26 498 A 82 128 0.33 120 9 09S +0.22 499 A 82 129 0.6 122 14 11S -0.84 500 A 83 13 0.29 92 7 11S -0.74 501 A 83 19 0.17 100 5 08S -0.79 502 A 83 22 0.26 132 8 08S -0.82 503 A 83 23 0.16 96 5 08S -0.82 504 A 83 26 0.47 100 12 08S -0.78 505 A 83 30 0.5 54 13 10S -0.69 506 A 83 53 0.43 116 12 10S +0.71 507 A 83 54 0.4 90 11 10S +0.79 508 A 83 59 0.2 79 6 10S -0.62 509 A 83 61 0.26 97 8 10S -0.60 510 A 83 63 0.24 86 7 09S +0.76 511 A 83 67 0.2 108 5 08S -0.78 512 A 83 73 0.47 46 10 08S -0.78 513 A 83 131 0.26 114 10 10S -0.70 514 A 83 131 0.2 88 7 11S -0.79 514 A 84 7 0.16 104 4 11S +0.75 515 A 84 13 0.22 116 6 07S -0.81 516 A 84 15 0.13 99 4 08S -0.79 517 A 84 26 0.31 85 9 10S -0.69 518 A 84 29 0.16 70 4 08S -0.82 519 A 84 39 0.18 71 5 lOS -0.75 520

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 14 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location A 84 48 0.29 58 8 08S -0.74 521 A 84 51 0.58 90 14 10S -0.65 522 A 84 54 0.36 88 10 1OS -0.65 523 A 84 56 0.41 87 12 lOS -0.63 524 A 84 59 0.48 104 13 10S -0.67 525 A 84 59 0.24 78 7 1OS +0.79 525 A 84 60 0.42 92 12 10S -0.60 526 A 84 60 0.21 64 6 1OS +0.76 526 A 84 61 0.31 109 9 10S -0.58 527 A 84 62 0.27 72 8 10S -0.72 528 A 84 66 0.33 95 7 07S -0.74 529 A 84 82 0.72 116 16 04S +0.67 530 A 84 131 0.14 130 6 11S -0.81 531 A 85 9 0.39 107 10 08S -0.75 532 A 85 9 0.08 43 2 10S -0.68 532 A 85 18 0.22 83 6 1OS -0.69 533 A 85 21 0.33 85 9 1OS -0.83 534 A 85 25 0.32 58 9 10S -0.71 535 A 85 27 0.45 118 12 1OS -0.76 536 A 85 28 0.31 77 8 1OS -0.71 537 A 85 29 0.22 103 6 08S -0.11 538 A 85 31 0.34 80 9 lOS -0.74 539 A 85 33 0.35 64 10 10S -0.78 540 A 85 49 0.41 97 11 1OS +0.72 541 A 85 50 0.39 81 11 10S +0.72 542 A 85 51 0.32 68 9 10S -0.70 543 A 85 52 0.34 114 10 10S -0.60 544 A 85 53 0.18 70 5 10S +0.81 545 A 85 57 0.2 39 6 10S +0.79 546 A 85 62 0.35 83 10 10S -0.65 547 A 85 93 0.24 104 6 04S +0.70 548 A 86 40 0.36 71 10 lOS -0.71 549 A 86 45 0.26 77 7 10S -0.63 550 A 86 49 0.26 83 7 10S -0.65 551 A 86 51 0.36 88 10 10S -0.65 552 A 86 52 0.35 90 10 lOS -0.60 553 A 86 130 0.15 125 4 08S +0.62 554 A 86 131 0.35 138 10 11S -0.82 555 A 87 17 0.35 73 9 10S -0.67 556 A 87 26 0.2 96 5 05S -0.77 557 A 87 35 1.23 86 24 10S -0.69 558 A 87 36 0.53 81 13 10S -0.71 559 A 87 38 0.36 83 10 10S -0.73 560 A 87 39 0.38 75 10 lOS -0.69 561 A 87 39 0.27 99 8 09S -0.82 561 A 87 83 0.34 183 10 04S +0.71 562 A 87 122 0.22 110 6 07S +0.64 563 A 87 130 0.35 154 10 11S -0.86 564 A 87 130 0.28 121 8 lOS -0.69 564

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 15 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg %TW Location A 88 6 0.32 85 9 08S -0.73 565 A 88 25 0.18 85 5 10S -0.73 566 A 88 27 0.16 61 4 10S -0.71 567 A 88 30 0.28 94 8 lOS -0.76 568 A 88 34 0.84 76 19 10S -0.71 569 A 88 53 0.7 83 18 09S +0.77 570 A 88 61 0.2 61 6 08S +0.83 571 A 88 129 0.32 115 9 08S -0.71 572 A 89 26 0.23 65 6 1OS -0.69 573 A 89 73 0.25 60 5 04S +0.63 574 A 89 106 0.39 73 10 06S -0.16 575 A 89 106 0.23 142 6 05S -0.82 575 A 89 128 0.39 133 11 07S -0.80 576 A 89 130 0.21 126 6 11S -0.79 577 A 90 9 0.7 112 17 08S -0.77 578 A 90 82 0.26 110 8 04S +0.73 579 A 91 29 0.21 88 6 01S -0.75 580 A 92 16 0.34 103 10 06S +0.73 581 A 92 57 0.21 130 5 06S +0.77 582 A 92 89 0.35 17 9 04S +0.63 583 A 92 92 0.37 80 10 04S +0.69 584 A 92 112 0.38 128 10 06S +0.64 585 A 92 127 0.51 99 13 04S +0.66 586 A 93 81 0.34 191 10 04S +0.71 587 A 93 88 0.3 82 8 04S +0.66 588 A 94 6 0.17 104 5 07S -0.73 589 A 94 46 0.16 103 5 07S -0.72 590 A 94 75 0.47 149 12 04S +0.65 591 A 94 83 0.39 147 10 04S +0.70 592 A 94 126 0.34 158 10 08S -0.80 593 A 94 128 0.31 130 9 08S -0.78 594 A 94 128 0.27 75 8 04S +0.65 594 A 94 129 0.62 83 16 08S -0.73 595 A 94 129 0.25 100 7 11S -0.79 595 A 95 2 0.39 174 11 11S +0.71 596 A 95 6 0.31 128 9 07S -0.79 597 A 95 7 0.23 134 6 07S -0.77 598 A 95 63 0.32 148 8 09S -0.77 599 A 95 74 0.51 161 13 04S +0.67 600 A 95 87 0.31 45 8 04S +0.69 601 A 95 122 0.39 139 11 09S -0.82 602 A 95 123 0.3 131 8 09S -0.79 603 A 95 125 0.32 64 9 04S +0.64 604 A 96 70 0.45 71 9 04S +0.69 605 A 96 123 0.16 75 5 07S -0.81 606 A 96 127 0.3 89 9 10S -0.77 607 A 97 118 0.2 48 6 03S +0.71 608 A 97 123 0.4 131 11 09S -0.73 609 A 97 123 0.26 137 8 08S -0.84 609

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 16 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location A 98 99 0.38 93 10 07S +0.47 610 A 98 125 0.21 80 6 09S -0.85 611 A 99 95 0.15 81 4 04S +0.70 612 A 100 7 0.39 120 11 07S -0.81 613 A 101 7 0.33 88 9 07S -0.79 614 A 101 55 0.2 142 6 05S -0.77 615 A 101 79 0.72 67 20 04S +0.72 616 A 101 122 0.43 38 12 09S -0.80 617 A 102 8 0.34 123 10 07S -0.79 618 A 102 20 0.4 141 11 07S -0.78 619 A 102 121 0.25 112 7 04S -0.81 620 A 102 123 0.46 47 12 10S -0.74 621 A 103 4 0.11 102 3 07S -0.73 622 A 103 5 0.41 102 11 07S -0.77 623 A 103 8 0.3 154 8 07S -0.73 624 A 103 17 0.15 128 5 07S -0.82 625 A 104 4 0.33 120 9 07S -0.77 626 A 104 73 0.54 141 16 04S +0.70 627 A 104 121 0.25 116 7 11S -0.85 628 A 105 5 0.49 110 13 07S -0.77 629 A 105 6 0.11 111 3 07S -0.86 630 A 105 36 0.15 112 4 07S -0.78 631 A 105 85 0.26 48 7 15S +0.74 632 A 105 86 0.42 164 14 11S +0.75 633 A 105 119 0.24 81 7 14S +0.71 634 A 105 119 0.25 85 7 12S +0.78 634 A 106 4 0.18 146 5 07S -0.77 635 A 106 7 0.47 129 12 07S -0.75 636 A ,106 18 0.2 114 6 07S -0.84 637 A 106 86 0.22 111 6 04S +0.70 638 A 106 117 0.37 124 10 lOS -0.74 639 A 106 117 0.33 104 9 lOS +0.63 639 A 106 119 0.56 134 14 11S +0.66 640 A 107 15 0.39 111 11 14S -0.84 641 A 107 31 0.27 65 8 09S +0.69 642 A 107 31 0.26 103 8 03S +0.66 642 A 107 42 0.17 125 5 05S -0.74 643 A 107 76 0.63 39 18 04S +0.66 644 A 107 97 0.54 126 13 14S -0.84 645 A 108 20 0.45 139 12 07S -0.82 646 A 108 67 0.32 108 11 03S -0.87 647 A 108 111 0.19 52 5 04S -0.76 648 A 109 75 0.21 33 6 04S +0.70 649 A 109 98 0.48 127 12 07S -0.82 650 A 109 117 0.38 123 10 10S -0.82 651 A 111 4 0.52 147 14 08S +0.73 652 A 111 48 0.33 88 9 05S -0.72 653 A 112 93 0.41 113 11 15S -0.81 654 A 112 94 0.24 84 6 03S +0.69 655

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 17 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg %TW Location A 112 115 0.37 67 10 loS -0.72 656 A 113 49 0.22 59 6 05S -0.69 657 A 113 72 0.44 104 14 04S +0.70 658 A 113 105 0.32 144 8 09S -0.84 659 A 113 111 0.25 93 7 07S -0.74 660 A 114 22 0.32 144 9 05S -0.80 661 A 114 39 0.17 72 5 05S -0.73 662 A 114 109 0.3 114 8 07S -0.72 663 A 115 6 0.37 108 10 07S -0.73 664 A 115 15 0.18 128 5 05S -0.82 665 A 115 28 0.22 104 7 05S -0.75 666 A 115 43 0.18 97 5 05S -0.74 667 A 115 47 0.3 97 8 05S -0.77 668 A 115 50 0.29 82 8 05S -0.71 669 A 115 63 0.19 81 5 05S -0.79 670 A 115 98 0.39 79 10 09S -0.89 671 A 116 5 0.12 128 4 08S +0.75 672 A 116 6 0.25 83 8 07S -0.68 673 A 116 21 0.26 128 7 05S -0.78 674 A 117 1 0.18 77 5 08S +0.81 675 A 117 24 0.18 65 5 05S -0.76 676 A 117 34 0.53 129 14 05S -0.80 677 A 118 87 0.19 77 5 1OS -0.66 678 A 118 98 0.31 70 8 05S -0.86 679 A 118 101 0.35 139 9 07S -0.75 680 A 119 2 0.22 71 6 10S -0.44 681 A 119 3 0.24 130 7 08S +0.75 682 A 119 70 0.1 90 3 04S +0.68 683 A 119 89 0.28 93 7 15S +0.77 684 A 119 102 0.49 65 12 07S -0.79 685 A 119 108 0.36 30 10 loS -0.80 686 A 120 1 0.33 94 9 08S +0.79 687 A 120 2 0.25 134 7 13S -0.80 688 A 120 107 0.41 159 11 10S +0.67 689 A 121 2 0.23 129 7 08S +0.70 690 A 121 32 0.23 128 6 05S -0.76 691 A 121 41 0.21 92 6 05S -0.72 692 A 121 73 0.16 91 5 08S +0.68 693 A 121 94 0.28 107 7 09S -0.82 694 A 121 105 0.45 50 12 lOS +0.53 695 A 122 1 0.19 91 5 11S -0.76 696 A 122 61 0.15 61 4 04S +0.68 697 A 122 93 0.21 321 4 15S -0.83 698 A 122 102 0.28 38 8 08S +0.07 699 A 122 103 0.5 135 13 10S -0.76 700 A 122 104 0.39 115 11 09S +0.69 701 A 123 1 0.21 79 6 08S +0.75 702 A 123 1 0.47 113 12 11S -0.79 702 A 123 1 0.23 103 6 12S +0.68 702

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 18 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location A 123 76 0.18 96 5 15S -0.79 703 A 123 92 0.22 139 6 15S -0.84 704 A 123 102 0.32 124 9 los -0.80 705 A 125 25 0.27 142 7 08S -0.76 706 A 125 26 0.2 77 5 08S -0.74 707 A 125 29 0.31 82 8 08S -0.76 708 A 125 44 0.21 107 6 07S -0.74 709 A 125 63 0.33 41 11 08S +0.73 710 A 125 74 0.12 125 4 15S -0.83 711 A 125 75 0.23 115 8 15S -0.89 712 A 125 80 0.46 50 11 04S +0.66 713 A 125 100 0.46 34 12 08S +0.67 714 A 125 100 0.3 32 8 09S +0.76 714 A 126 92 0.44 102 11 07S -0.70 715 A 126 92 0.2 106 5 09S -0.75 715 A 127 45 0.19 126 5 05S -0.76 716 A 127 60 0.21 93 7 09S +0.69 717 A 127 71 0.39 83 11 09S +0.71 718 A 128 95 0.16 126 4 12S +0.58 719 A 129 3 0.77 75 17 12S +0.62 720 A 129 33 0.21 76 6 05S -0.72 721 A 129 77 0.3 141 8 04S +0.73 722 A 130 87 0.18 107 5 07S -0.77 723 A 131 72 0.64 157 15 07S +0.73 724 A 131 84 0.51 121 13 07S -0.82 725 A 132 2 0.37 40 9 1OS -0.67 726 A 132 13 0.34 135 9 12S -0.80 727 A 132 15 0.43 133 11 14S -0.78 728 A 132 32 0.27 100 8 15S +0.65 729 A 132 80 0.3 142 8 09S +0.69 730 A 132 80 0.45 143 11 07S -0.77 730 A 133 1 0.16 103 5 lOS -0.69 731 A 133 2 0.36 106 10 10S -0.78 732 A 133 3 0.51 103 12 10S -0.75 733 A 133 19 0.28 104 7 11S -0.42 734 A 134 3 0.83 92 21 12S +0.62 735 A 134 85 0.13 68 5 1OS +0.53 736 A 135 71 0.64 108 20 09S -0.77 737 A 135 72 0.37 117 10 09S +0.69 738 A 136 4 0.46 108 11 10S -0.78 739 A 136 10 0.28 104 8 08S -0.73 740 A 136 10 0.35 124 9 05S -0.81 740 A 136 15 0.26 161 7 08S +0.75 741 A 136 80 0.17 85 6 08S -0.66 742 A 137 1 0.4 107 11 09S +0.73 743 A 137 3 0.46 107 11 10S -0.80 744 A 137 11 0.45 95 11 08S -0.76 745 A 137 14 0.12 101 4 08S -0.71 746 A 137 17 0.44 161 12 08S +0.69 747

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 19 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg %TW Location A 138 2 0.29 115 8 10S -0.82 748 A 138 2 0.33 151 8 09S -0.78 748 A 138 8 0.35 130 9 09S -0.87 749 A 138 26 0.28 126 7 06S +0.81 750 A 138 68 0.06 98 2 04S +0.62 751 A 138 74 0.28 87 8 12S +0.69 752 A 139 2 0.35 106 10 lOS -0.74 753 A 139 3 0.24 144 6 08S +0.78 754 A 139 3 0.51 122 12 1OS -0.82 754 A 139 4 0.17 132 5 1OS -0.78 755 A 139 5 0.27 112 7 09S +0.62 756 A 139 13 0.39 152 11 08S +0.69 757 A 139 16 0.43 151 12 11S -0.87 758 A 139 47 0.26 81 7 09S +0.62 759 A 139 62 0.68 146 17 11S -0.83 760 A 140 2 0.66 97 15 lOS -0.80 761 A 140 2 0.4 134 10 08S +0.78 761 A 140 3 0.52 95 14 lOS -0.71 762 A 140 14 0.28 154 7 08S +0.81 763 A 140 52 0.3 90 8 06S -0.02 764 A 141 2 0.93 97 19 10S -0.79 765 A 141 3 0.37 106 11 10S -0.69 766 A 141 47 0.58 94 15 09S +0.65 767 A 143 16 0.28 147 7 09S -0.79 768 A 143 43 0.24 109 7 07S -0.66 769 A 143 46 0.34 62 10 07S -0.74 770 A 143 47 0.29 108 8 07S -0.79 771 A 143 48 0.44 61 12 07S -0.75 772 A 143 50 0.4 113 11 06S +0.67 773 A 143 57 0.49 127 13 09S +0.69 774 A 144 14 0.26 131 7 07S -0.67 775 A 144 22 0.2 69 5 07S -0.69 776 A 144 24 0.29 120 8 07S -0.80 777 A 144 25 0.29 130 8 07S -0.62 778 A 145 2 0.24 141 6 10S -0.70 779 A 145 9 0.19 188 5 09S -0.74 780 A 145 12 0.19 111 5 07S -0.76 781" A 145 15 0.33 101 8 15S -0.81 782 A 145 16 0.31 135 8 07S -0.67 783 A 145 20 0.27 123 8 07S -0.62 784 A 145 25 0.27 26 8 05S -0.76 785 A 145 26 0.2 99 6 07S +0.67 786 A 145 31 0.23 138 7 07S -0.90 787 A 145 32 0.2 83 6 07S -0.73 788 A 145 33 0.21 99 6 07S -0.73 789 A 145 42 0.31 98 9 11S -0.80 790 A 145 42 0.3 86 8 08S -0.60 790 A 145 47 0.36 36 10 05S -0.87 791 A 145 52 0.67 96 16 12S +0.69 792

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 20 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location A 146 4 0.32 145 9 08S +0.80 793 A 146 5 0.29 115 8 09S +0.65 794 A 146 7 0.61 118 15 08S +0.80 795 A 146 7 0.36 66 10 08S -0.74 795 A 146 7 0.35 111 10 07S +0.74 795 A 146 8 0.3 135 8 08S +0.76 796 A 146 11 0.24 100 6 07S -0.71 797 A 146 15 0.24 88 6 07S +0.78 798 A 146 15 0.33 98 8 08S +0.83 798 A 146 16 0.23 121 6 07S -0.63 799 A 146 18 0.29 114 8 08S -0.55 800 A 146 21 0.47 87 11 07S -0.65 801 A 146 22 0.56 105 14 07S -0.60 802 A 146 23 0.22 112 6 07S -0.63 803 A 146 25 0.39 83 11 07S -0.80 804 A 146 26 0.39 110 11 07S -0.79 805 A 146 29 0.45 117 12 07S -0.71 806 A 146 34 0.48 110 13 08S -0.66 807 A 146 38 0.21 99 6 07S -0.73 808 A 146 49 0.34 111 10 10S -0.67 809 A 146 50 0.45 113 12 10S -0.69 810 A 147 2 0.11 105 3 09S +0.72 811 A 147 2 0.14 61 4 07S +0.82 811 A 147 13 0.3 100 9 07S -0.73 812 A 147 14 0.24 95 6 08S -0.63 813 A 147 15 0.32 113 9 07S -0.60 814 A 147 16 0.31 102 8 07S -0.65 815 A 147 18 0.22 48 6 08S -0.58 816 A 147 20 0.26 114 8 08S -0.58 817 A 147 30 0.38 111 10 12S +0.67 818 A 147 31 0.29 110 8 08S -0.68 819 A 148 1 0.21 128 6 08S -0.64 820 A 148 1 0.17 107 5 07S -0.69 820 A 148 2 0.27 130 8 14S -0.02 821 A 148 3 0.42 93 12 llS +0.62 822 A 148 3 0.15 106 5 07S +0.80 822 A 148 4 0.4 132 11 los -0.90 823 A 148 6 0.34 157 10 lOS -0.87 824 A 148 10 0.38 149 10 08S +0.80 825 A 148 13 0.4 140 11 07S +0.76 826 A 148 14 0.34 142 9 07S +0.81 827 A 148 15 0.29 103 8 07S -0.60 828 A 148 19 0.18 135 5 08S -0.60 829 A 148 22 0.19 94 5 08S -0.68 830 A 148 23 0.3 143 8 12S -0.84 831 A 148 36 0.45 87 12 10S -0.80 832 A 149 3 0.34 118 10 14S -0.89 833 A 149 6 0.42 129 12 07S +0.76 834 A 149 8 0.26 127 7 07S +0.76 835

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 21 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Tube Row Volts Deg %TW Location Count OTSG A 149 10 0.18 143 5 07S +0.78 836 A 149 11 0.6 87 14 08S -0.79 837 A 149 12 0.31 100 9 loS +0.69 838 A 149 12 0.3 123 8 08S -0.58 838 A 149 14 0.57 93 15 10S -0.72 839 A 149 15 0.36 88 9 1OS -0.58 840 A 149 19 0.64 101 16 lOS -0.80 841 A 149 19 0.34 114 9 12S -0.73 841 A 149 20 0.57 107 14 lOS -0.76 842 A 149 21 0.49 101 12 10S -0.73 843 A 149 28 0.76 85 18 10S -0.66 844 A 15.0 7 0.53 86 13 10S -0.74 845 A 150 10 0.51 112 13 10S -0.76 846 A 150 11 0.29 96 7 10S -0.65 847 A 150 14 0.41 98 11 1OS -0.82 848 A 150 15 0.76 103 17 10S -0.75 849 A 150 16 0.66 94 16 lOS -0.84 850 A 150 17 0.47 117 12 10S -0.69 851 A 150 18 0.51 104 13 10S -0.62 852 A 150 19 0.4 92 11 10S -0.47 853 B 1 5 0.2 89 6 10S -0.11 1 B 1 14 0.23 92 8 09S +0.84 2 B 1 15 0.19 103 5 13S -0.82 3 B 2 7 0.4 120 8 11S +0.60 4 B 2 10 0.42 138 12 09S -0.62 5 B 2 13 0.25 89 6 09S -0.74 6 B 2 20 0.45 112 14 10S -0.57 7 B 2 21 0.73 105 16 10S -0.66 8 B 2 22 0.36 64 12 10S -0.62 9 B 2 23 0.39 144 10 10S -0.76 10 B 2 25 0.28 60 7 08S -0.72 11 B 2 25 0.3 95 8 1OS -0.87 11 B 2 25 0.12 322 3 11S -0.81 11 B 2 26 0.27 127 9 08S -0.63 12 B 2 26 0.28 108 10 lOS -0.57 12 B 2 27 0.25 82 9 07S -0.68 13 B 2 27 0.3 113 10 09S +0.73 13 B 2 27 0.34 104 11 10S -0.57 13 B 3 1 0.37 81 8 07S +0.61 14 B 3 13 0.19 100 4 09S +0.49 15 B 3 15 0.46 106 9 09S +0.70 16 B 3 18 0.18 121 5 08S +0.64 17 B 3 19 0.25 43 9 10S -0.75 18 B 3 21 0.29 63 10 10S -0.71 19 B 3 23 0.28 123 7 09S +0.68 20 B 3 24 0.17 108 6 09S -0.70 21 B 3 24 0.54 98 16 1OS -0.71 21 B 3 25 0.41 106 10 10S -0.64 22

