2CAN030502, Inservice Inspection (ISI) Summary Report Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6

From kanterella
Jump to navigation Jump to search
Inservice Inspection (ISI) Summary Report Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6
ML050950226
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/25/2005
From: James D
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2CAN030502
Download: ML050950226 (19)


Text

Entergy Operations, Inc.

- Entergy 1448 S.R. 333 Russeliville, AR 72802 Tel 501 858 5000 2CAN030502 March 25, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Inservice Inspection (ISI) Summary Report Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6

Dear Sir or Madam:

Pursuant to the requirements of IOCFR50.55a, the attached Inservice Inspection (ISI)

Summary Reports for ASME Class 1, 2 and 3 pressure retaining components and their supports for Arkansas Nuclear One, Unit 2 (ANO-2) are provided for your information. The results presented by this letter are representative of the first inspection period of the third ten-year inspection interval. This submittal is provided in accordance with ASME Section Xl and Code Case N-532. Each attachment provides ASME form OAR-1 uOwner's Activity Report" plus tables that present: (1) an abstract of examinations and tests, (2) conditions requiring evaluation and (3) actions necessary for continued service.

There are no new commitments contained in this submittal. Should you have any questions or comments, please contact Mr. Fred Van Buskirk at (479) 858-3155.

Attachment(s) 1(kfl

2CAN030502 Page 2 cc: Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Drew Holland Mail Stop 0-7 D1 Washington, DC 20555-0001

i Attachment 1 2CAN030502 Owner's Activity Report OAR-2311

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number OAR-2311 Owner Enterov Arkansas. mncJ P.O. Box551. TCBY Tower. Little Rock, AR. 72203 (Name and Address of Owner)

Plant Arkansas Nuclear One / 1448 S.R. 333. Russellville, AR. 72801 (Name and Address of Plant)

Unit No. 2 Commercial service date March 26.1980 Refueling outage no. 2R14 (If applicable)

Current inspection interval Third O3rdE Inspection Interval (1st, 2nd, 3rd, 4th, other)

Current inspection period First (Isl) Inspection Period (1st, 2nd, 3rd)

Edition and Addenda of Section Xl applicable to the inspection plan 1992 Edition, 1993 Addenda Date and revision of inspection plan June 21. 2000 I Revision 5 Edition and Addenda of Section Xl applicable to repairs and replacements, if different than the inspection plan 1992 Ed.

CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, test, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authorization No. 14 I pi Expiration Date A (If applicable)

Signed / Manager, Enoineering Programs Owner or Owner's Designee, Title Date @/I /°7 t I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the Slate or Province of _ _ _ ___s_ _ and employed by Factory Mutual Insurance Co. of Johnston, RI. have inspected the Items described in this Owner's Activity Report, during the period March 26.2000 to November30. 2000., and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described this report. Furthermore, neither the inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

X Li A ) Commissions NB-9985. ARK-1064 A B "N"I" NS" Inspector's Signature National Board, State, Province, and Endorsements Date 9 - 2 This form (E00127) may be obtained from the Order Dept., ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300.

TABLE 1 ABSTRACT OF EXAMINATIONS AND TEST Total Total Total Examinations Examinations Examinations Examinations Credited (%)

Examination Required for Credited for Credited (%) For To Date for Category The Interval This Period The Period The Interval Remarks B-A 21 0 0.00 0.00 B-B 8 0 0.00 0.00 B-D 23 0 0.00 0.00 B-G-1 216 0 0.00 0.00 B-G-2 20 5 75.00 25.00 R-A 100 11 33.00 11.00 RISK Informed ISI is applied.

C-A 6 0 0.00 0.00 C-B 10 0 0.00 0.00 C-C 32 10 93.75 31.25 D-A 13 4 92.31 30.77 F-A 178 23 38.76 12.92 Examination Catergory B-J, B-F, C-F-I and C-F-2 are now R-A (Risk Informed).

TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Flaw or Relevant Condition Found Examination Item During Scheduled Section XI Category Number Item Description Flaw Characterization (IWA-3300) Examination or Test (Yes or No)

I N/A N/A 2T-1 Pressurizer Heater Nozzles Nozzle Through Wall No

__________ _______ ___________ __ N z(Repair M A I31217) No N/A N/A 2TE-4610-4 Nozzle Embedded Flaw No

____ _____ ____ ____ ____ ____ (W elded R epair M A T31223) _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ I. I _ _ _ _ _ _ _ _ _ _ _ _ _ -I- -

4. 4 4

PAGE 1 of 6 UNIT 2 INTERVAL 3 PERIOD 1 (Cycle 14)

TABLE 3 ABSTRACT OF REPAIR REPLACEMENTS OR CORRECTIVE MEASURES REQU RED FOR CONTINUED SERVICE CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND JOB ORDER NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YES/NO) 3 Replacement Pipe Replaced Piping, 2HCC-303-4" No 12/12/00 Plan # 97-2169, MAI 965162 3 Replacement Pipe Replaced Piping, 2HCC-304-4" No 12/12/00 Plan # 97-2170, MAI 965162 3 Replacement Pipe Replaced Piping, 2HCC-305-4" No 12/12/00 Plan # 97-2171, MAI 965162 3 Replacement Pipe Replaced Piping, 2HCC-306-4" No 12/12/00 Plan # 97-2172, MAI 965162 3 Replacement Pipe Replaced Piping, 2HCC-310-4" No 12/12/00 Plan # 97-2176, MAI 965162 2 Replacement Valve Replaced Disc, 2CV-5093 No 11/21/00 Plan # 97-2285, MAI 845260 2 Replacement Valve Reinstalled Valve 2CV-5093 No 11/20/00 Plan # 97-2286, MAI 846151 1 Replacement Valve Stud/Nut Replacement, 2CV-5084-1 No 11/30/00 Plan # 98-2067, MAI 942480 Replacement Valve Replaced Disc, 2CV-5 10 1-1 No 11/28/00 Plan # 98-2246, MAI 26172 2 Repair Valve Welded Repair, 2CV-5105-1 No 11/12/00 Plan # 99-2148, MAI 15803 2 Replacement Valve Replaced Disc, 2CV-5105-1 No 11/23/00 Plan # 99-2151, MAI 18129 I Replacement Valve Replaced Disc, 2SI-27B No 12/07/00 Plan # 99-2155, MAI 2399 2 Replacement Valve Replaced Fasteners, 2SI-3B No 11/28/00 Plan # 00-2009, MAI 12689 3 Replacement Valve Replaced Valve, 2CV-1406-2 No 11/26/00 Plan # 00-2010, MAI 6400 2 Replacement Tank Replaced Fasteners, 2T-6B Yes 10/11/00 Plan # 00-2013, MAI 7951 3 Replacement Pipe Remove/Reinstalled Piping, 2DBC-1-4" No 12/01/00 Plan # 00-2026, MAI 24048 2 Replacement Pump Stud/Nut replacement, 2P-60B No 11/28/00 Plan # 00-2028, MAI 23488 3 Replacement Valve Replaced Valve, 2CV-1425-1 No 12/07/00 Plan # 00-2035, MAI 22964 1 Replacement Valve Replaced Fasteners, 2CV-5043-2 No 12/11/00 Plan # 00-2051, MAI 19014 1 Replacement Valve Replaced Fasteners, 2CV-5063-2 No 12/11/00 Plan # 00-2052, MAI 19015 3 Replacement Valve Replaced Valve, 2CV-1504-2 No 11/16/00 Plan # 00-2056, MAI 22968 3 Replacement Valve Replaced Valve, 2CV-1 525-1 No 11/16/00 Plan # 00-2057, MAI 22969 3 Replacement Valve Replaced Valve, 2CV-1481-1 No 11/23/00 Plan # 00-2058, MAI 22963 1 Repair Heat Tube Plugging, 2E-24A No 10/11/00 Plan # 00-2062, MAI 28198 Exchanger

PAGE 2 of 6 UNIT 2 INTERVAL 3 PERIOD 1 (Cycle 14)

CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND JOB ORDER NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YES/NO) 1 Repair Heat Tube Plugging, 2E-24B No 10/11/00 Plan # 00-2063, MAI 28203 Exchanger 2 Replacement Valve Replaced Disc, 2CV-5106-2 No 11/24/00 Plan # 00-2067, MAI 5180 2 Replacement Valve Replaced Fasteners, 2CV-5091-1 No 11/28/00 Plan # 00-2069, MAI 18351 2 Replacement Valve Replaced Bonnet, 2S1-26A No 08/22/00 Plan # 00-2070, MAI 18391 2 Replacement Valve Replaced Disc, 2CV-5076-2 No 11/28/00 Plan # 00-2071, MAI 21304 2 Replacement Valve Replaced Disc, 2CV-5035-1 No 11/22/00 Plan # 00-2072, MAI 21299 2 Replacement Pipe Installed New Piping, 2DCB-4-2" No 12/01/00 Plan # 00-2076, MAI 21159 3 Replacement Pipe Replaced Piping, 2HCC-3184' No 11/09/00 Plan # 00-208 1, MAI 21074 3 Replacement Pipe Replaced Piping, 2HCC-317-4" No 10/11/00 Plan # 00-2082, MAI 21074 3 Replacement Pipe Replaced Piping, 2HCC-315-4" No 10/09/00 Plan # 00-2083, MAI 21074 3 Replacement Pipe Replaced Piping, 2HCC-316-4" No 11/09/00 Plan # 00-2084, MAI 21074 3 Replacement Pipe Replaced Piping, 2HBC-50-18" No 10/15/00 Plan # 00-2089, MAI 14300 2 Repair Valve Welded Repair, 2BS-1021A No 10/22/00 Plan # 00-2090, MAI 27382 3 Replacement Pipe Replaced Piping, 2HCC-311-4" No 12/12/00 Plan # 00-2091, MAI 21067 3 Replacement Pipe Replaced Piping, 2HCC-311-4" No 12/12/00 Plan # 00-2092, MAI 21067 3 Replacement Pipe Replaced Piping, 2HCC-312-4" No 12/12/00 Plan # 00-2093, MAI 21067 3 Replacement Pipe Replaced Piping, 2HCC-313-4" No 12/12/00 Plan # 00-2094, MAI 21068 3 Replacement Pipe Replaced Piping, 2HCC-314-4" No 12/12/00 Plan # 00-2095, MAI 21068 3 Replacement Pipe Replaced Piping, 2HCC-298-4" No 12/12/00 Plan # 00-2096, MAI 21068 CC Repair Containment Repaired abandoned anchor bolt holes No 01/08/01 Plan # 00-2100, MAT 16832 CC Repair Containment Repaired abandoned anchor bolt holes No 01/08/01 Plan # 00-2101, MAI 27090 CC Repair Containment Repaired abandoned anchor bolt holes No 12/02/00 Plan # 00-2102, MAI 16832 2 Replacement Pipe Reinstalled Piping, 2EBB-1-38" No 12/12/00 Plan # 00-2103, MAI 16864 2 Replacement Pipe Reinstalled Piping, 2EBB-2-38" No 12/12/00 Plan # 00-2104, MAI 16865 1 Replacement Heat Replaced Steam Generator, 2E-24A No 12/12/00 Plan # 00-2105, MAI 27975 Exchanger

PAGE 3 of 6 UNIT 2 INTERVAL 3 PERIOD 1 (Cycle 14)

CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND JOB ORDER NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR

__ TEST(YES/NO) 1 Replacement Heat Replaced Steam Generator, 2E-24B No 12/12/00 Plan # 00-2106, MAI 27974 Exchanger 3 Replacement Pipe Reinstalled Piping, 2HCC-210-2" No 11/14/00 Plan # 00-2108, MAI 16855 3 Replacement Support Reinstalled Support, 2HCC-210-HO1 1 No 11/15/00 Plan # 00-2109, MAI 16855 3 Replacement Support Reinstalled Support, 2HCC-210-H012 No 11/15/00 Plan # 00-2110, MAI 16855 1 Replacement Support Modified Support, 2BCA-14-H16 No 11/12/00 Plan # 00-2111, MAI 26989 3 Replacement Support Reinstalled Support, 2FCC-2-H16 No 11/15/00 Plan # 00-2112, MAT 26989 3 Replacement Support Modified Support, 2FCC-2-H9 No 11/12/00 Plan # 00-2113, MAI 26989 2 Replacement Pipe Reinstalled Piping, 2DBB-I-18" No 12/12/00 Plan # 00-2114, MAI 16864 2 Replacement Pipe Reinstalled Piping, 2DBB-2-18" No 12/12/00 Plan # 00-2115, MAI 16865 2 Replacement Support Modified Suppor, 2DBB-1-H1 No 11/24/00 Plan # 00-2116, MAI 16864 2 Replacement Support Modified Support, 2DBB-1-H4 No 11/24/00 Plan # 00-2117, MAI 16864 2 Replacement Support Modified Support, 2DBB-2-H17 No 11/24/00 Plan # 00-2118, MAI 16865 2 Replacement Support Reinstalled Support, 2EBB-1A-HT No 11/24/00 Plan # 00-2119, MAI 16864 2 Replacement Support Modified Support, 2EBB-2A-HI No 11/24/00 Plan # 00-2120, MAI 16865 Replacement Support Modified Support, 2DBB-10-H1 No 11/24/00 Plan # 00-2121, MAI 16872 Replacement Pipe Replaced Piping, 2DBB-9-4" No 12/06/00 Plan # 00-2122, MAI 16871 Replacement Pipe Replaced Piping, 2DBB-10-4" No 12/06/00 Plan # 00-2123, MAI 16872 CC Replacement Containment Restored Concrete Construction Opening No 12/02/00 Plan # 00-2126, MAI 16829 CC Replacement Containment Replaced tendon No 12/01/00 Plan # 00-2127, MAI 16830 2 Replacement Support Modified Support, 2DBB-4-H4 No 11/10/00 Plan # 00-2128, MAI 16870 3 Replacement Support Modified Support, 2HCC-2-1-HOO1 No 11/15/00 Plan # 00-2129, MAI 27975 I Replacement Support Modified Support, 2CCA-23-H28 No 11/15/00 Plan # 00-2130, MAI 27974 3 Replacement Support Modified Support, 2HCC-4-1-H005 No 11/15/00 Plan # 00-2131, MAI 27974 3 Replacement Support Modified Support, 2HCC-3-1-HOOI No 11/15/00 Plan # 00-2132, MAT 27974 1 Replacement Support Modified Support, 2CCA-26-15-H015 No 11/15/00 Plan # 00-2133, MAI 27974 MC Repair Containment Restored Rx. Liner Plate Opening No 12/01/00 Plan # 00-2134, MAT 16829

