MONTHYEAR2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 2CAN052202, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) - Revision 12022-05-31031 May 2022 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) - Revision 1 ML22126A0332022-05-10010 May 2022 Review of the Spring 2021 Steam Generator Tube Inspections During Refueling Outage 1R29 2CAN022201, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28)2022-02-0808 February 2022 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) ML22034A8992022-02-0303 February 2022 Steam Generator Tube Inspection Reports in Support of TSTF-577 1CAN102104, Steam Generator Tube Inspection Report - 1R292021-10-22022 October 2021 Steam Generator Tube Inspection Report - 1R29 2CAN082103, Unit 2 - Fifth 10-Year Interval Snubber Program Plan2021-08-31031 August 2021 Unit 2 - Fifth 10-Year Interval Snubber Program Plan 1CAN072102, Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29)2021-07-19019 July 2021 Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29) 2CAN122001, Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection2020-12-0404 December 2020 Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection 2CAN112005, Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval2020-11-24024 November 2020 Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval 2CAN072001, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27)2020-07-0808 July 2020 Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27) 1CAN012004, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage2020-01-28028 January 2020 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage 2CAN091901, Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program2019-09-0303 September 2019 Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program 2CAN021906, Steam Generator Tube Inspection Report2019-02-28028 February 2019 Steam Generator Tube Inspection Report 2CAN011903, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage2019-01-23023 January 2019 Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage 1CAN101802, Submittal of 45th-Year Reactor Building Inspection Report2018-10-10010 October 2018 Submittal of 45th-Year Reactor Building Inspection Report 1CAN091802, Snubber Testing Program for Fifth Inservice Test Interval2018-09-24024 September 2018 Snubber Testing Program for Fifth Inservice Test Interval 1CAN081808, Inservice Testing Plan for the Fifth 10-Year Interval2018-08-27027 August 2018 Inservice Testing Plan for the Fifth 10-Year Interval 1CAN071802, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27)2018-07-25025 July 2018 Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27) 2CAN101701, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25)2017-10-0606 October 2017 Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25) 1CAN091703, Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval2017-09-21021 September 2017 Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval 1CAN031703, Steam Generator Tube Inspection Report - 1R262017-03-22022 March 2017 Steam Generator Tube Inspection Report - 1R26 1CAN031702, Reactor Building Inspection Summary Report - 1R262017-03-14014 March 2017 Reactor Building Inspection Summary Report - 1R26 1CAN031705, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (1R26)2017-03-14014 March 2017 Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (1R26) 1CAN111602, Fifth Ten-Year Interval Inservice Testing Program, Relief Request VRR-ANO1-2017-12016-11-16016 November 2016 Fifth Ten-Year Interval Inservice Testing Program, Relief Request VRR-ANO1-2017-1 1CAN011602, Amended Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)2016-01-18018 January 2016 Amended Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25) 1CAN051502, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)2015-05-28028 May 2015 Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25) 2CAN011503, Year Containment Building Tendon Surveillance and Concrete Inspection2015-01-16016 January 2015 Year Containment Building Tendon Surveillance and Concrete Inspection 2CAN081406, Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23)2014-08-21021 August 2014 Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23) 2CAN081404, Steam Generator Tube Inspection Report - 2R232014-08-18018 August 2014 Steam Generator Tube Inspection Report - 2R23 1CAN111301, Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)2013-11-0505 November 2013 Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) 1CAN101306, Unit 1, Steam Generator Tube Inspection Report - 1R242013-10-23023 October 2013 Unit 1, Steam Generator Tube Inspection Report - 1R24 1CAN101304, Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)2013-10-21021 October 2013 Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) 1CAN101301, Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-0232013-10-0808 October 2013 Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-023 1CAN041305, Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections2013-04-30030 April 2013 Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections 2CAN121204, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22)2012-12-13013 December 2012 Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22) 1CAN031203, Unit 1, Steam Generator Tube Inspection Report - 1R232012-03-22022 March 2012 Unit 1, Steam Generator Tube Inspection Report - 1R23 2CAN051102, Inservice Inspection Summary Report for the Twenty-First Refueling Outage2011-05-25025 May 2011 Inservice Inspection Summary Report for the Twenty-First Refueling Outage 2CAN011105, Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program2011-01-25025 January 2011 Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program ML1036305792010-12-29029 December 2010 Notification of Inspection (NRC Inspection Report 050-368/2011002) and Request for Information ML1022504182010-07-29029 July 2010 Steam Generator Tube Inspection Report - 1R22 1CAN061004, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (1R22)2010-06-29029 June 2010 Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (1R22) 2CAN031006, Inservice Testing Plan for the Fourth 10-Year Interval2010-03-25025 March 2010 Inservice Testing Plan for the Fourth 10-Year Interval 1CAN021002, Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests2010-02-0909 February 2010 Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests 2CAN120901, Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20)2009-12-0707 December 2009 Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20) 1CAN030907, Steam Generator Tube Inspection Report - 1R212009-03-30030 March 2009 Steam Generator Tube Inspection Report - 1R21 1CAN030902, Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21)2009-03-0404 March 2009 Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21) CNRO-2009-00002, Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval2009-03-0404 March 2009 Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval 2CAN070802, Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19)2008-07-0101 July 2008 Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19) 2023-08-10
[Table view] Category:Letter type:
MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] |
Text
Entergy Operations, Inc.
