2CAN101701, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25)

From kanterella
Jump to navigation Jump to search
Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25)
ML17279A087
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 10/06/2017
From: Pyle S
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2CAN101701
Download: ML17279A087 (10)


Text

Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One 2CAN101701 October 6, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25)

Arkansas Nuclear One, Unit 2 Docket No. 50-368 License No. NPF-6

Dear Sir or Madam:

Article IWA-6000 of Section XI of the 2001 Edition with the 2003 Addenda of the American Society of Mechanical Engineers (ASME) Code requires an inservice inspection summary report to be submitted to the regulatory and enforcement authorities having jurisdiction at the plant site. The summary report is to contain the completed Form NIS-1, Owners Report for Inservice Inspection, and Form NIS-2, Owners Report for Repair or Replacement Activity.

This 2001 Edition with the 2003 Addenda of the ASME Code is the code of record for the fourth 10-year interval at Arkansas Nuclear One, Unit-2 (ANO-2).

ASME Code Case N-532 allows Entergy Operations, Inc., to prepare an Owners Activity Report form OAR-1 in place of the code-required NIS-1 and NIS-2 forms. The latest revision of this code case used in this report, N-532-5, is listed in Regulatory Guide (RG) 1.147, Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1, Revision 17, Table 1, Acceptable Section XI Code Cases. Therefore, prior NRC approval to implement this code case is not required.

This report is to be prepared at the completion of a refueling outage and submitted within 90 calendar days of the completion of the refueling outage. In this case the report is associated with the twenty-fifth refueling outage for ANO-2 (2R25). This outage was completed on July 8, 2017.

Attached is the completed Form OAR-1 for 2R25 for your information. Included with the form are tables listing the Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service and Abstract of Repair / Replacement Activities Required for Continued Service in accordance with Code Case N-532-5. The results that are provided in this submittal are for 2R25.

2CAN101701 Page 2 of 2 By means of this submittal, the reporting requirements of the ASME Code, Section XI, Article IWA-6000 are fulfilled for 2R25.

This letter contains no new commitments.

Should you have any questions regarding this submittal, please contact me.

Sincerely, ORIGINAL SIGNED BY STEPHENIE L. PYLE SLP/rwc

Attachment:

Form OAR-1, Owners Activity Report cc: Mr. Kriss M. Kennedy Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Wengert MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852

ATTACHMENT TO 2CAN101701 Form OAR-1 Owners Activity Report

Attachment to 2CAN101701 Page 1of7 FORM OAR-1 OWNERS ACTIVITY REPORT Report Number: --""'O....A....R....-=24

....2 = 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Plant: Arkansas Nuclear One/ 1448 S.R. 333. Russellville. AR. 72802 UnitNo:_--=2- Commercial Service Date: March 26. 1980 Refueling Outage No.: 2R25 (if applicable)

Current Inspection Interval: Fourth (4th) Inspection Interval (1st. 2nd. 3rd. 41h. Other)

Current Inspection Period: Second (2nd) Inspection Period (1sl. 2nd, 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plans: 2001 Edition with 2003 Addenda Date and Revision of Inspection Plans: July 18, 2013 /Revision O!SEP-ISl-AN02-105) and Februarv 14. 2014 /Revision 1 <SEP*

ISl*AN02-105), May 5. 2016 Revision 2 CSEP-ISl-AN02-105l Edition and Addenda of Section XI applicable to repair/replacement activities. if different than the Inspection Plans: =S=am......._e_ __

Code Cases used for inspection and evaluation: _ .....N.....-..... 5 .....

13 ....-.....3~N.....-.....

5..-32=---5___________________

(ir applicable. induding cases modified by Case N*532 and 1a1er revisions)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of _ _2R25 conform to the requirements of Section XI.