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 22 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location B 3 25 0.56 104 13 loS +0.55 22 B 3 26 0.65 117 19 loS +0.09 23 B 3 29 0.13 91 3 09S -0.72 24 B 3 30 0.25 149 8 08S +0.50 25 B 4 3 0.35 39 11 09S -0.80 26 B 4 13 0.36 106 11 08S -0.73 27 B 4 16 0.3 87 6 08S -0.73 28 B 4 17 0.46 101 13 09S +0.60 29 B 4 18 0.39 102 8 09S +0.68 30 B 4 19 0.49 98 14 09S +0.67 31 B 4 22 0.19 67 5 lOS -0.79 32 B 4 24 0.49 91 12 09S -0.81 33 B 4 25 0.18 95 6 09S -0.75 34 B 4 26 0.2 93 5 09S -0.75 35 B 4 29 0.22 106 8 09S -0.70 36 B 4 32 0.16 102 4 09S -0.79 37 B 4 34 0.09 102 2 09S -0.81 38 B 4 35 0.21 108 7 08S +0.72 39 B 4 36 0.11 91 3 09S -0.79 40 B 5 5 0.47 46 9 05S -0.84 41 B 5 9 0.18 84 4 07S -0.79 42 B 5 13 0.31 107 6 03S -0.82 43 B 5 24 0.24 27 8 08S -0.77 44 B 5 26 0.35 95 11 07S +0.75 45 B 5 27 0.36 87 9 07S +0.61 46 B 5 27 0.14 68 4 08S -0.81 46 B 5 30 0.15 77 5 08S -0.72 47 B 5 30 0.19 93 7 09S -0.73 47 B 5 34 0.14 135 5 08S -0.72 48 B 5 37 0.22 99 6 06S -0.78 49 B 5 37 0.15 115 4 07S -0.79 49 B 5 37 0.33 81 8 07S +0.72 49 B 5 37 0.14 67 4 09S -0.78 49 B 5 38 0.27 85 9 07S +0.72 50 B 5 38 0.66 89 19 09S -0.77 50 B 5 44 0.38 86 12 09S -0.81 51 B 5 44 0.26 69 9 13S -0.75 51 B 5 44 0.23 114 8 12S -0.75 51 B 5 46 0.21 81 7 09S -0.70 52 B 6 7 0.23 92 7 08S +0.60 53 B 6 9 0.26 115 8 1OS -0.78 54 B 6 9 0.34 98 10 08S +0.64 54 B 6 13 0.2 128 6 08S -0.79 55 B 6 13 0.15 82 5 09S -0.88 55 B 6 17 0.19 28 4 07S -0.77 56 B 6 17 0.21 161 4 08S -0.84 56 B 6 17 0.2 141 4 09S -0.73 56 B 6 18 0.22 92 7 08S -0.71 57 B 6 18 0.17 80 6 09S -0.75 57

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 23 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location B 6 22 0.25 94 8 09S +0.60 58 B 6 25 0.22 122 6 07S +0.68 59 B 6 26 0.3 .74 10 12S -0.73 60 B 6 27 0.26 116 7 08S +0.36 61 B 6 27 0.13 55 3 09S -0.75 61 B 6 28 0.23 71 8 07S +0.73 62 B 6 31 0.25 95 6 10S -0.77 63 B 6 36 0.26 98 9 08S -0.66 64 B 6 39 0.29 90 7 08S +0.70 65 B 6 39 0.09 77 2 08S -0.71 65 B 6 39 0.19 91 5 09S -0.81 65 B 6 40 0.22 104 8 08S +0.70 66 B 6 41 0.19 71 5 09S -0.79 67 B 6 43 0.17 42 5 07S -0.71 68 B 6 43 0.23 26 6 09S -0.71 68 B 6 44 0.28 91 9 07S -0.70 69 B 6 44 0.25 76 9 08S +0.70 69 B 6 44 0.57 83 17 09S -0.75 69 B 6 44 0.26 101 9 07S +0.77 69 B 6 46 0.55 91 16 08S -0.68 70 B 6 49 0.4 92 10 09S -0.76 71 B 6 49 0.24 34 6 1OS -0.73 71 B 6 49 0.12 79 3 12S -0.57 71 B 6 50 0.23 87 8 07S -0.66 72 B 6 50 0.29 108 10 10S -0.51 72 B 6 50 0.29 121 10 13S -0.80 72 B 6 50 0.24 60 8 07S +0.72 72 B 7 4 0.39 61 11 14S -0.80 73 B 7 4 0.41 44 11 13S -0.81 73 B 7 8 0.35 152 7 08S +0.58 74 B 7 9 0.47 28 12 09S -0.86 75 B 7 10 0.5 93 10 08S +0.56 76 B 7 11 0.3 90 9 08S -0.80 77 B 7 12 0.23 126 5 08S +0.55 78 B 7 15 0.27 114 8 08S -0.73 79 B 7 16 0.32 123 6 08S +0.56 80 B 7 16 0.17 113 4 08S -0.80 80 B 7 17 0.2 97 6 09S -0.84 81 B 7 18 0.15 149 3 08S -0.82 82 B 7 19 0.18 95 5 08S -0.77 83 B 7 19 0.27 105 8 03S -0.79 83 B 7 20 0.81 97 14 07S +0.73 84 B 7 22 0.33 128 7 08S +0.51 85 B 7 25 0.15 120 5 08S -0.81 86 B 7 26 0.4 77 11 12S -0.89 87 B 7 26 0.23 133 7 09S -0.73 87 B 7 26 0.35 126 10 07S +0.66 87 B 7 26 0.14 62 4 09S +0.04 87 B 7 28 0.4 95 13 08S +0.66 88

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 24 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location B 7 29 0.53 121 12 07S -0.74 89 B 7 29 0.49 94 12 07S +0.72 89 B 7 29 0.44 99 11 08S +0.55 89 B 7 29 0.49 93 12 09S -0.77 89 B 7 29 0.18. 79 5 09S +0.71 89 B 7 29 0.16 78 4 loS -0.78 89 B 7 30 0.41 65 13 04S -0.72 90 B 7 30 0.42 88 13 07S -0.70 90 B 7 30 0.36 73 12 07S +0.75 90 B 7 30 0.48 68 15 08S -0.70 90 B 7 30 1.19 78 28 08S +0.68 90 B 7 30 1.06 78 26 09S -0.68 90 B 7 33 0.1 136 3 02S +0.26 91 B 7 42 0.25 82 9 07S +0.75 92 B 7 42 0.23 102 8 09S -0.75 92 B 7 43 0.11 116 3 06S -0.77 93 B 7 43 0.25 80 6 08S -0.81 93 B 7 43 0.23 84 6 09S -0.77 93 B 7 44 0.4 153 13 07S +0.74 94 B 7 45 0.27 43 7 09S -0.81 95 B 7 47 0.33 113 8 07S +0.61 96 B 7 47 0.27 56 7 09S -0.81 96 B 7 52 0.23 54 8 09S -0.70 97 B 7 52 0.22 105 8 1OS +0.72 97 B 7 52 0.26- 70 9 13S -0.80 97 B 7 53 0.34 95 8 13S -0.79 98 B 8 4 0.3 116 9 10S -0.80 99 B 8 7 0.55 37 14 08S -0.81 100 B 8 10 0.33 91 7 08S +0.58 101 B 8 13 0.32 155 9 06S -0.82 102 B 8 15 0.44 77 12 07S +0.68 103 B 8 16 0.2 121 4 09S -0.82 104 B 8 17 0.2 124 6 06S -0.77 105 B 8 17 0.3 91 9 08S -0.84 105 B 8 17 0.22 100 7 09S -0.88 105 B 8 18 0.17 86 3 08S +0.58 106 B 8 18 0.22 114 5 07S +0.58 106 B 8 20 0.23 94 5 08S -0.76 107 B 8 20 0.15 106 3 08S +0.42 107 B 8 22 0.24 72 5 08S +0.53 108 B 8 24 0.14 127 3 09S -0.77 109 B 8 31 0.27 78 9 07S +0.66 110 B 8 31 0.37 61 12 03S -0.72 110 B 8 31 0.37 42 12 03S +0.77 110 B 8 31 0.29 85 10 09S -0.75 110 B 8 34 0.19 98 5 09S -0.79 111 B 8 36 0.17 104 5 09S -0.77 112 B 8 39 0.18 92 6 09S -0.72 113 B 8 43 0.2 102 7 09S -0.77 114

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 25 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 8 46 0.35 55 9 07S -0.67 115 B 8 46 0.42 66 10 07S +0.66 115 B 8 46 0.22 66 6 09S -0.80 115 B 8 49 0.16 33 4 08S -0.72 116 B 8 49 0.38 89 9 08S +0.65 116 B 8 50 0.23 71 8 07S -0.39 117 B 8 51 0.22 55 6 09S -0.77 118 B 8 52 0.18 64 6 09S -0.68 119 B 9 1 0.39 42 7 12S -0.77 120 B 9 1 0.33 78 6 09S -0.84 120 B 9 2 0.21 111 6 12S +0.62 121 B 9 4 0.51 98 13 09S -0.77 122 B 9 5 0.37 64 10 14S +/-0.77 123 B 9 5 0.77 98 18 07S -0.75 123 B 9 5 0.58 90 15 09S -0.77 123 B 9 7 0.3 112 9 09S -0.80 124 B 9 10 0.44 21 8 09S -0.82 125 B 9 12 0.36 100 7 08S -0.75 126 B 9 12 0.34 95 7 03S -0.80 126 B 9 13 0.45 62 12 08S -0.79 127 B 9 13 0.51 32 13 06S -0.84 127 B 9 16 0.29 106 8 08S +0.46 128 B 9 16 0.23 53 7 06S -0.73 128 B 9 17 0.55 107 10 09S -0.84 129 B 9 17 0.29 43 6 07S +0.53 129 B 9 18 0.37 73 10 08S -0.86 130 B 9 21 0.23 106 5 08S +0.29 131 B 9 27 0.23 137 5 09S -0.80 132 B 9 38 0.16 120 6 09S -0.73 133 B 9 46 0.23 63 8 07S -0.72 134 B 9 49 0.21 105 5 09S -0.77 135 B 9 51 0.29 6 7 09S -0.80 136 B 9 52 0.49 82 15 08S +0.72 137 B 9 52 0.21 110 7 09S -0.74 137 B 9 53 0.19 110 5 09S -0.74 138 B 9 54 0.24 81 8 09S -0.74 139 B 9 62 0.16 46 3 13S -0.87 140 B 10 2 0.38 41 10 09S -0.77 141 B 10 2 0.21 95 6 03S -0.84 141 B 10 6 0.18 107 4 12S -0.82 142 B 10 7 0.55 82 14 14S -0.84 143 B 10 8 0.55 152 10 09S -0.89 144 B 10 16 0.28 40 6 06S +/-0.67 145 B 10 18 0.21 68 4 06S +0.62 146 B 10 18 0.24 111 5 09S -0.84 146 B 10 20 0.18 48 4 06S +0.60 147 B 10 26 0.31 149 6 09S -0.82 148 B 10 *27 0.39 102 11 09S -0.88 149 B 10 35 0.35 94 11 09S -0.75 150

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 26 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

S~OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 10 54 0.2 55 5 08S -0.71 151 B 11 2 0.4 47 11 los -0.86 152 B I11 10 0.52 149 10 08S -0.87 153 B 11 11 0.47 41 12 09S -0.82 154 B 11 55 0.37 62 12 08S -0.68 155 B 11 57 0.24 88 8 08S +0.31 156 B 11 57 0.25 87 9 09S -0.72 156 B 11 59 0.55 85 16 09S +0.69 157 B 11 68 0.2 96 6 13S -0.89 158 B 11 68 0.33 74 10 09S +0.62 158 B 11 68 0.24 72 7 07S -0.78 158 B 12 1 0.43 94 8 13S +0.66 159 B 12 1 0.51 130 9 13S -0.89 159 B 12 1 0.48 123 9 08S -0.84 159 B 12 2 0.41 117 11 13S +0.53 160 B 12 4 0.38 63 11 13S -0.90 161 B 12 4 0.34 92 10 09S -0.82 161 B 12 6 0.5 61 13 09S -0.75 162 B 12 7 0.31 116 6 09S -0.84 163 B 12 7 0.27 134 5 08S -0.84 163 B 12 9 0.45 100 8 08S -0.84 164 B 12 37 0.18 87 5 07S -0.79 165 B 12 37 0.18 92 5 09S -0.75 165 B 12 40 0.31 84 10 07S -0.79 166 B 12 59 0.19 94 5 09S -0.79 167 B 12 66 0.31 101 9 lOS -0.80 168 B 12 66 0.27 85 8 09S -0.77 168 B 12 71 0.24 81 7 13S -0.88 169 B 13 1 0.51 112 9 13S -0.84 170 B 13 1 0.32 78 6 08S -0.84 170 B 13 2 0.33 81 9 13S -0.77 171 B 13 3 0.27 99 5 13S -0.86 172 B 13 3 0.19 118 4 09S -0.82 172 B 13 9 0.28 45 5 09S -0.84 173 B 13 9 0.46 89 9 08S -0.84 173 B 13 10 0.24 89 7 03S -0.79 174 B 1 13 20 0.42 93 8 07S -0.78 175 B 13 22 0.4 106 8 07S -0.82 176 B 13 27 0.35 102 10 03S -0.84 177 B 13 36 0.22 111 7 08S -0.81 178 B 13 43 0.75 97 17 09S -0.68 179 B 13 70 0.28 141 6 09S -0.80 180 B 13 72 0.15 78 3 09S -0.80 181 B 13 73 0.29 85 9 09S +0.62 182 B 13 73 0.4 46 12 09S -0.73 182 B 13 74 0.17 84 4 07S +0.73 183 B 14 5 0.33 83 6 09S -0.80 184 B 14 6 0.51 135 13 08S -0.88 185 B 14 6 0.35 41 10 08S +0.62 185

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 27 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Tube Row Volts Deg %TW Location Count OTSG B 14 7 0.51 81 9 09S -0.80 186 B 14 7 0.15 100 3 07S -0.77 186 B 14 10 0.41 121 11 08S -0.86 187 B 14 13 0.25 77 7 09S -0.86 188 B 14 25 0.24 69 7 07S -0.80 189 B 14 25 0.27 74 8 03S -0.82 189 B 14 26 0.55 83 10 03S -0.80 190 B 14 27 0.51 77 13 07S -0.77 191 B 14 67 0.31 98 7 09S -0.78 192 B 14 67 0.23 123 5 07S +0.69 192 B 14 70 0.34 148 10 09S -0.80 193 B 14 70 0.46 59 13 07S -0.82 193 B 14 71 0.31 39 7 07S +0.66 194 B 14 72 0.29 62 9 07S -0.77 195 B 14 75 0.64 109 12 15S -0.84 196 B 15 3 0.71 50 13 09S -0.77 197 B 15 5 0.25 133 5 13S -0.85 198 B 15 5 0.29 89 6 08S -0.84 198 B 15 6 0.35 54 10 07S -0.77 199 B 15 7 0.44 73 8 09S -0.80 200 B 15 8 0.39 44 11 09S -0.84 201 B 15 10 0.63 44 16 08S -0.77 202 B 15 12 0.43 83 12 10S -0.76 203 B 15 12 0.52 45 14 09S +0.82 203 B 15 32 0.25 58 5 07S -0.87 204 B 15 35 0.7 98 17 09S -0.82 205 B 15 64 0.42 106 13 09S -0.74 206 B 15 69 0.65 100 17 07S +0.68 207 B 15 70 0.45 94 9 07S +0.43 208 B 15 73 0.22 95 7 09S -0.82 209 B 15 75 1 123 23 10S +0.00 210 B 15 75 0.44 137 12 09S +0.60 210 B 15 75 0.4 65 11 09S -0.77 210 B 15 75 0.27 46 8 08S -0.73 210 B 15 75 0.76 20 19 07S -0.75 210 B 16 1 0.26 120 7 13S -0.84 211 B 16 6 0.44 81 8 09S -0.82 212 B 16 7 0.37 59 10 09S -0.77 213 B 16 10 0.42 55 8 09S -0.82 214 B 16 13 0.35 45 10 08S +0.60 215 B 16 19 0.35 137 10 09S -0.82 216 B 16 32 0.27 93 5 03S -0.84 217 B 16 34 0.28 93 6 03S -0.77 218 B 16 36 0.18 96 4 07S -0.78 219 B 16 38 0.44 84 8 07S -0.82 220 B 16 59 0.26 78 8 13S -0.75 221 B 16 74 0.18 146 6 09S -0.77 222 B 16 76 0.58 67 15 07S -0.77 223 B 16 77 0.42 109 9 09S +0.63 224

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 28 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

S~OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 16 77 0.17 50 4 08S -0.77 224 B 16 77 0.39 140 8 07S -0.58 224 B 16 80 0.39 88 11 09S -0.73 225 B 17 5 0.46 66 9 09S -0.77 226 B 17 6 0.37 98 10 09S -0.75 227 B 17 7 0.28 60 5 09S -0.79 228 B 17 22 0.28 81 8 09S -0.84 229 B 17 28 0.41 45 11 07S -0.84 230 B 17 45 0.39 105 12 09S -0.77 231 B 17 59 0.37 91 11 12S -0.73 232 B 17 65 0.38 107 12 09S -0.74 233 B 17 74 0.19 129 4 09S -0.78 234 B 17 74 0.77 84 15 07S -0.73 234 B 17 75 0.3 131 9 09S -0.79 235 B 17 75 0.38 96 11 07S +/-0.64 235 B 17 76 0.37 44 8 09S -0.77 236 B 17 77 0.29 103 9 09S -0.79 237 B 17 78 0.4 113 8 09S +0.60 238 B 17 82 0.27 76 6 09S -0.75 239 B 18 4 0.26 79 5 095 -0.80 240 B 18 8 0.61 17 12 09S +0.62 241 B 18 9 0.23 112 8 09S -0.82 242 B 18 9 0.39 62 12 02S +0.88 242 B 18 14 0.36 80 7 08S -0.78 243 B 18 17 0.47 122 14 035 -0.71 244 B 18 21 0.45 84 8 03S -0.73 245 B 18 30 0.24 115 7 09S -0.81 246 B 18 32 0.35 85 7 los -0.81 247 B 18 39 0.22 90 5 09S -0.82 248 B 18 43 0.26 84 8 07S -0.68 249 B 18 47 0.21 108 7 06S -0.68 250 B 18 68 0.23 91 8 13S -0.79 251 B 18 75 0.31 77 7 09S -0.80 252 B 18 75 0.25 44 5 07S -0.75 252 B 18 76 0.43 109 12 07S +0.62 253 B 18 76 0.2 134 6 07S -0.73 253 B 18 77 0.37 109 8 08S +0.44 254 B 18 79 0.31 90 7 09S -0.77 255 B 18 79 0.25 ill 5 09S +0.62 255 B 19 5 0.36 117 11 09S -0.84 256 B 19 6 0.53 57 10 09S -0.75 257 B 19 6 0.25 91 5 08S -0.82 257 B 19 7 0.39 73 12 08S -0.82 258 B 19 7 0.27 90 9 09S -0.84 258 B 19 8 0.19 81 4 08S -0.80 259 B 19 9 0.31 115 10 08S -0.84 260 B 19 10 0.61 60 11 08S -0.82 261 B 19 11 0.22 94 7 08S -0.86 262 B 1 19 18 0.26 91 5 03S -0.75 263

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 29 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location B 19 19 0.52 79 14 07S -0.73 264 B 19 21 0.35 93 10 07S -0.79 265 B 19 28 0.3 98 6 07S -0.78 266 B 19 30 0.64 66 12 07S -0.69 267 B 19 32 0.2 84 4 07S -0.75 268 B 19 32 0.31 72 6 03S -0.77 268 B 19 40 0.25 117 5 09S -0.90 269 B 19 46 0.41 99 12 09S -0.72 270 B 19 77 0.53 81 14 07S +0.53 271 B 19 78 0.47 57 10 09S -0.77 272 B 19 78 0.42 55 9 07S -0.75 272 B 19 78 0.32 131 7 07S +0.57 272 B 19 79 0.22 108 7 09S -0.79 273 B 19 80 0.37 87 8 09S -0.77 274 B 19 83 0.28 126 8 09S +0.60 275 B 19 83 0.21 96 7 09S -0.84 275 B 20 5 0.4 105 12 08S -0.78 276 B 20 6 0.35 48 7 09S -0.76 277 B 20 6 0.36 95 7 08S -0.84 277 B 20 9 0.62 76 17 08S -0.86 278 B 20 10 0.54 85 10 08S -0.84 279 B 20 74 0.41 34 12 09S -0.79 280 B 20 75 0.26 96 5 09S -0.82 281 B 20 76 0.37 43 11 07S +0.66 282 B 20 77 0.33 112 7 09S -0.75 283 B 20 77 0.26 111 5 08S +0.55 283 B 20 77 0.33 104 7 07S +0.62 283 B 20 85 0.29 148 6 09S -0.79 284 B 21 1 0.23 75 5 12S -0.84 285 B 21 4 0.5 57 15 08S -0.86 286 B 21 10 0.4 78 12 08S -0.84 287 B 21 11 0.62 34 12 08S -0.80 288 B 21 37 0.36 103 10 09S -0.77 289 B 21 38 0.51 90 9 09S -0.80 290 B 21 40 0.39 99 7 09S -0.82 291 B 21 40 0.24 77 5 07S -0.71 291 B 21 81 0.59 93 16 07S -0.73 292 B 21 81 0.31 106 10 07S +0.53 292 B 21 82 0.29 88 6 09S -0.75 293 B 21 82 0.33 119 7 07S +0.55 293 B 21 83 0.27 122 9 09S -0.79 294 B 21 83 0.32 111 10 07S +0.57 294 B 21 84 0.14 78 3 09S -0.80 295 B 21 87 0.39 128 12 09S +0.58 296 B 21 87 0.14 44 5 09S -0.84 296 B 22 4 0.27 65 6 08S -0.82 297 B 22 5 0.25 76 8 08S -0.88 298 B 22 6 0.27 79 6 09S -0.75 299 B 22 35 0.43 82 8 07S -0.78 300

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3FO508-03 Page 30 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 22 36 0.27 114 8 09S -0.82 301 B 22 84 0.21 132 7 09S -0.81 302 B 22 84 0.33 92 10 07S +0.68 302 B 22 85 0.26 109 5 08S +0.33 303 B 22 93 0.32 100 10 09S -0.75 304 B 23 5 0.54 58 10 08S -0.82 305 B 23 7 0.43 34 9 09S -0.84 306 B 23 9 0.29 60 6 09S -0.78 307 B 23 9 0.22 81 5 08S -0.84 307 B 23 10 0.34 139 11 08S -0.84 308 B 23 12 0.29 73 9 08S -0.89 309 B 23 36 0.48 78 9 03S -0.76 310 B 23 50 0.37 87 9 07S -0.70 311 B 23 63 0.25 89 8 03S -0.72 312 B 23 63 0.23 94 7 05S -0.66 312 B 23 63 0.21 103 7 09S -0.70 312 B 23 83 0.29 74 9 09S -0.80 313 B 23 85 0.2 119 6 09S -0.82 314 B 23 86 0.19 105 4 09S -0.75 315 B 23 86 0.19 96 4 07S +0.75 315 B 23 88 0.16 97 3 09S -0.84 316 B 23 91 0.28 51 9 09S +0.60 317 B 23 91 0.21 76 7 09S -0.82 317 B 24 4 0.33 71 10 08S +0.58 318 B 24 4 0.39 103 12 08S -0.82 318 B 24 9 0.43 125 8 09S +0.62 319 B 24 43 0.26 86 5 03S -0.78 320 B 24 58 0.12 36 4 06S -0.78 321 B 1 24 87 0.25 85 5 09S -0.77 322 B 24 88 0.24 ill 8 09S -0.82 323 B 24 89 0.28 134 6 07S +0.53 324 B 24 89 0.25 147 5 07S -0.77 324 B 24 92 0.38 44 11 08S -0.82 325 B 24 93 0.3 94 6 09S -0.73 326 B 24 93 0.29 45 6 07S +0.66 326 B 24 95 0.2 87 4 07S -0.77 327 B 24 95 0.24 107 5 13S -0.80 327 B 1 25 4 0.28 72 9 08S -0.88 328 B 25 8 0.23 70 8 09S +0.60 329 B 25 10 1.03 102 18 09S +0.62 330 B 25 14 0.22 101 4 08S -0.78 331 B 25 38 0.47 87 9 09S -0.78 332 B 25 39 0.54 81 15 03S -0.77 333 B 25 86 0.33 98 7 09S -0.79 334 B 25 88 0.25 100 5 09S -0.77 335 B 25 91 0.24 124 8 09S -0.82 336 B 25 92 0.23 99 5 07S +0.68 337 B 25 98 0.34 1 131 7 09S -0.79 338 B 26 5 0.25 1 131 8 09S -0.80 339