E ,ergy
,> w 5Russellville.
1448 S.R. 333 AR 72802 Tel 501 858 5000 2CAN070501 July 11, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Inservice Inspection (ISI) Summary Report Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6
Dear Sir or Madam:
Pursuant to the requirements of 10CFR50.55a, the attached Inservice Inspection (ISI)
Summary Report for ASME Class 1, 2 and 3 pressure retaining components and their supports for Arkansas Nuclear One, Unit 2 (ANO-2) is provided for your information. The results presented by this letter are representative of inspections performed up to and including refueling outage 2R17 during the second inspection period of the third ten-year inspection interval. This submittal is provided in accordance with ASME Section Xi and Code Case N-532-1. The attachment provides ASME form OAR-1 uOwner's Activity Report" plus tables that present: (1) an abstract of examinations and tests, (2) conditions requiring evaluation and (3) actions necessary for continued service.
This correspondence contains no commitments. Should you have any questions or comments, please contact Mr. Fred Van Buskirk at (479) 858-3155.
Sincerely, ale E. ames Acting irector, Nuclear Safety Assurance DEJ/fpv 7 )(47
2CAN070501 Page 2 cc: Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Drew Holland Mail Stop 0-7 D1 Washington, DC 20555-0001
Attachment 2CAN070501 Owner's Activity Report OAR-2322
FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number OAR-2322 Owner Enter-v Arkansas. Inc./ P.O. Box 551. Little Rock. AR. 72203 (Name and Address of Owner)
Plant Arkansas Nuclear One 11448 S.R. 333. Russellville, AR. 72802 (Name and Address of Plant)
Unit No. 2 Commercial service date March 26 1980 Refueling outage no. 2R17 (If applicable)
Current inspection interval Third (3rd) Inspection Interval (1st, 2nd, 3rd, 4th, other)
Current inspection period Second (2nd) Inspection Period (1st, 2nd, 3rd)
Edition and Addenda of Section Xl applicable to the Inspection plan 1992 Edition, Portions of 1993 Addenda Date and revision of Inspection plan February 15. 2002 / Revision 1 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the Inspection plan Same CERTIFICATE OF CONFORMANCE I certify that the statements made In this Owner's Activity Report are correct, and that the examinations, test, repairs, replacements, evaluations, and corrective measures represented by this report conformn to the requirements of Section XI.
Certificate of Authorization No. NIA Expiration Date. NIA (If applicable)
Riann vl*lWu L ,
t.Prm&ooes we- - in_ e Managner. iti m &Comionents er ProTrams a Date
/7 Ownbr or Owners ;Designee, Title 1 LA~A6/4W _ A/./ (
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arkansas and employed by ABS Grout Inc. of Houston. Texas have Inspected the items described In this Owner's Activity Report, during the period October 15. 2003 to April 11. 2005 . and state that to the best of my knowledge and belief. the Owner has performed all activities represented by this report In accordance with the requirements of Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected ththis Inspection.
LA. S Commissions NB-9985. ARK-1054 "A B"N'r NS' Inspector's Signature I National Board, State, Province, and Endorsements Date __-_8-_
This form (ED0127) may be obtained from the Order Dept, ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300.