PAGE 4 of 6 UNIT 2 INTERVAL 3 PERIOD 1 (Cycle 14)

CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND JOB ORDER NUMBER MEASURE DURING SCHEDULED SECTION Xi EXAMINATION OR TEST(YES/NO) 1 Replacement Support Replaced Fasteners, 2HS-SGA-E1 No 11/19/00 Plan # 00-2135, MAI 27975 1 Replacement Support Replaced Fasteners, 2HS-SGA-E2 No 11/19/00 Plan # 00-2136, MAI 27975 1 Replacement Support Replaced Fasteners, 2HS-SGA-WI No 11/19/00 Plan # 00-2137, MAI 27975 1 Replacement Support Replaced Fasteners, 2HS-SGA-W2 No 11/19/00 Plan # 00-2138, MAI 27975 Replacement support Replaced Fasteners, 2HS-SGA-EI No 11/19/00 Plan # 00-2139, MAI 27974 1 Replacement Support Replaced Fasteners, 2HS-SGB-E2 No 11/19/00 Plan # 00-2140, MAI 27974 1 Replacement Support Replaced Fasteners, 2HS-SGB-WI No 11/19/00 Plan # 00-2141, MAI 27974 1 Replacement Support Replaced Fasteners, 2HS-SGB-W2 No 11/19/00 Plan # 00-2142, MAI 27974 2 Repair Pipe Welded Repair, 2DBB-7-4" No 11/16/00 Plan # 00-2143, MAI 16871 MC Replacement Containment Installed test fittings on Liner Plate No 01/31/01 Plan # 00-2144, MAI 24004 2 Repair Pipe Welded Base Metal Repair, 2DBB-1-18" No 11/21/00 Plan # 00-2145, MAI 16867 1 Replacement Valve Replaced Valve, 2PSV-4634 No 12/11/00 Plan # 00-2154, MAI 30511 1 Repair Nozzles Welded Repair, 2T-1 Heater Nozzles Yes 08/21/00 Plan # 00-2156, MAI 31217 I Repair Nozzles Welded Repair, 2TE-4610-A/B Nozzle Yes 08/21/00 Plan # 00-2158, MAI 31223 3 Replacement Support Modified Support, 2HCC-312-HI I No 12/12/00 Plan # 00-2159, MAI 21067 3 Replacement Support Modified Support, 2HCC-298-H5 No 12/12/00 Plan # 00-2160, MAI 21068 3 Replacement Support Modified Support, 2HCC-313-H3 No 12/12/00 Plan # 00-2162, MAI 21068 3 Replacement Support Modified Support, 2HCC-313-H4 No 12/12/00 Plan # 00-2163, MAI 21068 3 Replacement Support Modified Support, 2HCC-314-H3 No 12/12/00 Plan # 00-2167, MAI 21068 3 Replacement Support Modified Support, 2HCC-312-H1O No 12/12/00 Plan # 00-2168, MAI 21067 3 Replacement Support Modified Support, 2HCC-31 1-H8 No 12/12/00 Plan # 00-2169, MAI 21067 3 Replacement Support Modified Support, 2HCC-3 1I-H10 No 12/12/00 Plan # 00-2170, MAI 21067 3 Repair Support Remove/Reinstalled, 2HCC-292-HI I No 10/06/00 Plan # 00-2171, MAI 28047 2 Repair Valve Machined Disc, 2SI-1 IB No 11/21/00 Plan # 00-2173, MAI 24665 3 Replacement Support Modified Support, 2HCC-311 -H9 No 12/12/00 Plan # 00-2175, MAI 21067 2 Replacement Valve Replaced Valve, 2PSV-4822 No 11/23/00 Plan # 00-2176, MAI 25570