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 31 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location B 26 7 0.22 103 7 09S -0.82 340 B 26 7 0.3 111 10 08S -0.80 340 B 26 9 0.45 99 13 09S +0.65 341 B 26 23 0.33 85 7 03S -0.75 342 B 26 26 0.37 45 11 07S -0.82 343 B 26 26 0.29 139 9 03S -0.77 343 B 26 93 0.15 86 5 08S +0.13 344 B 26 93 0.24 93 8 07S +0.62 344 B 26 94 0.25 88 5 07S +0.66 345 B 26 96 0.2 120 4 08S -0.73 346 B 26 97 0.27 52 8 08S -0.82 347 B 26 98 0.31 63 6 07S -0.77 348 B 27 5 0.32 149 6 09S +0.65 349 B 27 5 0.44 79 9 09S -0.78 349 B 27 6 0.41 71 12 08S -0.77 350 B 27 6 0.18 111 6 08S +0.62 350 B 27 6 0.57 51 16 07S +0.62 350 B 27 9 0.28 92 6 08S -0.87 351 B 27 10 0.32 63 10 08S -0.86 352 B 27 21 0.8 18 20 09S -0.74 353 B 27 32 0.5 81 14 05S -0.77 354 B 27 40 0.42 124 9 03S -0.80 355 B 27 42 0.41 101 8 03S -0.80 356 B 27 45 0.3 87 9 03S -0.79 357 B 27 94 0.38 101 11 07S +0.55 358 B 27 94 0.25 70 8 07S -0.77 358 B 27 94 0.63 85 17 09S +0.60 358 B 27 94 0.68 117 18 08S +0.71 358 B 27 95 0.51 109 10 08S +0.62 359 B 27 98 0.29 127 9 09S -0.77 360 B 28 4 0.51 92 12 03S -0.72 361 B 28 4 0.26 55 7 08S -0.72 361 B 28 4 0.23 102 6 08S +0.61 361 B 28 5 0.38 45 11 07S -0.70 362 B 28 5 0.36 59 11 09S -0.72 362 B 28 6 0.27 100 7 09S -0.75 363 B 28 7 0.25 132 8 07S +0.77 364 B 28 7 .0.32 129 10 08S -0.77 364 B 28 13 0.35 61 11 05S -0.63 365 B 28 30 0.37 65 8 03S -0.87 366 B 28 38 0.18 96 4 09S -0.76 367 B 28 44 0.23 97 5 07S -0.73 368 B 28 94 0.21 91 7 09S -0.77 369 B 28 94 0.51 88 14 08S +0.66 369 B 28 94 0.58 96 16 08S -0.73 369 B 28 96 0.33 43 10 08S -0.75 370 B 28 96 0.36 136 11 07S -0.59 370 B 28 101 0.21 93 4 09S +0.62 371 B 29 6 0.48 108 11 08S -0.63 372

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 32 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B___

OTSG Tube Row Volts Deg BobTW Location Count B 29 7 0.37 125 11 07S +0.77 373 B 29 9 0.37 74 11 08S -0.74 374 B 29 17 0.28 72 9 03S -0.70 375 B 29 42 0.43 93 9 03S -0.82 376 B 29 94 0.19 120 6 09S -0.82 377 B 29 95 0.33 78 7 08S -0.77 378 B 29 98 0.55 142 15 08S TOSS5 379 B 29 100 0.18 86 6 09S -0.84 380 B 29 101 0.4 70 8 09S +0.57 381 B 29 101 0.22 82 4 09S -0.84 381 B 29 103 0.32 49 6 los +0.75 382 B 29 103 0.19 91 4 13S -0.82 382 B 29 104 0.17 95 3 13S -0.77 383 B 30 4 0.27 46 6 08S -0.66 384 B 30 7 0.22 114 7 07S -0.66 385 B 30 7 0.29 91 9 08S -0.74 385 B 30 9 0.2 61 6 08S -0.72 386 B 30 11 0.25 71 8 08S -0.72 387 B 30 14 0.61 58 13 09S -0.72 388 B 30 37 0.21 101 7 09S -0.84 389 B 30 41 0.42 89 12 03S -0.82 390 B 30 100 0.34 81 10 07S +0.75 391 B 31 5 0.59 74 13 03S -0.66 392 B 31 6 0.26 111 8 07S +0.72 393 B 31 6 0.39 131 12 08S +0.66 393 B 31 6 0.24 69 8 09S -0.70 393 B 31 7 0.4 100 9 08S -0.68 394 B 31 8 0.34 88 10 07S +0.79 395 B 31 12 0.23 115 7 08S -0.74 396 B 1 31 22 0.32 137 10 07S -0.72 397 B 31 42 1.15 82 19 09S -0.73 398 B 31 45 0.29 96 8 09S -0.82 399 B 31 58 0.26 72 8 03S -0.66 400 B 31 82 0.21 96 4 09S -0.82 401 B 32 6 0.75 81 19 03S -0.66 402 B 32 7 0.24 101 6 08S -0.66 403 B 1 32 8 0.26 116 8 08S -0.77 404 B 32 9 0.38 47 9 03S -0.61 405 B 32 11 0.37 68 9 08S -0.72 406 B 32 15 0.77 82 16 09S -0.61 407 B 32 25 0.47 66 10 03S -0.68 408 B 32 25 0.44 27 10 09S -0.72 408 B 32 35 0.71 66 13 09S -0.71 409 B 1 32 89 0.33 41 10 05S -0.78 410 B 32 106 0.39 103 12 lOS +0.19 411 B 33 6 0.36 44 11 08S -0.70 412 B 33 27 0.27 83 8 09S -0.79 413 B 33 47 0.46 74 12 09S -0.79 414 B 33 1 70 0.27 1 79 7 07S -0.70 415

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 33 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 34 7 0.3 117 9 07S +0.68 416 B 34 7 0.29 50 9 09S -0.73 416 B 34 8 0.45 48 10 09S -0.75 417 B 34 11 0.46 32 13 08S -0.74 418 B 34 103 0.19 109 4 08S -0.87 419 B 35 8 0.57 72 16 09S +0.64 420 B 35 20 0.64 73 13 04S -0.70 421 B 35 42 1.11 51 24 09S -0.73 422 B 35 60 0.26 102 6 06S -0.72 423 B 35 108 0.71 80 13 07S -0.69 424 B 36 1 0.3 115 10 13S -0.79 425 B 36 3 0.27 116 10 09S +/-0.72 426 B 36 5 0.32 66 11 09S +0.69 427 B 36 7 0.23 101 7 07S +0.79 428 B 36 8 0.25 65 6 08S -0.68 429 B 36 9 0.23 86 7 09S -0.75 430 B 36 10 0.37 81 9 09S +0.69 431 B 36 11 0.31 78 9 08S -0.75 432 B 36 12 0.2 113 5 08S -0.74 433 B 36 19 0.29 80 9 03S -0.70 434 B 36 19 0.54 94 15 09S -0.70 434 B 36 36 0.32 99 9 07S -0.82 435 B 36 42 0.34 121 7 03S -0.75 436 B 36 47 0.9 93 21 07S -0.73 437 B 36 57 0.47 99 14 09S -0.70 438 B 36 64 0.23 74 6 03S -0.63 439 B 36 92 0.4 89 12 03S -0.84 440 B 37 3 0.3 84 7 09S +/-0.70 441 B 37 6 0.45 93 14 05S -0.73 442 B 37 6 0.42 44 14 09S -0.80 442 B 37 8 0.33 104 10 07S +0.75 443 B 37 12 0.24 72 7 08S -0.72 444 B 37 12 0.48 83 14 09S -0.70 444 B 37 18 0.37 70 11 03S -0.66 445 B 37 21 0.2 118 5 07S -0.70 446 B 37 34 0.24 119 5 09S -0.77 447 B 37 48 0.59 91 15 07S -0.77 448 B 37 98 0.28 117 9 07S -0.79 449 B 37 114 0.33. 50 6 095 -0.80 450 B 37 114 0.22 73 4 05S -0.79 450 B 38 4 0.31 83 7 09S +0.72 451 B 38 5 0.42 97 14 09S +0.52 452 B 38 8 0.42 91 12 08S -0.72 453 B 38 10 0.34 117 10 09S +0.73 454 B 38 11 0.32 47 7 08S -0.53 455 B 38 27 0.45 45 10 03S -0.68 456 B 38 38 0.48 87 10 09S -0.70 457 B 38 45 0.34 41 7 07S -0.75 458 B 38 62 1 0.25 91 8 03S -0.72 459

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 34 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg %TW Location B 38 70 0.39 76 12 03S -0.68 460 B 38 75 0.24 100 6 07S -0.72 461 B 39 3 0.39 62 13 09S +0.66 462 B 39 5 0.37 132 12 09S +0.70 463 B 39 8 0.63 126 13 07S +0.73 464 B 39 9 0.4 85 12 07S +0.79 465 B 39 11 0.32 70 10 09S +0.69 466 B 39 34 0.49 96 10 09S -0.78 467 B 39 49 0.58 96 11 03S -0.76 468 B 39 61 0.57 77 16 09S -0.70 469 B 39 116 0.35 65 7 09S -0.78 470 B 40 3 0.43 45 14 09S +0.68 471 B 40 5 0.38 96 13 09S +0.70 472 B 40 6 0.44 121 9 09S -0.61 473 B 40 8 0.44 90 9 07S +0.71 474 B 40 9 0.35 90 10 07S +0.68 475 B 40 25 0.41 34 12 10S +0.86 476 B 40 35 0.31 85 9 02S -0.80 477 B 40 49 0.46 112 9 07S -0.76 478 B 40 52 0.53 86 11 07S -0.76 479 B 40 117 0.21 105 4 13S -0.78 480 B 41 4 0.48 66 10 09S +0.77 481 B 41 7 0.36 92 12 07S +0.69 482 B 41 8 0.29 109 6 07S +0.67 483 B 41 11 0.34 56 8 08S -0.66 484 B 41 38 0.94 86 17 09S -0.73 485 B 41 56 0.3 97 6 03S -0.75 486 B 42 7 0.33 71 11 07S +0.69 487 B 42 11 0.48 47 14 03S -0.61 488 B 42 11 0.24 61 7 09S +0.71 488 B 42 28 0.62 68 13 09S -0.70 489 B 42 46 0.38 86 8 09S -0.77 490 B 42 69 0.55 88 12 03S -0.63 491 B 42 113 0.43 46 8 09S -0.78 492 B 42 115 0.24 134 5 06S +0.62 493 B 42 117 0.27 118 5 13S -0.86 494 B 43 3 0.48 57 10 09S +0.75 495 B 43 4 0.33 57 11 05S +0.67 496 B 43 6 0.38 80 13 07S +0.67 497 B 43 7 0.32 90 7 07S +0.69 498 B 43 7 0.42 44 9 09S -0.74 498 B 43 8 0.23 105 8 09S -0.71 499 B 43 9 0.19 105 4 03S -0.74 500 B 43 13 0.22 86 5 06S +0.46 501 B 43 19 0.44 111 9 09S -0.75 502 B 43 26 0.46 44 13 07S -0.66 503 B 43 44 0.41 76 12 03S -0.77 504 B 43 116 0.37 43 7 03S -0.73 505 B 44 1 0.29 120 10 12S -0.78 506

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 35 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Tube Row Volts Deg B TW Location Count OTSG B 44 7 0.31 82 11 07S +0.73 507 B 44 8 0.33 109 7 08S +0.66 508 B 44 8 0.43 66 9 09S -0.63 508 B 44 22 0.41 62 12 03S -0.68 509 B 44 38 0.25 89 5 05S -0.78 510 B 45 3 0.44 84 14 09S +0.74 511 B 45 7 0.6 114 18 07S +0.69 512 B 45 8 0.45 77 9 09S +0.86 513 B 45 35 1.06 91 19 07S -0.80 514 B 45 44 0.46 100 13 15S +0.50 515 B 45 55 0.38 94 8 07S -0.78 516 B 45 118 0.12 60 4 07S -0.77 517 B 46 6 0.35 86 8 07S +0.69 518 B 46 7 0.44 87 14 07S +0.71 519 B 46 8 0.36 48 8 09S +0.64 520 B 46 12 0.33 82 7 03S -0.70 521 B 46 48 0.19 301 6 03S -0.73 522 B 46 52 0.22 96 7 07S -0.79 523 B 46 55 0.37 226 8 03S -0.74 524 B 46 67 0.54 88 11 07S -0.65 525 B 46 116 0.21 79 7 09S -0.84 526 B 46 117 0.17 58 4 07S -0.73 527 B 47 3 0.23 97 8 08S -0.71 528 B 47 5 0.29 93 10 07S +0.71 529 B 47 6 0.37 36 8 07S +0.75 530 B 47 6 0.35 152 7 09S -0.76 530 B 47 7 0.63 101 19 07S +0.73 531 B 47 8 0.3 72 6 07S +0.71 532 B 47 8 0.52 66 11 09S -0.70 532 B 47 10 0.16 123 6 09S -0.69 533 B 47 38 0.49 221 10 05S -0.78 534 B 47 53 0.44 84 9 07S -0.78 535 B 47 78 0.38 68 11 06S +0.76 536 B 48 7 0.57 111 11 07S +0.73 537 B 48 7 0.52 133 11 09S -0.74 537 B 48 9 0.27 68 6 07S +0.69 538 B 48 9 0.59 39 12 09S +0.68 538 B 48 35 0.35 104 7 09S -0.77 539 B 48 64 0.58 25 18 09S -0.70 540 B 48 111 0.16 105 6 08S -0.77 541 B 48 119 0.29 129 6 06S +0.60 542 B 48 122 0.38 92 12 10S -0.71 543 B 49 4 0.39 65 8 08S +0.61 544 B 49 6 0.29 122 6 07S +0.73 545 B 49 8 0.3 86 6 07S +0.73 546 B 49 9 0.43 39 14 08S +0.74 547 B 49 52 0.21 69 7 03S -0.84 548 B 49 78 0.33 67 7 12S -0.42 549 B 49 119 0.38 90 7 06S +0.69 550

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 36 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B ____

OTSG Tube Row Volts Deg BobTW Location Count B 49 120 0.26 89 9 06S +0.66 551 B 49 120 0.15 20 5 06S -0.77 551 B 49 121 0.23 74 5 09S -0.80 552 B 50 1 0.44 48 14 04S +0.80 553 B 50 3 0.38 120 8 09S -0.76 554 B 50 4 0.4 109 13 09S +0.70 555 B 50 6 0.32 79 11 09S +0.68 556 B 50 6 0.39 19 13 09S -0.78 556 B 50 13 0.45 57 9 03S -0.68 557 B 50 25 0.43 84 9 07S -0.72 558 B 50 37 0.38 162 11 03S -0.75 559 B 50 55 0.14 103 3 07S -0.73 560 B 51 6 0.38 108 8 09S -0.76 561 B 51 17 0.39 71 8 07S -0.72 562 B 51 33 0.42 88 9 09S -0.72 563 B 51 37 0.96 76 18 09S -0.78 564 B 51 50 0.32 58 7 07S -0.76 565 B 51 78 0.24 83 8 035 -0.70 566 B 51 83 0.26 81 8 05S -0.72 567 B 52 6 0.53 81 11 075 +0.67 568 B 52 6 0.19 88 4 09S -0.74 568 B 52 7 0.27 63 9 07S -0.65 569 B 52 7 0.43 108 14 07S +0.74 569 B 52 7 0.25 102 9 095 +0.68 569 B 52 7 0.25 29 9 09S -0.72 569 B 52 8 0.24 72 5 07S +0.73 570 B 52 28 0.43 83 13 07S -0.68 571 B 52 30 0.66 95 18 los -0.76 572 B 52 46 0.44 104 13 07S -0.75 573 B 52 68 0.3 86 7 03S -0.70 574 B 53 7 0.32 69 11 09S +/-0.72 575 B 53 26 0.3 98 9 03S -0.66 576 B 53 32 0.36 64 11 07S -0.70 577 B 53 36 0.69 65 14 09S -0.66 578 B 53 57 0.32 66 10 07S -0.80 579 B 53 59 0.34 81 10 07S -0.82 580 B 53 123 0.24 89 8 08S -0.77 581 B 53 124 0.47 27 9 09S -0.86 582 B 54 1 0.37 92 10 11S -0.82 583 B 54 6 0.53 101 16 07S +/-0.73 584 B 54 7 0.39 46 8 07S +0.69 585 B 54 28 0.16 86 5 05S -0.77 586 B 54 58 0.35 84 10 09S -0.75 587 B 54 114 0.23 95 8 07S -0.82 588 B 54 121 0.54 61 10 07S -0.73 589 B 54 124 0.36 98 11 09S -0.77 590 B 55 4 0.61 132 12 09S +0.68 591 B 55 30 0.64 54 13 09S -0.66 592 B 55 87 0.25 83 6 1 1S +0.72 593

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 37 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

____ OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 56 4 0.3 ill I11 08S +0.78 594 B 56 21 0.24 120 5 05S -0.68 595 B 56 39 0.92 79 17 07S -0.73 596 B 56 39 0.61 38 12 03S -0.75 596 B 56 45 0.3 106 6 07S -0.75 597 B 56 72 0.3 101 11 03S -0.70 598 B 56 78 0.37 76 8 01S -0.67 599 B 56 ill 0.18 83 6 07S -0.75 600 B 56 122 0.46 84 9 07S -0.78 601 B 56 124 0.28 101 5 05S -0.84 602 B 56 127 0.3 41 10 07S -0.75 603 B 57 2 0.38 56 10 12S +0.72 604 B 57 6 0.32 104 11 07S +0.73 605 B 57 39 0.5 83 14 07S -0.78 606 B 57 122 0.3 91 10 07S -0.75 607 B 57 126 0.48 78 14 07S -0.71 608 B 58 6 0.46 48 10 09S +0.61 609 B 58 8 0.14 57 3 03S -0.63 610 B 58 39 0.28 100 9 03S -0.66 611 B 58 49 0.24 68 5 11S +0.64 612 B 58 71 0.26 44 10 07S -0.66 613 B 58 78 0.4 83 9 07S -0.68 614 B 58 86 0.29 75 10 07S -0.70 615 B 58 101 0.17 117 4 07S -0.78 616 B 58 124 0.19 117 6 08S -0.73 617 B 58 125 0.36 88 7 08S -0.77 618 B 58 125 0.34 42 7 07S -0.75 618 B 58 125 0.26 43 5 07S +0.60 618 B 58 126 0.35 71 11 07S +0.69 619 B 58 127 0.25 75 5 08S -0.82 620 B 59 1 0.62 110 15 09S -0.67 621 B 59 5 0.38 33 13 09S -0.74 622 B 59 7 0.28 59 10 07S +0.73 623 B 59 45 0.33 96 10 07S -0.77 624 B 59 56 0.54 87 12 07S -0.70 625 B 59 113 0.56 85 10 07S -0.71 626 B 59 114 0.26 97 8 05S +0.66 627 B 59 118 0.29 80 9 07S -0.75 628 B 59 121 0.34 35 7 09S -0.73 629 B 59 122 0.67 104 18 09S -0.75 630 B 59 122 0.46 75 14 07S -0.78 630 B 59 123 0.24 75 5 09S +0.62 631 B 60 1 0.39 37 10 12S -0.78 632 B 60 6 0.16 134 4 03S -0.63 633 B 60 16 0.32 51 6 04S -0.83 634 B 60 48 0.37 77 11 07S -0.75 635 B 60 52 0.28 57 9 07S -0.71 636 B 60 1 70 0.23 84 5 05S +0.72 637 B 60 1 117 0.49 78 9 07S -0.73 638

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 38 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 60 119 1.06 84 18 07S -0.78 639 B 60 120 0.28 89 9 03S -0.79 640 B 60 124 0.3 54 10 07S -0.77 641 B 60 125 0.15 64 3 07S -0.77 642 B 60 126 0.23 83 8 09S -0.75 643 B 60 127 0.29 138 6 09S -0.82 644 B 60 127 0.32 49 6 08S -0.80 644 B 60 127 0.44 39 8 07S -0.73 644 B 61 1 0.46 138 12 09S -0.67 645 B 61 27 0.58 52 10 09S -0.73 646 B 61 28 0.44 55 8 07S -0.78 647 B 61 34 0.39 101 7 12S -0.71 648 B 61 42 0.7 78 18 07S -0.73 649 B 61 44 0.3 86 9 03S -0.73 650 B 61 50 0.31 71 10 07S -0.75 651 B 61 68 0.21 73 5 05S +0.78 652 B 61 124 0.2 112 4 09S +0.62 653 B 62 4 0.22 36 6 09S +0.70 654 B 62 6 0.35 60 8 07S +0.73 655 B 62 13 0.42 79 14 03S -0.69 656 B 62 56 0.16 64 4 07S -0.70 657 B 62 58 0.22 89 6 09S +/-0.82 658 B 62 83 0.24 54 9 02S +/-0.83 659 B 62 103 0.24 83 5 07S -0.77 660 B 62 115 0.37 90 12 14S -0.80 661 B 62 122 0.3 58 6 05S +0.59 662 B 62 127 0.15 68 5 08S -0.77 663 B 63 1 0.39 90 10 12S -0.78 664 B 63 7 0.29 34 10 08S -0.71 665 B 63 12 0.73 58 14 04S +0.78 666 B 63 19 0.42 77 11 03S -0.71 667 B 63 25 0.46 65 12 05S -0.80 668 B 63 69 1.26 91 22 07S -0.65 669 B 63 113 0.24 81 5 04S +0.68 670 B 63 117 0.37 95 12 05S +0.74 671 B 63 124 0.18 92 4 04S +0.67 672 B 63 125 0.3 83 10 08S -0.68 673 B 63 125 0.3 106 10 07S +0.70 673 B 64 5 0.56 106 13 09S -0.72 674 B 64 8 0.32 65 11 09S +0.74 675 B 64 34 0.44 68 8 05S -0.77 676 B 64 34 0.28 45 5 045 +0.73 676 B 64 68 0.3 74 11 07S -0.74 677 B 64 77 0.37 89 8 07S -0.68 678 B 64 105 0.27 76 6 14S -0.84 679 B 64 121 0.51 88 10 04S +0.69 680 B 64 123 0.39 112 12 07S +/-0.57 681 B 65 1 0.25 105 6 145 -0.65 682 B 65 8 0.44 23 9 035 -0.69 683

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 39 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location B 65 50 0.51 39 15 07S -0.75 684 B 65 52 0.46 45 13 09S -0.77 685 B 65 52 0.25 78 8 06S +0.55 685 B 65 64 0.18 88 6 09S +0.81 686 B 65 71 0.26 51 5 09S -0.75 687 B 65 71 0.31 37 6 07S -0.69 687 B 65 112 0.41 97 12 04S +0.58 688 B 65 113 0.41 83 8 04S +0.75 689 B 65 115 0.56 93 15 04S +0.85 690 B 65 116 0.29 131 6 05S +0.64 691 B 65 119 1.12 98 25 05S +0.67 692 B 65 121 0.63 97 17 05S +0.66 693 B 65 122 0.64 82 12 05S +0.72 694 B 65 125 0.28 81 8 04S +0.66 695 B 65 127 0.32 109 9 09S -0.75 696 B 65 127 0.39 99 11 07S +0.60 696 B 65 127 0.2 65 6 07S -0.76 696 B 66 1 0.53 48 14 13S +0.72 697 B 66 4 0.6 45 14 09S +0.70 698 B 66 5 0.53 76 12 09S -0.72 699 B 66 37 0.89 90 15 09S -0.75 700 B 66 57 0.19 83 5 07S -0.81 701 B 66 58 0.49 82 12 07S -0.81 702 B 66 64 0.19 89 5 09S +0.75 703 B 66 67 0.21 74 4 07S -0.70 704 B 66 72 0.28 50 6 07S -0.69 705 B 66 91 0.13 62 5 03S -0.66 706 B 66 106 0.46 95 13 07S -0.73 707 B 66 111 0.55 91 11 05S +0.69 708 B 66 112 0.26 97 8 05S +0.72 709 B 66 126 0.82 92 20 04S +0.64 710 B 67 5 0.43 76 14 09S -0.73 711 B 67 26 0.21 35 6 09S +0.69 712 B 67 33 0.76 89 13 07S -0.75 713 B 67 38 0.35 59 7 09S +0.74 714 B 67 40 0.43 54 13 09S +0.67 715 B 67 42 0.49 91 14 09S +0.69 716 B 67 44 0.31 39 10 09S -0.71 717 B 67 47 0.37 119 11 09S +0.69 718 B 67 49 0.29 71 9 09S -0.69 719 B 67 50 0.42 59 9 09S -0.71 720 B 67 51 0.35 35 11 09S -0.73 721 B 67 52 0.96 86 17 07S -0.76 722 B 67 54 0.2 66 4 09S -0.71 723 B 67 55 0.9 47 22 09S +0.69 724 B 67 59 0.56 83 12 09S +0.77 725 B 67 62 0.24 87 7 09S +0.79 726 B 67 63 0.27 76 10 09S +0.76 727 B 67 64 0.23 108 5 09S +0.77 728

