Issue date | Title | Topic | |
---|---|---|---|
ML24022A226 | 22 January 2024 | (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 24th Refueling Outage for Unit 3 | |
CCN:22-14, Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 3 | 31 January 2022 | Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 3 | |
ML21041A450 | 9 February 2021 | (PBAPS) Unit 2 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 2 | Coatings Moisture barrier |
ML20034E332 | 29 January 2020 | (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 22nd Refueling Outage for Unit 3 | |
ML19308A011 | 31 October 2019 | Relief Request I4R-63 Associated with the Fourth Inservice Inspection (ISI) Interval | |
ML19233A133 | 21 August 2019 | Inservice Inspection Relief Request 15R-10 | |
ML19050A352 | 19 February 2019 | Submittal of the Snubber Inservice Testing Program Plan for the Fifth 10-Year Interval | Safe Shutdown |
ML19024A195 | 23 January 2019 | Results of Visual Inspections of Unit 2 Replacement Steam Dryer in the Second Refueling Outage After Reaching EPU Conditions | |
ML19025A031 | 16 January 2019 | (Pbaps), Unit 2 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 22nd Refueling Outage for Unit 2 | |
ML18337A196 | 29 November 2018 | Submittal of the Fifth Ten-Year Interval Inservice Testing Program Plan | Safe Shutdown Reactor Vessel Water Level High Radiation Area Ultimate heat sink Stroke time Squib Incorporated by reference FLEX Scram Discharge Volume Cold shutdown justification Power-Operated Valves Power Operated Valves Grace period |
ML18030A190 | 30 January 2018 | Results of Visual Inspections of Unit 3 Replacement Steam Dryer | |
ML17039A884 | 9 February 2017 | Submittal of the In-Service Inspection (ISI) Owner'S Activity Report (OAR) for the 21st Refueling Outage | |
ML16189A218 | 29 June 2016 | BWR Vessel and Internals Project - Vessel Internals Inspection Summaries for Fall 2015 Outages | Weld Overlay VT-2 EVT-1 Pressure Boundary Leakage Dissimilar Metal Weld DM weld |
ML16118A414 | 27 April 2016 | Submittal of Relief Request Associated with the Fourth Inservice Testing Interval - Pressure Isolation Valve Leakage Testing Frequency | Power-Operated Valves |
ML16021A089 | 20 January 2016 | Submittal of the In-Service Inspection (ISI) Owner'S Activity Report (OAR) for the 20th Refueling Outage | |
ML15225A592 | 13 August 2015 | Responds to Request for Additional Information Regarding Proposed Relief Request Associated with the Common Emergency Service Water (Esw)System Piping | Mission time |
ML15068A350 | 3 March 2015 | Submittal of the In-Service Inspection (ISI) Owner'S Activity Report (Oar)For the 20th Refueling Outage for Unit 2 and Supplement to the 18 Refueling Outage OAR | Coatings Code Reconciliation |
RS-14-316, Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System Operating Pressure | 29 October 2014 | Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System Operating Pressure | Functionality Assessment Through-Wall Leak |
ML14021A046 | 21 January 2014 | Submittal of the Inservice Inspection (ISI) Owner'S Activity Report for the 19th Refueling Outage for Unit 3 | Coatings |
ML13022A030 | 17 January 2013 | Submittal of the Inservice Inspection (ISI) Owner'S Activity Report for the 19th Refueling Outage | |
ML12012A219 | 11 January 2012 | Submittal of the Inservice Inspection (ISI) Owner'S Activity Report for the 18th Refueling Outage | Pressure boundary leak |
ML110070023 | 5 January 2011 | Submittal of Inservice Inspection (ISI) Owner'S Activity Report for the 18th Refueling Outage | Moisture barrier |
ML100190131 | 8 January 2010 | Submittal of Inservice Inspection (ISI) Owner'S Activity Report for the 17th Refueling Outage | |
ML090330171 | 29 January 2009 | Submittal of Third Interval Inservice Inspection (ISI) Owners Activity Reports | Weld Overlay Moisture barrier |
ML083230056 | 13 November 2008 | Submittal of Program for the Fourth Ten-Year Interval Inservice Testing Program | Safe Shutdown Reactor Vessel Water Level High Radiation Area Stroke time Squib Incorporated by reference Cold shutdown justification Power Operated Valves |
ML080640587 | 29 February 2008 | Submittal of Relief Requests Associated with the Third and Fourth Inservice Inspection (Lsi) Intervals and the First and Second Containment Inservice Inspection (Cisi) Intervals | Probabilistic Risk Assessment VT-2 Incorporated by reference Scram Discharge Volume Dissimilar Metal Weld DM weld |
RS-07-058, Amergen/Exelon Nuclear - Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements | 19 April 2007 | Amergen/Exelon Nuclear - Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements | EVT-1 |
ML021270007 | 26 April 2002 | Submittal of the Third 10-Year Interval First Inspection Period, Inservice Inspection Owners Activity Report | VT-2 Scram Discharge Volume |