Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RA-22-0303, End of Cycle 28 (M1 R28) Steam Generator Tube Inspection Report | 25 October 2022 | End of Cycle 28 (M1 R28) Steam Generator Tube Inspection Report | Nondestructive Examination |
RA-22-0178, End of Cycle 28 (M1R28) Inservice Inspection Summary Report | 8 August 2022 | End of Cycle 28 (M1R28) Inservice Inspection Summary Report | |
RA-19-0400, End of Cycle 27 (M1R27) Inservice Inspection Summary Report | 19 January 2021 | End of Cycle 27 (M1R27) Inservice Inspection Summary Report | |
RA-20-0031, Revision to Request for Alternative in Accordance with 10 CFR 50.55a (z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period | 23 January 2020 | Revision to Request for Alternative in Accordance with 10 CFR 50.55a (z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period | Non-Destructive Examination Incorporated by reference |
RA-19-0341, Request for Alternative in Accordance with 10 CFR 50.55a (z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period | 19 December 2019 | Request for Alternative in Accordance with 10 CFR 50.55a (z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period | Non-Destructive Examination Incorporated by reference |
RA-19-0268, End of Cycle 26 (M1 R26) Inservice Inspection Summary Report | 10 July 2019 | End of Cycle 26 (M1 R26) Inservice Inspection Summary Report | Boric Acid |
MNS-18-003, End of Cycle 25 In-service and Steam Generator In-service Inspection Summary Reports | 11 January 2018 | End of Cycle 25 In-service and Steam Generator In-service Inspection Summary Reports | Non-Destructive Examination |
MNS-17-033, Snubber Program Plan for the Fourth Ten-Year Lnservice Testing (IST) Interval | 2 August 2017 | Snubber Program Plan for the Fourth Ten-Year Lnservice Testing (IST) Interval | Safe Shutdown Incorporated by reference Earthquake |
ML16208A058 | 14 July 2016 | End of Cycle 24 Inservice Inspection Report | Boric Acid |
MNS-15-010, Inservice Inspection Report, End of Cycle 23 Refueling Outage | 12 February 2015 | Inservice Inspection Report, End of Cycle 23 Refueling Outage | Boric Acid Weld Overlay Hydrostatic VT-2 Thermal fatigue |
ML14197A287 | 26 June 2014 | MISI-1462.10-0040, Revision 0, Fourth Inspection Interval Inservice Inspection Plan, Enclosure 1 | Boric Acid Weld Overlay Nondestructive Examination VT-2 Aging Management License Renewal EVT-1 Liquid penetrant Dissimilar Metal Weld Thermal fatigue |
MNS-14-053, MISI-1462.20-0040, Revision 0, Fourth Inspection Interval Inservice Inspection Pressure Test Plan | 24 June 2014 | MISI-1462.20-0040, Revision 0, Fourth Inspection Interval Inservice Inspection Pressure Test Plan | VT-2 |
MNS-14-026, Risk-Informed Inservice Inspection Program Response to Request for Additional Information | 3 March 2014 | Risk-Informed Inservice Inspection Program Response to Request for Additional Information | |
ML13234A069 | 13 August 2013 | Relief Request Serial #13-MN-002, Risk-Informed Inservice Inspection Program Fourth Inservice Inspection Interval | Safe Shutdown Mission time Internal Flooding Probabilistic Risk Assessment Nondestructive Examination VT-2 Multiple Spurious Operation Flow Accelerated Corrosion Large early release frequency Stress corrosion cracking Weak link Manual Operator Action Thermal fatigue |
ML13212A067 | 22 July 2013 | Inservice Inspection Report End of Cycle 22 Refueling Outage | Boric Acid Weld Overlay Hydrostatic VT-2 Through-Wall Leakage Dissimilar Metal Weld Thermal fatigue |
ML13205A169 | 11 July 2013 | Steam Generator In-Service Inspection Summary Report Unit 1, End of Cycle (EOC)22 | Non-Destructive Examination Power Uprate |