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 40 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location B 67 70 0.3 101 6 03S -0.81 729 B 67 71 0.3 82 6 08S -0.72 730 B 67 112 0.46 99 14 05S +0.68 731 B 67 112 0.44 99 13 04S +0.63 731 B 67 113 0.34 104 7 04S +0.69 732 B 67 123 0.19 35 6 08S -0.73 733 B 67 125 0.34 83 10 07S -0.73 734 B 67 126 0.62 94 12 09S +0.64 735 B 67 126 0.38 117 8 07S -0.75 735 B 68 3 0.23 110 6 11S -0.63 736 B 68 5 0.46 70 10 09S +0.72 737 B 68 21 1.05 91 17 08S -0.82 738 B 68 30 0.27 110 5 07S -0.80 739 B 68 33 0.64 80 11 07S -0.75 740 B 68 38 0.42 59 8 09S +0.70 741 B 68 41 0.43 30 13 12S -0.77 742 B 68 42 0.69 102 13 09S +0.59 743 B 68 43 0.71 37 19 09S -0.71 744 B 68 44 0.3 127 6 09S -0.71 745 B 68 45 0.76 83 20 09S +0.72 746 B 68 45 0.45 54 13 09S -0.68 746 B 68 45 0.29 38 9 05S +0.62 746 B 68 47 0.62 142 12 09S +0.65 747 B 68 48 0.75 78 20 09S +0.69 748 B 68 49 0.46 86 9 09S +0.65 749 B 68 50 0.61 124 17 09S +0.67 750 B 68 50 0.41 139 12 09S -0.71 750 B 68 50 0.28 117 9 07S -0.73 750 B 68 51 0.64 128 12 09S -0.71 751 B 68 51 0.63 51 12 09S +0.65 751 B 68 52 0.47 124 14 09S +0.62 752 B 68 52 0.49 88 14 09S -0.62 752 B 68 53 0.58 70 11 09S +0.61 753 B 68 53 0.37 31 8 09S -0.69 753 B 68 54 0.62 93 17 07S -0.79 754 B 68 56 0.47 93 10 09S +0.65 755 B 68 57 0.13 73 3 09S -0.61 756 B 68 57 0.45 104 10 09S +0.77 756 B 68 58 0.3 98 6 09S +0.80 757 B 68 59 0.26 64 8 07S -0.68 758 B 68 59 0.36 69 11 09S -0.64 758 B 68 59 0.47 96 14 09S +0.77 758 B 68 60 0.25 73 6 09S -0.57 759 B 68 60 0.35 90 7 09S +0.82 759 B 68 61 0.44 97 13 09S +0.77 760 B 68 62 0.21 68 5 09S -0.59 761 B 68 62 0.43 95 9 09S +0.73 761 B 68 63 0.24 100 7 09S +0.79 762 B 68 64 0.55 95 11 095 +0.77 763

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 41 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location B 68 67 0.29 112 6 03S -0.81 764 B 68 69 0.22 70 5 07S -0.77 765 B 68 70 0.31 45 6 09S -0.68 766 B 68 102 0.19 93 4 07S -0.75 767 B 68 111 0.3 97 10 04S +0.58 768 B 68 125 0.56 95 11 05S -0.58 769 B 68 127 0.25 120 5 07S -0.42 770 B 68 129 0.31 81 7 09S -0.75 771 B 68 129 0.12 103 3 09S +0.69 771 B 69 8 0.39 96 13 12S -0.75 772 B 69 14 0.32 152 11 03S -0.64 773 B 69 15 0.25 110 6 04S +0.74 774 B 69 17 0.2 78 6 03S +0.66 775 B 69 17 0.37 64 10 03S -0.79 775 B 69 40 0.33 90 6 09S +0.67 776 B 69 40 0.33 42 6 09S -0.71 776 B 69 43 0.33 114 10 09S +0.67 777 B 69 44 0.73 34 14 09S +0.63 778 B 69 45 0.68 105 18 09S +0.74 779 B 69 46 0.76 114 20 09S +0.71 780 B 69 46 0.28 117 9 07S -0.79 780 B 69 47 0.68 103 13 09S +0.70 781 B 69 47 0.28 60 6 09S -0.73 781 B 69 48 0.67 85 18 09S +0.62 782 B 69 48 0.2 76 7 09S -0.70 782 B 69 49 0.73 83 14 09S +0.61 783 B 69 49 0.77 53 15 09S -0.69 783 B 69 49 0.44 35 9 05S +0.64 783 B 69 50 0.49 97 14 09S +0.69 784 B 69 50 0.37 81 11 09S -0.73 784 B 69 .51 0.72 75 14 09S +0.63 785 B 69 51 0.44 58 9 09S -0.71 785 B 69 52 0.64 66 17 09S +0.64 786 B 69 52 0.46 47 13 09S -0.66 786 B 69 53 0.41 150 8 loS -0.79 787 B 69 53 0.38 71 8 09S +0.72 787 B 69 53 0.69 158 13 09S -0.67 787 B 69 54 0.52 92 15 09S +0.65 788 B 69 54 0.99 71 23 09S -0.71 788 B 69 55 0.65 88 13 09S +0.65 789 B 69 55 0.4 84 8 09S -0.73 789 B 69 55 0.12 80 3 04S +0.71 789 B 69 56 0.91 88 22 09S -0.73 790 B 69 56 0.84 93 21 07S -0.79 790 B 69 57 0.27 113 6 09S +0.69 791 B 69 57 0.25 131 5 09S +0.54 791 B 69 58 0.27 75 6 09S -0.62 792 B 69 58 0.69 96 14 09S +0.82 792 B 69 59 0.37 82 8 09S -0.62 793

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 42 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location B 69 59 1.5 82 24 09S +0.86 793 B 69 60 0.38 82 11 09S -0.50 794 B 69 60 0.71 88 19 09S +0.75 794 B 69 61 0.48 91 10 09S +0.75 795 B 69 62 0.39 95 12 09S +0.81 796 B 69 62 0.18 107 6 09S -0.66 796 B 69 63 0.4 108 9 09S +0.79 797 B 69 64 0.14 75 4 04S +0.77 798 B 69 64 0.26 105 8 09S +0.77 798 B 69 69 0.15 108 3 06S +0.66 799 B 69 70 0.17 72 4 06S +0.67 800 B 69 70 0.19 79 4 04S +0.63 800 B 69 72 0.31 123 6 11S -0.58 801 B 69 72 0.25 105 5 08S -0.74 801 B 69 72 0.21 107 4 07S +0.56 801 B 69 111 0.39 111 8 05S +0.69 802 B 69 116 0.37 125 11 05S +0.50 803 B 69 126 0.42 86 12 04S +0.80 804 B 69 126 0.24 95 7 09S -0.66 804 B 69 126 0.23 109 7 09S +0.58 804 B 69 128 0.39 147 11 07S -0.52 805 B 70 6 0.38 31 11 07S -0.74 806 B 70 38 0.33 55 10 09S -0.69 807 B 70 47 0.3 158 9 09S -0.67 808 B 70 47 0.48 70 13 09S +0.79 808 B 70 48 0.81 45 13 09S -0.67 809 B 70 50 0.52 32 14 09S +0.70 810 B 70 52 0.37 150 11 09S -0.69 811 B 70 52 0.56 86 15 09S +0.65 811 B 70 53 0.52 81 9 09S -0.56 812 B 70 53 0.36 81 6 09S +0.79 812 B 70 54 0.45 88 13 09S -0.71 813 B 70 56 0.19 106 6 09S -0.60 814 B 70 58 0.35 98 10 09S -0.69 815 B 70 58 0.35 66 10 09S +0.79 815 B 70 59 0.35 83 6 09S -0.53 816 B 70 59 0.88 92 14 09S +0.86 816 B 70 60 0.35 68 10 09S +0.79 817 B 70 61 0.22 86 4 07S -0.71 818 B 70 61 0.43 101 7 09S -0.63 818 B 70 61 0.91 102 14 09S +0.74 818 B 70 62 0.6 89 10 09S +0.81 819 B 70 63 0.22 70 4 09S -0.67 820 B 70 63 0.25 117 4 09S +0.79 820 B 70 68 0.7 87 13 07S -0.76 821 B 70 68 0.12 70 3 04S +0.73 821 B 70 70 0.2 61 4 09S -0.75 822 B 70 71 0.23 67 5 09S -0.72 823 B 70 110 0.29 94 6 04S +0.73 824

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 43 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location B 70 111 0.51 91 14 04S +0.67 825 B 70 111 0.32 96 9 05S +0.66 825 B 70 128 0.57 109 15 09S +0.61 826 B 71 6 0.36 39 10 03S -0.72 827 B 71 26 0.33 77 10 07S +0.76 828 B 71 38 0.9 83 14 07S -0.65 829 B 71 42 0.52 49 9 09S +0.79 830 B 71 43 0.47 28 13 06S +0.71 831 B 71 43 0.53 63 14 09S +0.77 831 B 71 46 0.4 150 11 09S +0.79 832 B 71 48 0.42 30 12 09S +0.77 833 B 71 48 0.27 51 8 09S -0.69 833 B 71 49 0.44 118 7 09S +0.77 834 B 71 50 0.49 52 13 09S -0.57 835 B 71 51 0.55 64 9 03S -0.67 836 B 71 51 0.54 81 9 09S +0.82 836 B 71 54 0.32 87 9 09S +0.72 837 B 71 55 0.83 68 13 07S -0.67 838 B 71 55 0.34 36 6 07S +0.74 838 B 71 55 0.51 105 9 09S -0.69 838 B 71 55 0.44 56 8 09S +0.77 838 B 71 56 0.31 24 9 09S -0.60 839 B 71 56 0.21 58 7 09S +0.74 839 B 71 57 0.28 80 5 09S +0.77 840 B 71 58 0.2 129 6 09S -0.62 841 B 71 58 0.23 64 7 09S +0.74 841 B 71 59 0.38 97 7 09S +0.81 842 B 71 60 0.25 115 8 09S -0.64 843 B 71 61 0.22 96 4 09S +0.79 844 B 71 62 0.42 82 12 09S +0.74 845 B 71 63 0.27 117 5 09S +0.74 846 B 71 71 0.21 100 4 08S -0.71 847 B 71 76 0.22 128 5 07S +0.63 848 B 71 82 0.34 30 8 07S -0.61 849 B 71 86 0.17 92 4 04S +0.76 850 B 71 111 0.27 76 8 05S +0.68 851 B 72 2 0.28 94 5 13S -0.82 852 B 72 39 0.62 63 16 12S +0.77 853 B 72 41 0.29 83 9 09S +0.75 854 B 72 43 0.42 48 12 09S +0.75 855 B 72 46 0.73 71 12 07S -0.76 856 B 72 46 0.29 117 5 09S +0.77 856 B 72 50 0.42 52 12 07S -0.76 857 B 72 50 0.25 56 8 09S +0.81 857 B 72 51 0.46 29 8 09S -0.67 858 B 72 51 0.35 121 6 09S +0.75 858 B 72 53 0.56 46 9 09S +0.72 859 B 72 54 0.51 57 14 09S -0.62 860 B 72 54 0.59 121 15 09S +0.79 860

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 44 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg %TW Location B 72 57 0.35 84 6 07S -0.71 861 B 72 57 0.41 93 7 09S -0.65 861 B 72 57 0.28 102 5 09S +0.79 861 B 72 58 0.24 128 7 09S -0.64 862 B 72 58 0.56 87 15 09S +0.77 862 B 72 61 0.26 92 5 09S +0.77 863 B 72 64 0.33 73 6 loS -0.78 864 B 72 65 0.49 71 9 07S -0.71 865 B 72 67 0.51 69 10 03S -0.77 866 B 72 107 0.28 95 6 04S +0.73 867 B 72 129 0.48 99 13 10S -0.67 868 B 73 31 0.33 19 9 09S +0.75 869 B 73 44 0.38 68 7 09S +0.77 870 B 73 46 0.26 164 5 09S +0.75 871 B 73 46 0.35 55 7 09S -0.67 871 B 73 48 0.4 42 7 09S +0.75 872 B 73 51 0.29 78 8 03S -0.71 873 B 73 53 0.39 33 10 09S -0.66 874 B 73 53 0.34 53 9 09S +0.79 874 B 73 56 0.45 59 12 07S -0.75 875 B 73 56 0.45 154 12 09S -0.69 875 B 73 57 0.25 107 5 09S +0.75 876 B 73 58 0.25 145 7 09S -0.69 877 B 73 58 0.16 91 4 09S +0.72 877 B 73 58 0.36 83 9 07S -0.73 877 B 73 65 0.35 59 7 04S +0.60 878 B 73 67 0.38 132 8 07S -0.77 879 B 73 70 0.2 70 4 09S -0.75 880 B 73 74 0.23 114 5 11S -0.59 881 B 73 82 0.34 61 11 07S +0.74 882 B 73 86 0.23 49 8 04S +0.76 883 B 73 108 0.28 96 8 05S +0.73 884 B 73 118 0.2 76 6 06S -0.90 885 B 73 128 0.53 97 14 lOS -0.81 886 B 73 128 0.44 120 12 09S +0.63 886 B 74 53 0.51 33 9 03S +0.76 887 B 74 56 0.24 68 7 03S -0.68 888 B 74 64 0.18 124 4 10S -0.78 889 B 74 64 0.18 67 4 05S +0.70 889 B 74 70 0.25 103 5 07S -0.76 890 B 74 123 0.17 62 4 09S -0.82 891 B 75 21 0.26 114 8 07S -0.84 892 B 75 24 0.28 104 5 04S +0.66 893 B 75 26 0.39 61 7 07S -0.82 894 B 75 51 0.28 88 8 03S -0.73 895 B 75 66 0.31 115 6 10S '-0.79 896 B 75 105 0.19 68 4 02S +0.83 897 B 75 123 0.49 88 9 04S +0.67 898 B 75 123 0.3 126 6 15S +0.56 898

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 45 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B ____

OTSG Tube Row Volts Deg BobTW Location Count B 75 124 0.28 128 6 09S -0.83 899 B 76 64 0.37 90 7 14S -0.77 900 B 76 64 1.17 99 19 07S -0.81 900 B 76 65 0.35 101 7 12S +/-0.81 901 B 76 65 0.24 127 5 13S +0.51 901 B 76 68 0.47 71 9 07S -0.73 902 B 76 69 0.21 78 4 07S -0.75 903 B 76 100 0.35 91 6 02S -0.67 904 B 1 76 101 0.26 70 7 13S -0.76 905 B 76 119 0.29 115 6 07S -0.70 906 B 76 119 0.34 98 7 08S +0.70 906 B 76 120 0.46 88 9 09S -0.76 907 B 76 120 0.43 104 8 07S -0.79 907 B 76 121 0.33 69 6 07S -0.74 908 B 76 123 0.4 104 8 11S -0.56 909 B 77 72 0.28 96 6 07S -0.74 910 B 77 75 0.37 .83 7 08S -0.65 911 B 77 102 0.61 103 10 15S -0.39 912 B 77 103 0.26 141 7 07S +0.72 913 B 77 119 0.66 21 12 07S -0.75 914 B 77 125 0.78 104 14 11S -0.64 915 B 77 125 0.35 81 7 loS +0.22 915 B 77 125 0.27 138 5 05S -0.70 915 B 1 78 8 0.29 89 6 13S -0.75 916 B 78 52 0.44 30 11 03S -0.71 917 B 78 54 0.24 84 7 09S -0.69 918 B 78 71 0.31 100 6 06S -0.60 919 B 78 75 0.32 42 6 07S -0.70 920 B 78 109 0.27 105 5 07S -0.65 921 B 78 113 0.39 130 8 05S -0.77 922 B 78 122 0.26 82 5 09S -0.75 923 B 79 10 0.32 41 9 12S +0.65 924 B 1 79 21 0.37 118 7 07S -0.69 925 B 79 26 0.31 129 6 11S -0.67 926 B 79 34 0.34 90 6 09S --0.77 927 B 79 39 0.68 91 16 12S -0.74 928 B 79 40 0.37 106 7 11S -0.74 929 B 79 40 0.36 61 7 13S -0.74 929 B 79 54 0.16 119 5 09S -0.71 930 B 79 54 0.34 103 9 105 -0.72 930 B 1 79 55 0.3 116 6 06S -0.69 931 B 79 56 0.49 69 13 09S -0.71 932 B 79 57 0.97 90 16 07S -0.69 933 B 79 61 0.32 70 6 07S -0.69 934 B 79 61 0.36 70 7 12S -0.70 934 B 79 66 0.49 109 9 07S -0.68 935 B 79 75 0.3 95 6 07S -0.70 936 B 79 75 0.22 102 4 08S -0.73 936 B 79 77 0.27 67 5 07S -0.74 937

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 46 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 79 77 0.23 87 5 05S -0.81 937 B 79 79 0.31 54 6 07S -0.81 938 B 79 114 0.28 137 6 07S +0.42 939 B 79 123 0.41 77 8 06S -0.72 940 B 79 126 0.45 99 9 07S -0.70 941 B 80 9 0.48 54 12 11S -0.72 942 B 80 20 0.33 55 6 09S -0.67 943 B 80 30 0.28 64 5 07S -0.72 944 B 80 35 0.35 85 9 12S -0.67 945 B 80 43 0.26 79 7 03S -0.71 946 B 80 44 0.25 117 5 09S +0.75 947 B 80 49 0.28 84 8 09S +0.77 948 B 80 50 0.35 132 7 115 +0.63 949 B 80 52 0.25 87 5 09S +0.75 950 B 80 58 0.87 96 15 075 -0.65 951 B 80 58 0.52 98 9 09S -0.70 951 B 80 59 0.19 99 5 07S -0.69 952 B 80 60 0.35 87 7 07S -0.74 953 B 80 61 0.25 75 7 09S +/-0.77 954 B 80 61 0.23 88 6 12S -0.60 954 B 80 62 0.32 56 6 09S +0.77 955 B 80 62 0.2 100 4 12S -0.23 955 B 80 65 0.31 67 6 los -0.78 956 B 80 65 0.33 54 6 13S -0.82 956 B 80 70 0.25 130 5 09S +0.66 957 B 80 70 0.33 81 7 07S -0.73 957 B 80 76 0.3 94 6 07S -0.72 958 B 80 76 0.17 73 3 06S -0.68 958 B 80 78 0.25 115 5 05S -0.74 959 B 80 80 0.26 76 5 07S -0.77 960 B 80 100 0.25 128 5 04S -0.74 961 B 80 125 0.35 32 7 07S -0.68 962 B 80 126 0.38 106 8 07S -0.74 963 B 80 127 0.36 117 7 08S +0.68 964 B 80 127 0.41 109 8 07S +0.64 964 B 80 127 0.54 94 10 07S -0.76 964 B 80 129 0.23 128 4 05S -0.46 965 B 80 131 0.33 101 6 13S -0.67 966 B 81 9 0.28 85 5 09S -0.65 967 B 81 16 0.34 118 9 09S -0.67 968 B 81 35 0.21 108 4 05S -0.70 969 B 81 41 0.46 114 9 09S -0.76 970 B 81 48 0.2 69 6 09S +0.71 971 B 81 49 0.32 25 6 09S -0.65 972 B 81 49 0.31 86 6 09S +0.77 972 B 81 62 0.4 74 11 09S +0.64 973 B 81 64 0.93 96 14 10S -0.67 974 B 81 65 0.68 98 13 10S -0.72 975 B 81 75 0.21 124 4 07S -0.69 976

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 47 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Row Volts Deg B TW Location Count OTSG Tube B 81 78 0.21 90 4 09S -0.78 977 B 81 121 0.34 112 7 07S -0.79 978 B 81 122 0.57 107 11 07S -0.70 979 B 81 125 0.57 123 11 07S -0.70 980 B 81 125 0.54 91 10 03S -0.46 980 B 81 126 0.56 107 10 08S +0.72 981 B 81 126 0.28 127 5 07S -0.70 981 B 81 126 0.28 92 6 04S -0.72 981 B 81 126 0.29 87 6 03S -0.44 981 B 81 126 0.41 127 8 03S +0.35 981 B 81 128 0.23 76 4 07S -0.66 982 B 82 5 0.23 80 5 09S -0.81 983 B 82 6 0.51 87 10 09S -0.86 984 B 82 28 0.43 142 10 07S -0.74 985 B 82 30 0.12 52 3 07S -0.60 986 B 82 38 0.43 72 10 09S -0.86 987 B 82 41 0.26 97 5 07S -0.76 988 B 82 42 0.4 34 12 07S -0.64 989 B 82 47 0.19 97 3 04S -0.74 990 B 82 47 0.18 85 3 09S +0.82 990 B 82 49 0.33 111 6 07S -0.71 991 B 82 50 0.41 103 12 07S -0.68 992 B 82 50 0.31 71 9 09S +0.78 992 B 82 52 0.79 47 20 06S -0.68 993 B 82 53 0.56 41 9 06S -0.67 994 B 82 57 0.21 100 4 09S +0.79 995 B 82 61 0.37 87 6 09S +0.77 996 B 82 64 0.3 77 5 12S +0.65 997 B 82 100 0.2 94 6 06S -0.74 998 B 82 117 0.12 28 2 07S -0.68 999 B 82 125 0.41 102 8 08S +0.65 1000 B 82 125 0.34 152 7 09S +0.00 1000 B 83 6 0.25 62 5 09S +0.59 1001 B 83 8 0.25 88 5 09S -0.72 1002 B 83 9 0.45 93 9 09S -0.84 1003 B 83 11 0.6 54 11 09S -0.74 1004 B 83 17 0.21 80 4 09S -0.74 1005 B 83 20 0.28 57 7 11S +0.65 1006 B 83 29 0.23 76 6 09S -0.76 1007 B 83 35 0.67 51 11 03S -0.69 1008 B 83 36 0.55 28 12 09S -0.75 1009 B 83 45 0.5 77 14 07S -0.73 1010 B 83 49 0.27 68 8 06S -0.72 1011 B 83 49 0.19 91 6 07S -0.66 1011 B 83 49 0.19 89 6 07S +0.75 1011 B 83 51 0.51 57 14 11S +0.80 1012 B 83 57 0.38 92 7 07S -0.69 1013 B 83 57 0.3 81 5 09S -0.65 1013 B 83 61 0.3 86 5 07S -0.74 1014

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 48 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 83 61 0.29 87 5 09S +0.77 1014 B 83 79 0.27 72 5 07S -0.72 1015 B 83 97 0.3 82 5 12S -0.76 1016 B 83 99 0.47 34 12 06S -0.67 1017 B 1 83 110 0.27 95 5 04S +0.76 1018 B 83 122 0.25 85 5 07S -0.71 1019 B 83 123 0.26 148 5 07S -0.76 1020 B 83 125 0.3 126 6 07S -0.67 1021 B 83 126 0.3 127 6 07S -0.73 1022 B 83 127 0.42 138 8 07S +0.67 1023 B 83 127 0.39 123 8 07S -0.72 1023 B 83 128 0.37 94 7 04S +/-0.62 1024 B 83 128 0.2 131 4 04S -0.78 1024 B 83 129 0.25 104 5 07S -0.84 1025 B 83 130 0.38 110 7 09S -0.73 1026 B 83 131 0.22 28 5 13S -0.79 1027 B 83 131 0.53 116 10 09S -0.79 1027 B 84 9 0.31 62 6 09S +0.71 1028 B 84 26 0.3 89 6 07S -0.76 1029 B 84 27 0.31 37 7 03S -0.85 1030 B 84 38 0.29 95 7 09S -0.77 1031 B 84 39 0.3 80 6 09S -0.76 1032 B 84 39 0.77 98 13 07S -0.83 1032 B 84 47 0.42 54 7 09S -0.62 1033 B 84 47 0.22 66 4 09S +0.80 1033 B 84 61 0.37 74 7 09S +0.81 1034 B 84 72 0.29 95 6 07S -0.74 1035 B 84 75 0.54 74 10 07S -0.74 1036 B 84 80 0.29 120 5 05S -0.60' 1037 B 84 85 0.65 85 11 07S -0.77 1038 B 84 114 0.2 81 4 07S -0.65 1039 B 84 123 0.62 99 11 08S +0.68 1040 B 84 125 0.51 106 10 08S +0.66 1041 B 84 125 0.46 130 9 03S +0.33 1041 B 84 126 0.38 111 8 09S -0.02 1042 B 84 128 0.45 110 9 07S -0.79 1043 B 85 37 0.64 36 11 07S -0.67 1044 B 85 38 0.41 97 9 03S -0.72 1045 B 85 39 0.46 30 10 10S -0.80 1046 B 85 43 0.44 71 8 09S -0.67 1047 B 85 43 0.22 82 4 105 -0.58 1047 B 85 49 0.31 61 5 10S +0.74 1048 B 85 49 0.11 62 2 10S -0.63 1048 B 85 50 0.36 87 11 10S +0.73 1049 B 85 51 0.85 18 13 lOS -0.63 1050 B 85 72 0.35 77 6 06S -0.75 1051 B 85 76 0.28 29 6 04S -0.81 1052 B 85 90 0.26 55 5 07S -0.72 1053 B 85 123 1 0.4 113 8 08S +0.76 1054