PAGE 5 of 6 UNIT 2 INTERVAL 3 PERIOD 1 (Cycle 14)

CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND JOB ORDER NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YESINO) 3 Repair& Pump Welded repair, stud replacement on No 05/01/01 Plan # 00-2179, MAI 19175 Replacement 2P-7B 2 Repair Pump Weld Buildup, 2P-89A No 10/10/00 Plan # 00-2188, MAI 33461 2 Repair Valve Welded Repair, 2PSV-5089 No 10/08/00 Plan # 00-2189, MAI 13702 I Replacement Valve Replaced Fasteners, 2CV-5086-2 No 11/27/00 Plan # 00-2190, MAI 33126 1 Replacement Valve Replaced Fasteners, 2CV-4651 No 12/11/00 Plan # 00-2194, MAI 18033 MC Replacement Penetration Replaced Fasteners, 2E-27 No 10/26/00 Plan # 00-2198, MAI 19257 MC Replacement Penetration Replaced Fasteners, 2E-36 No 10/26/00 Plan # 00-2200, MAI 25525 MC Replacement Penetration Replaced Fasteners, 2E-6 No 10/26/00 Plan # 00-2202, MAI 25532 MC Replacement Penetration Replaced Fasteners, 2E-61 No 10/26/00 Plan # 00-2207, MAI 25545 MC Replacement Penetration Replaced Fasteners, 2E-71 No 10/26/00 Plan # 00-2211, MAI 25556 2 Replacement Valve Replaced Disc, 2CV-2201-2 No 11/24/00 Plan # 00-2212, MAI 34111 3 Replacement Support Modified Support, 2HCC-3 I-HI No 12/12/00 Plan # 00-2215, MAI 31325 3 Replacement Support Modified Support, 2HCC-3 11-H 19 No 12/12/00 Plan # 00-2216, MAI 31325 3 Replacement Valve Replaced Valve, 2CV-1421-2 No 11/16/00 Plan # 00-2217, MAI 34429 3 Replacement Pipe Replaced Piping, 2HBC-33-1 1/2' No 10/15/00 Plan # 00-2218, MAI 11392 2 Replacement Pipe Remove/Reinstalled Piping, No 12/02/00 Plan # 00-2219, MAI 34374 2DCB-501-2" 3 Replacement Support Modified Support, 2HCC-31 1-1-6 No 12/12/00 Plan # 00-2220, MAI 21067 2 Replacement Valve Replaced Disc, 2PSV-5007 No 12/08/00 Plan # 00-2221, MAI 34690 2 Replacement Valve Nozzle Replacement, 2PSV-5087 No 11/28/00 Plan # 00-2222, MAI 34877 3 Replacement Support Modified Support, 2HCC-259-H002 No 12/12/00 Plan # 00 2224, MAI 21068 2 Repair Valve Machined Disc, 2CV-3851-1 No 11/21/00 Plan # 00-2225, MAI 35177 3 Replacement Valve Replaced Valve, 2MS-39A No 12/06/00 Plan # 00-2226, MAI 34420 3 Replacement Valve Replaced Valve, 2MS-39B No 12/06/00 Plan # 00-2227, MAI 34420 3 Replacement Support Modified Support, 2HCC-314-HI No 12/12/00 Plan # 00-2228, MAI 21068 3 Replacement Support Modified Support, 2HCC-314-H2 No 12/12/00 Plan # 00-2229, MAI 21068

PAGE 6 of 6 UNIT 2 INTERVAL 3 PERIOD 1 (Cycle 14)

CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND JOB ORDER NUMBER MEASURE DURING SCHEDULED SECTION Xl EXAMINATION OR TEST(YES/NO) 3 Replacement Support Modified Support, 2HCC-313-H10 No 12/12/00 Plan # 00-2230, MAI 21068 3 Replacement Support Modified Support, 2HCC-3-H8 No 12/12/00 Plan # 00-223 1, MAI 21068 2 Replacement Tank Replaced Fasteners, 2T-2A No 12/08/00 Plan # 00-2237, MAI 31051 1 Replacement Valve Replaced Fasteners, 2CV-5003-1 No 12/11/00 Plan # 00-2240, MAI 18128 1 Replacement Valve Stud/Nut Replacement, 2CV-5023-1 No 11/30/00 Plan # 00-2241, MAI 18130 1 Replacement Valves Modified Capacity, PZR Valves No 11/03/00 Plan # 00-2243, MAI N/A 2 Repair Rx. Liner Welded Repair, Rx Liner Plate No 11/06/00 Plan # 00-2244, MAI 36412 2 Repair Valve Machined Nozzle, 2PSV-4836 No 12/07/00 Plan # 00-2245, MAI 36544 2 Repair Support Welded Repair, 2EBB-1-H2 No 11/13/00 Plan # 00-2246, MAI 35969 2 Repair Support Welded Repair, 2EBB-2-H2 No 11/13/00 Plan # 00-2248, MAI 35969 1,2 Replacement Pipe Revised System P/T Calculations No 11/15/00 Plan # 00-2249, MAI N/A

&3 1,2 Replacement Pipe Revised System P/T Calculations No 12/12/00 Plan # 00-2250, MAI N/A

&3 3 Replacement Pipe Installed Spacer, 2SUS-2P7B No 12/03/00 Plan # 00-2251, MAI 25580 2 Replacement Support Modified Support 2DBB-7-H5 No 11/24/00 Plan # 00-2252, MAI 16871 2 Replacement Pipe Installed New Piping & Valve, 2SI-76 No 12/04/00 Plan # 00-2253, MAI 37159 2 Replacement Penetration Stud/Nut Replacement for 2P-53 No 11/28/00 Plan # 00-2255, MAI 32905 3 Replacement Valve Replaced Valve 2SW-138 No 05/09/01 Plan # 01-2077, MAI 36055 2 Replacement Valve Replaced nozzle on valve 2PSV-4835 No 06/19/01 Plan # 01-2109, MAI 27673 2 Replacement Valve Replaced plug on Valve 2CV-4816 No 06/19/01 Plan # 01-2118, MAI 44923 3 Repair Htexch Welded repair, 2VE-IA No 05/01/01 Plan # 01-2119, MAT 45391 2 Replacement Pump Replaced plunger cap on 2P-36A No 06/19/01 Plan # 01-2124, MAI 44779 NOTE: Table 3 is an abstract for all Repair/Replacement activities performed during Cycle 14 to comply with Site Procedures.

Attachment 2 2CAN030502 Owner's Activity Report OAR-2312

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number OAR-2312 e.. C...-.. Arl,..n..e In- I0 fl Rn. 1C4T'r YV T a I WIl. .l- AM IA~1-(Name and Address of Owner)

Plant Arkansas Nuclear One / 1448 S.R. 333. Russellville. AR. 72802 (Name and Address of Plant)

Unit No. 2 Commercial service date March 26.1980 Refueling outage no. 2R15 (If applicable)

Current inspection interval Third (3rd) Inspection Interval (1st, 2nd, 3rd, 4th, other)

Current inspection period First (1st) Inspection Period (1st, 2nd, 3rd)

Edition and Addenda of Section Xl applicable to the inspection plan 1992 Edition. Portions of 1993 Addenda Date and revision of inspection plan June 21. 2000/ Revision 5 Edition and Addenda of Section Xl applicable to repairs and replacements, if different than the inspection plan Same CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owners Activity Report are correct, and that the examinations, test, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section Xt.

Certificate of Authorization No. N/A Expiration Date N/A (if applicable)

Signed e d -oI mn Prorarm s & Components Date l +/-/g 0 Owner[CrOwner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arkansas and employed by ABS Group Inc. of Houston. Texas have inspected the items described in this Owner's Activity Report, during the period Dec.1.2000 to Auaust 3.2002 , and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

C, i)

  • I iL d Commissions NB-9985, ARK-1054 WA"B" ¶N" Iy"NS" National Board, State, Province, and Endorsements Inspector's Signture Date 12-De -OD3 This form (E00127) may be obtained from the Order Dept., ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300.