ML13078A009 | 27 February 2013 | Fourth Ten-Year Inservice Testing Interval Inservice Testing Program, Revision 28 | Safe Shutdown Boric Acid Stroke time Anchor Darling Operability Determination Scaffolding |
ML12321A050 | 1 November 2012 | Steam Generator Inservice Inspection Report | |
ML12025A139 | 12 January 2012 | Inservice Inspection Report End of Cycle 21 Refueling Outage | |
ML11362A079 | 15 December 2011 | Fourth Inspection Interval Inservice Inspection Pressure Test Plan | Boric Acid Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |
ML102510186 | 30 August 2010 | Relief Request Serial #10-MN-001 | Non-Destructive Examination Incorporated by reference |
ML102040515 | 15 July 2010 | Inservice Inspection Report Unit 1, End of Cycle 20 Refueling Outage | Boric Acid Weld Overlay Hydrostatic VT-2 Stress corrosion cracking Dissimilar Metal Weld DM weld Thermal fatigue |
ML091880423 | 29 June 2009 | Relief Request Serial #09-MN-003 | Probabilistic Risk Assessment |
ML091880424 | 29 June 2009 | Relief Request Serial #09-MN-004 | License Renewal |
ML090510661 | 9 February 2009 | In-Service Inspection Report, Unit 1, End of Cycle (EOC) 19 | Weld Overlay Hydrostatic VT-2 FLEX Commercial Grade Dissimilar Metal Weld |
ML090490836 | 2 February 2009 | Steam Generator In-Service Inspection Report, End of Cycle (EOC) 19 | Non-Destructive Examination |
ML080580577 | 26 March 2008 | Relief, Third 10-Year Interval Inservice Inspection Program Plan Repair of Chemical Volume and Control System Valve 1NV-240, MD6274 | Non-Destructive Examination Safe Shutdown Earthquake Nondestructive Examination Incorporated by reference Stress corrosion cracking License Renewal Pressure Boundary Leakage Through-Wall Leakage Dissimilar Metal Weld Operational leakage |
ML072620462 | 23 August 2007 | Inservice Inspection Report, End of Cycle 18 Refueling Outage | Weld Overlay VT-2 Through-Wall Leakage Dissimilar Metal Weld |
ML070450020 | 8 February 2007 | Notification of Inspection and Request for Information | Boric Acid Nondestructive Examination VT-2 |
ML061780165 | 9 June 2006 | Inservice Testing Program, Request for Additional Information, Relief Request Nos. MC-GRP-01 | Boric Acid |
ML051300364 | 3 May 2005 | Units 1 & 2, Inservice Testing Program Relief Request MC-SRP-NS-01 Supplement | |
ML050810599 | 11 March 2005 | Duke Requests NRC Approval of an Alternative to the Requirements of the 1998 Edition Through the 2000 Addenda of the Pressure Vessel Code, Section XI for the Listed Inservice Inspection Intervals | Incorporated by reference |
ML042330588 | 12 August 2004 | Third Ten-Year Inservice Testing Interval Inservice Testing Program, Revision 27 | Safe Shutdown Boric Acid Stroke time Temporary Modification Operability Determination Scaffolding |
ML042160288 | 26 July 2004 | Relief Request (RR) 03-001 | |
ML041940170 | 30 June 2004 | Inservice Inspection Report End of Cycle 16 Refueling Outage | Anchor Darling VT-2 Dissimilar Metal Weld Thermal fatigue |
ML040760747 | 8 March 2004 | Inservice Inspection Plan Relief Requests | High Radiation Area Hydrostatic VT-2 Incorporated by reference |
ML040150511 | 5 January 2004 | Inservice Inspection (ISI) Pressure Test Plan, Third Ten-Year Interval Plan | VT-2 |
ML040020041 | 9 December 2003 | to Third Interval Inservice Inspection Plan, McGuire Nuclear Station, Units 1 and 2, Unit 1, Section 1 Through Unit 2, Section 2 | Thermal fatigue |
ML040020040 | 9 December 2003 | to Third Interval Inservice Inspection Plan, McGuire Nuclear Station, Units 1 and 2, General Requirements Through Unit 1, Section 2 | VT-2 Aging Management Liquid penetrant Dissimilar Metal Weld Thermal fatigue |