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 49 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 85 126 0.51 82 9 07S -0.70 1055 B 85 127 0.3 29 6 09S -0.81 1056 B 85 127 0.34 101 7 07S -0.84 1056 B 85 128 0.22 62 4 07S -0.77 1057 B 1 86 6 0.26 111 5 09S -0.74 1058 B 86 6 0.49 125 8 09S +0.70 1058 B 86 7 0.53 70 10 09S +0.63 1059 B 86 7 0.49 26 10 09S -0.77 1059 B 86 25 0.41 117 9 07S -0.76 1060 B 86 38 0.5 30 11 09S -0.74 1061 B 86 53 0.78 88 12 07S -0.74 1062 B 86 53 0.48 48 8 09S -0.62 1062 B 86 76 0.21 59 4 07S -0.69 1063 B 86 85 0.29 110 5 06S -0.81 1064 B 86 104 0.33 77 6 07S -0.74 1065 B 86 108 0.28 100 5 06S -0.76 1066 B 86 110 0.21 35 4 05S -0.74 1067 B 86 112 0.28 98 5 02S -0.76 1068 B 86 116 0.3 117 6 05S -0.76 1069 B 86 124 0.62 94 12 08S +0.72 1070 B 86 124 0.24 162 5 03S --0.02 1070 B 86 125 0.3 95 6 07S -0.02 1071 B 86 126 0.46 115 9 07S +0.64 1072 B 86 126 0.58 114 11 07S -0.07 1072 B 86 126 0.38 103 8 03S +0.35 1072 B 86 129 0.22 95 4 095 -0.76 1073 B 87 8 0.26 60 5 09S -0.77 1074 B 1 87 8 0.31 116 6 07S -0.82 1074 B 87 22 0.52 71 9 07S -0.72 1075 B 87 40 0.94 81 15 09S -0.67 1076 B 87 49 0.71 79 18 06S -0.75 1077 B 87 50 0.37 67 6 06S -0.74 1078 B 87 53 0.65 59 17 06S -0.75 1079 B 87 53 0.32 79 10 11S +0.83 1079 B 87 56 0.24 76 4 07S -0.69 1080 B 87 57 0.21 68 7 09S +0.80 1081 B 87 67 0.29 93 5 07S -0.77 1082 B 87 85 0.19 70 4 06S -0.81 1083 B 87 112 0.4 118 10 07S +0.55 1084 B 87 123 0.37 105 8 08S -0.09 1085 B 87 125 0.29 106 6 08S -0.18 1086 B 88 3 0.23 92 5 loS +0.56 1087 B 88 8 0.45 106 8 07S -0.79 1088 B 88 12 0.66 89 12 07S -0.74 1089 B 88 19 0.49 86 9 03S -0.81 1090 B 88 23 0.23 94 6 07S -0.79 1091 B 88 29 0.54 78 12 07S -0.72 1092 B 88 31 0.47 76 11 09S -0.74 1093 B 88 47 0.51 103 9 09S -0.67 1094

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 50 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%Tb OTSG A and B OTSG Tube Row Volts Deg TWatoTb Bobi B 88 49 0.28 47 5 06S -0.74 1095 B 88 50 0.25 154 8 06S -0.72 1096 B 88 51 0.48 48 8 03S -0.69 1097 B 88 53 0.77 70 12 07S -0.65 1098 B 88 70 0.45 79 8 06S -0.73 1099 B 88 113 0.46 110 8 07S +0.69 1100 B 88 123 0.25 95 5 085 +0.28 1101 B 88 123 0.2 137 4 08S -0.16 1101 B 88 123 0.28 134 6 07S -0.05 1101 B 88 123 0.47 133 9 03S -0.07 1101 B 88 125 0.26 71 5 07S -0.73 1102 B 88 127 0.27 102 5 09S -0.77 1103 B 88 128 0.52 123 10 07S -0.74 1104 B 88 129 0.26 92 5 11S -0.73 1105 B 1 88 129 0.18 55 4 07S -0.79 1105 B 89 4 0.36 62 7 loS +0.53 1106 B 89 5 0.43 57 8 01S -0.73 1107 B 89 49 0.2 53 6 07S -0.68 1108 B 89 50 0.54 34 9 09S -0.65 1109 B 89 53 0.32 55 10 07S -0.70 1110 B 89 84 0.72 80 12 07S -0.74 1111 B 89 109 0.23 107 4 07S -0.71 1112 B 89 122 0.13 32 3 07S +0.02 1113 B 89 123 0.55 126 10 07S -0.09 1114 B 89 126 0.25 64 5 07S -0.74 1115 B 89 127 0.27 108 6 07S -0.76 1116 B 90 5 0.6 49 11 07S -0.72 1117 B 90 35 0.24 117 6 07S -0.86 1118 B 90 41 0.77 72 19 07S -0.70 1119 B 90 48 0.27 69 8 07S -0.70 1120 B 1 90 50 0.52 48 14 06S +0.70 1121 B 90 60 0.85 81 14 07S -0.73 1122 B 90 65 0.46 81 8 07S -0.68 1123 B 90 89 0.25 79 5 07S -0.77 1124 B 90 126 0.35 95 7 07S -0.81 1125 B 90 128 0.44 113 9 09S -0.84 1126 B 91 1 0.26 80 5 13S -0.81 1127 B 91 5 0.33 27 6 09S +0.63 1128 B 91 6 0.65 71 12 09S +0.61 1129 B 91 7 0.45 191 8 09S +0.65 1130 B 91 12 0.32 41 7 07S -0.79 1131 B 91 41 0.36 45 11 06S +0.72 1132 B 91 42 0.28 78 5 lOS -0.70 1133 B 91 53 0.27 79 8 13S +0.87 1134 B 91 58 0.21 75 6 08S -0.64 1135 B 91 87 0.33 65 6 03S -0.76 1136 B 91 96 0.48 31 12 03S -0.71 1137 B 91. 119 0.25 97 5 07S -0.74 1138 B 91. 126 0.22. 99 4 07S -0.76 1139

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 51 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 92 8 0.29 117 6 07S -0.68 1140 B 92 17 0.6 97 11 095 -0.80 1141 B 92 36 0.78 74 14 07S -0.90 1142 B 92 38 0.15 85 3 09S -0.74 1143 B 92 47 0.23 101 7 06S -0.67 1144 B 92 60 0.63 85 11 07S -0.73 1145 B 92 116 0.22 36 5 07S -0.77 1146 B 92 120 0.14 103 3 07S -0.79 1147 B 92 120 0.31 128 6 05S -0.76 1147 B 92 124 0.56 83 11 07S -0.78 1148 B 92 126 0.37 78 7 09S -0.86 1149 B 92 126 0.62 118 12 07S -0.85 1149 B 93 4 0.24 103 5 09S +0.66 1150 B 93 6 0.4 104 8 09S +0.66 1151 B 93 17 0.7 88 12 09S -0.78 1152 B 93 34 0.31 70 8 07S -0.88 1153 B 93 36 0.87 90 17 09S -0.72 1154 B 93 40 0.69 68 11 09S -0.65 1155 B 93 50 0.27 81 8 08S +0.77 1156 B 93 55 0.34 37 9 07S -0.73 1157 B 93 116 0.12 127 3 07S -0.86 1158 B 94 7 0.63 44 11 09S +0.65 1159 B 94 17 0.38 88 7 15S +/-0.85 1160 B 94 51 0.36 94 6 14S -0.81 1161 B 94 56 0.15 46 5 07S -0.72 1162 B 94 66 0.39 84 7 07S -0.71 1163 B 94 127 0.3 56 6 09S +0.63 1164 B 95 1 0.31 94 6 07S -0.77 1165 B 95 3 0.38 4 7 09S +0.63 1166 B 95 5 0.39 105 7 07S -0.77 1167 B 95 6 0.46 43 9 09S +0.45 1168 B 95 20 0.52 97 12 07S -0.81 1169 B 95 21 0.45 19 8 06S +0.75 1170 B 95 23 0.41 76 8 07S -0.80 1171 B 95 26 0.39 102 9 07S -0.85 1172 B 1 95 27 0.27 90 7 15S +0.79 1173 B 95 53 0.42 46 7 08S +0.76 1174 B 95 85 0.75 93 13 07S +0.65 1175 B 95 90 0.27 55 5 07S -0.75 1176 B 96 4 0.63 74 11 09S +0.65 1177 B 96 35 0.4 54 7 06S +0.63 1178 B 96 51 0.7 38 18 06S +0.68 1179 B 96 66 0.91 89 14 07S -0.66 1180 B 96 67 0.27 68 8 06S +0.66 1181 B 96 70 0.81 84 15 07S -0.75 1182 B 96 100 0.3 95 5 loS -0.77 1183 B 96 127 0.71 80 13 07S +0.82 1184 B 97 2 0.51 1 160 10 09S +0.68 1185 B 97 3 0.2 1 51 4 09S +0.75 1186

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 52 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube OTSG Tube Row Volts Deg  % TW Location Count B 97 5 0.2 149 4 13S -0.88 1187 B 97 5 0.4 113 8 07S +0.67 1187 B 97 41 0.4 53 12 09S -0.59 1188 B 97 41 0.31 42 9 llS -0.79 1188 B 97 63 0.28 83 5 06S +0.66 1189 B 97 98 0.34 95 10 13S -0.76 1190 B 97 121 0.35 98 7 07S -0.71 1191 B 97 123 0.42 60 8 09S +0.72 1192 B 98 35 0.29 37 8 07S -0.90 1193 B 98 48 0.76 27 19 07S +0.70 1194 B 98 54 0.28 82 9 08S -0.65 1195 B 98 108 0.21 242 4 05S -0.74 1196 B 98 124 0.39 111 8 09S +0.58 1197 B 99 2 0.59 34 11 09S +0.59 1198 B 99 4 0.67 125 12 09S +0.59 1199 B 99 6 0.17 85 4 06S -0.09 1200 B 99 7 0.23 55 4 09S +0.70. 1201 B 99 41 0.6 55 16 03S -0.68 1202 B 99 46 0.33 98 6 07S -0.67 1203 B 99 106 0.16 99 5 06S -0.74 1204 B 99 114 0.18 47 4 07S -0.82 1205 B 99 122 0.22 115 4 09S -0.81 1206 B 99 123 0.2 117 5 09S -0.82 1207 B 99 126 0.62 97 11 07S +0.28 1208 B 100 3 0.3 65 6 09S -0.76 1209 B 100 5 0.55 109 10 09S +0.70 1210 B 100 5 0.29 112 6 07S -0.74 1210 B 100 21 0.43 100 8 07S -0.76 1211 B 100 84 0.37 131 7 03S -0.67 1212 B 100 120 0.19 53 4 05S -0.79 1213 B 100 122 0.35 36 7 09S +0.67 1214 B 100 122 0.51 33 9 07S -0.60 1214 B 101 10 0.42 7 8 07S -0.81 1215 B 101 24 0.68 55 16 09S -0.77 1216 B 101 35 0.4 69 10 07S -0.79 1217 B 101 81 0.2 102 6 07S -0.72 1218 B 102 95 0.9 92 21 07S -0.72 1219 B 102 111 0.38 119 8 07S +0.65 1220 B 102 112 0.34 128 6 07S -0.66 1221 B 102 113 0.63 102 13 07S +0.65 1222 B 102 115 0.64 123 13 07S +0.58 1223 B 102 116 0.46 120 8 07S -0.65 1224 B 102 116 0.17 136 3 07S +0.50 1224 B 102 119 0.25 93 6 07S -0.84 1225 B 103 5 0.65 110 12 09S +0.63 1226 B 103 27 0.26 101 7 07S -0.77 1227 B 103 55 0.27 49 5 07S -0.74 1228 B 103 97 0.26 74 7 04S -0.69 1229 B 103 121 0.25 59 5 09S +0.60 1230

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 53 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 103 123 0.33 61 7 07S -0.74 1231 B 104 46 0.51 82 8 07S -0.69 1232 B 104 119 0.22 109 4 09S +0.60 1233 B 104 119 0.37 127 7 08S +/-0.65 1233 B 104 122 0.75 64 15 loS +0.61 1234 B 104 123 0.5 36 9 07S +0.67 1235 B 105 5 0.28 115 5 09S +0.68 1236 B 105 42 0.85 81 13 07S -0.74 1237 B 105 44 0.49 79 8 lOS -0.30 1238 B 105 87 0.27 58 5 07S -0.73 1239 B 105 104 0.15 82 5 07S -0.74 1240 B 105 113 0.62 86 12 07S -0.80 1241 B 105 117 0.3 123 7 08S +0.63 1242 B 105 120 0.33 81 7 07S -0.68 1243 B 105 122 0.32 114 6 07S -0.76 1244 B 106 38 0.57 89 9 07S -0.76 1245 B 106 55 0.19 34 7 07S -0.70 1246 B 106 61 1.08 90 17 07S -0.71 1247 B 106 71 0.41 83 6 07S -0.74 1248 B 106 92 0.16 101 3 03S -0.71 1249 B 106 97 0.47 45 13 02S -0.69 1250 B 106 117 0.22 106 4 09S -0.79 1251 B 106 118 0.35 96 8 08S -0.77 1252 B 107 23 0.29 92 5 07S -0.80 1253 B 107 67 0.41 100 11 07S -0.74 1254 B 107 116 0.31 85 7 07S -0.86 1255 B 108 25 0.35 40 7 07S -0.80 1256 B 108 55 0.33 54 6 07S -0.75 1257 B 109 52 0.61 90 10 07S -0.73 1258 B 109 84 0.37 84 7 03S -0.74 1259 B 109 84 0.8 100 13 07S -0.69 1259 B 109 100 0.3 48 9 07S -0.74 1260 B 109 108 0.24 95 7 07S -0.74 1261 B 109 117 0.22 116 5 09S -0.79 1262 B 110 14 0.21 124 4 15S -0.78 1263 B 110 24 0.45 86 9 09S -0.77 1264 B 110 50 0.19 65 3 07S -0.80 1265 B 110 57 0.19 75 4 07S -0.80 1266 B 110 81 0.33 89 6 03S -0.69 1267 B 110 85 0.26 78 5 06S +/-0.18 1268 B 110 112 0.28 140 6 08S +0.56 1269 B 111 27 0.32 46 6 07S -0.83 1270 B ill 66 0.77 76 13 07S -0.72 1271 B ill 71 0.36 83 10 03S -0.72 1272 B ill 71 0.39 83 11 07S -0.74 1272 B ill ill 0.2 87 4 07S -0.74 1273 B 112 26 0.37 83 8 09S -0.75 1274 B 112 42 0.51 30 10 09S -0.75 1275 B 112 82 0.58 95 10 07S -0.74 1276

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 54 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

____ OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 112 114 0.25 148 6 09S +0.61 1277 B 112 114 0.28 112 6 09S -0.86 1277 B 11.3 23 0.22 69 4 09S -0.84 1278 B 11.3 71 0.17 114 5 07S -0.74 1279 B 113 85 0.15 82 5 07S -0.71 1280 B 113 94 0.28 126 5 07S -0.69 1281 B 113 108 0.29 108 6. 07S -0.81 1282 B 114 39 0.81 21 15 09S -0.72 1283 B 114 49 .0.13 11 3 07S -0.75 1284 B 114 70 0.46 110 8 07S -0.71 1285 B 114 93 0.48 64 9 02S -0.71 1286 B 114 111 0.33 126 6 09S +0.65 1287 B 115 5 0.3 104 6 07S -0.42 1288 B 1 115 40 0.46 52 10 07S -0.81 1289 B 115 43 0.38 92 8 07S -0.86 1290 B 115 57 0.68 89 13 07S -0.79 1291 B 115 61 0.38 93 7 03S -0.71 1292 B 115 63 0.19 56 3 07S -0.73 1293 B 115 80 0.25 108 8 07S -0.69 1294 B 115 87 0.47 78 9 07S -0.64 1295 B 115 99 0.25 100 5 07S -0.67 1296 B 115 100 0.33 87 10 07S -0.74 1297 B 115 109 0.17 134 3 09S +0.67 1298 B 115 109 0.14 86 3 09S -0.81 1298 B 115 112 0.25 115 6 105 -0.81 1299 B 115 114 0.17 76 3 07S -0.79 1300 B 116 25 0.48 23 10 07S -0.86 1301 B 116 35 0.54 54 12 07S -0.74 1302 B 116 39 0.25 91 6 03S -0.80 1303 B 116 49 0.72 85 15 07S -0.79 1304 B 116 50 0.37 105 8 07S -0.79 1305 B 116 52 0.26 113 6 07S -0.81 1306 B 116 61 0.27 67 4 07S -0.76 1307 B 116 62 0.2 44 7 07S -0.73 1308 B 116 80 0.37 95 5 07S -0.69 1309 B 116 81 0.23 64 8 07S -0.71 1310 B 116 92 0.16 79 3 07S -0.69 1__311 B 116 100 0.3 108 6 13S -0.72 1312 B 116 ill 0.26 102 5 10S -0.79 1313 B 1 117 40 0.31 101 7 07S -0.84 1314 B 117 71 0.25 85 8 07S -0.68 1315 B 117 73 0.31 112 10 07S -0.68 1316 B 117 82 0.88 96 19 07S -0.74 1317 B 118 19 0.32 97 6 07S -0.77 1318 B 118 30 0.42 46 9 07S -0.86 1319 B 11.8 56 0.19 46 3 07S -0.74 1320 B 118 60 0.3 109 4 13S -0.76 1321 B 11.8 64 0.2 90 3 03S -0.71 1322 B 118 66 0.32 105 5 03S -0.71 1323

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 55 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 118 66 0.51 99 7 07S -0.71 1323 B 118 76 0.16 103 2 07S -0.71 1324 B 118 89 0.21 101 4 07S -0.73 1325 B 118 99 0.37 80 9 07S -0.72 1326 B 118 105 0.17 102 3 09S +0.74 1327 B 119 12 0.46 95 9 07S -0.79 1328 B 119 20 0.36 86 7 09S -0.79 1329 B 119 40 0.37 49 8 07S -0.80 1330 B 119 48 0.67 97 13 07S -0.81 1331 B 119 66 0.31 105 5 07S -0.71 1332 B 119 75 0.21 71 7 07S -0.71 1333 B 119 79 0.14 79 5 07S -0.75 1334 B 119 80 0.21 73 3 07S -0.71 1335 B 119 94 0.19 109 4 13S -0.76 1336 B 119 97 0.28 97 6 075 -0.80 1337 B 119 106 0.2 65 4 los -0.83 1338 B 119 106 0.15 125 3 09S +0.70 1338 B 120 3 0.44 25 9 07S -0.75 1339 B 120 5 0.31 39 6 03S -0.86 1340 B 120 50 0.18 73 4 07S -0.79 1341 B 120 56 0.23 113, 3 03S -0.71 1342 B 120 63 0.53 69 16 07S -0.69 1343 B 120 97 0.36 97 7 07S -0.74 1344 B 120 102 0.38 82 9 07S -0.67 1345 B 120 102 0.26 83 6 09S +0.67 1345 B 120 103 0.28 83 5 09S -0.77 1346 B 120 105 0.32 102 6 09S +/-0.67 1347 B 1 121 38 0.34 76 8 07S -0.76 1348 B 121 45 0.48 88 11 07S -0.78 1349 B 121 48 0.22 120 5 07S -0.72 1350 B 121 49 0.32 64 7 07S -0.79 1351 B 121 63 0.41 84 6 07S -0.67 1352 B 121 64 0.24 110 9 07S -0.73 1353 B 121 68 0.6 106 18 07S -0.69 1354 B 121 78 0.37 78 13 03S -0.68 1355 B 121 91 0.21 92 4 07S -0.72 1356 B 121 95 0.26 142 5 08S +0.74 1357 B 122 18 0.38 50 8 03S -0.79 1358 B 122 38 0.43 97 9 07S -0.77 1359 B 122 55 0.36 93 5 07S -0.69 1360 B 122 56 0.39 91 13 07S -0.69 1361 B 122 57 0.3 67 4 07S -0.71 1362 B 122 72 0.29 91 10 07S -0.76 1363 B 122 89 0.24 127 6 07S -0.30 1364 B 122 89 0.2 83 5 07S +0.69 1364 B 122 101 0.28 92 7 09S +0.72 1365 B 122 102 0.29 75 5 07S -0.79 1366 B 122 103 0.27 97 6 10S -0.77 1367 B 123 6 0.23 97 5 1 07S +0.68 1368

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 56 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location B 123 6 0.29 92 6 07S -0.70 1368 B 123 8 0.22 128 4 07S -0.79 1369 B 123 30 0.36 113 8 07S -0.79 1370 B 123 43 0.19 70 4 07S -0.81 1371 B 123 65 0.34 86 12 07S -0.74 1372 B 123 70 0.24 85 4 07S -0.71 1373 B 123 74 0.54 79 8 07S -0.75 1374 B 123 76 0.4 103 6 07S -0.71 1375 B 123 93 0.32 124 8 07S -0.72 1376 B 123 102 0.55 110 10 loS -0.76 1377 B 123 103 0.38 126 8 10S -0.74 1378 B 124 6 0.23 126 5 07S +0.68 1379 B 124 17 0.45 91 9 07S -0.81 1380 B 124 29 0.25 69 6 07S -0.79 1381 B 124 29 0.24 51 6 06S -0.79 1381 B 124 44 0.13 16 3 07S -0.82 1382 B 124 45 0.22 76 5 07S -0.79 1383 B 124 48 0.37 107 8 07S -0.77 1384 B 124 57 0.15 77 2 07S -0.71 1385 B 124 65 0.15 76 2 07S -0.71 1386 B 124 66 0.25 66 9 03S -0.66 1387 B 124 67 0.25 86 4 07S -0.71 1388 B 124 70 0.29 113 10 07S -0.73 1389 B 124 71 1.28 84 16 07S -0.66 1390 B 124 73 0.38 109 6 07S -0.73 1391 B 124 99 0.38 78 9 lOS -0.72 1392 B 125 34 0.2 86 5 07S -0.82 1393 B 125 42 0.29 115 7 07S -0.79 1394 B 125 82 0.32 69 6 07S -0.65 1395 B 125 86 0.32 84 6 07S -0.74 1396 B 125 89 0.54 99 13 07S -0.72 1397 B 125 92 0.18 89 4 07S -0.69 1398 B 125 98 0.46 90 11 10S -0.67 1399 B 125 99 0.15 104 3 10S -0.67 1400 B 125 100 0.51 83 9 1OS -0.79 1401 B 126 2 0.31 78 6 lOS +0.70 1402 B 126 2 0.37 46 8 lOS -0.60 1402 B 126 2 0.3 42 6 09S +0.59 1402 B 126 4 0.21 149 4 09S +0.68 1403 B 126 7 0.52 68 10 lOS +0.65 1404 B 126 13 0.32 60 7 07S -0.74 1405 B 126 22 0.22 66 4 14S -0.77 1406 B 126 26 0.31 63 7 15S -0.89 1407 B 12.6 43 0.29 83 7 07S -0.79 1408 B 126 53 0.5 103 16 07S -0.71 1409 B 126 62 0.17 63 3 07S -0.69 1410 B 126 64 0.18 100 3 07S -0.74 1411 B 126 66 0.17 94 3 07S -0.74 1412 B 126 68 0.14 49 2 07S -0.69 1413