(refueling outage number)

  • The NIS-2A form for R&R Plan number 427455-02 could not be signed as documented in CR-AN0-2-2017-4689 The NIS-2A form for R&R Plan number 440713-03 could not be signed as documented in CR-AN0-2-2017-4667 The NIS-2A form for R&R Plan number 440713-04 could not be signed as documented in CR-AN0-2-2017-4892 The NIS-2A form for R&R Plan number 453805-27 could not be signed as documented in CR-AN0-2-2017-5133 The NIS-2A form for R&R Plan number 430530-01 could not be signed as documented in CR-AN0-2-2017-5320 The NIS-2A form for R&R Plan number 402241-01 could not be si ned as documented in CR-AN0-2-2017-5278 The NIS-2A i rm i R&R Plan ber 458342-01 could not be si ned as documented in CR-AN0-2-2017-5319 Ret'A1Jl Signed: ...,,.t:s/!t.~~~~¥.-..J~'=Bll~'!ll..../IN.~'H.J~------ Date: 104 ~//7 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Attachment to 2CAN101701 Page 2of7 Date: Jo/ O"I / 17

Attachment to 2CAN101701 Page 3 of 7 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Item Description Evaluation Description Number D-B 2VUC-1A Shutdown Cooling Heat Exchanger See Operability evaluation CR-ANO-2-2015-05263 D2.10 Room Cooler. (Copper Cooling coil) small pin hole leak.

D-B 2F-6C C Service Water (SW) Strainer 1 drop See Operability evaluation CR-ANO-2-2017-03766 D2.10 per minute leak on connecting piping.

D-B A branch connection at FW-135 on 2HCC-319 See Operability tab of CR-ANO-2-2015-05154 and see D2.10 2K-4A SW supply line did not receive the also CR-ANO-2-2015-05154. Component was classified Code required surface examination. CR-ANO- as Operable-DNC.

2-2015-5154.

E-A Containment liner plate flaws (arc strikes) CR-ANO-2-2016-00632 / EC-70969 E1.10 E-A Containment liner degradation (adjacent to See action documented in CR-ANO-2-2016-794 / EC-E1.10 moisture barrier flaws) CR-ANO-2-2016- 63218 764,801,815 D-B Microbial Induced Corrosion (MIC) pit in SW See Operability tab of CR-ANO-2-2017-3388 D2.10 2HBC-76-1 E-A 2P-66 and 2P-68 Containment sump See Operability tab of CR-ANO-2-2017-3138 and EC E1.10 penetration degradation. 65304.

  • Item was Repaired / Replaced during 2R25 refueling outage.

Attachment to 2CAN101701 Page 4 of 7 TABLE 2 ABSTRACT OF REPAIR / REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Repair / Replacement (R&R) Plan Code Date Item Description Description of Work Numbers and Work Order (WO)

Class Completed Number 2 2E-29 Repair of cracked internal baffles of 08/29/17 52668568-11 letdown cooler 3 2E-27 2E-27 internal inspection (plug tubes) 09/11/17 52318633-01 1 2CCA-27 2R-25 Repair of 5/64" cut on 2CCA-27, 05/25/17 207721-01 "B" CVCS pipe 3 2CCW-39C Replace 2CCW-39C 08/07/17 427110-01 1 2CVC-1187 2CVC-1187 cut out and replace 07/11/17 431119-01 2 2CVC-1A 2CVC-1A leaks by 08/29/17 390075-01 2 2DBB-1 Replace 2DBB-1 elbow due to high Flow 08/07/17 328843-01 Assisted Corrosion (FAC) wear rate 2 2E-35A 2E-35A Shutdown cooling heat exchanger 07/10/17 455652-01 replacement 2 2E-35B 2E-35B Shutdown cooling heat exchanger 07/10/17 455681-01 replacement 3 2F-6A Verify all bolts installed in strainer baskets 08/11/17 438842-02 3 2F-6B Replace 2F-6B strainer basket seat plate 03/22/16 440325-01 3 2F-6C 2F-6C SW strainer weld documents 04/27/17 438839-02 2 2HBB-3-1 2HBB-3, 5 Supply and return lines 09/12/17 440713-24

