L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report | 13 September 2023 | Twenty-Third Refueling Outage Inservice Inspection Summary Report | |
L-23-016, Twenty-Eighth Refueling Outage Inservice Inspection Summary Report | 21 February 2023 | Twenty-Eighth Refueling Outage Inservice Inspection Summary Report | |
L-22-100, 180-Day Steam Generator Tube Inspection Report | 5 May 2022 | 180-Day Steam Generator Tube Inspection Report | Nondestructive Examination |
L-22-015, Twenty-Second Refueling Outage Inservice Inspection Summary Report | 7 February 2022 | Twenty-Second Refueling Outage Inservice Inspection Summary Report | |
L-21-191, Twenty-Seventh Refueling Outage Inservice Inspection Summary Report | 3 August 2021 | Twenty-Seventh Refueling Outage Inservice Inspection Summary Report | |
L-21-034, Report of Facility Changes, Tests and Experiments | 23 February 2021 | Report of Facility Changes, Tests and Experiments | Functionality Assessment Pandemic Coronavirus Turbine Missile COVID-19 |
L-20-264, 180-Day Steam Generator Tube Inspection Report | 13 October 2020 | 180-Day Steam Generator Tube Inspection Report | Nondestructive Examination |
L-20-156, Steam Generator Inspection Reports - Spring 2020 Refueling Outage | 28 July 2020 | Steam Generator Inspection Reports - Spring 2020 Refueling Outage | Nondestructive Examination |
L-20-127, Supplement to 10 CFR 50.55a Request Number VRR4, Revision 0, Containment Isolation Valve Test Frequency | 6 April 2020 | Supplement to 10 CFR 50.55a Request Number VRR4, Revision 0, Containment Isolation Valve Test Frequency | |
L-19-107, Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements | 27 August 2019 | Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements | VT-2 Through-Wall Leak Through Wall Leak Scaffolding |
L-19-060, Attachment C: Beaver Valley, Unit 2, 2R20 Steam Generator Examination Results 2RCS-SG21C (Tubes with Service Induced Indications) | 28 March 2019 | Attachment C: Beaver Valley, Unit 2, 2R20 Steam Generator Examination Results 2RCS-SG21C (Tubes with Service Induced Indications) | |
L-19-010, Twentieth Refueling Outage Inservice Inspection Summary Report | 31 January 2019 | Twentieth Refueling Outage Inservice Inspection Summary Report | Weld Overlay |
L-18-176, Twenty-Fifth Refueling Outage Inservice Inspection Summary Report | 23 July 2018 | Twenty-Fifth Refueling Outage Inservice Inspection Summary Report | |
L-18-107, Submittal of Snubber Program for Beaver Valley Power Station, Units Nos. 1 and 2 | 7 June 2018 | Submittal of Snubber Program for Beaver Valley Power Station, Units Nos. 1 and 2 | Safe Shutdown |
L-17-294, Submittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2 | 17 October 2017 | Submittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2 | Nondestructive Examination |
L-17-298, Submittal of the 10-Year Interval Inservice Testing Programs | 10 October 2017 | Submittal of the 10-Year Interval Inservice Testing Programs | Safe Shutdown Boric Acid Stroke time Temporary Modification Incorporated by reference Large early release frequency Cold shutdown justification Power-Operated Valves Pressure Boundary Leakage Scaffolding Grace period |
CNS-17-044, Inservice Inspection Report for Unit 1 End of Cycle 23 Refueling Outage | 21 August 2017 | Inservice Inspection Report for Unit 1 End of Cycle 23 Refueling Outage | Boric Acid |
L-17-240, Nineteenth Refueling Outage Lnservice Inspection Summary Report | 18 August 2017 | Nineteenth Refueling Outage Lnservice Inspection Summary Report | |
L-17-074, Steam Generator Inspection Reports - Spring 2017 Refueling Outage | 8 August 2017 | Steam Generator Inspection Reports - Spring 2017 Refueling Outage | |
ML17013A587 | 13 January 2017 | Twenty-Fourth Refueling Outage Inspection Summary Report | |
L-16-241, Updated Steam Generator Inspection Report - Fall 2015 Refueling Outage | 11 October 2016 | Updated Steam Generator Inspection Report - Fall 2015 Refueling Outage | Nondestructive Examination |
L-16-019, Eighteenth Refueling Outage Lnservice Inspection Summary Report | 22 January 2016 | Eighteenth Refueling Outage Lnservice Inspection Summary Report | |
L-16-022, Steam Generator Inspection Reports - Fall 2015 Refueling Outage | 22 January 2016 | Steam Generator Inspection Reports - Fall 2015 Refueling Outage | Nondestructive Examination |
L-15-200, Twenty-Third Refueling Outage Inservice Inspection Report | 18 August 2015 | Twenty-Third Refueling Outage Inservice Inspection Report | |
L-14-243, Seventeenth Refueling Outage Inservice Inspection Summary Report | 20 August 2014 | Seventeenth Refueling Outage Inservice Inspection Summary Report | Boric Acid Weld Overlay Hydrostatic VT-2 Moisture barrier Liquid penetrant Dissimilar Metal Weld Grace period |
ML14034A108 | 30 January 2014 | Twenty-Second Refueling Outage Inservice Inspection Report | Boric Acid Hydrostatic Coatings VT-2 Moisture barrier |