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 57 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube OTSG Tube Row Volts Deg  % TW Location Count B 126 75 0.18 114 7 07S -0.73 1414 B 126 96 0.35 89 9 09S +0.67 1415 B 126 98 0.19 159 4 loS +0.67 1416 B 126 98 0.39 120 7 1OS -0.62 1416 B 127 3 0.36 83 7 lOS +0.65 1417 B 127 3 0.51 33 10 lOS -0.65 1417 B 127 5 0.27 117 6 09S -0.72 1418 B 127 6 0.23 73 5 14S -0.83 1419 B 127 20 0.24 114 5 13S -0.84 1420 B 127 31 0.24 99 6 07S -0.79 1421 B 127 53 0.25 106 4 07S -0.71 1422 B 127 58 0.69 98 20 07S -0.73 1423 B 127 95 0.57 81 15 lOS -0.74 1424 B 127 96 0.19 121 4 lOS +0.67 1425 B 127 96 0.58 96 10 10S -0.67 1425 B 127 98 0.14 99 3 10S -0.67 1426 B 128 8 0.25 156 5 07S +0.68 1427 B 128 33 0.29 107 7 09S -0.79 1428 B 128 38 0.4 113 9 09S -0.77 1429 B 128 39 0.23 70 5 07S -0.81 1430 B 128 52 0.2 113 3 07S -0.71 1431 B 128 53 0.43 79 14 13S -0.74 1432 B 128 58 0.19 92 3 07S -0.71 1433 B 128 66 0.47 86 7 07S -0.71 1434 B 128 85 0.23 78 7 07S -0.65 1435 B 128 87 0.27 68 8 13S -0.77 1436 B 128 93 0.32 81 10 lOS -0.69 1437 B 128 94 0.37 100 7 10S -0.46 1438 B 129 1 0.27 115 5 10S +0.65 1439 B 129 2 0.51 94 10 11S -0.68 1440 B 129 3 0.27 72 5 09S +0.72 1441 B 129 4 0.3 90 6 09S +0.59 1442 B 129 34 0.54 86 12 07S -0.78 1443 B 129 40 0.25 77 6 07S -0.83 1444 B 129 51 0.33 100 5 07S -0.71 1445 B 129 52 0.56 99 17 07S -0.71 1446 B 129 53 0.54 61 8 07S -0.71 1447 B 129 53 0.59 91 8 09S -0.74 1447 B 129 69 0.52 99 7 07S -0.73 1448 B 129 93 0.31 103 6 10S -0.56 1449 B 129 93 0.21 138 4 10S +0.69 1449 B 129 94 0.23 79 7 07S -0.74 1450 B 129 94 0.21 82 6 10S -0.69 1450 B 129 94 0.32 71 9 13S -0.74 1450 B 130 2 0.22 48 4 13S -0.73 1451 B 130 6 0.19 84 4 09S +0.68 1452 B 13,0 14 0.45 97 8 09S -0.74 1453 B 130 14 0.35 99 6 07S +0.73 1453 B 130 19 0.36 56 7 lOS -0.82 1454

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 58 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location B 130 23 0.66 87 13 07S -0.77 1455 B 130 33 0.26 98 6 07S -0.77 1456 B 130 39 0.31 92 7 03S -0.74 1457 B 130 47 0.48 101 7 07S -0.71 1458 B 130 65. 0.36 78 5 07S -0.69 1459 B 130 71 0.22 88 3 07S -0.71 1460 B 130 91 0.33 107 9 10S -0.67 1461 B 130 92 0.52 101 14 1OS -0.67 1462 B 130 93 0.19 72 6 07S -0.70 1463 B 130 93 0.31 103 9 1OS -0.72 1463 B 131 50 0.51 87 7 07S -0.71 1464 B 131 67 0.37 99 5 07S -0.73 1465 B 131 81 0.23 80 5 13S -0.74 1466 B 131 82 0.22 82 7 07S -0.69 1467 B 131 82 0.25 93 8 13S -0.76 1467 B 131 90 0.2 91 6 lOS -0.69 1468 B 132 4 0.36 148 7 09S +0.63 1469 B 132 6 0.27 40 5 07S -0.79 1470 B 132 26 0.2 85 5 07S -0.76 1471 B 132 30 0.27 93 6 07S -0.77 1472 B 132 36 0.28 81 7 07S -0.76 1473 B 132 45 0.57 90 8 07S -0.74 1474 B 132 48 0.78 93 11 07S -0.71 1475 B 132 49 0.29 86 10 07S -0.76 1476 B 132 58 0.56 106 17 07S -0.71 1477 B 132 63 0.8 94 11 07S -0.69 1478 B 132 72 0.34 55 9 07S -0.72 1479 B 132 74 0.24 51 6 07S -0.72 1480 B 132 76 0.21 100 4 13S -0.76 1481 B 132 80 0.28 66 7 07S -0.88 1482 B 132 83 0.18 102 6 10S -0.67 1483 B 132 84 0.43 107 11 10S -0.65 1484 B 132 85 0.34 76 10 07S -0.72 1485 B 133 2 0.32 139 7 12S +0.63 1486 B 133 3 0.35 78 7 lOS -0.68 1487 B 133 3 0.23 250 5 1OS +0.83 1487 B 133 5 0.18 138 3 09S +0.63 1488 B 133 35 0.38 85 8 07S -0.75 1489 B 133 46 0.26 94 9 07S -0.69 1490 B 133 49 0.25 101 4 07S -0.71 1491 B 133 57 0.21 114 3 07S -0.74 1492 B 133 69 0.3 104 5 13S -0.83 1493 B 133 85 0.19 90 4 10S -0.65 1494 B 134 4 0.38 152 7 09S +0.72 1495 B 134 4 0.56 27 10 10S +0.63 1495 B 134 4 0.27 75 5 lOS -0.68 1495 B 134 6 0.62 36 11 09S +0.68 1496 B 134 7 0.45 75 9 09S +0.73 1497 B 134 29 0.28 90 7 07S -0.77 1498

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 59 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg B TW Location B 134 35 0.2 86 5 07S -0.77 1499 B 134 38 0.56 104 12 07S -0.72 1500 B 134 39 0.31 136 7 07S -0.75 1501 B 134 45 0.55 50 8 07S -0.69 1502 B 134 48 0.3 106 11 13S -0.76 1503 B 134 63 0.59 91 8 07S -0.71 1504 B 134 70 0.23 132 6 07S -0.79 1505 B 134 75 0.29 34 8 07S -0.72 1506 B 134 78 0.21 104 4 07S -0.71 1507 B 134 81 0.23 61 4 07S -0.62 1508 B 134 85 0.24 87 7 07S -0.72 1509 B 135 2 0.4 20 8 loS +0.70 1510 B 135 3 0.33 101 6 10S -0.72 1511 B .135 3 0.3 79 6 10S +0.63 1511 B 135 29 0.5 92 11 07S -0.72 1512 B 135 41 0.34 121 8 07S -0.72 1513 B 135 43 0.48 77 7 07S -0.69 1514 B 135 43 0.42 108 6 09S -0.76 1514 B 135 45 0.29 96 4 07S -0.69 1515 B 135 47 0.43 100 6 07S -0.69 1516 B 135 81 0.39 111 7 lOS -0.62 1517 B 136 1 0.49 112 10 lOS +0.65 1518 B 136 3 0.54 145 10 11S -0.79 1519 B 136 3 0.65 92 12 10S +0.63 1519 B 136 4 0.44 68 8 10S -0.70 1520 B . 136 4 0.29 75 6 10S +0.63 1520 B 136 9 0.41 12 8 09S +0.66 1521 B 136 13 0.41 129 8 15S -0.83 1522 B 136 15 0.21 96 4 15S -0.84 1523 B 136 28 0.38 45 7 07S -0.85 1524 B 136 32 0.68 99 13 07S -0.76 1525 B 136 45 0.63 92 9 07S -0.71 1526 B 136 49 0.26 77 4 07S -0.69 1527 B 136 73 0.27 71 7 09S -0.77 1528 B 136 79 0.19 91 5 13S -0.72 1529 B 136 81 0.3 81 8 13S -0.70 1530 B 137 1 0.35 79 7 10S +0.63 1531 B 137 1 0.29 150 6 10S -0.70 1531 B 137 2 0.38 81 8 1OS +0.72 1532 B 137 3 0.41 96 8 10S +0.70 1533 B 137 3 0.48 133 9 10S -0.77 1533 B 137 28 0.23 43 5 07S -0.79 1534 B 137 43 0.22 82 3 07S -0.69 1535 B 137 57 0.25 86 4 07S -0.71 1536 B 137 66 0.21 80 8 15S -0.74 1537 B 137 74 0.16 62 4 07S -0.74 1538 B 137 77 0.31 73 8 07S -0.70 1539 B 138 1 0.29 130 6 12S +0.53 1540 B 138 1 0.37 126 7 lOS -0.77 1540

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 60 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg %TW Location B 138 2 0.78 46 14 11S -0.68 1541 B 138 2 0.54 115 10 loS +0.70 1541 B 138 2 0.44 54 9 lOS -0.68 1541 B 138 9 0.3 89 6 09S +0.65 1542 B 138 20 0.55 55 11 07S -0.73 1543 B 138 28 0.24 109 6 07S -0.77 1544 B 138 30 0.61 92 10 07S -0.72 1545 B 138 42 0.28 89 4 07S -0.71 1546 B 138 50 0.26 66 4 07S -0.69 1547 B 138 59 0.23 74 8 13S -0.74 1548 B 138 63 0.31 101 11 13S -0.74 1549 B 138 66 0.22 107 6 13S -0.77 1550 B 138 74 0.23 97 6 13S -0.72 1551 B 139 3 0.37 96 7 10S +0.53 1552 B 139 5 0.25 86 5 09S +0.55 1553 B 139 7 0.35 50 7 05S -0.77 1554 B 139 15 0.26 140 6 07S -0.70 1555 B 139 21 0.44 79 9 07S -0.77 1556 B 139 24 0.17 17 4 07S -0.75 1557 B 139 34 0.22 98 5 07S -0.77 1558 B 139 45 0.98 93 13 07S -0.76 1559 B 139 49 0.22 82 3 07S -0.74 1560 B 139 53 0.29 90 4 07S -0.74 1561 B 139 64 0.17 104 6 14S -0.72 1562 B 139 74 0.72 105 17 07S -0.72 1563 B 139 74 0.18 72 5 13S +0.74 1563 B 140 3 0.3 59 6 10S +0.63 1564 B 140 3 0.36 136 7 lOS -0.65 1564 B 140 3 0.37 57 7 03S -0.79 1564 B 140 4 0.31. 112 6 10S +0.63 1565 B 140 6 0.26 102 5 13S -0.82 1566 B 140 14 0.16 105 3 07S -0.74 1567 B 140 15 1.31 94 22 07S -0.75 1568 B 140 21 0.63 87 13 07S -0.75 1569 B 140 32 0.34 86 7 07S -0.76 1570 B 140 55 0.19 121 7 09S -0.76 1571 B 140 58 0.42 104 6 13S -0.76 1572 B 141 3 0.39 34 7 10S -0.75 1573 B 141 4 0.59 66 11 lOS +0.70 1574 B 141 26 0.23 68 5 07S -0.77 1575 B 141 29 0.48 117 10 13S -0.86 1576 B 141 39 0.27 85 10 07S -0.69 1577 B 141 57 0.33 107 11 07S -0.69 1578 B 141 59 0.3 84 10 14S -0.72 1579 B 141 61 0.31 66 11 05S +0.43 1580 B 142 3 0.3 56 6 10S +0.61 1581 B 142 3 0.37 149 7 10S -0.70 1581 B 142 11 0.36 60 7 07S -0.79 1582 B 142 12 0.34 79 8 07S -0.75 1583

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 61 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 142 14 0.58 92 12 07S -0.73 1584 B 142 15 0.33 67 7 07S -0.84 1585 B 142 17 0.38 96 8 07S -0.75 1586 B 142 24 0.26 110 6 07S -0.75 1587 B 142 25 0.25 91 5 07S -0.77 1588 B 142 34 0.22 70 8 08S -0.73 1589 B 142 38 0.32 70 11 03S -0.71 1590 B 142 38 0.32 86 11 07S -0.73 1590 B 142 40 0.33 94 11 13S -0.78 1591 B 142 55 0.39 89 6 09S -0.78 1592 B 142 57 0.41 93 6 07S -0.74 1593 B 142 65 0.3 75 8 08S -0.72 1594 B 143 2 0.19 134 4 los -0.82 1595 B 143 3 0.54 113 10 lOS -0.72 1596 B 143 15 0.23 42 5 04S -0.76 1597 B 143 26 0.19 108 4 07S -0.77 1598 B 143 27 0.19 152 4 15S -0.79 1599 B 143 31 0.37 95 8 07S -0.75 1600 B 143 60 0.24 131 5 13S -0.69 1601 B 144 2 0.5 48 9 lOS -0.73 1602 B 144 3 0.51 39 10 lOS -0.68 1603 B 144 8 0.24 75 5 07S -0.74 1604 B 144 9 0.43 111 9 07S -0.68 1605 B 144 12 0.86 83 16 07S -0.79 1606 B 144 13 0.41 91 9 07S -0.75 1607 B 144 15 0.58 89 11 07S -0.76 1608 B 144 16 0.53 110 11 07S -0.75 1609 B 144 19 0.26 105 5 07S -0.77 1610 B 144 22 0.38 99 8 07S -0.75 1611 B 144 23 0.2 103 4 07S -0.74 1612 B 1 144 31 0.17 68 6 07S -0.69 1613 B 144 49 0.52 84 17 07S -0.69 1614 B 144 50 0.35 91 5 07S -0.71 1615 B 144 51 0.25 53 9 07S -0.73 1616 B 144 56 0.39 88 7 07S -0.67 1617 B 144 57 0.62 95 15 07S -0.67 1618 B 144 57 0.38 104 10 13S -0.79 1618 B 145 2 0.42 84 8 10S -0.79 1619 B 145 8 0.44 88 9 07S -0.77 1620 B 145 10 0.25 63 6 07S -0.73 1621 B 145 10 0.17 140 4 04S -0.77 1621 B 145 12 0.32 101 6 07S -0.72 1622 B 145 13 0.38 87 8 07S -0.72 1623 B 145 15 0.23 93 5 07S -0.79 1624 B 145 21 0.33 97 7 07S -0.75 1625 B 145 22 0.31 132 7 13S -0.88 1626 B 145 26 0.2 87 5 07S -0.75 1627 B 145 26 0.24 161 5 07S +0.60 1627 B 145 28 0.52 87 8 07S -0.76 1628

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 62 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B OTSG Tube Row Volts Deg BobTW Location Count B 145 33 0.15 103 5 07S -0.67 1629 B 145 33 0.24 54 9 07S +0.76 1629 B 145 34 0.75 92 11 07S -0.72 1630 B 145 36 0.19 99 6 07S -0.87 1631 B 145 37 0.44 104 7 14S +0.67 1632 B 145 39 0.26 80 4 07S -0.74 1633 B 145 47 0.21 80 3 07S -0.69 1634 B 145 54 0.26 118 9 loS -0.67 1635 B 146 1 0.16 136 4 13S -0.79 1636 B 146 11 0.25 145 5 07S -0.76 1637 B 146 14 0.92 93 17 07S -0.77 1638 B 146 16 0.24 100 6 07S -0.77 1639 B 146 17 0.32 81 6 07S -0.83 1640 B 146 18 0.28 105 6 07S -0.79 1641 B 146 19 0.36 89 7 07S -0.77 1642 B 146 24 0.24 118 6 09S +0.37 1643 B 146 26 0.34 72 5 07S -0.60 1644 B 146 26 0.42 81 6 07S +0.71 1644 B 1 146 26 0.81 92 11 08S -0.69 1644 B 146 26 0.32 53 5 08S +0.72 1644 B 146 26 0.91 89 12 09S -0.78 1644 B 146 26 0.25 97 4 09S +0.63 1644 B 146 30 0.54 78 8 07S -0.76 1645 B 146 47 0.44 103 7 07S -0.72 1646 B 146 48 0.49 130 16 loS -0.64 1647 B 146 49 0.36 110 5 lOS -0.67 1648 B 146 50 0.22 55 8 07S -0.67 1649 B 146 50 0.33 149 11 loS -0.64 1649 B 147 5 0.43 148 9 13S -0.84 1650 B 147 8 0.19 104 4 08S +0.61 1651 B 147 9 0.69 44 14 02S +0.77 1652 B 147 12 0.42 88 8 07S -0.74 1653 B 147 15 0.42 94 9 07S -0.75 1654 B 147 15 0.14 132 3 07S +0.58 1654 B 147 16 0.2 100 4 07S -0.74 1655 B 147 16 0.18 84 4 07S +0.67 1655 B 147 17 0.26 97 6 07S -r0.70 1656 B 147 18 0.16 93 3 07S --0.71 1657 B 147 20 0.14 150 3 07S +0.67 1658 B 147 23 0.15 126 4 09S +0.54 1659 B 147 23 0.36 95 8 09S -0.81 1659 B 147 23 0.22 110 5 08S +0.67 1659 B 147 23 0.32 80 7 07S -0.77 1659 B 147 23 0.38 82 8 03S -0.75 1659 B 147 23 0.22 63 5 02S -0.60 1659 B 147 23 0.26 150 6 05S -0.78 1659 B 147 24 0.56 86 8 07S -0.77 1660 B 147 32 0.34 153 1 12 09S +0.65 1661 B 147 42 0.16 67 1 5 10S +0.76 1662

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 63 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg %TW Location B 147 43 0.31 90 5 loS -0.65 1663 B 147 44 0.25 85 9 07S -0.64 1664 B 147 44 0.17 83 6 lOS -0.64 1664 B 147 45 0.3 122 5 13S -0.74 1665 B 148 2 0.37 80 7 13S -0.83 1666 B 148 2 0.23 100 5 09S -0.86 1666 B 148 7 0.23 76 5 08S +0.65 1667 B 148 9 0.37 150 8 13S -0.81 1668 B 148 17 0.51 109 11 07S +0.60 1669 B 148 20 0.52 85 10 10S +0.67 1670 B 148 20 0.18 83 4 loS -0.81 1670 B 148 25 0.22 117 3 09S +0.63 1671 B 148 36 0.35 74 12 lOS +0.67 1672 B 148 37 0.27 83 4 1OS -0.60 1673 B 148 37 0.25 117 4 lOS +0.72 1673 B 148 41 0.31 111 11 10S -0.67 1674 B 149 1 0.17 111 3 09S -0.81 1675 B 149 2 0.25 137 6 13S -0.81 1676 B 149 5 0.38 61 8 13S -0.83 1677 B 149 7 0.27 59 5 07S -0.74 1678 B 149 11 0.41 89 8 07S -0.79 1679 B 149 12 0.22 103 5 12S +0.58 1680 B 149 13 0.86 98 15 1OS +0.56 1681 B 149 14 0.42 116 9 10S +0.65 1682 B 149 15 0.17 133 4 11S -0.81 1683 B 149 15 0.38 82 8 10S +0.63 1683 B 149 15 0.15 63 4 09S +0.61 1683 B 149 16 0.21 89 4 10S +0.72 1684 B 149 17 0.33 75 7 10S +0.68 1685 B 149 24 0.45 91 15 lOS +0.74 1686 B 149 26 0.4 110 13 10S -0.67 1687 B 149 26 0.28 90 10 10S +0.69 1687 B 149 27 0.47 114 7 10S -0.72 1688 B 149 27 0.23 121 3 10S +0.69 1688 B 149 28 0.34 126 12 10S -0.67 1689 B 149 28 0.18 109 6 13S -0.78 1689 B 149 29 0.56 107 8 10S -0.55 1690 B 149 30 0.51 87 16 10S -0.62 1691 B 149 30 0.51 79 16 10S +0.69 1691 B 149 30 0.22 85 8 13S +0.63 1691 B 149 31 0.66 88 9 10S -0.67 1692 B 149 31 0.26 131 4 10S +0.74 1692 B 149 32 0.4 81 13 lOS +0.74 1693 B 149 32 0.37 115 13 lOS -0.71 1693 B 150 1 0.75 70 15 lOS +0.65 1694 B 150 1 0.37 74 8 lOS -0.77 1694 B 150 3 0.35 44 8 lOS -0.77 1695 B 150 4 0.23 111 5 13S -0.83, 1696 B 150 5 0.24 82 4 lOS -0.60 1697

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 64 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B Bobbin Tube Count OTSG Tube Row Volts Deg %TW Location B 150 6 0.24 94 5 10S -0.75 1698 B 150 9 0.22 113 5 10S +0.63 1699 B 150 9 0.17 95 4 lOS -0.68 1699 B 150 10 0.4 124 8 1OS +0.60 1700 B 150 10 0.27 109 5 1OS -0.79 1700 B 150 11 0.34 128 8 10S +0.63 1701 B 150 11 0.27 122 6 10S -0.77 1701 B 150 12 0.35 104 7 10S +0.60 1702 B 150 12 0.36 118 7 10S -0.77 1702 B 150 13 0.41 92 9 lOS +0.61 1703 B 150 13 0.3 88 7 1OS -0.75 1703 B 150 14 0.33 109 5 1OS -0.69 1704 B 150 14 0.26 86 4 07S -0.74 1704 B 150 15 0.42 87 14 07S -0.74 1705 B 150 15 0.27 106 10 1OS -0.69 1705 B 150 15 0.36 84 12 1OS +0.67 1705 B 150 16 0.29 109 4 10S -0.65 1706 B 150 17 0.31 104 11 10S -0.69 1707 B 150 17 0.24 101 8 14S -0.68 1707 B 150 18 0.48 90 7 1OS -0.72 1708 B 150 18 0.26 107 4 14S -0.76 1708 B 150 19 0.14 138 5 09S +0.58 1709 B 150 19 0.45 107 15 10S -0.69 1709 B 150 19 0.28 82 10 10S +0.69 1709 B 150 20 0.22 93 3 10S +0.65 1710 B 150 20 0.24 108 4 07S -0.74 1710 B 150 20 0.48 97 7 10S -0.60 1710 B 150 21 0.33 119 12 13S +0.56 1711 B 150 21 0.26 106 9 14S -0.72 1711 B 150 21 0.52 119 17 10S -0.67 1711 B 150 21 0.3 97 11 10S +0.74 1711 B 150 22 0.42 118 6 10S -0.62 1712 B 150 22 0.35 167 5 1OS +0.58 1712 B 150 23 0.29 109 10 lOS -0.69 1713 B 150 23 0.38 93 13 10S +0.67 1713 B 150 24 0.62 99 9 10S -0.69 1714 B 150 24 0.33 92 5 10S +0.83 1714 B 150 24 0.31 121 5 11S -0.65 1714 B 150 25 0.38 126 13 10S -0.69 1715 B 150 25 0.35 94 12 lOS +0.74 1715 B 150 25 0.36 100 12 14S -0.74 1715 B 150 27 0.26 98 9 lOS -0.67 1716 B 150 27 0.16 119 5 07S -0.71 1716 B 151 2 0.33 91 7 lOS -0.70 1717 B 151 2 0.31 70 6 13S -0.76 1717 B 151 3 0.41 93 9 1OS -0.75 1718 B 151 4 0.35 76 7 lOS -0.74 1719 B 151 5 0.29 81 6 10S -0.75 1720 B 151 5 0.25 184 6 13S -0.79 1720

U.S. Nuclear Regulatory Commission Appendix 1 to Attachment 3F0508-03 Page 65 of 65 Tubes In-Service with Through-Wall Indications 1% to 39%

OTSG A and B OTSG Tube Row Volts Deg %B TuWe TW Location B 151 8 0.23 95 5 10S -0.77 1721 B 151 8 0.14 90 3 11S -0.65 1721 B 151 9 0.2 92 3 lOS -0.72 1722 B 151 10 0.2 70 7 lOS +0.67 1723 B 151 10 0.17 82 6 13S -0.72 1723 B 151 10 0.31 98 11 13S +0.61 1723 B 151 10 0.6 87 19 10S -0.76 1723 B 151 11 0.31 103 5 lOS -0.65 1724 B 151 12 0.6 120 19 10S -0.67 1725 B 151 12 0.25 85 9 lOS +0.69 1725 B 151 15 0.35 117 12 10S -0.67 1726 B 151 15 0.64 101 20 lOS +0.69 1726

PROGRESS ENERGY FLORIDA, INC.

CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302/LICENSE NUMBER DPR-72 APPENDIX 2 TO SPECIAL REPORT 08-01 FIRST SPAN IGA IN OTSG-B Appendix Acronyms IGA Intergranular Attack LTS Lower Tubesheet OTSG Once-Through Steam Generator TW Through-Wall

U.S. Nuclear Regulatory Commission Appendix 2 to Attachment 3F0508-03 Page 1 of 7 First Span IGA in OTSG-B Re ression Analysis Ind. Inches  % Change in TW Tube Row Col Code  % TW above Volts Deg from 1997, or Count LTS earliest, Indication 16 22 TWD 23 6.58 0.13 134 3 1 24 43 TWD 30 39.03 0.24 133 -3 2 38 45 TWD 32 9.54 0.5 170 4 3 38 64 TWD 31 8.06 0.2 136 2 4 40 46 TWD 29 10.05 0.32 156 0 5 41 39 TWD 24 10.91 0.19 66 -3 6 42 34 TWD 30 8.71 0.2 141 6 7 42 42 TWD 22 7.17 0.14 118 -6 8 42 42 TWD 32 .7.67 0.17 68 1 8 42 42 TWD 31 10.5 0.29 150 1 8 42 47 TWD 31 10.98 0.14 113 6 9 42 63 TWD 27 9.11 0.22 140 0 10 42 63 TWD 31 13.54 0.14 128 0 10 43 48 TWD 26 10.74 0.14 73 -2 11 43 48 TWD 11 26.13 0.07 150 3 11 43 82 TWD 27 4.25 0.11 135 -3 12 45 40 TWD 30 8.76 0.34 158 -2 13 45 40 TWD 28 12.25 0.57 176 -4 13 45 40 TWD 30 13.07 0.34 148 -2 13 45 48 TWD 32 13.53 0.15 101 -2 14 45 49 TWD 30 13.4 0.21 133 -1 15 46 41 TWD 32 8.54 0.24 117 -2 16 46 49 TWD 28 14.24 0.31 154 -2 17 48 43 TWD 26 8.83 0.3 164 -4 18 48 43 TWD 17 9.4 0.06 120 -6 18 48 43 TWD 32 11.51 0.25 112 0 18 48 43 TWD 27 12.17 0.17 137 -3 18 48 43 TWD 24 14.81 0.19 152 -2 18 48 61 TWD 20 7.43 0.17 151 1 19 48 72 TWD 21 9.03 0.12 137 -10 20 49 56 TWD 23 6.18 0.13 156 10 21 49 56 TWD 23 11.91 0.11 145 -8 21 51 30 TWD 34 10.47 0.58 157 4 22 51 55 TWD 31 7.75 0.26 146 -3 23 51 79 TWD 28 9.79 0.25 150 -4 24 51 79 TWD 31 13.51 0.31 143 -1 24 51 80 TWD 29 8.69 0.17 123 3 25 52 37 TWD 30 13.06 0.15 156 1 26 52 37 TWD 26 13.3 0.12 81 -3 26 52 37 TWD 24 13.65 0.12 155 1 26 52 37 TWD 13 17.48 0.05 69 -9 26 52 49 TWD 29 14.7 0.23 152 -4 27 53 44 TWD 26 8.11 0.11 132 3 28 53 44 TWD 32 9.65 0.31 137 -1 28 53 44 TWD 30 10.68 0.25 124 3 28 53 44 TWD 24 11.01 0.07 102 -10 28 54 82 TWD 20 6.12 0.08 85 -4 29 54 82 TWD 30 9.7 0.17 152 -1 29 54 82 TWD 30 10.76 0.26 117 -2 29 56 37 TWD 31 8.43 0.4 153 -2 30

U.S. Nuclear Regulatory Commission Appendix 2 to Attachment 3F0508-03 Page 2 of 7 First Span IGA in OTSG-B Regression Analysis Ind. Inches  % Change in TW Tube Row Col Code  % TW above Volts Deg from 1997, or Count LTS earliest, Indication 56 37 TWD 31 11.22 0.22 134 -2 30 56 53 TWD 33 5.5 0.22 119 1 31 56 53 TWD 29 11.45 0.34 142 -2 31 56 53 TWD 20 13.48 0.06 155 -2 31 56 53 TWD 26 14.43 0.16 153 6 31 57 33 TWD 28 14.08 0.26 149 -4 32 57 33 TWD 31 26.93 0.23 144 1 32 57 89 TWD 26 6.64 0.2 132 -3 33 57 89 TWD 30 7.1 0.12 130 9 33 57 89 TWD 21 7.34 0.1 141 -1 33 57 89 TWD 26 10.22 0.14 113 1 33 58 33 TWD 31 8.83 0.26 155 0 34 58 33 TWD 20 11.23 0.08 88 -5 34 58 33 TWD 29 15.5 0.14 67 2 34 58 89 TWD 33 5.86 0.26 138 1 35 59 30 TWD 29 9.74 0.35 164 2 36 59 40 TWD 25 9.26 0.16 131 -7 37 59 80 TWD 27 12.31 0.19 140 1 38 60 34 TWD 29 15.49 0.19 94 0 39 60 44 TWD 26 8.01 0.21 163 -6 40 61 25 TWD 34 6.8 0.33 136 2 41 61 25 TWD 31 8.08 0.38 158 -1 41 61 27 TWD 36 9.82 0.24 149 7 42 61 46 TWD 19 8.35 0.11 145 -3 43 61 82 TWD 30 8.36 0.24 117 0 44 61 82 TWD 22 12.33 0.08 133 1 44 61 88 TWD 33 6.01 0.18 125 4 45 62 28 TWD 34 8.07 0.24 121 0 46 62 28 TWD 28 9.83 0.14 144 4 46 62 28 TWD 33 10.47 0.6 153 -1 46 62 28 TWD 26 11.26 0.04 75 -4 46 62 44 TWD 27 9.72 0.15 115 0 47 62 44 TWD 24 11.81 0.2 162 -3 47 62 99 TWD 33 9.29 0.17 124 4 48 62 99 TWD 32 10.12 0.16 143 -2 48 63 26 TWD 30 11.6 0.23 148 -1 49 63 26 TWD 27 27.65 0.36 174 -4 49 63 41 TWD 33 12.2 0.34 138 -1 50 63 41 TWD 31 13.59 0.2 148 2 50 64 42 TWD 32 11.83 0.21 121 -2 51 65 37 TWD 20 6.82 0.09 126 12 52 65 37 TWD 32 8.47 0.24 76 3 52 65 37 TWD 31 10.61 0.25 121 1 52 65 37 TWD 27 12.47 0.17 112 -2 52 65 37 TWD 29 12.91 0.18 150 -5 52 65 37 TWD 27 16.68 0.19 69 -3 52 65 37 TWD 30 17.19 0.27 147 -2 52 65 42 TWD 21 6.72 0.14 69 -10 53 65 44 TWD 27 11.35 0.19 144 -7 54 65 44 TWD 29 14.39 0.23 52 -4 54

U.S. Nuclear Regulatory Commission Appendix 2 to Attachment 3F0508-03 Page 3 of 7 First Span IGA in OTSG-B Regression Analysis Row Ind. Inches %from Change in or TW Tube Col Code  % TW above Volts Deg 1997, Count LTS earliest, Indication 65 50 TWD 24 12.22 0.06 94 -6 55 65 50 TWD 28 13.44 0.12 93 1 55 66 34 TWD 26 8.72 0.09 151 3 56 66 34 TWD 29 12.58 0.14 106 5 56 67 50 TWD 33 11.78 0.25 79 1 57 68 38 TWD 29 10.07 0.28 144 -1 58 68 38 TWD 30 11.66 0.23 84 -4 58 68 38 TWD 23 13.8 0.21 153 3 58 68 38 TWD 26 15.67 0.17 145 -3 58 68 38 TWD 27 16.95 0.28 159 1 58 68 99 TWD 32 8.13 0.47 160 1 59 68 99 TWD 33 11.3 0.45 51 1 59 69 42 TWD 33 13.87 0.26 144 5 60 70 38 TWD 30 13.94 0.24 159 7 61 70 38 TWD 26 15.46 0.19 150 -7 61 70 38 TWD 25 15.7 0.11 60 -11 61 70 38 TWD 31 17.6 0.41 150 0 61 70 58 TWD 28 31.12 0.17 108 -1 62 71 95 TWD 26 7 0.18 123 -3 63 73 44 TWD 24 24.22 0.14 74 -4 64 77 86 TWD 23 7.82 0.13 139 0 65 78 41 TWD 30 27.43 0.13 151 -2 66 78 45 TWD 30 25.76 0.27 74 -4 67 78 93 TWD 32 11.51 0.36 142 -5 68 79 43 TWD 29 25.92 0.25 136 -6 69 79 92 TWD 30 12.62 0.27 138 -4 70 79 92 TWD 34 14.63 0.18 129 -1 70 79 97 TWD 34 9.39 0.41 130 1 71 79 97 TWD 29 16.43 0.29 162 2 71 80 48 TWD 29 5.17 0.2 135 1 72 80 99 TWD 28 7 0.1 82 0 73 80 99 TWD 36 7.81 0.38 159 2 73 80 99 TWD 29 10.23 0.35 165 -3 73 80 99 TWD 32 11.28 0.2 124 3 73 80 99 TWD 29 14.6 0.2 125 0 73 81 104 TWD 28 8.48 0.16 124 0 74 83 100 TWD 22 5.96 0.1 79 11 75 83 100 TWD 32 7.86 0.41 151 3 75 83 100 TWD 29 10.9 0.28 150 5 75 84 31 TWD 33 12.49 0.26 130 -1 76 84 93 TWD 26 14.4 0.09 141 -2 77 84 98 TWD 26 9.15 0.18 76 -4 78 84 98 TWD 21 10.18 0.13 165 7 78 84 98 TWD 35 11.06 0.49 165 3 78 84 98 TWD 30 12.17 0.44 154 -4 78 84 98 TWD 25 13.71 0.13 74 -8 78 84 98 TWD 22 16.88 0.09 90 -7 78 84 100 TWD 29 6.99 0.25 161 2 79 84 100 TWD 29 8.33 0.22 144 -2 79 84 100 TWD 28 11.13 0.15 169 0 79

U.S. Nuclear Regulatory Commission Appendix 2 to Attachment 3F0508-03 Page 4 of 7 First Span IGA in OTSG-B Regression Analysis Id. Inches  % Change in TW Tube Row Col Code  % TW above Volts Deg from 1997, or Count LTS earliest, Indication 85 43 TWD 34 10.42 0.29 114 0 80 85 92 TWD 28 8.23 0.12 131 4 81 85 96 TWD 31 9.7 0.29 88 -3 82 85 98 TWD 29 9.64 0.3 144 0 83 86 24 TWD 31 9.1 0.4 155 -3 84 86 24 TWD 34 12.79 0.29 121 0 84 87 39 TWD 24 12.75 0.16 93 -4 85 88 34 TWD 32 12.72 0.25 62 -5 86 88 34 TWD 29 15.38 0.15 114 -4 86 88 45 TWD 30 14 0.22 128 -5 87 89 33 TWD 32 9.7 0.32 144 -3 88 89 39 TWD 31 14.35 0.21 113 0 89 89 89 TWD 27 5.79 0.17 135 3 90 89 89 TWD 30 8.4 0.24 139 5 90 89 89 TWD 17 11.35 0.22 166 1 90 90 40 TWD 33 8.31 0.38 144 0 91 90 40 TWD 24 9.9 0.1 151 -3 91 90 40 TWD 32 11.78 0.26 134 -1 91 90 40 TWD 33 11.97 0.13 90 4 91 90 40 TWD 24 12.24 0.15 122 -4 91 90 40 TWD 31 14.49 0.23 106 2 91 90 40 TWD 25 15.5 0.17 126 -1 91 90 40 TWD 22 17.77 0.05 132 3 91 90 88 TWD 30 5.33 0.25 136 -2 92 91 93 TWD 28 9.24 0.15 97 1 93 91 94 TWD 31 8.03 0.21 133 -2 94 91 94 TWD 30 10.74 0.31 156 -1 94 91 98 TWD 30 8.96 0.23 123 -2 95 91 98 TWD 31 11.14 0.27 121 -8 95 92 39 TWD 28 10.95 0.23 130 -2 96 92 40 TWD 26 14.33 0.17 59 -3 97 92 43 TWD 35 5.73 0.49 144 -3 98 93 31 TWD 28 11.09 0.23 80 -2 99 93 31 TWD 32 12.7 0.27 63 -4 99 93 46 TWD 17 6.85 0.17 164 2 100 93 46 TWD 26 10.98 0.38 157 1 100 93 46 TWD 23 11.97 0.12 153 -6 100 93 46 TWD 19 15.68 0.18 159 -4 100 93 79 TWD 33 10.56 0.15 118 1 101 93 87 TWD 21 7.44 0.13 158 4 102 93 94 TWD 30 6.98 0.58 168 -4 103 93 94 TWD 33 12.48 0.35 139 0 103 95 36 TWD 32 9.71 0.24 106 1 104 95 36 TWD 29 14.62 0.2 131 -3 104 95 36 TWD 25 18.01 0.31 165 0 104 95 47 TWD 29 10.34 0.55 176 5 105 96 40 TWD 33 10.33 0.23 151 1 106 96 41 TWD 35 11.69 0.37 136 2 107 96 41 TWD 16 13.13 0.12 127 -6 107 96 44 TWD 22 6.69 0.18 125 -3 108

U.S. Nuclear Regulatory Commission Appendix 2 to Attachment 3F0508-03 Page 5 of 7 First Span IGA in OTSG-B Regression Analysis Ind. Inches  % Change in TW Tube Row Col Code  % TW above Volts Deg from 1997, or Count LTS earliest, Indication 96 44 TWD 23 9.07 0.15 80 -1 108 96 45 TWD 28 12.17 0.22 113 0 109 96 91 TWD 19 11.89 0.11 145 3 110 97 41 TWD 29 11.44 0.3 160 -1 111 97 41 TWD 29 13.5 0.28 75 -2 111 98 39 TWD 23 6.69 0.15 59 -7 112 98 39 TWD 28 12.09 0.21 104 -5 112 98 39 TWD 29 14.48 0.2 96 -2 112 98 39 TWD 31 15.59 0.19 128 3 112 98 39 TWD 26 17.94 0.13 93 2 112 98 42 TWD 33 12.04 0.21 147 0 113 98 42 TWD 27 15.09 0.22 51 0 113 98 45 TWD 25 12.19 0.09 86 -2 114 98 47 TWD 28 6.98 0.13 121 2 115 98 47 TWD 25 17.19 0.16 79 -5 115 99 41 TWD 30 10.41 0.2 121 0 116 100 33 TWD 31 10.17 0.23 100 1 117 100 33 TWD 32 11.07 0.24 94 1 117 100 36 TWD 31 8.04 0.46 154 -3 118 100 36 TWD 29 13.64 0.31 57 -4 118 100 38 TWD 24 14.87 0.15 66 -3 119 100 38 TWD 30 15.1 0.44 173 -3 119 100 38 TWD 28 17.07 0.21 123 -4 119 100 41 TWD 31 8.05 0.53 162 -1 120 100 41 TWD 32 17.43 0.35 148 3 120 100 45 TWD 30 15.07 0.29 137 0 121 100 66 TWD 30 9.98 0.1 112 9 122 100 92 TWD 32 7.21 0.19 117 -1 123 100 92 TWD 24 9.1 0.36 166 1 123 101 43 TWD 28 9.19 0.27 47 -1 124 101 47 TWD 27 9.04 0.12 103 4 125 101 47 TWD 16 11.29 0.14 163 -11 125 101 47 TWD 28 15.28 0.14 101 6 125 101 98 TWD 27 13.11 0.14 132 -5 126 101 98 TWD 24 17.27 0.12 81 0 126 102 41 TWD 27 16.34 0.37 160 -7 127 102 43 TWD 31 7.75 0.36 162 2 128 102 43 TWD 33 12.29 0.26 81 0 128 102 43 TWD 30 13.32 0.12 105 2 128 102 44 TWD 27 9.72 0.2 67 -2 129 103 36 TWD 32 11.35 0.32 159 0 130 103 37 TWD 34 10.45 0.38 128 3 131 103 37 TWD 30 15.36 0.26 130 -4 131 103 37 TWD 26 23.93 0.12 136 6 131 103 41 TWD 22 15.84 0.16 73 -6 132 103 94 TWD 30 5.24 0.17 91 0 133 104 40 TWD 24 13.35 0.14 124 4 134 104 40 TWD 24 15.21 0.09 74 -7 134 104 44 TWD 22 11.83 0.13 51 4 135 104 44 TWD 24 12.41 0.1 151 1 135

U.S. Nuclear Regulatory Commission Appendix 2 to Attachment 3F0508-03 Page 6 of 7 First Span IGA in OTSG-B Regression Analysis Ind. Inches  % Change in TW Tube Row Col Code  % TW above Volts Deg from 1997, or Count LTS earliest, Indication 104 44 TWD 19 18.06 0.1 56 -8 135 104 90 TWD 23 8.88 0.11 145 -6 136 104 90 TWD 27 12.02 0.18 106 1 136 104 90 TWD 29 14.12 0.11 136 -3 136 106 42 TWD 22 11.57 0.11 107 -9 137 106 42 TWD 25 12.69 0.25 148 -5 137 106 42 TWD 25 14.97 0.14 48 0 137 106 42 TWD 33 16.51 0.35 127 2 137 106 43 TWD 26 7.1 0.14 135 3 138 106 48 TWD 31 8.92 0.31 139 -1 139 106 50 TWD 25 10.69 0.14 44 0 140 106 50 TWD 27 13.84 0.28 49 -2 140 106 74 TWD 28 9.31 0.18 138 0 141 106 74 TWD 20 14.08 0.07 152 5 141 107 47 TWD 33 7.4 0.28 148 -1 142 107 47 TWD 30 12.08 0.25 125 -1 142 107 47 TWD 27 14.4 0.16 106 -5 142 107 47 TWD 28 16.36 0.19 82 -3 142 107 66 TWD 26 6.64 0.11 137 9 143 107 66 TWD 26 7.44 0.1 123 -1 143 107 66 TWD 20 12.24 0.09 107 1 143 107 66 TWD 25 14.8 0.09 135 2 143 108 34 TWD 30 15.04 0.24 53 -2 144 108 74 TWD 25 13.3 0.2 141 1 145 109 46 TWD 25 8.48 0.28 157 0 146 109 46 TWD 28 10.83 0.14 112 1 146 109 46 TWD 24 12.35 0.14 147 -4 146 110 40 TWD 28 12.95 0.34 158 5 147 110 43 TWD 31 24.49 0.16 107 2 148 110 46 TWD 30 12.37 0.21 54 0 149 110 52 TWD 28 9.61 0.2 125 -3 150 110 52 TWD 30 10.31 0.28 143 0 150 110 52 TWD 26 11.4 0.11 113 2 150 110 52 TWD 30 14.03 0.16 114 2 150 111 39 TWD 26 10.17 0.19 136 -2 151 111 42 TWD 30 11.51 0.43 161 -1 152 111 42 TWD 25 14.15 0.27 176 -6 152 111 51 TWD 32 11.32 0.25 146 2 153 113 44 TWD 25 7.94 0.1 127 3 154 113 44 TWD 31 10.24 0.36 150 -2 154 113 44 TWD 26 12.41 0.26 169 0 154 113 45 TWD 28 17.11 0.18 61 -1 155 114 41 TWD 27 8.26 0.2 123 -7 156 114 41 TWD 27 9.16 0.09 86 4 156 114 42 TWD 24 6.95 0.1 150 -1 157 114 42 TWD 28 8.29 0.18 170 4 157 114 42 TWD 25 8.61 0.27 168 -5 157 114 42 TWD 31 11.67 0.45 159 -1 157 114 42 TWD 22 26.48 0.11 110 -2 157 114 43 TWD 23 6.94 0.07 75 -2 158

U.S. Nuclear Regulatory Commission Appendix 2 to Attachment 3F0508-03 Page 7 of 7 First Span IGA in OTSG-B Regression Analysis Ind. Inches  % Change in TW Tube Row Col Code  % TW above Volts Deg from 1997, or Count LTS earliest, Indication 114 43 TWD 31 7.43 0.25 172 6 158 114 43 TWD 26 10.71 0.25 169 -2 158 114 43 TWD 26 12.49 0.21 158 -4 158 114 43 TWD 26 24.16 0.16 94 2 158 114 43 TWD 11 26.29 0.05 118 -21 158 114 46 TWD 21 6.7 0.18 141 3 159 116 43 TWD 26 6.44 0.12 131 1 160 116 43 TWD 31 6.87 0.2 127 2 160 116 43 TWD 23 7.24 0.09 122 -1 160 116 43 TWD 27 7.98 0.15 127 1 160 118 41 TWD 32 5.8 0.26 141 3 161 118 41 TWD 29 8.87 0.2 61 -5 161 118 41 TWD 24 9.63 0.16 69 -5 161 123 77 TWD 27 4.58 0.13 145 3 162 129 41 TWD 30 21.47 0.22 109 1 163 131 3 TWD 24 37.29 0.28 152 3 164

PROGRESS ENERGY FLORIDA, INC.

CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302/LICENSE NUMBER DPR-72 APPENDIX 3 TO SPECIAL REPORT 08-01 SERVICE INDUCED INDICATIONS - PLUGGED IN 15R Appendix Acronyms SAI Single Axial Indication MAI Multiple Axial Indications SCI Single Circumferential Indication MAA Multiple Axial Anomaly MCI Multiple Circumferential Indications SVI Single Volumetric Indications TWD Through-Wall Dimensions MVI Multiple Volumetric Indications I-Code Indication Code UTE Upper Tube End LTE Lower Tube End 15S Fifteenth Tube Support Plate

U.S. Nuclear Regulatory Commission Appendix 3 to Attachment 3F0508-03 Page 1 of 5 Service Induced Indications - Plugged in 15R OTSG Row Tube Volts Indication Location Length  % TW A 3 31 1.9 SCI LTE +0.10 0.46 96 A 3 33 0.3 SCI LTE +0.11 0.28 92 A 4 2 0.31 SAI 15S -6.99 3.66 68 A 4 17 2.16 MCI LTE +0.31 0.68 55 A 4 30 2.81 SCI LTE +0.37 0.35 99 A 4 33 0.22 MAI 15S -4.93 3.75 1 A 4 36 0.46 MAI 15S -3.01 5.44 39 A 4 36 0.11 SAI 15S -7.06 0.66 55 A 5 36 0.23 SAI 15S -1.04 0.33 21 A 5 36 0.55 MAI 15S -4.92 5.05 1 A 5 46 0.28 SAI 15S -5.35 0.69 63 A 6 43 0.75 SCI LTE +0.35 0.33 70 A 6 47 0.2 SAI 15S -3.98 2.48 39 A 7 40 0.28 SAI 15S -2.98 2.19 18 A 9 2 1.06 SCI LTE +0.17 0.21 92 A 9 3 0.36 SCI LTE +0.18 0.23 36 A 10 1 1.41 SCI LTE +0.02 0.21 96 A 10 2 1.88 SCI LTE +0.07 0.28 98 A 10 10 0.58 SCI LTE +0.43 0.21 36 A 11 2 1.66 SCI LTE +0.16 0.21 94 A 11 4 .0.68 SCI LTE +0.47 0.21 23 A 11 52 0.59 SAI 14S +0.82 0.22 1 A 12 70 2.19 SCI LTE +0.12 0.21 98 A 13 2 1.48 SCI LTE +0.17 0.26 92 A 14 75 2.05 SCI LTE +0.07 0.23 99 A 15 2 0.23 SCI LTE +0.14 0.18 30 A 15 9 0.53 SCI LTE +0.12 0.21 50 A 16 80 1.09 SCI LTE +0.07 0.25 99 A 17 5 1.65 MCI LTE +0.33 0.91 44 A 18 84 0.68 SCI LTE +0.12 0.35 99 A 20 84 0.66 SCI LTE +0.20 0.30 43 A 28 5 0.45 SCI LTE +0.12 0.16 60 A 30 1 1.41 SCI LTE +0.10 0.23 27 A 30 3 0.26 SVI 15S -0.02 0.14 x 0.10 19 A 34 106 0.79 SCI LTE +0.27 0.21 93 A 38 1 0.81 SCI LTE +0.35 0.19 96 A 39 115 0.23 SCI LTE +0.26 0.19 95 A 40 117 1.55 SCI LTE +0.37 0.42 88 A 43 118 1.49 SCI LTE +0.13 0.25 95 A 47 122 0.86 SCI LTE +0.14 0.30 95 A 49 123 0.41 SCI LTE +0.40 0.28 95 A 50 123 1.93 SCI LTE +0.07 0.35 82 A 51 124 0.8 SCI LTE +0.14 0.19 99 A 58 75 1.24 SAI UTS -0.66 0.33 89 A 58 128 0.56 SCI LTE +0.10 0.19 74 A 58 129 0.69 SCI LTE +0.18 0.12 86

