MONTHYEAR2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 2CAN052202, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) - Revision 12022-05-31031 May 2022 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) - Revision 1 ML22126A0332022-05-10010 May 2022 Review of the Spring 2021 Steam Generator Tube Inspections During Refueling Outage 1R29 2CAN022201, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28)2022-02-0808 February 2022 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) ML22034A8992022-02-0303 February 2022 Steam Generator Tube Inspection Reports in Support of TSTF-577 1CAN102104, Steam Generator Tube Inspection Report - 1R292021-10-22022 October 2021 Steam Generator Tube Inspection Report - 1R29 2CAN082103, Unit 2 - Fifth 10-Year Interval Snubber Program Plan2021-08-31031 August 2021 Unit 2 - Fifth 10-Year Interval Snubber Program Plan 1CAN072102, Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29)2021-07-19019 July 2021 Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29) 2CAN122001, Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection2020-12-0404 December 2020 Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection 2CAN112005, Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval2020-11-24024 November 2020 Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval 2CAN072001, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27)2020-07-0808 July 2020 Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27) 1CAN012004, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage2020-01-28028 January 2020 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage 2CAN091901, Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program2019-09-0303 September 2019 Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program 2CAN021906, Steam Generator Tube Inspection Report2019-02-28028 February 2019 Steam Generator Tube Inspection Report 2CAN011903, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage2019-01-23023 January 2019 Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage 1CAN101802, Submittal of 45th-Year Reactor Building Inspection Report2018-10-10010 October 2018 Submittal of 45th-Year Reactor Building Inspection Report 1CAN091802, Snubber Testing Program for Fifth Inservice Test Interval2018-09-24024 September 2018 Snubber Testing Program for Fifth Inservice Test Interval 1CAN081808, Inservice Testing Plan for the Fifth 10-Year Interval2018-08-27027 August 2018 Inservice Testing Plan for the Fifth 10-Year Interval 1CAN071802, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27)2018-07-25025 July 2018 Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27) 2CAN101701, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25)2017-10-0606 October 2017 Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25) 1CAN091703, Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval2017-09-21021 September 2017 Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval 1CAN031703, Steam Generator Tube Inspection Report - 1R262017-03-22022 March 2017 Steam Generator Tube Inspection Report - 1R26 1CAN031702, Reactor Building Inspection Summary Report - 1R262017-03-14014 March 2017 Reactor Building Inspection Summary Report - 1R26 1CAN031705, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (1R26)2017-03-14014 March 2017 Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (1R26) 1CAN111602, Fifth Ten-Year Interval Inservice Testing Program, Relief Request VRR-ANO1-2017-12016-11-16016 November 2016 Fifth Ten-Year Interval Inservice Testing Program, Relief Request VRR-ANO1-2017-1 1CAN011602, Amended Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)2016-01-18018 January 2016 Amended Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25) 1CAN051502, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)2015-05-28028 May 2015 Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25) 2CAN011503, Year Containment Building Tendon Surveillance and Concrete Inspection2015-01-16016 January 2015 Year Containment Building Tendon Surveillance and Concrete Inspection 2CAN081406, Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23)2014-08-21021 August 2014 Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23) 2CAN081404, Steam Generator Tube Inspection Report - 2R232014-08-18018 August 2014 Steam Generator Tube Inspection Report - 2R23 1CAN111301, Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)2013-11-0505 November 2013 Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) 1CAN101306, Unit 1, Steam Generator Tube Inspection Report - 1R242013-10-23023 October 2013 Unit 1, Steam Generator Tube Inspection Report - 1R24 1CAN101304, Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)2013-10-21021 October 2013 Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) 1CAN101301, Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-0232013-10-0808 October 2013 Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-023 1CAN041305, Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections2013-04-30030 April 2013 Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections 2CAN121204, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22)2012-12-13013 December 2012 Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22) 1CAN031203, Unit 1, Steam Generator Tube Inspection Report - 1R232012-03-22022 March 2012 Unit 1, Steam Generator Tube Inspection Report - 1R23 2CAN051102, Inservice Inspection Summary Report for the Twenty-First Refueling Outage2011-05-25025 May 2011 Inservice Inspection Summary Report for the Twenty-First Refueling Outage 2CAN011105, Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program2011-01-25025 January 2011 Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program ML1036305792010-12-29029 December 2010 Notification of Inspection (NRC Inspection Report 050-368/2011002) and Request for Information ML1022504182010-07-29029 July 2010 Steam Generator Tube Inspection Report - 1R22 1CAN061004, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (1R22)2010-06-29029 June 2010 Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (1R22) 2CAN031006, Inservice Testing Plan for the Fourth 10-Year Interval2010-03-25025 March 2010 Inservice Testing Plan for the Fourth 10-Year Interval 1CAN021002, Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests2010-02-0909 February 2010 Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests 2CAN120901, Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20)2009-12-0707 December 2009 Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20) 1CAN030907, Steam Generator Tube Inspection Report - 1R212009-03-30030 March 2009 Steam Generator Tube Inspection Report - 1R21 1CAN030902, Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21)2009-03-0404 March 2009 Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21) CNRO-2009-00002, Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval2009-03-0404 March 2009 Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval 2CAN070802, Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19)2008-07-0101 July 2008 Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19) 2023-08-10
[Table view] Category:Letter type:
MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] |
Text
Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Licensing Arkansas Nuclear One 1CAN111301 November 5, 2013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)
Arkansas Nuclear One, Unit 1 Docket No. 50-313 License No. DPR-51
REFERENCE:
Entergy Letter dated October 21, 2013, Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) (1CAN101304)
(ML13295A077)
Dear Sir or Madam:
Entergy Operations, Inc., (Entergy) submitted the Arkansas Nuclear One, Unit 1 (ANO-1)
Inservice Inspection Summary Report for the twenty-fourth refueling outage (1R24) via the reference. This report was provided in accordance with Article IWA-6000 of Section XI of the 2001 Edition with the 2003 Addenda of the American Society of Mechanical Engineers Code.
