ML24022A22622 January 2024(PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 24th Refueling Outage for Unit 3
CCN:22-14, Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 331 January 2022Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 3
ML21041A4509 February 2021(PBAPS) Unit 2 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 2Coatings
Moisture barrier
ML20034E33229 January 2020(PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 22nd Refueling Outage for Unit 3
ML19308A01131 October 2019Relief Request I4R-63 Associated with the Fourth Inservice Inspection (ISI) Interval
ML19233A13321 August 2019Inservice Inspection Relief Request 15R-10
ML19050A35219 February 2019Submittal of the Snubber Inservice Testing Program Plan for the Fifth 10-Year IntervalSafe Shutdown
ML19024A19523 January 2019Results of Visual Inspections of Unit 2 Replacement Steam Dryer in the Second Refueling Outage After Reaching EPU Conditions
ML19025A03116 January 2019(Pbaps), Unit 2 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 22nd Refueling Outage for Unit 2
ML18337A19629 November 2018Submittal of the Fifth Ten-Year Interval Inservice Testing Program PlanSafe Shutdown
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Stroke time
Squib
Incorporated by reference
FLEX
Scram Discharge Volume
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Grace period
ML18030A19030 January 2018Results of Visual Inspections of Unit 3 Replacement Steam Dryer
ML17039A8849 February 2017Submittal of the In-Service Inspection (ISI) Owner'S Activity Report (OAR) for the 21st Refueling Outage
ML16189A21829 June 2016BWR Vessel and Internals Project - Vessel Internals Inspection Summaries for Fall 2015 OutagesWeld Overlay
VT-2
EVT-1
Pressure Boundary Leakage
Dissimilar Metal Weld
DM weld
ML16118A41427 April 2016Submittal of Relief Request Associated with the Fourth Inservice Testing Interval - Pressure Isolation Valve Leakage Testing FrequencyPower-Operated Valves
ML16021A08920 January 2016Submittal of the In-Service Inspection (ISI) Owner'S Activity Report (OAR) for the 20th Refueling Outage
ML15225A59213 August 2015Responds to Request for Additional Information Regarding Proposed Relief Request Associated with the Common Emergency Service Water (Esw)System PipingMission time
ML15068A3503 March 2015Submittal of the In-Service Inspection (ISI) Owner'S Activity Report (Oar)For the 20th Refueling Outage for Unit 2 and Supplement to the 18 Refueling Outage OARCoatings
Code Reconciliation
RS-14-316, Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System Operating Pressure29 October 2014Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System Operating PressureFunctionality Assessment
Through-Wall Leak
ML14021A04621 January 2014Submittal of the Inservice Inspection (ISI) Owner'S Activity Report for the 19th Refueling Outage for Unit 3Coatings
ML13022A03017 January 2013Submittal of the Inservice Inspection (ISI) Owner'S Activity Report for the 19th Refueling Outage
ML12012A21911 January 2012Submittal of the Inservice Inspection (ISI) Owner'S Activity Report for the 18th Refueling OutagePressure boundary leak
ML1100700235 January 2011Submittal of Inservice Inspection (ISI) Owner'S Activity Report for the 18th Refueling OutageMoisture barrier
ML1001901318 January 2010Submittal of Inservice Inspection (ISI) Owner'S Activity Report for the 17th Refueling Outage
ML09033017129 January 2009Submittal of Third Interval Inservice Inspection (ISI) Owners Activity ReportsWeld Overlay
Moisture barrier
ML08323005613 November 2008Submittal of Program for the Fourth Ten-Year Interval Inservice Testing ProgramSafe Shutdown
Reactor Vessel Water Level
High Radiation Area
Stroke time
Squib
Incorporated by reference
Cold shutdown justification
Power Operated Valves
ML08064058729 February 2008Submittal of Relief Requests Associated with the Third and Fourth Inservice Inspection (Lsi) Intervals and the First and Second Containment Inservice Inspection (Cisi) IntervalsProbabilistic Risk Assessment
VT-2
Incorporated by reference
Scram Discharge Volume
Dissimilar Metal Weld
DM weld
RS-07-058, Amergen/Exelon Nuclear - Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements19 April 2007Amergen/Exelon Nuclear - Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code RequirementsEVT-1
ML02127000726 April 2002Submittal of the Third 10-Year Interval First Inspection Period, Inservice Inspection Owners Activity ReportVT-2