Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24032A111 | 1 February 2024 | Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval | |
ML23053A211 | 7 February 2023 | Owner'S Activity Report | |
ML22216A071 | 29 June 2022 | Steam Generator Tube Inspection Report | Nondestructive Examination |
ML21216A231 | 15 July 2021 | Owner'S Activity Report | |
ML21043A250 | 13 January 2021 | Owner'S Activity Report for Third Period of the Fourth Inspection Interval | Through Wall Leak |
ML20252A220 | 3 September 2020 | Revised License Renewal Commitment Supplement Pressurizer Surge Line Welds Inspection Frequency | Liquid penetrant |
ML20101H294 | 26 March 2020 | Summary of Facility Changes, Tests and Experiments | Surveillance Frequency Control Program |
ML20087G307 | 19 March 2020 | ASME Section XI Inservice Inspection Program Proposed Inservice Inspection Alternative N1-I5-NDE-003 | Finite Element Analysis Through-Wall Leak Dissimilar Metal Weld DM weld |
ML20028D492 | 22 January 2020 | Inservice Testing Program Plan for Pumps, Valves, and Snubbers Fifth 10-Year Interval Update for Units 1 and 2; Request for Alternatives to Requirements of ASME OM Code | Safe Shutdown Boric Acid Stroke time Temporary Modification Incorporated by reference Cold shutdown justification Power Operated Valves Scaffolding Grace period Coast down |
ML19191A009 | 2 July 2019 | Owner'S Activity Report | |
ML19179A075 | 24 June 2019 | Steam Generator Tube Inspection Report | Nondestructive Examination |
ML18361A648 | 20 December 2018 | ASME Section XI Inservice Inspection Program Relief Request N2-I4-LMT-003 - Fourth Interval Period 2 Limited Examinations | |
ML18275A105 | 26 September 2018 | ASME Section XI Inservice Inspection Program Request for Proposed Alternative N1-I4-CS-002 Snubber Program Extension | Earthquake |
ML18255A061 | 4 September 2018 | Submittal of Steam Generator Tube Inspection Report | Nondestructive Examination |
ML18198A115 | 11 July 2018 | Owner'S Activity Report (Form OAR-1), for Refueling Outage N1R25 | Boric Acid |
ML18033A337 | 4 January 2018 | Owner'S Activity Report Refueling Outage N2R25 - Second Period of the Fourth ISI Interval | Through-Wall Leak |
ML17160A263 | 5 June 2017 | ASME Section XI Inservice Inspection Program PRA Information to Support Proposed Inservice Inspection Alternatives N1-14-NDE-010 and N2-14-NDE-005 | Internal Flooding |
ML17121A036 | 24 April 2017 | ASME Section XI Inservice Inspection Program Relief Request N1-I4-LMT-002 - Fourth Interval Period 2 Limited Examinations | |
ML16215A192 | 27 July 2016 | ASME Section XI Inservice Inspection Program - Proposed Inservice Inspection Alternative N1-14-NDE-008, Proposed Inservice Inspection Alternative N2-14-NDE-003 | Probabilistic Risk Assessment |
ML16202A066 | 12 July 2016 | Steam Generator Tube Inspection Report | Nondestructive Examination |
ML15091A687 | 25 June 2015 | Relief Request (RR) N2-I4-NDE-002, Inservice Inspection Program | Boric Acid VT-2 |
ML15069A227 | 2 March 2015 | ASME Section XI Inservice Inspection Program Proposed Inservice Inspection Alternative N2-I4-NDE-002 | |
ML14115A066 | 21 April 2014 | ASME Section XI Inservice Inspection Program Relief Request N2-I4-LMT-002-Fourth Interval Period 1 Limited Examinations | Boric Acid Nondestructive Examination VT-2 Liquid penetrant Pressure boundary leak |
ML14035A067 | 14 January 2014 | Steam Generator Tube Inspection Report | Nondestructive Examination |
ML13204A117 | 17 July 2013 | ASME Inservice Testing Program for Pumps and Valves Request for Alternative to Requirements of ASME OM Code Request for Alternative G-1 | Grace period |