The summary report contained an Owners Activity Report Form OAR-1 in place of the code-required forms.
This report was prepared at the completion of the refueling outage and submitted within 90 calendar days of the completion of the outage. This outage was completed on August 7, 2013.
During the Authorized Nuclear Inservice Inspectors review of the submitted report it was determined that some of the information that was provided was from previous OARs and not applicable to this report. Specifically Code Cases N-661 and N-513-1 were not utilized during the reporting period. In addition, the information in Table 1 of the report related to the HBD 18 repair was performed and reported correctly in the previous cycles report.
Based on the above, attached is the completed revised Form OAR-1 for ANO-1 for your information. Included with the form are tables listing the Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service and Abstract of
1CAN111301 Page 2 of 2 Repair/Replacement Activities Required for Continued Service in accordance with Code Case N-532-4. The results that are contained in the revised form are for 1R24.
This letter contains no new regulatory commitments.
By means of this submittal, the reporting requirements of IWA-6000 are fulfilled for 1R24.
If you have any questions or require additional information, please contact me.
Sincerely, Original signed by David B. Bice for Stephenie L. Pyle SLP/rwc
Attachment:
Revised Form OAR-1 Owners Activity Report cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852
Attachment to 1CAN111301 Revised Form OAR-1 Owners Activity Report
Attachment to 1CAN111301 Page 1 of 4 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number OAR-1422 Plant Arkansas Nuclear One / 1448 S.R. 333, Russellville, AR. 72802 Unit No. 1 Commercial service date December 19, 1974 Refueling outage no. 1R24 (If applicable)
Current inspection interval Fourth (4th) Inspection Interval (1st, 2nd, 3rd, 4th, other)
Current inspection period Second (2nd) Inspection Period (1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plan 2001 Edition with 2003 Addenda Date and revision of inspection plan November 23, 2010 / Revision 0 (SEP-ISI-101);
September 12, 2012 / Revision 1 (SEP-ISI-101)
July 18, 2013 / Revision 0 (SEP-ISI-ANO1-101)
Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan Same _______________
Code Cases used: N-532-4 (if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations, tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 1R24 conform to the requirements of Section XI.
(refueling outage number)
Signed Original signed by Jamie Gobell / ASME Section XI Repair / Replacement Engineer Date _10/07/2013_______
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arkansas and employed by HSBCT of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Original signed by Carl Thompson Commissions ARK-1054 Inspector's Signature National Board, State, Province, and Endorsements Date 10/08/2013
Attachment to 1CAN111301 Page 2 of 4 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category Item Description Evaluation Description and Item Number N/A Flow Accelerated Corrosion degradation of Pipe wall thickness was measured to be less than the EBB-1-18 Feedwater piping component acceptance criteria (Tcrit). Piping was analyzed using Finite number EBB01P020A. Measured thickness Element Analysis and accepted for continued use as was 0.666 inches versus a Tcrit value of documented under EC-45816, CR-ANO-1-2013-00489 and 0.669 inches CR-ANO-1-2013-01132.
N/A Flow Accelerated Corrosion degradation of Pipe wall thickness was measured to be less than the EBB-1-18 Feedwater piping component acceptance criteria (Tcrit). Piping was analyzed using Finite number EBB01E004. Measured thickness Element Analysis and accepted for continued use as was 0.753 inches versus a Tcrit value of documented under EC-45816, CR-ANO-1-2013-00489 and 0.776 inches. CR-ANO-1-2013-01213.
Attachment to 1CAN111301 Page 3 of 4 TABLE 2 ABSTRACT OF REPAIR / REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Description of Work Date Repair / Replacement Plan Class Completed Number & Work Order Number 1 Restraint Replace rear bracket due to wear in load 29-Sep-2012 Plan # WO-00281913-10 pin hole CR-ANO-2-2012-02249 1 Stud Replaced reactor closure head stud due to 5-Oct-2012 Plan # WO-52357868-06 thread damage CR-ANO-2-2012-02023 T3 Pipe Repair weld FW-36R1 in HCD-112-6 20-Jun-2013 Plan # WO-00338362-01 Service Water piping CR-ANO-1-2012-01853 1 Steam Generator E-24A tube plugging 18-Jul-2013 Plan # 52399714-09 WO 52399714 1 Steam Generator E-24B tube plugging 18-Jul-2013 Plan # 52399668-10 WO 52399668 2 Pipe Repair of socket weld FW-12GC2 on 7-Aug-2013 WO-00358952-03 CCB-1-1 piping due to pinhole leak in new CR-ANO-1-2013-02285 weld 1 Control Rod Drive Replaced CRDM top closure (Quick Vent) 14-Aug-2013 WO-52399792-13 Mechanism (CRDM)-12 assembly due to damage that occurred to R&R Plan # 50233739-13 the seating surface as a result of CR-ANO-1-2013-01708 and maintenance CR-ANO-1-2013-02626 1 CRDM-19 Replaced CRDM due to damage that 14-Aug-2013 WO-00297993-03 occurred to the seating surface as a result R&R Plan # 00297993-03 of maintenance CR-ANO-1-2011-02905
Attachment to 1CAN111301 Page 4 of 4 TABLE 2 (continued)
ABSTRACT OF REPAIR / REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Description of Work Date Repair / Replacement Plan Class Completed Number & Work Order Number 1 CV-1228 Replaced valve bonnet due to a scratch in 28-Aug-2013 Plan # 00296958-11 the pressure seal ring seating area WO 00296958 NOTE: ANO-1, Fourth Interval, Second Period