Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-22-0303, End of Cycle 28 (M1 R28) Steam Generator Tube Inspection Report25 October 2022End of Cycle 28 (M1 R28) Steam Generator Tube Inspection ReportNondestructive Examination
RA-22-0178, End of Cycle 28 (M1R28) Inservice Inspection Summary Report8 August 2022End of Cycle 28 (M1R28) Inservice Inspection Summary Report
RA-19-0400, End of Cycle 27 (M1R27) Inservice Inspection Summary Report19 January 2021End of Cycle 27 (M1R27) Inservice Inspection Summary Report
RA-20-0031, Revision to Request for Alternative in Accordance with 10 CFR 50.55a (z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period23 January 2020Revision to Request for Alternative in Accordance with 10 CFR 50.55a (z)(1) to Delay the Update of the ASME Code of Record for the First Inspection PeriodNon-Destructive Examination
Incorporated by reference
RA-19-0341, Request for Alternative in Accordance with 10 CFR 50.55a (z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period19 December 2019Request for Alternative in Accordance with 10 CFR 50.55a (z)(1) to Delay the Update of the ASME Code of Record for the First Inspection PeriodNon-Destructive Examination
Incorporated by reference
RA-19-0268, End of Cycle 26 (M1 R26) Inservice Inspection Summary Report10 July 2019End of Cycle 26 (M1 R26) Inservice Inspection Summary ReportBoric Acid
MNS-18-003, End of Cycle 25 In-service and Steam Generator In-service Inspection Summary Reports11 January 2018End of Cycle 25 In-service and Steam Generator In-service Inspection Summary ReportsNon-Destructive Examination
MNS-17-033, Snubber Program Plan for the Fourth Ten-Year Lnservice Testing (IST) Interval2 August 2017Snubber Program Plan for the Fourth Ten-Year Lnservice Testing (IST) IntervalSafe Shutdown
Incorporated by reference
Earthquake
ML16208A05814 July 2016End of Cycle 24 Inservice Inspection ReportBoric Acid
MNS-15-010, Inservice Inspection Report, End of Cycle 23 Refueling Outage12 February 2015Inservice Inspection Report, End of Cycle 23 Refueling OutageBoric Acid
Weld Overlay
Hydrostatic
VT-2
Thermal fatigue
ML14197A28726 June 2014MISI-1462.10-0040, Revision 0, Fourth Inspection Interval Inservice Inspection Plan, Enclosure 1Boric Acid
Weld Overlay
Nondestructive Examination
VT-2
Aging Management
License Renewal
EVT-1
Liquid penetrant
Dissimilar Metal Weld
Thermal fatigue
MNS-14-053, MISI-1462.20-0040, Revision 0, Fourth Inspection Interval Inservice Inspection Pressure Test Plan24 June 2014MISI-1462.20-0040, Revision 0, Fourth Inspection Interval Inservice Inspection Pressure Test PlanVT-2
MNS-14-026, Risk-Informed Inservice Inspection Program Response to Request for Additional Information3 March 2014Risk-Informed Inservice Inspection Program Response to Request for Additional Information
ML13234A06913 August 2013Relief Request Serial #13-MN-002, Risk-Informed Inservice Inspection Program Fourth Inservice Inspection IntervalSafe Shutdown
Mission time
Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Multiple Spurious Operation
Flow Accelerated Corrosion
Large early release frequency
Stress corrosion cracking
Weak link
Manual Operator Action
Thermal fatigue
ML13212A06722 July 2013Inservice Inspection Report End of Cycle 22 Refueling OutageBoric Acid
Weld Overlay
Hydrostatic
VT-2
Through-Wall Leakage
Dissimilar Metal Weld
Thermal fatigue
ML13205A16911 July 2013Steam Generator In-Service Inspection Summary Report Unit 1, End of Cycle (EOC)22Non-Destructive Examination