U.S. Nuclear Regulatory Commission Appendix 3 to Attachment 3F0508-03 Page 2 of 5 Service Induced Indications - Plugged in 15R OTSG Row Tube Volts Indication Location Length  % TW A 59 124 0.86 SCI LTE +0.13 0.26 91 A 60 121 0.66 SVI 11S -17.74 0.37 x 0.67 24 A 62 104 0.7 SAI 03S +1.47 0.22 10 A 62 129 0.62 SCI LTE +0.16 0.23 97 A 66 108 0.39 SAI 11S -13.59 0.25 14 A 79 14 0.19 SVI UTS +0.38 0.18 x 0.16 32 A 81 41 2.28 SCI LTE +0.29 0.46 73 A 83 88 3.11 SCI LTE +0.12 0.55 46 A 86 79 2.54 SCI LTE +0.16 0.64 36 A 86 79 1.27 SCI LTE +0.72 0.21 46 A 86 99 0.48 MAI UTE -4.10 0.22 48 A 86 99 0.38 SCI UTE -3.04 0.33 63 A 89 1 2.02 SCI LTE +0.12 0.30 99 A 89 41 0.42 SAI UTE -4.20 0.17 64 A 90 1 1.34 SCI LTE +0.03 0.32 95 A 90 129 0.64 SCI LTE +0.11 0.23 93 A 92 117 0.54 SAI 14S +33.35 0.32 99 A 95 82 0.38 SAI 15S +39.39 0.24 1 A 95 82 0.74 SAI 15S +42.31 0.61 1 A 98 3 0.3 SVI 15S +0.10 0.25 x 0.24 7 A 110 1 1.63 SCI LTE +0.13 0.25 51 A 110 5 0.23 SAI 15S -3.05 0.99 1 A 112 1 0.36 SVI 15S +0.68 0.22 x 0.24 40 A 113 2 0.14 SAI 14S +26.11 0.16 1 A 113 2 0.11 SAI 14S +27.23 0.51 1 A 113 2 0.17 SAI 14S +28.07 0.59 1 A 115 105 0.1 SAI UTS -0.95 0.46 1 A 115 113 0.4 SAI 14S +32.98 1.64 1 A 116 2 1.45 SCI LTE +0.14 0.23 48 A 116 112 0.33 SAI 14S +33.18 1.99 58 A 120 63 0.86 SAI UTE -4.28 0.16 45 A 122 1 0.28 SVI 14S +33.68 0.23 x 0.24 34 A 123 3 0.52 SCI LTE +0.47 0.16 62 A 129 94 0.15 SAI 15S +1.02 0.27 61 A 129 94 0.22 SAI 15S +1.84 0.25 21 A 130 91 0.18 SAI 15S +0.90 0.22 71 A 130 93 0.19 SAI 15S +0.84 0.19 78 A 131 89 0.21 SAI 15S +1.15 0.56 64 A 132 85 1.09 SCI LTE +0.06 0.18 75 A 133 84 0.8 SO LTE +0.35 0.21 99 A 135 75 0.94 SCI LTE +0.07 0.23 95 A 135 82 0.82 SCI LTE +0.07 0.16 92 A 136 80 1.69 SCI LTE +0.08 0.37 94 A 137 77 0.75 SCI LTE +0.12 0.27 98 A 139 66 0.71 SCI LTE +0.14 0.21 59 A 139 73 0.36 SCI LTE +0.32 0.23 93

U.S. Nuclear Regulatory Commission Appendix 3 to Attachment 3F0508-03 Page 3 of 5 Service Induced Indications - Plugged in 15R OTSG Row Tube Volts Indication Location Length  % TW A 141 67 0.53 SCI LTE +0.07 0.27 97 A 142 1 0.26 SVI 15S -0.84 0.18 x 0.18 34 A 142 64 1.83 SCI LTE +0.03 0.18 90 A 143 61 0.68 SCI LTE +0.12 0.30 85 A 143 62 0.76 SCI LTE +0.47 0.36 91 A 144 56 1.41 SCI LTE +0.09 0.20 87 A 145 54 0.66 SCI LTE +0.14 0.18 88 A 147 16 0.91 SCI LTE +0.11 0.25 98 A 147 33 1.04 SCI LTE +0.08 0.18 99 A 148 2 0.77 SCI LTE +0.12 0.34 95 A 148 32 0.7 SCI LTE +0.49 0.18 76 A 148 40 1.76 SCI LTE +0.16 0.41 80 A 149 3 1.46 SCI LTE +0.13 0.37 96 A 149 4 1.03 SCI LTE +0.13 0.27 83 A 149 9 0.52 SCI LTE +0.45 0.30 78 A 149 20 1.39 SCI LTE +0.28 0.57 96 A 150 15 0.6 SCI LTE +0.38 0.58 98 A 150 16 0.84 SCI LTE +0.30 0.16 58 A 151 10 1.14 SCI LTE +0.18 0.20 99 B 5 3 0.4 MAI 15S -6.34 2.32 12 B 5 45 0.3 SAI 15S -4.99 2.08 26 B 5 46 0.22 SAI 15S -6.86 2.48 13 B 7 6 0.04 SAI 15S -5.41 1.63 12 B 7 52 0.18 SAI 15S -2.64 1.09 23 B 8 57 0.83 MAI UTE -3.34 0.33 35 B 9 6 1.32 MCI LTE +0.41 0.62 96 B 10 16 1.35 SCI LTE +0.42 0.3 96 B 11 3 0.43 SAI 15S -4.39 1.68 39 B 12 11 1.92 SCI LTE +0.41 0.46 98 B 13 12 1.44 SCI LTE +0.41 0.42 83 B 14 14 0.77 SCI LTE +0.29 0.21 95 B 18 76 0.38 SAI UTS +22.37 2.94 13 B 18 78 1.33 SCI LTE +0.47 0.21 39 B 22 54 0.63 SAI UTE -3.91 0.23 58 B 23 90 0.56 SAI UTS -10.86 0.22 65 B 28 15 0.18 SAI 11S -9.12 0.17 0 B 29 101 0.89 SAI UTE -4.35 0.20 41 B 33 75 1.17 SAI UTE -4.08 0.19 55 B 35 81 0.99 SAI UTE -4.40 0.16 84 B 39 94 0.45 SAI UTS +18.29 1.20 48 B 39 94 0.13 SAI UTS +17.64 0.26 42 B 44 1 1.1 SCI LTE +0.17 0.16 91 B 46 3 0.93 SCI LTE +0.43 0.16 98 B 46 103 1.83 MAI UTE -4.04 0.15 76 B 49 2 0.43 SVI LTS +0.01 0.28 x 0.12 23

U.S. Nuclear Regulatory Commission Appendix 3 to Attachment 3F0508-03 Page 4 of 5 Service Induced Indications - Plugged in 15R OTSG Row Tube Volts Indication Location Length  % TW B 51 124 0.97 MAI 15S -1.38 1.50 28 B 53 126 0.21 MAI 15S -1.84 0.65 1 B 54 116 1.14 MAI UTE -3.97 0.16 67 B 54 127 0.28 SAI 15S -2.46 0.44 1 B 54 127 0.17 SAI 15S -4.84 0.93 79 B 55 2 0.19 SAI 15S -4.72 4.14 61 B 55 2 0.15 SAI 15S -7.15 1.46 20 B 56 2 0.25 SAI 15S -6.81 3.58 61 B 56 2 0.24 SAI 15S -8.77 2.27 7 B 56 127 0.25 SAI 15S -3.42 0.60 48 B 58 128 0.36 SAI 15S -2.93 0.79 1 B 59 33 0.21 SVI UTE -3.93 0.23 x 0.21 11 B 59 124 0.22 SAI 15S +1.39 0.22 76 B 59 124 0.28 SAI 15S +2.09 1.47 13 B 65 20 2.26 MAI UTE -4.04 0.21 62 B 66 75 2.86 SCI UTE -0.18 0.88 38 B 67 20 1.67 MAI UTE -3.86 0.20 62 B 73 32 0.45 SAI UTE -4.40 0.16 43 B 75 49 0.53 MAI UTE -4.43 0.21 44 B 79 49 0.24 SAI 09S -19.30 0.16 1 B 79 64 1.06 SAI UTE -0.72 0.25 74 B 80 40 0.17 SVI UTE -3.91 0.13 x 0.12 32 B 86 118 0.47 MAI UTE -4.00 0.16 59 B 87 57 0.42 SAI 11S +4.30 4.17 1 B 88 33 1 SCI UTE -3.21 0.79 42 B 89 108 0.27 SAI UTE -4.53 0.22 85 B 96 97 0.98 MAI UTE -4.06 0.15 64 B 96 101 0.48 MAI UTE -4.60 0.13 74 B 99 35 0.27 SAI UTS -18.01 0.40 58 B 99 35 0.17 SAI UTS -17.35 0.57 51 B 107 72 0.88 SAI UTE -4.25 0.18 56 B 111 1 0.2 SAI 15S -1.69 0.97 8 B 122 103 0.12 SAI 15S -1.29 0.56 1 B 122 103 0.13 SAI 15S -2.79 0.22 68 B 124 100 0.21 SAI 15S -3.81 1.06 5 B 127 97 0.2 SAI 15S -5.07 0.33 5 B 127 97 0.39 SAI 15S -4.46 1.55 1 B 127 97 0.26 SAI 15S -3.79 0.47 1 B 127 98 0.1 SAI 15S -4.06 0.42 32 B 127 98 0.15 SAI 15S -4.43 1.19 28 B 128 95 0.26 SAI 15S -4.47 0.89 1 B 129 93 0.08 SAI 15S -1.63 0.86 1 B 129 93 0.11 SAI 15S -1.15 0.61 1 B 129 94 0.21 SAI 15S -1.41 1.14 1 B 130 93 0.13 SAI 15S -2.83 0.44 1 B 137 68 0.36 SAI UTS -15.90 0.29 61

U.S. Nuclear Regulatory Commission Appendix 3 to Attachment 3F0508-03 Page 5 of 5 Service Induced Indications - Plugged in 15R OTSG Row Tube Volts Indication Location Length  % TW B 139 8 0.3 SAI UTS +19.39 0.28 64 B 139 8 0.67 SAI UTS -15.31 0.30 80 B 140 2 0.73 MCI UTE -3.31 0.57 67 B 140 2 0.58 SAI UTE -3.63 0.29 98 B 140 68 0.73 SAI 10S -3.04 2.39 25 B 145 20 0.33 SAI URI -0.63 0.65 82

PROGRESS ENERGY FLORIDA, INC.

CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302/LICENSE NUMBER DPR-72 APPENDIX 4 TO SPECIAL REPORT 08-01 SERVICE INDUCED INDICATIONS - REROLLED IN 15R Appendix Acronyms SAI Single Axial Indication MAI Multiple Axial Indications SCI Single Circumferential Indication MAA Multiple Axial Anomaly MCI Multiple Circumferential Indications SVI Single Volumetric Indications TWD Through-Wall Dimensions MVI Multiple Volumetric Indications I-Code Indication Code UTE Upper Tube End LTE Lower Tube End 15S Fifteenth Tube Support Plate

U.S. Nuclear Regulatory Commission Appendix 4 to Attachment 3F0508-03 Page 1 of 4 Service Induced Indications - Rerolled in 15R OTSG Row Tube Volts Indication Location Length  % TW A 12 1 1.18 SCI UTE -0.16 0.38 23 A 43 19 0.6 SAI UTE -1.02 0.15 48 A 43 30 0.9 SAI UTE -1.31 0.26 76 A 45 24 1.92 SCI UTE -0.23 0.54 64 A 54 110 1.47 SVI UTE -0.77 0.27 x 0.26 42 A 57 115 0.46 SAI UTE -0.95 0.21 83 A 61 19 1.33 SAI UTE -1.13 0.15 48 A 64 31 1.94 SCI UTE -0.22 0.83 63 A 69 48 0.71 SCI UTE -1.20 0.12 56 A 71 126 0.39 SAI UTE -1.07 0.14 76 A 79 105 1.52 MAI UTE -1.47 0.28 69 A 81 50 0.91 SCI UTE -0.34 0.21 46 A 83 53 0.78 MAI UTE -1.15 0.19 58 A 84 37 0.6 SAI UTE -1.10 0.18 45 A 85 124 0.81 SAI UTE -1.11 0.20 51 A 86 2 2.74 MCI UTE -0.35 0.44 81 A 101 42 1.2 SCI UTE -0.11 0.70 56 A 101 48 1.21 SCI UTE -0.22 0.79 83 A 103 41 0.92 SCI UTE -0.11 0.87 98 A 103 45 1.7 SCI UTE -0.16 0.96 56 A 104 76 0.57 SCI UTE -1.50 0.23 46 A 105 67 1.44 SCI UTE -0.17 0.91 97 A 105 106 1.52 SCI UTE -0.13 0.70 98 A 117 96 0.6 SAI UTE -1.00 0.18 76 A 118 12 0.53 SCI UTE -0.33 0.16 31 A 126 46 0.49 SAI UTE -1.14 0.21 97 A 130 1 1.87 SCI UTE -0.45 0.32 48 A 131 56 2.76 SCI UTE -0.15 0.60 86 A 138 72 2.64 SCI UTE -0.85 0.29 97 A 139 72 1.4 MAI UTE -1.05 0.16 78 B 16 10 4.17 SCI UTE -0.08 0.60 96 B 17 12 0.87 SCI UTE -0.33 0.27 73 B 19 47 1.5 SCI UTE -0.24 0.23 69 B 24 47 0.54 SCI UTE -0.23 0.39 99 B 25 58 0.51 MCI UTE -0.30 1.10 83 B 27 16 1.6 SCI UTE -0.10 0.12 51 B 27 43 1.31 SCI UTE -0.24 0.24 90 B 28 64 1.43 SCI UTE -0.14 0.26 100 B 28 88 1.36 SCI UTE -0.27 0.18 78 B 30 103 1.31 SCI UTE -0.29 0.33 83 B 35 103 0.63 SCI UTE -0.25 0.27 85 B 41 16 4.99 SO UTE -0.21 0.32 68 B 41 26 0.97 SCI UTE -0.20 0.21 66 B 44 67 3.89 SCI UTE -0.17 1.03 59 B 44 118 2.16 SCI UTE -0.27 0.24 58 B 45 14 0.92 SCI UTE -0.20 0.23 79 B 45 67 11.27 SCI UTE -0.03 0.33 75 B 45 100 2.62 SO UTE -0.17 0.21 71

U.S. Nuclear Regulatory Commission Appendix 4 to Attachment 3F0508-03 Page 2 of 4 Service Induced Indications - Rerolled in 15R OTSG Row Tube Volts Indication Location Length  % TW B 45 118 0.49 SCI UTE -0.34 0.27 94 B 47 121 0.92 SCI UTE -0.42 0.15 94 B 48 29 11.83 SCO UTE -0.04 0.29 98 B 48 50 1.77 SAI UTE -0.47 0.17 95 B 49 19 1.83 SCI UTE -0.15 0.21 100 B 49 67 9.11 SCI UTE -0.07 0.82 98 B 51 112 0.83 SCI UTE -0.29 0.36 98 B 53 11 1.29 SCI UTE -0.20 0.41 73 B 56 9 3.25 SCI UTE -0.12 0.47 86 B 57 28 12.8 SCI UTE -0.02 0.76 90 B 60 27 1.67 SCI UTE -0.16 0.29 95 B 61 43 1.49 MCI UTE -0.15 1.08 66 B 61 80 2.24 SCI UTE -0.21 0.72 50 B 61 121 0.93 SCI UTE -0.25 0.21 98 B 64 34 1.6 SCI UTE -0.20 0.67 98 B 65 87 2.42 SCI UTE -0.06 0.69 14 B 66 95 10.69 SCI UTE -0.09 0.35 98 B 66 130 1.06 SCI UTE -0.27 0.18 98 B 67 11 2.8 SCI UTE -0.13 0.32 98 B 67 24 2.3 SCI UTE -0.22 0.21 98 B 67 34 0.6 SCI UTE -0.28 0.15 97 B 67 79 5.48 SCI UTE -0.10 0.57 68 B 68 29 1.12 SCI UTE -0.20 0.23 98 B 68 130 1.4 SCI UTE -0.31 0.21 55 B 70 15 1.37 SCI UTE -0.28 0.23 59 B 70 130 1.98 SCI UTE -0.33 0.39 84 B 71 8 1.39 SAI UTE -0.74 0.19 88 B 71 105 2.53 SCI UTE -0.15 0.21 99 B 73 22 0.95 SAI UTE -0.71 0.19 66 B 73 36 0.88 SAI UTE -0.63 0.21 56 B 74 32 1.49 MAI UTE -0.70 0.35 98 B 74 38 1.52 SAI UTE -0.67 0.19 89 B 74 115 0.75 SCI UTE -0.27 0.39 93 B 78 114 3.22 SCI UTE -0.39 0.27 99 B 79 24 0.68 SAI UTE -0.77 0.15 64 B 79 24 0.34 SAI UTE -0.64 0.12 95 B 81 9 1.1 SAI UTE -0.78 0.18 54 B 81 37 1.07 SCI UTE -0.19 0.24 58 B 81 105 2.43 SCI UTE -0.17 0.21 100 B 82 28 2.76 SCI UTE -0.22 0.29 100 B 82 108 1.43 SCI UTE -0.25 0.21 81 B 82 121 1.16 SCI UTE -0.37 0.27 97 B 83 28 1.4 SCI UTE -0.16 0.17 84 B 83 44 5.21 SCI UTE -0.07 0.54 26 B 83 130 1.3 SCI UTE -0.25 0.24 100 B 84 13 1.81 SCI UTE -0.13 0.30 59 B 84 64 1.72 SAI UTE -0.77 0.16 97 B 85 42 2.45 SCI UTE -0.11 0.18 47 B 86 120 1.12 SCI UTE -0.15 0.83 57 B 87 7 1.64 SCI UTE -0.21 0.45 81

U.S. Nuclear Regulatory Commission Appendix 4 to Attachment 3F0508-03 Page 3 of 4 Service Induced Indications - Rerolled in 15R OTSG Row Tube Volts Indication Location Length  % TW B 87 42 3.63 MCI UTE -0.14 1.40 44 B 89 7 1.82 SCI UTE -0.26 0.51 99 B 89 17 1.75 SCI UTE -0.26 0.48 76 B 89 64 0.8 SCI UTE -0.70 0.18 72 B 90 13 2.13 SCI UTE -0.29 0.39 81 B 90 106 1.61 SCI UTE -0.15 0.18 95 B 91 96 1.77 SCI UTE -0.13 0.23 99 B 91 120 1.34 SCI UTE -0.22 0.21 99 B 92 16 1.25 SCI UTE -0.23 0.88 94 B 93 36 4.05 SCI UTE -0.18 0.41 72 B 93 103 1.19 SCI UTE -0.18 0.85 96 B 98 29 2.98 SCI UTE -0.21 0.38 86 B 98 52 0.39 SCI UTE -1.27 0.15 33 B 99 60 3.93 SCI UTE -0.11 0.26 78 B 101 25 2.23 SCI UTE -0.28 0.32 41 B 102 26 1.7 SCI UTE -0.24 0.29 63 B 102 51 0.14 SVI UTE -1.29 0.30 x 0.17 11 B 103 18 1.87 SCI UTE -0.10 0.26 98 B 103 60 10.16 MCI UTE -0.10 1.58 94 B 103 89 2.35 SCI UTE -0.16 0.23 97 B 105 29 1.18 SCI UTE -0.20 0.62 56 B 105 105 1.06 SCI UTE -0.13 0.71 61 B 106 19 1.02 SCI UTE -0.20 0.23 67 B 106 34 1.52 SCI UTE -0.10 0.51 92 B 107 66 4.21 SCI UTE -0.10 0.41 82 B 108 20 0.77 SCI UTE -0.21 0.26 98 B 108 63 1.06 SAI UTE -0.69 0.16 62 B 108 70 4.14 SCI UTE -0.14 0.23 53 B 112 11 1.41 SCI UTE -0.31 0.21 58 B 112 25 0.74 SCI UTE -0.25 0.21 77 B 112 28 1.9 SCI UTE -0.21 0.77 66 B 112 64 4.28 SCI UTE -0.18 0.30 95 B 113 25 3.41 SCI UTE -0.23 0.82 63 B 113 38 1.02 SCI UTE -0.28 0.18 41 B 113 62 6.34 SCI UTE -0.18 0.57 35 B 113 71 1.87 SAI UTE -0.65 0.18 36 B 113 114 2.95 SCI UTE -0.30 0.24 62 B 114 93 1.11 SAI UTE -1.28 0.15 47 B 114 95 0.54 SAI UTE -1.23 0.12 33 B 115 23 1.07 SCI UTE -0.18 0.21 59 B 115 25 3.8 SCI UTE -0.26 0.57 89 B 115 43 6.95 SCI UTE -0.06 0.56 68 B 115 101 0.96 SAI UTE -1.27 0.12 35 B 117 2 0.49 SCI UTE -0.24 0.21 78 B 117 82 1.34 SAI UTE -0.69 0.20 99 B 118 43 1.56 SCI UTE -0.24 0.26 94 B 120 18 11.97 SCI UTE -0.11 0.32 97 B 121 69 0.57 SCI UTE -0.27 0.15 83 B 121 84 0.47 SAI UTE -1.22 0.12 67 B 122 77 0.99 SCI UTE -0.23 0.21 99

U.S. Nuclear Regulatory Commission Appendix 4 to Attachment 3F0508-03 Page 4 of 4 Service Induced Indications - Rerolled in 15R OTSG Row Tube Volts Indication Location Length  % TW B 123 13 0.62 SCO UTE -0.37 0.32 66 B 124 46 1.66 SCO UTE -0.30 0.18 50 B 125 37 5.35 SCO UTE -0.22 0.21 99 B 127 26 2.08 SCO UTE -0.27 0.98 73 B 127 43 1.9 SCO UTE -0.22 0.21 71 B 129 12 2.73 SCI UTE -0.18 0.38 93 B 129 25 1.23 SCO UTE -0.30 0.27 97 B 130 59 0.23 SAI UTE -2.32 1.33 1 B 130 59 2.05 SCO UTE -0.10 0.27 44 B 131 14 1.27 SCO UTE -0.28 0.60 97 B 131 25 1.53 SCO UTE -0.17 0.26 24 B 134 50 2.01 SCO UTE -0.21 0.29 97 B 135 19 1.23 SCO UTE -0.27 0.21 100 B 135 21 5.05 SCO UTE -0.11 0.30 73 B 136 17 0.48 SVI UTE -0.51 0.21 x 0.20 38 B 137 23 2.08 SCO UTE -0.24 0.51 82 B 139 2 1.1 SCO UTE -0.20 0.23 40 B 139 64 1.69 SCO UTE -0.29 0.27 99 B 142 25 0.24 SAI UTE -1.47 0.31 61 B 148 37 0.61 SCO UTE -0.41 0.15 78 B 149 2 1.81 SCO UTE -0.27 0.41 79 B 151 14 4.55 SCO UTE -0.14 0.36 43

PROGRESS ENERGY FLORIDA, INC.

CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302/LICENSE NUMBER DPR-72 APPENDIX 5 TO SPECIAL REPORT 08-01 OTSG-B First Span IGA Graphs

U.S. Nuclear Regulatory Commission Appendix 5 to Attachment 3F0508-03 Page 1 of 3 CR3 SG-B RFO-15 2007 1st Span IGA Return to Service Indication Axial Distribution 0

0) 42 8 36 8
  • 0 30 0

=6

=5 24 =31

"- 2 18 17 I 39 57 12 6E 65 011 1

0) 6 0 8

0 t2( 0 40 50s 08 z

LTS+Inchl1 T 0 0 [0 2 4

[0 6

11 8

41 10 65 12

[68 14 I 57 16 39 18 20 17 12 1 22 24 26 28 11 5 1 6 Number of Indications 30 0

32 1

34 36 38 101 0 11 [

40 I

42 0

44. >44 25 .25 0

U.S. Nuclear Regulatory Commission Appendix 5 to Attachment 3F0508-03 Page 2 of 3 CR3 SG-B RFO-15 2007 1st Span IGA Return to Service

%TW Distribution 160 140 120 0

(U 100 Co 80 80 0

n60 E

z 40 20 0

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95. 100

%/oTW

U.S. Nuclear Regulatory Commission Appendix 5 to Attachment 3F0508-03 Page 3 of 3 CR3 SG-B RFO-15 2007 1st Span IGA Return to Service

%TW Growth Distribution 80 70 68 62 60 59 U) a 0

50 39 40 0

I-ma30 z

20 184 10 ooa T- I I II I' .

0