L-13-058, Steam Generator Inspection Report - Technical Specification 5.6.6.2.1 | 23 April 2013 | Steam Generator Inspection Report - Technical Specification 5.6.6.2.1 | Nondestructive Examination |
L-13-027, Sixteenth Refueling Outage Inservice Inspection Summary Report | 1 February 2013 | Sixteenth Refueling Outage Inservice Inspection Summary Report | Boric Acid Weld Overlay Hydrostatic VT-2 Control of Heavy Loads Liquid penetrant Dissimilar Metal Weld |
L-12-419, Submittal of Twenty-First Refueling Outage Inservice Inspection Report Revision | 28 December 2012 | Submittal of Twenty-First Refueling Outage Inservice Inspection Report Revision | Boric Acid Hydrostatic VT-2 Moisture barrier |
L-12-206, Twenty-First Refueling Outage Inservice Inspection Report | 8 August 2012 | Twenty-First Refueling Outage Inservice Inspection Report | Boric Acid Hydrostatic VT-2 Moisture barrier |
L-11-182, Fifteenth Refueling Outage Inservice Inspection Report | 5 July 2011 | Fifteenth Refueling Outage Inservice Inspection Report | Boric Acid Weld Overlay Hydrostatic VT-2 Moisture barrier |
L-11-002, Twentieth Refueling Outage Inservice Inspection Report | 31 January 2011 | Twentieth Refueling Outage Inservice Inspection Report | Hydrostatic VT-2 Moisture barrier |
L-10-020, Fourteenth Refueling Outage Inservice Inspection Report | 22 February 2010 | Fourteenth Refueling Outage Inservice Inspection Report | Boric Acid Weld Overlay Hydrostatic Coatings VT-2 Moisture barrier |
L-09-203, Nineteenth Refueling Outage Inservice Inspection Report for April 1, 2008 to May 21, 2009 | 18 August 2009 | Nineteenth Refueling Outage Inservice Inspection Report for April 1, 2008 to May 21, 2009 | |
L-08-339, Impractical American Society of Mechanical Engineers Code Section XI Weld Examination Requirements | 26 November 2008 | Impractical American Society of Mechanical Engineers Code Section XI Weld Examination Requirements | VT-2 |
L-08-265, Thirteenth Refueling Outage Inservice Inspection Report | 18 August 2008 | Thirteenth Refueling Outage Inservice Inspection Report | |
ML080250060 | 21 January 2008 | Eighteenth Refueling Outage Inservice Inspection Report | Weld Overlay Hydrostatic VT-2 Dissimilar Metal Weld |
L-07-147, Supplemental Information in Support of ASME Code Relief Request PRR6 | 14 November 2007 | Supplemental Information in Support of ASME Code Relief Request PRR6 | |
ML071370347 | 11 May 2007 | Proposed Alternatives and Relief Requests Associated with the Inservice Testing Program Ten-Year Update | Safe Shutdown Boric Acid Stroke time Incorporated by reference Breakaway torque Cold shutdown justification Power-Operated Valves Power Operated Valves Pressure Boundary Leakage Scaffolding |
L-07-023, Twelfth Refueling Outage Inservice Inspection Report | 2 February 2007 | Twelfth Refueling Outage Inservice Inspection Report | Boric Acid Weld Overlay Hydrostatic VT-2 |
L-06-104, Seventeenth Refueling Outage Inservice Inspection Report | 14 July 2006 | Seventeenth Refueling Outage Inservice Inspection Report | Hydrostatic VT-2 Moisture barrier |
L-05-164, Proposed Alternative to American Society of Mechanical Engineers Code Section XI Visual Examination Requirements Associated with Third Ten-Year Interval Inservice Inspection Program | 31 October 2005 | Proposed Alternative to American Society of Mechanical Engineers Code Section XI Visual Examination Requirements Associated with Third Ten-Year Interval Inservice Inspection Program | Coatings |
L-05-030, Sixteenth Refueling Outage Inservice Inspection Report | 10 February 2005 | Sixteenth Refueling Outage Inservice Inspection Report | Hydrostatic VT-2 |
L-05-014, Inservice Testing Programs, Proposed Revisions 1M and 2J | 4 February 2005 | Inservice Testing Programs, Proposed Revisions 1M and 2J | |
L-04-117, Inservice Testing Program, Proposed Revision 1L | 3 September 2004 | Inservice Testing Program, Proposed Revision 1L | Cold shutdown justification |
L-04-100, No. 2, Inservice Testing Programs, Proposed Revisions 1K and 2I, Addenda 1 | 9 July 2004 | No. 2, Inservice Testing Programs, Proposed Revisions 1K and 2I, Addenda 1 | |
L-04-066, Inservice Testing Programs, Proposed Revisions 1K and 2I | 21 May 2004 | Inservice Testing Programs, Proposed Revisions 1K and 2I | |
L-04-033, Inservice Inspection Programs, Proposed Revisions 1J and 2H | 12 March 2004 | Inservice Inspection Programs, Proposed Revisions 1J and 2H | Cold shutdown justification |
L-04-029, Year 2003 Steam Generator Examination Reports | 4 March 2004 | Year 2003 Steam Generator Examination Reports | |
L-03-217, Tenth Refueling Outage Inservice Inspection Report | 30 December 2003 | Tenth Refueling Outage Inservice Inspection Report | Non-Destructive Examination Hydrostatic VT-2 Moisture barrier |