ML13114A253 | 22 April 2013 | ASME Section XI Inservice Inspection Program Examination Results and Revised Request for Alternative to ASME Code Steam Generator Nozzle-to-Vessel Weld Examination Requirements, Alternative Request N2-I4-LMT-001-R1 | Boric Acid Weld Overlay Nondestructive Examination Dissimilar Metal Weld |
ML13092A132 | 18 March 2013 | Summary of Facility Changes, Tests and Experiments | Boric Acid Stroke time Design basis earthquake Earthquake Pressure Boundary Leakage |
ML11270A122 | 21 September 2011 | ASME Section Xl Inservice Inspection Program Relief Request N2-I3-PRT-002 - Limited Coverage Examinations Performed in the Third Ten-Year Inspection Interval | |
ML111380517 | 17 May 2011 | ASME Section XI Inservice Inspection Program Request for Alternative ASME Code Pressurizer Nozzle-to-Vessel Weld Examination Requirements Relief Request N1-I4-NDE-003-R1 | Boric Acid Weld Overlay VT-2 Aging Management |
ML102640440 | 21 September 2010 | Steam Generator Tube Inspection Report | Nondestructive Examination |
ML102360041 | 19 August 2010 | Fourth Interval Inservice Testing Program Plan, Pump Relief Request P-6, Response to Request for Additional Information | |
ML102010111 | 19 July 2010 | Submittal of Report on Second Refueling Outage of Third Period of Third Inspection Interval | |
ML091330236 | 12 May 2009 | Response to NRC Comments on the Fourth Interval ISI Program | |
ML082880160 | 7 October 2008 | Fourth Interval Inservice Inspection Plan and Associated Proposed Alternatives and Relief Requests | Boric Acid Time of Discovery High Radiation Area Weld Overlay Hydrostatic Nondestructive Examination VT-2 Aging Management Foreign Material Exclusion Through-Wall Leak Dissimilar Metal Weld |
ML070660112 | 6 March 2007 | Containment IWE Inservice Inspection Plan | Coatings VT-2 Moisture barrier |
ML070120268 | 9 January 2007 | Revised ASME Section XI Inservice Inspection Program Relief Request Partial Examination of Reactor Pressure Vessel Head-to-Flange Welds-CMP-020 R1 | |
ML061870407 | 5 July 2006 | Owner'S Activity Reports | Through-Wall Leak |
ML050530049 | 21 February 2005 | Annual Steam Generator Tube Inspection Report | |
ML042440618 | 23 August 2004 | Virginia Electric and Power Company North Anna Power Station Unit 2 Owner'S Activity Reports | |
ML042110117 | 28 July 2004 | Owners Activity Reports | |
ML040970424 | 30 March 2004 | ASME Section XI Inservice Inspection Program Request to Use Code Case N-663 as Alternative | |
ML040290659 | 22 January 2004 | Unit 1 ASME Section XI Inservice Inspection Program Relief Requests Partial Examination of Reactor Pressure Vessel Head-to-flange Welds | |
ML030690373 | 26 February 2003 | Submittal of Annual Steam Generator Inservice Inspection Summary Report Performed During 2002 | |
ML022190627 | 30 July 2002 | Virginia Electric and Power Co., (Dominion) North Anna Power Station Unit 2 Final Inservice Inspection Summary Report | Weld Overlay |
ML020710697 | 28 February 2002 | Annual Steam Generator Inservice Inspection Summary Report | |
ML020160165 | 4 January 2002 | Inservice Inspection Report ASME Section XI, Subsection Iwl Concrete Inspections | |
PLA-5343, Part 2 - Susquehanna Steam Electric Station Unit 2 Tenth Inspection Outage ISI Summary Report. Appendix D - ASME Repair and Replacements NIS-2 Forms | 24 July 2001 | Part 2 - Susquehanna Steam Electric Station Unit 2 Tenth Inspection Outage ISI Summary Report. Appendix D - ASME Repair and Replacements NIS-2 Forms | Hydrostatic Anchor Darling VT-2 FLEX |
ML003673458 | 15 December 1999 | Inservice Inspection Summary Report for North Anna Power Station, Unit 2, 1999 Refueling Outage Owner'S Report of Inservice Inspections. | Boric Acid Packing leak Coatings VT-2 |