TABLE 1 ABSTRACT OF EXAMINATIONS AND TEST Ioiai i otai Examinations Examinations Total Examinations Total Examinations Examination Required For Credited For This Credited (%) For Credited (%) To Date Category The Interval Period The Period For The Interval Remarks B-A 24 0 0.00 0.00 B-B 4 0 0.00 25.00 B-D 28 9 75.00 46.43 B-G-I 254 76 100.00 70.78 Code Case N-598 B-G-2 18 7 87.75 55.56 R-A 290 41 41.00 45.52 B-K 14 5 83.33 50.00 B-L- 12 0 0.00 0.00 B-L-2 4 0 0.00 0.00 B-M-2 21 0 0.00 0.00 B-N-1 3 1 100.00 66.67 Code Case N-598 B-N-2 22 0 0.00 0.00 B-N-3 10 0 0.00 0.00 B-P 7 2 80.00 57.14 C-A 6 1 50.00 50.00 C-B 8 2 100.00 50.00 C-C 16 6 100.00 87.50 Code Case N-598 C-H 186 13 20.97 40.32 D-A 11 4 100.00 72.73 Code Case N-598 D-B 48 3 18.75 39.58 F-A 184 50 81.97 51.63 E-D 3 1 100.00 66.67 E-G 70 3 12.50 25.71 E-A 3 DOME 50.00 49.99 DOME INSPECTED 2R17 L-A 2 1 100.00 50.00 2 INSPECTIONS PER INTERVAL L-B 23 12 100.00 50.00 2 INSPECTIONS PER INTERVAL
TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE F law or Relevant Condition Found Examination Item During Scheduled Section XI Category Number Item Description Flaw Characterization (IWA-3300) Examination or Test (Yes or No)
E-D E5.30 Reactor Building Moisture Barrier Damage to Moisture Barrier Yes
___ ___ ____ ___ ___ ___ ___(CR-AN O-2-2005-0673)
F- 12 uprt2C--IIImproper Clearances (ISI Y Yes91-111)
F-A F1.20 Support 2GCB-9-HI 1 (CR-ANO-2-2005-0942)
F- 120 upot2BB2-2Deformation of fasteners Yes F-A F1.20A Support 2EBB-2A-H2 (CR-ANO-2-2005-1012) #20-020 YSe lB-G-2 lB7.70 lValve Sl-I6Ahinge pin coverfastener l Deformation of fastener Yes B-- Vle 7.0 I1Ahig incvrfatnr(CR-ANO-2-2005-0806) (151 ft 22-074)
F-A F1.30A Support 2HBC-83-H3 Improper Clearances Yes
__ _ __ __ _ __ _ _ __ _ _ __ _ _ _ (CR-ANO-2-2005-0454) (ISI ft 72-108)
F- 1.0 upot2DB51-O7Improper Configuration (ISI #Yes80-545 F-A F1.20C Support 2DCB-501-H007 (CR-ANO-2-2005-0916)
F-A F1.20A Support 2GCB-9-H Improper Configuration Yes
______ _ __ _____ _ _ __ _ _ __ _ _ __ _ _ _ (CR-ANO-2-2005-0942) (ISI ft 91-11I1)
Yes X-AUG X-AUG N/A N/A Support 2HBC-34-HI Support_2HBC-34-H22_
Corrosion Products (CR-ANO-2-2005-0801) f A-100002) eSI X-AUG N/A Support 2HIBC-34-H22 (CorrAosion Products#A-I 0 00 4
'I PAGE Iof 3 UNIT 2 INTERVAL 3 PERIOD 2 (For Cycle 17)
TABLE3 ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND MAI OR WO NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YES/NO) 2 Repair Valve Machined disc for valve 2SI-IOC No 11/5/2003 Plan # 02-2066, WO 50248967 3 Replacement Valve Replaced disc for valve 2FP-2A No 11/13/2003 Plan # 03-2003, WO 50271938 3 Repair Valve Re-installed body to bonnet seal weld on No 4/9/2004 Plan # 03-2011, WO 78462 valve 2CV-1563-1 I Replacement Steam Install mechanical tube plugs on 2E-24A No 4/6/2005 Plan # 03-2033, WO 50274522 Generator Replacement Steam Install mechanical tube plugs on 2E-24B No 4/6/2005 Plan # 03-2037, WO 50274523 Generator 3 