TABLE 1 ABSTRACT OF EXAMINATIONS AND TEST

-o-a-iota -_

Examinations Examinations Total Examinations Total Examinations Examination Required for Credited for This Credited (%/) For Credited (%) To Date Category The Interval Period The Period for The Interval Remarks B-A 19 0 0.00 0.00 B-B 4 1 100.00 25.00 B-D 25 4 100.00 16.00 B-G-1 254 72 100.00 28.35 33.33 _

B-G-2 18 6 100.00 R-A298 99 100.00 33.22 B-K14 1 100.00 33.33 B-K selected for interval exceeds code requirements B-N-1 3 1 100.00 33.33 Accessible areas of the reactor vessel each period B-P 7 2 100.00 28.57 C-A 6 2 100.00 33.33 C-B8 2 100.00 25.00 C-C 17 8 100.00 47.06 Code Case N-598 C-H 186 62 100.00 33.33 D-A 11 4 100.00 36.36 Code Case N-598 D-B58 16 100.00 27.59 F-A 184 48 100.00 26.09 B-K selected for interval exceeds code requirements

TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Hlaw or Relevant Condition Found Examination Item During Scheduled Section XI Category Number Item Description Flaw Characterization (IWA-3300) Examination or Test (Yes or No)

NONE I

PAGE 1 of 3 UNIT 2 INTERVAL 3 PERIOD I (For Cycle 15)

TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND JOB ORDER NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YES/NO) 2 Replacement Valve Replaced disc on 2PSV-1002 -No 07/07/02 Plan # 98-2138, MA 981289 2 Replacement Valve Replaced disc on 2PSV-1006 No 07/07/02 Plan # 98-2146, MAI 981289 2 Replacement Valve Replaced disc on 2PSV-1054 No 07/07/02 Plan # 98-2152, MAI 981289 2 Replacement Valve Replaced disc on 2PSV-1056 No 07/17/02 Plan # 98-2156, MAI 981289 3 Replacement Heat Replaced cooler housing on 2E-47A. No 07/19/02 Plan # 00-2014, MAI 3926 Exchanger Invoked CC N-416-1hsg_4.o/0Pn 0 1,_3 3 Replacement Heat Replaced cooler housing on 2E-47C. No 07/19/02 Plan # 00-2015, MAT 3924 3__Replacement Exchanger Invoked CC Nl 16-1 ____N01 2Pn0-5__9 3 Replacement Vessel Replaced flange fasteners on 2E-27 No 01/31/02 Plan # 00-2054, MAI 23519 3 Replacement Valve Replaced valve 2CV-1509-1 No 02/01/02 Plan # 00-2060, MAI 16785 3 Replacement Valve Replaced B/B fasteners on 2FP-2B No 02/04/02 Plan # 01-2126, MAM 27630 2 Replacement Pump Replaced end cap on 2P-36A No 08/09/01 Plan # 01-2132, MAI 47536 2 Replacement Valve Replaced disc on 2CV-5016-2 No 04/16/02 Plan # 01-2133, MAI 21297 2 Replacement Valve Replaced disc on 2CV-5015-1 No 04/16/02 Plan #01-2135, MAI 21296 2 Replacement Valve Replaced disc on 2CV-5055-1 No 04/16/02 Plan # 01-2136, MAI 21300 2 Replacement Valve Replaced disc on 2CV-5056-2 No 04/16/02 Plan # 01-2137, MAI 21301 2 Replacement Pump Replaced end cap on 2P-36B No 09t24/01 Plan # 01-2138, MAI 48254 2 Replacement Valve Replaced B/B fasteners on 2CV-1001 No 05/07/02 Plan # 01-2166, MAI 37382 1 Replacement Valve Replaced B/B fasteners on 2CV-5003-1 No 04/17/02 Plan # 01-2184, MAI 36820 2 Replacement Valve Replaced valve 2PSV-5047 No 04/30/02 Plan # 01-2208, MAT 55416 3 Replacement Piping Replaced piping 2DBC-3-4". Invoked CC No 05/01/02 Plan # 01-2214, MAI 50629 N-416-1 1 Replacement Valve Replaced valve 2PSV-4633 No 05/02/02 Plan # 01-2219, MAI 55690 2 Replacement Pump Replaced casing on 2P-36A No 03/21/02 Plan # 0 1-2229, MAI 56421 2 Replacement Valve Replaced valve 2PSV-4867 No 04/30/02 Plan # 0 1-2230, MAI 55198 1 Replacement Valve Replaced disc on 2SI-13A No 04/29/02 Plan # 02-2001, MAI 30716

PAGE 2 of 3 UNIT 2 INTERVAL 3 PERIOD 1 (For Cycle 15)

REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CODE CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND JOB ORDER NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YES/NO) 3 Replacement Valve Replaced disc on 2FP-3B No 02/04/02 Plan # 02-2002, MAI 33884 3 Replacement Valve Tack welded new disc on 2FP-3B No 01/28/02 Plan # 02-2003, MAI 58477 2 Replacement Valve Replaced B/B fasteners on 2CVC-9C No 02/26/02 Plan # 02-2004, MAI 21477 2 Replacement Valves Replaced valves 2SV-5004, 2SI-46 & No 04/30/02 Plan # 02-2029, MAI 50723 2SI-48. Invoked CC N-416-1 Replacement Valve Replaced disc on 2CVC-22C No 04/02/02 Plan # 02-2045, MAI 57080 2

Replacement Valve Replaced disc on 2CVC-69C No 04/02/02 Plan # 02-2046, MAI 57080 2

Replacement Valve Replaced B/B fasteners on 2CV-465 1 No 04/30/02 Plan # 02-2054, MAI 40465 1

Replacement Valve Replaced B/B fasteners on 2CV-4652 No 04/30/02 Plan # 02-2055, MAI 40466 1

Repair Pump Performed non-welded repairs on 2P-4B No 03/18/02 Plan # 02-2056, MAI 40799 3

Replacement Valve Replaced disc on 2CVC-22B No 04/18/02 Plan # 02-2057, MAI 61939 2

Replacement Valve Replaced disc on 2CVC-69B No 04/17/02 Plan # 02-2058, MAI 61939 2

Replacement Pump Replaced casing on 2P-36C No 05/09/02 Plan # 02-2061, MAI 63191 2

Replacement Valve Replaced disc on 2PSV-4800 No 04/25/02 Plan # 02-2062, MAI 52541 2

Replacement Valve Replaced valve 2PSV-4822 No 04/30/02 Plan # 02-2063, MAI 54110 2

Replacement Valve Replaced valve 2EFW-1OB. Invoked CC No 04/30/02 Plan # 02-2064, MAI 59351 3

N 416-1 3 Replacement Piping Replaced piping 2HBC-189-2". Invoked No 04/22/02 Plan # 02-2065, MAI 62662 CC N-416-1 2 Replacement Valve Replaced valve 2PSV-5047. Invoked CC No 04/30/02 Plan # 02-2067, MAI 62373

_ _ N-416-1 2 Replacement Valves Replaced valves 2CVC-158 & 2CVC- No 04/30/02 Plan # 02-2068, MAI 62265 159. Invoked CC N-416-1 1 Replacement Tank Installed MNSA-2 on 2T-l, Nozzle El No 05/20/02 Plan # 02-2074, MAI 49444 I Replacement Tank Installed MNSA-2 on 2T-1, Nozzle E2 No 05/20/02 Plan # 02-2075, MAI 49444 1 Replacement Tank Installed MNSA-2 on 2T-1, Nozzle C2 No 05/20/02 Plan # 02-2076, MAI 49444 1 Replacement Tank Installed MNSA-2 on 2T-l, Nozzle F4 No 05/20/02 Plan # 02-2077, MAI 49444 1 Replacement Tank Installed MNSA-2 on 2T-l, Nozzle GI No 05/20/02 Plan # 02-2078, MAI 49444

PAGE 3 of 3 UNIT 2 INTERVAL 3 PERIOD 1 (For Cycle 15)

I-CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR DATE REPAIR/REPLACEMENT CLASS REPLACEMENT DESCRIPTION RELEVANT COMPLETED PLAN NUMBER AND OR CORRECTIVE CONDITION FOUND JOB ORDER NUMBER MEASURE DURING SCHEDULED SECTION XI EXAMINATION OR TEST(YES/NO) 3 Replacement Piping Replaced piping 2HBC-106-12". Invoked No 04/26/02 Plan # 02-2079, MAI 63946 CC N-416-1 2 Replacement Snubbers Replaced snubbers 2DBB-l-H9 & 2DBB- No 04/29/02 Plan # 02-2080, MAI 54117 2-H19 3 Replacement Heat Replaced flange fasteners on 2VCC-2B No 04/26/02 Plan # 02-2083, MAI 63945 Exchanger 3 Replacement Heat Replaced flange fasteners on 2VCC-2C No 04/26/02 Plan # 02-2084, MAI 63945 Exchanger 3 Replacement Heat Replaced flanges on 2VCC-2C. Invoked No 04/26/02 Plan # 02-2087, MAI 64218 Exchanger CC N-416-1 1 Replacement Tank Installed MNSA-2 on 2T-1, Nozzle N2 No 05/20/02 Plan # 02-2089, MAI 49444 3 Replacement Pump Replaced pump bowl on 2P-4A No 07/16/02 Plan # 02-2111, MAI 60208 NOTE: Table 3 is an abstract for all Repair/Replacement activities performed during Cycle 15 to comply with Site Procedures.