Power Uprate
ML13078A00927 February 2013Fourth Ten-Year Inservice Testing Interval Inservice Testing Program, Revision 28Safe Shutdown
Boric Acid
Stroke time
Anchor Darling
Operability Determination
Scaffolding
ML12321A0501 November 2012Steam Generator Inservice Inspection Report
ML12025A13912 January 2012Inservice Inspection Report End of Cycle 21 Refueling Outage
ML11362A07915 December 2011Fourth Inspection Interval Inservice Inspection Pressure Test PlanBoric Acid
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
ML10251018630 August 2010Relief Request Serial #10-MN-001Non-Destructive Examination
Incorporated by reference
ML10204051515 July 2010Inservice Inspection Report Unit 1, End of Cycle 20 Refueling OutageBoric Acid
Weld Overlay
Hydrostatic
VT-2
Stress corrosion cracking
Dissimilar Metal Weld
DM weld
Thermal fatigue
ML09188042329 June 2009Relief Request Serial #09-MN-003Probabilistic Risk Assessment
ML09188042429 June 2009Relief Request Serial #09-MN-004License Renewal
ML0905106619 February 2009In-Service Inspection Report, Unit 1, End of Cycle (EOC) 19Weld Overlay
Hydrostatic
VT-2
FLEX
Commercial Grade
Dissimilar Metal Weld
ML0904908362 February 2009Steam Generator In-Service Inspection Report, End of Cycle (EOC) 19Non-Destructive Examination
ML08058057726 March 2008Relief, Third 10-Year Interval Inservice Inspection Program Plan Repair of Chemical Volume and Control System Valve 1NV-240, MD6274Non-Destructive Examination
Safe Shutdown Earthquake
Nondestructive Examination
Incorporated by reference
Stress corrosion cracking
License Renewal
Pressure Boundary Leakage
Through-Wall Leakage
Dissimilar Metal Weld
Operational leakage
ML07262046223 August 2007Inservice Inspection Report, End of Cycle 18 Refueling OutageWeld Overlay
VT-2
Through-Wall Leakage
Dissimilar Metal Weld
ML0704500208 February 2007Notification of Inspection and Request for InformationBoric Acid
Nondestructive Examination
VT-2
ML0617801659 June 2006Inservice Testing Program, Request for Additional Information, Relief Request Nos. MC-GRP-01Boric Acid
ML0513003643 May 2005Units 1 & 2, Inservice Testing Program Relief Request MC-SRP-NS-01 Supplement
ML05081059911 March 2005Duke Requests NRC Approval of an Alternative to the Requirements of the 1998 Edition Through the 2000 Addenda of the Pressure Vessel Code, Section XI for the Listed Inservice Inspection IntervalsIncorporated by reference
ML04233058812 August 2004Third Ten-Year Inservice Testing Interval Inservice Testing Program, Revision 27Safe Shutdown
Boric Acid
Stroke time
Temporary Modification
Operability Determination
Scaffolding
ML04216028826 July 2004Relief Request (RR) 03-001
ML04194017030 June 2004Inservice Inspection Report End of Cycle 16 Refueling OutageAnchor Darling
VT-2
Dissimilar Metal Weld
Thermal fatigue
ML0407607478 March 2004Inservice Inspection Plan Relief RequestsHigh Radiation Area
Hydrostatic
VT-2
Incorporated by reference
ML0401505115 January 2004Inservice Inspection (ISI) Pressure Test Plan, Third Ten-Year Interval PlanVT-2
ML0400200419 December 2003to Third Interval Inservice Inspection Plan, McGuire Nuclear Station, Units 1 and 2, Unit 1, Section 1 Through Unit 2, Section 2Thermal fatigue
ML0400200409 December 2003to Third Interval Inservice Inspection Plan, McGuire Nuclear Station, Units 1 and 2, General Requirements Through Unit 1, Section 2VT-2
Aging Management
Liquid penetrant
Dissimilar Metal Weld
Thermal fatigue