Replacement Pump Replaced pump wet end on 2P-4C No 8/23/2004 Plan # 03-2045, WO 50269225 2 Replacement Valve Replaced valves 2CVC-22B & 2CVC- No 2/26/2004 Plan # 03-2058, WO 50271357 69B. N-416-1 2 Replacement Valve Replaced valves 2CVC-22C & 2CVC- No 12/8/2003 Plan # 03-2059, WO 50271358 69C. N-416-1 2 Replacement Pipe Replace 2HCB-60-3" pipe N-416-2 Yes 4/4/2005 Plan # 03-2067, WO 25594 2 Replacement Valve Replaced disc on valve 2SI-3B No 4/11/2005 Plan # 03-2091, WO 29921 2 Repair Pump Repaired pump skid for 2P-89A Yes 11/10/2004 Plan # 03-2125, WO 31733 3 Replacement Support Installed new support 2HCC-55-H7 No 8/26/2004 Plan # 04-2067, WO 50271615 3 Replacement Support Installed new supports 2HCC-56-H6 & No 8/26/2004 Plan # 04-2068, WO 50271615 H8 3 Replacement Support Installed new supports 2HCC-56-H7 & No 8/26/2004 Plan # 04-2069, WO 50271615 H9 3 Replacement Support Modify support 2HCC-63-HI No 8/26/2004 Plan # 04-2070, WO 50271615 3 Replacement Support Install new support 2HCC-63-H12 No 8/26/2004 Plan # 04-2071, WO 50271615 3 Replacement Pipe Modify 2HCC-55-3" piping No 8/26/2004 Plan # 04-2072, WO 50271615 3 Replacement Pipe Modify 2HCC-56-3" piping N-416-2 No 9/9/2004 Plan # 04-2073, WO 50271615
.1 PAGE 2 of 3 UNIT 2 INTERVAL 3 PERIOD 2 (For Cycle 17)
CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND MAI OR WO NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YES/NO) 3 Replacement Pipe Modify 2HCC-59-3" piping. N-416-2 No 8/30/2004 Plan # 04-2074, WO 50271615 3 Replacement Pipe Modify 2HCC-59-3" piping. N-416-2 No 9/10/2004 Plan # 04-2075, WO 50271615 3 Replacement Install new support 2HCC-59-H38 No 9/26/2004 Plan # 04-2076, WO 50271615 3 Replacement Support Install new support 2HCC-59-H39 No 9/26/2004 Plan # 04-2077, WO 50271615 2 Replaccment Valve Replaced valve 2CV-5056-2. N-416-2 No 4/9/2005 Plan # 04-2090, WO 36359 3 Replacement Pipe Install new flanges for 2VCC-2D header No 4/5/2005 Plan # 04-2097, WO 37454 piping. N416-2 Replacement Valve Replaced body to bonnet fasteners on No 4/9/2005 Plan # 04-2102, WO 50275361 valve 2SI-14D 1 Replacement Valve Replaced valve 2RC-5E. N-416-2 No 4/9/2005 Plan # 04-2103, WO 30420 2 Replacement Valve Replaced valve 2CV-5016-2. N-416-2 No 4/9/2005 Plan # 04-2104, WO 38635 VIII Replacement Tank Replaced manway fasteners on 2T-4 No 4/8/2005 Plan # 04-2112, WO 30538 3 Replacement Pump Replaced pump wet end on 2P-4B No 12/4/2004 Plan # 04-2115, WO 27994 2 Replacement Valve Tack weld disc on valve 2SI-3B No 3/24/2005 Plan # 04-2116, WO 29921 2 Replacement Valve Replaced B/B fasteners on 2CVC-139 No 3/30/2005 Plan # 04-2121, WO 50242602 2 Replacement Support Replaced spring can on 2DBB-l-H18 No 4/5/2005 Plan # 05-2002, WO 36869 2 Replacement Valve Replaced valve 2CV-4816. N-416-2 No 4/9/2005 Plan # 05-2003, WO 33952 3 Replacement Cooling Coil Replaced 2VUC-6A No 4/5/2005 Plan # 05-2005, WO 38322 3 Replacement Pipe Installed flanges on 