Attachment to 2CAN101701 Page 5 of 7 TABLE 2 (Continued)

Repair / Replacement (R&R)

Date Code Class Item Description Description of Work Plan Numbers and Work Order Completed (WO) Number 2 2HBB-3-12 2HBB-3,5 Supply and return line - 09/14/17 440713-52 supports 3 2HBC-106-1 Replace SW supply and return line for 09/12/17 440713-02 2VCC-2C/2D 3 2HBC-33-20 Repair corrosion on FW-2 08/30/17 477845-01 3 2HBC-34-H20 Weld repair and Base Metal Repair 08/15/17 477939-06 (BMR) 3 2HBC-50 Replace degraded portion of SW piping 09/06/17 468097-01 (2HBC-50-2) 3 2HBC-50 Replace 18" SW piping 09/06/17 468097-05 3 2HBC-68-12 Replace degraded SW pipe on line 06/13/17 471297-02 2HBC-68-12 3 2HBC-69-12 Replace degraded SW pipe on line 09/22/17 449642-02 2HBC-69-8-12 3 2HBC-76 Replace deficient SW piping upstream of 09/08/17 449638-01 FW-47C1 3 2HBC-76 2HBC-76 4" piping replacement 08/30/17 449638-12 3 2HCC-298 FW-4R1 BMR 06/28/17 473629-03 3 2HCC-313 Perform weld repair for through-wall leak 04/11/17 461547-01 2 2M-116A Replace cooling coil 06/07/16 430298-04

Attachment to 2CAN101701 Page 6 of 7 TABLE 2 (Continued)

Repair / Replacement (R&R)

Date Code Class Item Description Description of Work Plan Numbers and Work Order Completed (WO) Number 3 2MS-39A Perform repair / replacement in 09/11/17 471540-07 accordance with (IAW) EC-71145 3 2MS-39B Perform repair / replacement IAW 09/11/17 52671489-07 EC-71145 3 2P-4A BMR pump discharge cone CR-ANO 453805-27/ CR-ANO-2-2016-2017-05133 03146/3157 2 2P-55 Flued Head Replace SW supply flued head for 2P-55 09/12/17 440713-25 Reactor Building penetration 2 2P-55 Flued Head Replace SW supply flued head for 2P-63 09/12/17 440713-26 Reactor Building penetration 1 2SI-13D Cut out and replace valve 03/14/16 437746-08 1 2SI-14A Cut out and replace valve 08/23/17 432399-01 2 2SI-3B Replace valve 2SI-3B CR-ANO 402241-01 2017-05278 3 2SW-1002A Through-wall leakage identified 11/11/16 452665-04 3 2SW-24B Repair valve 08/11/17 474191-01 3 2SW-25A Replace valve and associated piping to 09/07/17 394570-01 facilitate valve replacement 3 2SW-25A Repair of butt weld due to pinhole leak 05/26/17 473880-2

Attachment to 2CAN101701 Page 7 of 7 TABLE 2 (Continued)

Repair / Replacement (R&R)

Date Code Class Item Description Description of Work Plan Numbers and Work Order Completed (WO) Number 3 2SW-25B Replace 2SW-25B with stainless steel 09/20/17 413383-01 equivalent 3 2SW-69A Replace valve and associated piping to 09/07/17 394576-01 facilitate valve replacement 3 2SW-69B Replace 2SW-69B with stainless steel 08/11/17 413382-01 equivalent 3 2VCC-2C/2D Replace SW supply and return line for 09/12/17 440713-01 2VCC-2C/2D 3 2VUC-11B Replace cooling coil due to pinhole leak 03/14/16 427105-01 3 2VUC-1A Replace leaking Cooling coil 07/30/16 434506-01 3 2VUC-2C Replace switchgear cooling coil. 07/06/17 452684-07