2HCC-249 pipe for No 3/30/2005 Plan # 05-2006, WO 38322 2VUC-6A. N-416-2 3 Replacement Cooling Coil Replaced 2VUC-6B No 4/5/2005 Plan # 05-2010, WO 50266877 3 Replacement Pipe Installed flanges on 2HCC-255 pipe for No 3/30/2005 Plan # 05-2011, WO 50266877 2VUC-6B. N-416-2 1 Replacement Valve Replaced disc on valve 2S1-13A No 4/9/2005 Plan # 05-2016, WO 50272572 2 Replacement Valve Installed nipple on spare valve for 2PSV- No 3/24/2005 Plan # 05-2018, WO 57252 5047 (S/N N99283-00-0003) 1 Replacement Valve Replaced valve 2PSV-4633 No 4/9/2005 Plan # 05-2020, WO 62464 1 Replacement Valve Replaced valve 2RC-SD. N-416-2 No 4/9/2005 Plan # 05-2021, WO 62370
I PAGE 3 of 3 UNIT 2 INTERVAL 3 PERIOD 2 (For Cycle 17)
CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND MAT OR WO NUMBER MEASURE DURING SCHEDULED SECTION XI EXAM1INATION OR TEST(YESINO)
Replacement Pressurizer Installed MNSA2 on 2T-1 for nozzles H4, No 4/11/2005 Plan #t05-2025, WO 53378 C4, G3, U3, J2, P2, VI, PI & X3 3 Replacement Valve Replaced valve 2MS-39A disc No 4/9/2005 Plan # 05-2026, WO 58644 3 Replacement Valve Replaced valve 2MS-39B disc No 4/9/2005 Plan # 05-2027, WO 58648 3 Replacement Pipe Replaced 2XJ-14B & 2XJ-15B No 4/11/2005 Plan # 05-2028, WO 50965678 3 Replacement Pipe Replaced 2XJ-14A & 2XJ-ISA No 4/11/2005 Plan # 05-2030, WO 50965681 I _ Replacement Valve Replaced valve 2RC-5B. N-416-2 No 4/9/2005 Plan # 05-2031, WO 62537
__ Replacement Valve Replaced valve 2RC-5C. N-416-2 No 4/9/2005 Plan # 05-2032, WO 62537 2 Replacement Valve Replaced valve 2PSV-5047 No 4/9/2005 Plan # 05-2035, WO 57252 2 Replacement Pipe Installed nipple for 2PSV-5067. N-416-2 No 4/1/2005 Plan # 05-2036, WO 57253 2 Replacement Valve Installed valve 2PSV-5067 No 4/11/2005 Plan # 05-2037, WO 57253 I _ Repair Pressurizer Excavate PWSCC indications No 4/7/2005 Plan # 05-2038, WO 53378 I Replacement Pressurizer Modify nozzle Xl on 2T-1 No 4/11/2005 Plan # 05-2039, WO 53378 IWE Replacement Containment Replaced 2C-I hatch bolting Yes 4/6/2005 Plan # 05-2040, WO 62837 3 Replacement Pipe Install new flanges for 2VCC-2C header No 4/5/2005 Plan # 05-2042, WO 30416 piping. N-416-2 3 Replacement Pipe Modify 2HBC-83-30" piping No 4/4/2005 Plan # 05-2044, WO 38583 3 Replacement Support Replaced lower threaded rod on 2HBC- No 4/9/2005 Plan # 05-2045, WO 63100 50-112 Replacement Support Replaced clamp fasteners on 2CCA No 4/11/2005 Plan # 05-2050, WO 30420 H4 3 Repair Pipe Base metal repair on 2HBC-50-3/4" No 4/6/2005 Plan # 05-2052, WO 62924 Replacement Support Modify support 2CCA-32-H4 No 4/7/2005 Plan # 05-2053, WO 30420 MC Repair Containment Resealed damaged areas of the moisture Yes 4/14/05 WO# 40900 (CR-ANO-2-2005-Moisture barrier. Removed wire from moisture 1247). Exempt from R/R rules of Barrier barrier. IWA-4000 by IWA-4111.
Note: Table 3 is an abstract of all Repair/Replacement activities performed during cycle 17 due to site procedure requirements.